Loading...
HomeMy WebLinkAbout090005_routine_202407241y11c Ul ♦ 1J1L. ly/ %-Umpllilllurz 111noPU00011 v UPerallUn KeVIeW U Structure Lvaniation U lecnnlcal Assistance I Reason for Visit: /" 9 Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Arrival Time: Departure Time: County: Region: I r Farm Name: Kg h; GP& Owner Email: Owner Name: Mailing Address: Physical Address: Phone: Facility Contact: h�j C �i Title: �{� �j(� _ Phone: Onsite Representative: A W Integrator• �j � fi d Certified Operator: are I/I f,IN 1 01 Certification Number: i00i0 Back-up Operator: Certification Number: Location of Farm: Latitude: Longitude: x x Design Current Design Current �.Design Current`,' - Swine Capacity Pop Weft Capacity Pop Cattle Capacity °Pop �_ . Wean to Finish Layer Dairy Cow Wean to FeederI INon-Layer _ Dairy Calf Feeder to Finish a _ Dairy Heifer Farrow to Wean ° Design ° Current Dry Cow Farrow to Feeder ,I Pant'Ca x 3 o I Y,. aci P fY °P6 Non-Dai ry Farrow to Finish Layers Beef Stocker Gilts Non -Layers Beef Feeder Boars Pullets I jBeef Brood Cow 41 Turkeysel Other Turkey Poults n ° Ot her _ Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: _ a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? _ d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? ❑ Yes No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE Page I of 3 511212020 Continued Facility Number: jDate of Inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: 4 U S s a1Zy Spillway?: NO Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes [j No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes 0 No ❑ NA ❑ NE maintenance or improvement? Waste Aanlication 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes �j No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): r. 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes Q,No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes Q No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes [S,,No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes - ] No ❑ NA ❑ NE Required Records & Documents \ 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes qNo ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes NP No ❑ NA ❑ NE the appropriate box. ❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. [—]Yes No ❑ Waste Application ❑Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and V Rainfall Inspections 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes E[No 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes �'E] No ❑ NA ❑ NE ❑ Weather Code ❑ Sludge Survey ❑ NA ❑ NE ❑ NA ❑ NE Page 2 of 3 511212020 Continued Facility Number: - Date of Inspectiou: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check [-]Yes EkNo ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWW? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? Reviewer/Inspector Name: Reviewer/Inspector Signature: Page 3 of 3 ❑ Yes ❑ No ❑ NA ❑ NE ElYes EqNo ❑ NA ❑ NE ❑ Yes 'Q,,No ❑ NA ❑ NE ❑ Yes taNo ❑ NA ❑ NE 0 Yes E� No 0 NA ❑ NE ❑ Yes E No ❑ NA ❑ NE ❑ Yes E� No ❑ Yes qNo ❑ Yes J!kNo ❑NA ❑NE ❑ NA 0 NE ❑ NA ❑ NE CdiV412 a --are Slud�4C IV_r . 4-nood_ Phone: ql q i t11 1 C Date: , Z?% M S/12/2020