Loading...
HomeMy WebLinkAboutNCC242317_(ARPA) DWI Letter of Intent to Fund_20240806 SAA7i 4 n'; ROY COOPER is,( ~ ., �h Governor ""' : ELIZABETH S.BISER ..1/ Secretary \*44,Quw' '' SHADI ESKAF NORTH CAROLINA Director Environmental Quality March 23, 2023 The Honorable Phillip Britt, Mayor Town of Chadbourn 602 N. Brown Street Chadbourn,NC 28431 Subject: Letter of Intent to Fund Town of Chadbourn 2022 Water Distribution System Improvements September 2022 Application Cycle Project No.: SRP-D-ARP-0321 Dear Mayor Britt: The Division of Water Infrastructure (Division) has reviewed your application, and the State Water Infrastructure Authority (SWIA) has approved your project as eligible to receive a total funding amount of$5,472,000 from the following funding: State Reserve Funds (SRP) grant from the American Rescue Plan Act(ARPA). Projects funded from ARPA must meet applicable federal law and guidance for the ARPA funds. The SRP ARPA Project Grant will be one hundred percent of eligible project costs up to a maximum of$5,472,000. Please note that this intent to fund is contingent on meeting all of the following milestones: Milestone* Date Engineering Report Submittal July 3, 2023 Engineering Report Approval September 1, 2023 Bid and Design Package Submittal March 1, 2024 Bid and Design Package Approval July 1, 2024 Advertise Project, Receive Bids, Submit Bid November 1, 2024 Information, and Receive Authority To Award Execute Construction Contract(s) December 31, 2024 *Failure to meet any milestone may result in the forfeiture of funding for the proposed project. All costs incurred prior to March 3, 2021 are not eligible for ARPA funds and the Division will make no reimbursements of ARPA funds after December 31, 2026. D_ 00 Department E Q North Carolina Dertm ofEnvironmental Quaty I DivisionI .Northof Carolina Wate 27ast699-1Departmenta Environmental oirwn� /`� 919.707.9160 The Honorable Phillip Britt, Mayor March 23, 2023 Page 2 of 3 The first milestone is the submittal of an Engineering Report on July 3, 2023. The Engineering Report must be developed using the guidance found on our website (https://deq.nc.gov/about/divisions/water-infrastructure/i-have-funding/engineering- reportenvironmental-information). Failure to meet any milestone may result in the forfeiture of funding for the proposed project. The State Environmental Policy Act exempts projects funded by the State Reserve from state-mandated environmental review. Federal requirements may still apply. [NCGS 113A- 12(2)h.] Upon detailed review of the project during the funding process, it may be determined that portions of your project are not eligible for funding and the total funding amount may be reduced. Additionally, changes in the scope or priority points awarded—based on additional information that becomes apparent during project review—may also result in changes to the total funding amount and loan terms. Engineering Services Procurement The Uniform Guidance 2 CFR 200.317 through 2 CFR 200.327 gives minimum requirements for procurement, with 2 CFR 200.319(b) addressing engineering services procurement guidelines. ARP-funded projects must also adhere to North Carolina State law. All projects must also comply with North Carolina General Statute 143-64.31, Article 3D Procurement of Architectural, Engineering, and Surveying Services. Projects cannot be exempted from qualification-based selection of these services under N.C.G.S. 143-64.32. Any services provided that were not selected in compliance with federal requirements will be ineligible for reimbursement. US Treasury Requirements Projects with an expected total cost of ten million dollars or more must meet US Treasury requirements for prevailing wage rates, project labor agreements, and related requirements. Recipients can either certify meeting the requirements or provide plans and reports as the SLFRF Compliance and Reporting Guidance (treasury.gov) specifies. Drought Bill Requirements In accordance with G.S. 143-355.4, a project "for the purpose of extending waterlines or expanding water treatment capacity" must document numerous requirements during the review process. You can find additional information at the following link: http://www.ncleg.net/enactedlegislation/statutes/html/bysection/chapter143/gs_143-355.4.html Upon receipt of your letter of intent to fund,please fill out the attached Federal ID & Unique Entity ID (UEI) form, attached and email it to Pam Whitley at pam.whitley@ncdenr.gov. If you choose to decline this funding, the Authorized Representative as declared in the application must directly contact the Division project manager via email or letter on the applicant's letterhead. The Honorable Phillip Britt, Mayor March 23, 2023 Page 3 of 3 We are offering a free permit assistance service to address any questions you have about potential permitting requirements,pitfalls, fees, and timelines. If interested, please complete our online form at https://deq.nc.gov/permits-rules/permit-assistance-and-guidance/permit- assistance-request-form and a regional environmental coordinator will contact you. When applying for a permit; attach a copy of this letter to your permit application. We find this helpful to identify ARPA projects to get your permit to you faster to assist with meeting the federal expenditure deadline of December 31, 2026. If you have any questions,please contact Aisha Lau at aisha.lau@ncdenr.gov or by phone at(910) 970-6400. Sincerely, e ?.71.- Jon Risgaard, Chief State Revolving Fund Section EC: Zachary Bennett, LKC Engineering, PLLC (via email) Aisha Lau(via email) Pam Whitley ARPA (COM_LOIF)