HomeMy WebLinkAboutNCC242397_ESC Approval Submitted_20240806 ,+ a+STATE.,
ROY COOPER
Governor a
ELIZABETH S.BISER . „4a ,,
Secretary ,s .
WILLIAM E.TOBY VINSON,JR. NORTH CAROLINA
Interim Director Environmental Quality
July 29, 2024
LETTER OF APPROVAL WITH MODIFICATIONS
I and Z Properties, LLC
Attention: Zoya Yeychik, Owner
13606 East Independence Boulevard
Indian Trail,North Carolina 28079
RE: Project Name: LPX Accessories
Project ID: UNION-2023-076
Acres Approved: 1.35
County: Union
_City: Indian Trail
Location: Unionville- Indian Trail Rd.
River Basin: Yadkin Pee Dee
Stream Classification: Other
Submitted By: Brian Crutchfield, PE, Timmons Group
Date Received by LQS: July 24, 2024
Plan Type: Revised
Dear Sir or Madam:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be
acceptable with modifications and hereby issue this letter of Approval with Modifications. The
Modifications Required for Approval are listed on the attached page. This plan approval shall expire three
(3) years following the date of approval, if no land-disturbing activity has been undertaken, as is required
by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic
Notice of Intent(eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000
Construction General Permit. After the form is reviewed and found to be complete, you will receive a link
with payment instructions for the $120 annual permit fee. After the fee is processed, you will receive the
COC via email. As the Financially Responsible Party shown on the FRO form submitted for this
project, you MUST obtain the COC prior to commencement of any land disturbing
activity. The eNOI form may be accessed at deq.nc.gov/NCGOI. Please direct questions about
the eNOl form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this
project changes in the future, the new responsible party must obtain a new COC.
Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on
file at the job site:
North Carolina Department of Environmental Quality Division of Energy,Mineral,and Land Resources
Mooresville Regional Office 610 East Center Avenue,Suite 301 Mooresville,North Carolina 28115
704-235-2100
Letter of Approval with Modifications
I and Z Properties, LLC
July 29, 2024
Page 2 of 3
1. The approved E&SC plan as well as any approved deviation.
2. The NCGO1 permit and the COC, once it is received.
3. Records of inspections made during the previous 30 days.
Also;this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to
ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of
existing natural resources and adjoining properties. If, following the commencement of this project, it is
determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the
Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this
office may require revisions to the plan and implementation of the revisions to ensure compliance with the
Act.
Acceptance and approval of this plartis conditioned upon your compliance with Federal and State water
quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to
this land-disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility Form, which you provided. You are requested to file an amended form if there is any
change in the information included on the form. In addition, it would be helpful if you notify this office of
the proposed starting date for this project.
Your cooperation is appreciated.
Sincerely,
Ben Garrow
Assistant Regional Engineer
Land Quality Section
BAG
Enclosure: Certificate of Approval
Modifications Required for Approval
NCGO1 Fact Sheet
c: Timmons Group
Attn: Brian Crutchfield, PE
610 East Morehead Street, Suite 250
Charlotte, North Carolina 28202
•
DANorth Carolina Department of Environmental Quality Division of Energy,Mineral,and Land Resources
iMI
Mooresville Regional Office 610 East Center Avenue,Suite 301;Mooresville,North Carolina 28115
1 /N 704-663-1699
Letter of Approval with Modifications
I and Z Properties, LLC
July 29, 2024
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: LPX Accessories
Project ID: UNION-2023-076
County: Union
Reviewed by: Ben Garrow
1. Baffle configuration seems excessive on the proposed plans.Narrow the baffles around the OCS and
confine them within the footprint of the proposed skimmer basin.
2. Construction Seqeunce should note to obtain Erosion Control Permit&NCGO1 coverage prior to
land disturbance. Additionally, the sequencing discusses a relocation of sewer lateral prior to the
basin construction. Discuss any additional measures (if needed) for the initial work.
3. EMS for the proposed basin should extend all the way to existing soil on the downstream side.
4. Riprap Apron for C-1 is close to the existing road. The plans should show the Apron turning
downstream and not encroaching on the roadway edge.
5. Additional measures may be required - The applicant is responsible for the control of sediment on-site. If
the approved erosion and sedimentation control measures prove insufficient, the applicant must take
those additional steps necessary to stop sediment from leaving this site. [15A NCAC 4B .0115]
Ref: G.S. 113A-54.1 through G.S. 113A-57
Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504
General Permit NCG 010000 NPDES for Construction Activities
North Carolina Department of Environmental Quality Division of Energy,Mineral,and Land Resources
Mooresville Regional Office;610 East Center Avenue,Suite 301 Mooresville,North Carolina 28115
e�� /'" 704-663-1699