HomeMy WebLinkAboutNC0028037_Affidavit_20240806 70097050 71013913
AFFIDAVIT OF PUBLICATION
STATE OF NORTH CAROLINA LEXINGTON, NC July 25, 2024
DAVIDSON COUNTY
I, Lynn Bowers OF THE DISPATCH,A NEWSPAPER PUBLISHED IN THE CITY OF LEXINGTON, COUNTY AND STATE
AFORESAID, BEING DULY SWORN, SAYS THE FOREGOING LEGAL OF WHICH THE ATTACHED IS A TRUE COPY,
WAS PUBLISHED IN SAID NEWSPAPER ONCE, BEGINNING THE 25th DAY OF July, 2024..
PUBLICATION FEE: $ 95.93
mott.
bc..pe.„1,0 (SEAL)
e 661,,,a0
SWORN TO AND SUBSC ED BEFORE ME, T `Sik De OF Pit
909\c-
1,,
. 14,11
MY COMMISSION EXPIRES (A D3 (7 D9 1G COURTNEY L LOHR
NOTARY PUBLIC
Davidson County, North Carolina
My Commission Expires 08/03/2026
Ad Copy:
Public Notice
North Carolina
Environmental Management
Commission/NPDES Unit
1617 Mail Service Center
Raleigh, NC 27699-1617
Notice of Intent to Issue a NPDES Wastewater Permit NC0028037 Lexington {Combined} WTPs #1 &
#2 The North Carolina Environmental Management Commission proposes to issue a NPDES wastewater
discharge permit to the person(s) listed below. Written comments regarding the proposed permit will be
accepted until 30 days after the publish date of this notice. The Director of the NC Division of Water Resources
(DWR) may hold a public hearing should there be a significant degree of public interest. Please mail comments
and/or information requests to DWR at the above address. Interested persons may visit the DWR at 512 N.
Salisbury Street, Raleigh,NC 27604 to review the information on file. Additional information on NPDES
permits and this notice may be found on our website: https://deq.nc.gov/public-notices-hearings, or by calling
(919) 707-3601. The City of Lexington has applied to renew NPDES permit NC0028037 for its potable water
treatment plants [WTPs #1 & #2 (combined)] discharging conventional treatment system wastewater to Abbotts
Creek, Yadkin Pee-Dee River Basin. Water-quality limited parameters include pH, Total Copper, Total
Suspended Solids (TSS), and Total Residual Chlorine (TRC). This discharge may affect future wasteload
allocations in this portion of the watershed.
July 25, 2024