Loading...
HomeMy WebLinkAbout20040933 Ver 1_Reports_20061212bC~ Project Num: 20040933 Name: NCDOT -Bridge 143 On Sr 1304 B-2848 County: Mitchell Location: North Toe River Ramseytown Latitude: +36°01'30" SW Plan Location: Owner: NC DOT PDEA Contact Person: Tippett, Lyndo Inspection Date: 12/12/2006 Reason for Inspection: Routine On-Site Representative(s): Primary Inspector: Michael R Parker Secondary Inspector(s): Phone: 828-296-4500 Question Areas: Site Visit Inspection Summary: DOT is proposing to replace Bridge No. 143 NCSR 1304 over the North Toe River at the Mitchell and Yancey County lines. Initial plans were to place three (3) piers in the North Toe River, however, this was revised to include only one pier due to the presence of mussels in the river. Also, a temporary workpad will be installed during bridge construction and removeal of the old bridge. A total of 0.354 acres of stream will be affected. It is recommended that WQ Certification Nos. 3403 and 3366 be issued. The 401 Certification was issued on December 12, 2006. Staff Report Version: 1 Status: Issued Project Type: Replace bridge with bridge Region: Asheville Longitude: -82°19'00" Title: Phone: Entry Time: 10:00 AM Exit Time: 10:45 AM Inspection Type: Staff Report Page: 1 Project Num: 20040933 Owner: NC DOT PDFr4 Inspection Date: 12/12/2006 Inspection Type: Staff Report Reason for Visit: Routine Site Visit res No NH Nt Do impacts described in the application differ those seen in the field? ^ ~ ^ ^ If yes, please describe differences: Are the Intermittent/Perennial calls different in the application? ^ ~ ^ ^ If yes, please describe differences, and how mitigation ratios are affected: Are there additional impacts not described in the application? ^ ~ ^ ^ If yes, please describe and quantify: Were the impacts in place prior to the application for the 401 Certification? ^ ~ ^ ^ Additional conditions recommended for the Certification: Recommended project modifications: Is this a modification request to an existing Certification? ^ ~ ^ ^ Are there additional stromwater conditions that should be required due to the following classifications: ^ ~ ^ ^ # 303(d)list, Class WS, NSW, ORW, HQW Describe: Is this a subdivision or otherwise part of a larger project? ^ ^ ~ ^ # If yes, what phase is this? Are there prior impacts from prior phases? ^ ^ ~ ^ If yes, what are the cumulative imacts for this project? Possible secondary impacts noted: Comment: Page: 2