Loading...
HomeMy WebLinkAboutNC0088226_BIMS Report_20240702United States Environmental Protection Agency Form Approved. EPA Washington, D.C. 20460 OMB No. 2040-0057 Water Compliance Inspection Report Approval expires 8-31-98 Section A: National Data System Coding (i.e., PCS) Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type 1 IN 1 2 u 3 I NCO088226 I11 121 24/06/21 I17 18LC I 19 Ls_] I 201 I 211111 I I I I I I II I I I I I I I I I I I I I I I I I I I I I I I II I I I I I r6 Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA ---------------------- Reserved ------------------- 67 1.0 701, I 71 1 I 72 I Lr i I 71 I 74 79 I I I I I I I80 LJ J I I Section B: Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include Entry Time/Date Permit Effective Date POTW name and NPDES Dermit Number) 10:OOAM 24/06/21 20/09/01 Wells Fargo / Duke Energy Center 550 S Tryon St Exit Time/Date Permit Expiration Date Charlotte NC 28202 12:OOPM 24/06/21 25/06/30 Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) Other Facility Data John Franklin McMahan/ORC// Name, Address of Responsible Official/Title/Phone and Fax Number Contacted Rhonda F Ballard,550 S Tryon St 30th Floor Charlotte NC 28202//704-374-4761 / No Section C: Areas Evaluated During Inspection (Check only those areas evaluated) Permit 0 Flow Measurement Operations & Maintenar Records/Reports Self -Monitoring Progran 0 Facility Site Review Compliance Schedules Effluent/Receiving Wate Laboratory Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date Edward Watson DWR/MRO WQ/ � � J �� WCc�A,drG Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date DocuSigned by: 7/2/2024 4.4" H Nuft FA -F161FB69A2D84A3... EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete. Page# NPDES yr/mo/day Inspection Type NCO088226 I11 12I 24/06/21 117 18 i c i (Cont.) Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) The treatment system is experiencing issues with elevated Copper. The MRO has issued Notices of Violations in January 2024 and June 2023 for this condition. The permittee is due to reply to the recently issued NOV-NOI letter by the 25th of June, 2024. During the site visit, it was communicated that an email reponse is acceptable to address the NOV-NOI. During the site visit, a review of the eDMR records from January 2023 through May 2024 revealed inconsistencies in the way the laboratory is reporting limits for Copper on the eDMR. Although the eDMR are reporting the elevated values for Copper, the lab reporting is not consistant with the permit limits. Please contact the laboratory to have inconsistencies being reported on the eDMR corrected. Most of the treatment system is composed of inert materials that should not leach copper into the effluent water. During the site visit the possibility of copper entering the treatment system from a green area was discussed. Additional filtration will be added to the treatment system before water from the green area enters the treatment system. Part of the treatment includes a zeolite filter. There is a slight possibility that the copper may be accumulating in the zeolite filter chamber and being released from the zeolite. During the site visit, it was mentioned that the zeolite filter material has not been changed in several years. The permittee may want to collect a sample after the zeolite filter to verify that copper is not being released from the zeolite filter. The wet well prior to the outfall was viewed as part of the review of the outfall. The effluent water entering the well was clear: no foam, color, solids, or odor were present. Page# Permit: NCO088226 Owner -Facility: wells Fargo / Duke Energy Center Inspection Date: 06/21/2024 Inspection Type: Compliance Evaluation Permit Yes No NA NE (If the present permit expires in 6 months or less). Has the permittee submitted a new ❑ ❑ 0 ❑ application? Is the facility as described in the permit? 0 ❑ ❑ ❑ # Are there any special conditions for the permit? ❑ 0 ❑ ❑ Is access to the plant site restricted to the general public? 0 ❑ ❑ ❑ Is the inspector granted access to all areas for inspection? 0 ❑ ❑ ❑ Comment: The permit expires June 30, 2025. An application for permit renewal will be submitted without modifications to the treatment system. Please submit the permit renewal within 180 days of the permit expiration date as per i40-CFR 122.21 (d)l. The permittee needs to update the contact information for the permit. Operations & Maintenance Yes No NA NE Is the plant generally clean with acceptable housekeeping? 0 ❑ ❑ ❑ Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable 0 ❑ ❑ ❑ Solids, pH, DO, Sludge Judge, and other that are applicable? Comment: O&M Records were reviewed. The activated carbon was last changed in January 2022. The permittee will email the waste manifest to the RO for record keeping purposes. The O&M Records were reviewed from January 2024 throuah June 21. 2024. The records appear to be in order. Compliance Schedules Yes No NA NE Is there a compliance schedule for this facility? ❑ 0 ❑ ❑ Is the facility compliant with the permit and conditions for the review period? ❑ ❑ 0 ❑ Comment: The treatment system typically pasess wet toxicity sampling. Page# 3