HomeMy WebLinkAboutWQ0045669_Narrative_20240730CARMEL VILLAGE - PHASE 1 & 2
Southport -Supply Road (NC 211) and Zion Hill Road (SR 1114)
Brunswick County, NC
For
Sunset Apts, LLC
Mandy Melton Manager
309 Post Office Drive Indian Trail, NC 28079
704-614-0339 / mandy@ingramwalters.com
And
CF Master Limited Partnership
G. David Cuthbertson
2627 Brekonridge Centre Drive Monroe, NC 28110
Jmccall@carolina-development.com
Prepared by:
NORRIS & BLAND CONSULTING ENGINEERS, P.C.
1429- Ash — Little River Rd. NW
Ash, North Carolina 28420
(910) 287-5900/ pnorris@nbengr.com
License # C-5102
N&B Project No. NT22112
NARRATIVE
CARMEL VILLAGE -- PHASE 'I & 2
GRAVITY
This public sewer system is designed to service 108 3-bedroom single family lots, 89 3-
bedroom townhouse units for Phase 1 and Phase 2.
The system is comprised of gravity 8" lines, a pump station, and 6" force main. The
pump station is sized to accommodate future flows from Carmel Village Phase 3, 4, and
5, and the Clemmons Tract Subdivision. The pump station is designed for a flow of
116,130 GPD with duplex 45HP pumps capable of 300 GPD at 180 TDH.
A total of 6,599 LF of 8-inch gravity line, and 35 LF of 6-inch SSFM will be needed to
complete the system.
This new system will connect into an existing 8" SSFM along Zion Hill and will be served
by the Brunswick County.
LOW PRESSURE
This public sewer system is designed to service 26 3-bedroom single family lots. The
system is comprised of low-pressure lines that will discharge into a proposed sewer
manhole.
A total of 1,196 LF of 2-inch LPSSFM and 778 LF of 3-inch LPSSFM will be needed to
complete the system.
This new system will connect into a proposed sewer manhole in the gravity portion of
Carmel Village that will flow to a proposed pump station that will connect into an existing
8" SSFM along Zion Hill Road and be served by the Brunswick County.