HomeMy WebLinkAboutNC0059200_CEI NOD2024PC0131_20240801
SENT VIA ELECTRONIC MAIL ONLY: NO HARD COPY WILL BE MAILED
August 1, 2024
Julie Babcock
Trillium Links & Village LLC
Email: jbabcock@trilliumnc.com
SUBJECT: NOTICE OF DEFICIENCY
Tracking Number: NOD-2024-PC-0131
Permit No. NC0059200
Trillium Links & Village WWTP
Jackson County
Dear Permittee:
The North Carolina Division of Water Resources conducted an inspection of the Trillium Links & Village WWTP on
July 11, 2024. This inspection was conducted to verify that the facility is operating in compliance with the
conditions and limitations specified in NPDES WW Permit No. NC0059200. A summary of the findings and
comments noted during the inspection are provided in the enclosed copy of the inspection report.
The Compliance Evaluation inspection was conducted by Division of Water Resources staff from the Asheville
Regional Office. The following deficiency(s) was noted during the inspection:
Inspection Area Description of Deficiency _________________________________________________________________________________________________________________________________________________________________________ Flow Measurement – Effluent A calibration verification is not being conducted annually as required by permit. Part II.D.3 NPDES Standard Conditions: “Flow measurement devices shall be calibrated at a minimum of once per year…”
_________________________________________________________________________________________________________________________________________________________________________
Docusign Envelope ID: 9BA164C1-3479-4AC9-B659-60EB74D0044C
Remedial actions should have already been taken to correct this problem and prevent further occurrences in the
future. The Division of Water Resources may pursue enforcement action for this and any additional violations of
State law. To prevent further action, carefully review these deficiencies and address the causes of
non-compliance to prevent the recurrence of similar situations.
If you should have any questions, please do not hesitate to contact Mikal Willmer with the Water Quality
Regional Operations Section in the Asheville Regional Office at 828-296-4686.
Sincerely,
Daniel Boss, Assistant Regional Supervisor
Water Quality Regional Operations Section
Asheville Regional Office
Division of Water Resources, NCDEQ
ATTACHMENTS: Inspection Report
Ec: LF
Docusign Envelope ID: 9BA164C1-3479-4AC9-B659-60EB74D0044C
EPA
United States Environmental Protection Agency
Washington, D.C. 20460
Water Compliance Inspection Report
Form Approved.
OMB No. 2040-0057
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 N 52 NC0059200 24/07/11 C S31112171819 20
21 66
Inspection Work Days Facility Self-Monitoring Evaluation Rating B1 QA ----------------------Reserved-------------------
N67707172 73 74 75 80
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
POTW name and NPDES permit Number)
Trillium Links & Village WWTP
298 Fenly Forest Trl
Cashiers NC 28717
Entry Time/Date Permit Effective Date
Exit Time/Date Permit Expiration Date
10:00AM 24/07/11 23/02/01
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
///
Kenneth Jason Rummel/ORC/828-785-3769/
Robert P Barr/ORC/828-251-1900/
Other Facility Data
11:30PM 24/07/11 27/10/31
Name, Address of Responsible Official/Title/Phone and Fax Number
Dewayne Calven Ward,PO Box 2644 Cashiers NC 28717//828-743-5886/8287430687 Contacted
No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Permit Flow Measurement Operations & Maintenance Records/Reports
Self-Monitoring Program Sludge Handling Disposal Facility Site Review Effluent/Receiving Waters
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s)Agency/Office/Phone and Fax Numbers Date
Melanie Kemp DWR/ARO WQ/ - - /
Mikal Willmer DWR/ARO WQ/828-296-4686/
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
Daniel J Boss DWR/ARO WQ/828-296-4658/
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
Page#1
Docusign Envelope ID: 9BA164C1-3479-4AC9-B659-60EB74D0044C
8/1/2024
8/2/2024
8/2/2024
NPDES yr/mo/day
24/07/11
Inspection Type
C3111218
1
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
Mikal Willmer and Melanie Kemp, with the Asheville Regional Office, conducted a Compliance
Evaluation Inspection of Trillium's Wastewater Treatment Plant on July 11, 2024. This inspection was
conducted to determine whether the facility is being operated and maintained in compliance with
NPDES Permit #NC0059200. RPB Systems and Trillium staff were present and assisted in the
inspection.
The following items were noted during inspection:
Operational staff indicate they still have limited ability to alter settings beyond what was originally
programmed for the WWTP within the SCADA system.
Bar Screen: A 2mm fine screen is installed. Brushes were replaced for the first time in 2023. No
reported issues or major pass-through debris noted.
EQ Basin: A pressure transducer is used to monitor the level in the EQ basin, which is connected to
SCADA. Any alarms triggered will call Trillium staff who will contact RPB systems. ORC states he can
pull the transducer up and down to determine if it is reading the liquid level accurately.
Oxic and Anoxic Basins: The ORC checked the DO and MLSS with field meters at the time of the
inspection. DO read 0.72 mg/L and the MLSS was showing approximately 10,000 mg/L. The ORC
indicated the MBR literature states the membranes can handle a higher solid content but based on
his experience with the facility, there are issues with running the solids at the manufacturer suggested
levels.
MBRs: Membranes were replaced in November of 2021 and there have been no tears noted to the
membranes since they were installed. Staff indicated if there is too much suction detected on the
membranes, the pumps will shut down to prevent damage. When the clean alarm sounds, staff will
perform a filter wash. The ORC performs a chlorine wash once a quarter and washes with just water
monthly. The original clean in place (CIP) system is still inoperable. DWR still recommends staff
attempt to fix or alter this system so the ORC does not need to climb to the top of the building to feed
cleaning chemicals.
Blower Motors: It should be noted the EQ basin and membranes tanks share blower motors, which
limits how much the ORC can adjust the power to the motors depending on the season. The old
motors are retained onsite as spares in case there are any issues with the motors in operation.
Solids: ORC reports Mike’s septic pumps the facility monthly in the peak season. Solids were most
recently removed on June 9, 2024.
Flow meter: Facility utilizes a mag meter and was previously verifying effluent mag meter flow
readings by measuring volume/time and comparing to the mag meter reading. At the time of the
inspection, the ORC reported the meter was not being calibrated/verified to be within 10% of true
value annually. Please note, per Part II.D.3 of the NPDES Standard Conditions this must be done, at
a minimum, annually. Due to the nature and placement of the mag meter, staff can verify the reading
is accurate by checking discharge volume/time and, if possible, checking any diagnostics for the
meter within the SCADA system set by the manufacturer. Please notify the ARO, once the calibration
verification has occurred and the associated percentage error. Should the percentage error exceed
10%, the permittee will need to replace or send off the mag meter for calibration. Trillium should also
reach out to the mag meter manufacturer (IFM) to see if they have any recommendations for in-situ
calibration verifications.
Inline turbidimeter: An inline turbidimeter is installed. The ORC stated he relies on turbidity samples
taken as he is unsure of the accuracy of the inline turbidimeter. Please note, if/when the infiltration
NC0059200 17 (Cont.)
Page#2
Docusign Envelope ID: 9BA164C1-3479-4AC9-B659-60EB74D0044C
Permit:NC0059200
Inspection Date:07/11/2024
Owner - Facility:
Inspection Type:
Trillium Links & Village WWTP
Compliance Evaluation
basin is placed into service, the inline turbidimeter will need to be calibrated annually per permit
#WQ0037555 since continuous readings are required.
Generator: Onsite generator tests underload daily at approximately 1330. Blossman gas refills the
propane tank onsite and Trillium maintains a contract with a local company to service all the
generators. The propane tank was reading 80% full at the time of the inspection.
Outfall- Trillium staff maintain the path to the outfall near well #7. Recommend the outfall location be
marked for future facility staff to easily locate.
US/DS: ORC reports no issues accessing the sampling location 100’ upstream and of the outfall and
at the mouth of the UT to Thorpe Lake.
Noted Deficiencies:
Flow Measurement: A calibration verification is not being conducted annually as required by permit.
Part II.D.3 NPDES Standard Conditions: “Flow measurement devices shall be calibrated at a minimum
of once per year…”
Page#3
Docusign Envelope ID: 9BA164C1-3479-4AC9-B659-60EB74D0044C
Permit:NC0059200
Inspection Date:07/11/2024
Owner - Facility:
Inspection Type:
Trillium Links & Village WWTP
Compliance Evaluation
Record Keeping Yes No NA NE
Are records kept and maintained as required by the permit?
Is all required information readily available, complete and current?
Are all records maintained for 3 years (lab. reg. required 5 years)?
Are analytical results consistent with data reported on DMRs?
Is the chain-of-custody complete?
Dates, times and location of sampling
Name of individual performing the sampling
Results of analysis and calibration
Dates of analysis
Name of person performing analyses
Transported COCs
Are DMRs complete: do they include all permit parameters?
Has the facility submitted its annual compliance report to users and DWQ?
(If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified
operator on each shift?
Is the ORC visitation log available and current?
Is the ORC certified at grade equal to or higher than the facility classification?
Is the backup operator certified at one grade less or greater than the facility
classification?
Is a copy of the current NPDES permit available on site?
Facility has copy of previous year's Annual Report on file for review?
Facility flows range from 15,000 to 40,000 during the peak season.Comment:
Operations & Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping?
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable
Solids, pH, DO, Sludge Judge, and other that are applicable?
ORC checks solids, ammonia and DO as needed.Comment:
Permit Yes No NA NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new
application?
Is the facility as described in the permit?
# Are there any special conditions for the permit?
Page#4
Docusign Envelope ID: 9BA164C1-3479-4AC9-B659-60EB74D0044C
Permit:NC0059200
Inspection Date:07/11/2024
Owner - Facility:
Inspection Type:
Trillium Links & Village WWTP
Compliance Evaluation
Permit Yes No NA NE
Is access to the plant site restricted to the general public?
Is the inspector granted access to all areas for inspection?
Trillium should verify components are accurate during next permit renewal. Permit
mentions 12 MBRs; however, this was originally for the complete build out.
Comment:
Bar Screens Yes No NA NE
Type of bar screen
a.Manual
b.Mechanical
Are the bars adequately screening debris?
Is the screen free of excessive debris?
Is disposal of screening in compliance?
Is the unit in good condition?
Fine screen at headworks. See summary for details.Comment:
Equalization Basins Yes No NA NE
Is the basin aerated?
Is the basin free of bypass lines or structures to the natural environment?
Is the basin free of excessive grease?
Are all pumps present?
Are all pumps operable?
Are float controls operable?
Are audible and visual alarms operable?
# Is basin size/volume adequate?
EQ basins are interconnected. See summary for details.Comment:
Aerobic Digester Yes No NA NE
Is the capacity adequate?
Is the mixing adequate?
Is the site free of excessive foaming in the tank?
# Is the odor acceptable?
# Is tankage available for properly waste sludge?
Comment:
Page#5
Docusign Envelope ID: 9BA164C1-3479-4AC9-B659-60EB74D0044C
Permit:NC0059200
Inspection Date:07/11/2024
Owner - Facility:
Inspection Type:
Trillium Links & Village WWTP
Compliance Evaluation
Disinfection - UV Yes No NA NE
Are extra UV bulbs available on site?
Are UV bulbs clean?
Is UV intensity adequate?
Is transmittance at or above designed level?
Is there a backup system on site?
Is effluent clear and free of solids?
Two UV banks in control room. See summary for details.Comment:
Flow Measurement - Effluent Yes No NA NE
# Is flow meter used for reporting?
Is flow meter calibrated annually?
Is the flow meter operational?
(If units are separated) Does the chart recorder match the flow meter?
Mag meter has not been calibrated annually. See summary for details.Comment:
Effluent Pipe Yes No NA NE
Is right of way to the outfall properly maintained?
Are the receiving water free of foam other than trace amounts and other debris?
If effluent (diffuser pipes are required) are they operating properly?
Path to the effluent pipe is maintained by Trillium staff. See summary for details.Comment:
Effluent Sampling Yes No NA NE
Is composite sampling flow proportional?
Is sample collected below all treatment units?
Is proper volume collected?
Is the tubing clean?
# Is proper temperature set for sample storage (kept at less than or equal to 6.0
degrees Celsius)?
Is the facility sampling performed as required by the permit (frequency, sampling type
representative)?
Comment:
Upstream / Downstream Sampling Yes No NA NE
Page#6
Docusign Envelope ID: 9BA164C1-3479-4AC9-B659-60EB74D0044C
Permit:NC0059200
Inspection Date:07/11/2024
Owner - Facility:
Inspection Type:
Trillium Links & Village WWTP
Compliance Evaluation
Upstream / Downstream Sampling Yes No NA NE
Is the facility sampling performed as required by the permit (frequency, sampling type,
and sampling location)?
Comment:
Standby Power Yes No NA NE
Is automatically activated standby power available?
Is the generator tested by interrupting primary power source?
Is the generator tested under load?
Was generator tested & operational during the inspection?
Do the generator(s) have adequate capacity to operate the entire wastewater site?
Is there an emergency agreement with a fuel vendor for extended run on back-up
power?
Is the generator fuel level monitored?
See summary for details.Comment:
Page#7