Loading...
HomeMy WebLinkAbout310849_lagoon fb 5 day poa_20240802PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES FIVE (5) DAY DRAW DOWN PERIOD I. TOTAL VOLUME TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 31-849 2. Current liquid volume in structural freeboard a. current liquid level according to marker b. designed structural freeboard zone (Normally 12 inches or greater) c. line b - line a (inches within structural freeboard) _ d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c x line d x 7.48 gallons = 12 ft3 10 inches _12 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 5 days = line f 4. Total volume of waste to be land applied during 5 day draw down 2 inches inches 72020 ft2 89785_ gallons _180 days 94947 ft3 82419 ft3 0 ft3 42011 ft3 _8728_ gallons I. total volume to be land applied line e + line k = 98513 gallons REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE WITH A LIQUID LEVEL WITHIN THE STRUCTURAL FREEBOARD ELEVATIONS II. TOTAL VOLUME OF WASTE STORED WITHIN STRUCTURAL FREEBOARD ELEVATIONS FOR ALL WASTE STRUCTURES FOR FACILITY PoA (5 Day) 2/21/00 1 1. structure ID: 1 line 1 = 98513 gallons 2. structure ID: line I = gallons 3. structure ID: line I = gallons 4. structure ID: line I = gallons 5. structure ID: line I = gallons 6. structure ID: line I = gallons n. lines 1 + 2 + 3 + 4 + 5 + 6 = 98513 gallons o. line n = 3.63 acre -inches 27,154 III. TOTAL ACRES AVAILABLE TO RECEIVE WASTE DURING 5 DAY DRAW DOWN PERIOD' 2 1 While this section deals with hydraulic loading capacities, applications cannot exceed agronomic rate for receiving crop according to its certified waste plan 2 Fields with no remaining PAN balance, no receiving crop, and/or completely saturated are not considered available to receive waste p. tract # q. field # r. soil type s. crop t. acres u. remaining IRR-2 PAN balance (lb/acre) v. maximum application rate (in/hr) w. maximum application amount (inches 72435 1 FOA BERMUDA 2.15 112.18 0.5 1 72435 2 FOA BERMUDA 1.56 170.57 0.5 1 72435 PIVOT AUB BERMUDA 8.83 69.96 0.6 1 72435 8 AUB BERMUDA 2.97 126.12 0.6 1 72435 9 AUB BERMUDA 1.99 137.75 0.6 1 x. total acres available during 5 day draw down (sum of column t) = 17.5 acres IV. FACILITY'S PoA OVERALL HYDRAULIC LOAD TO BE LAND APPLIED PER ACRE y. line o = 0.21 inches per acre to be applied within 5 days line x PoA (5 Day) 2/21/00 2 If unable to land apply hydraulic load listed in line y, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new hydraulic load based on new information. Plan to land apply hydraulic load: 1. Describe moisture conditions of fields? (e.g./ Is there water standing in field; does irrigation equipment mar down in field; "trafficability" across soils; will soils absorb application without runoff , etc.) FIELDS ARE DRYING OUT 2. Date and amount of last rainfall event? 7/29/24 0.2' 3. Dates of last waste application event per field 6/27/24 PIVOT & FIELD 8 4. Given optimum soil and weather conditions, is irrigation equipment capable of applying the volume in line "n" at appropriate seasonal (i.e. winter) application rates within five days? YES 5. Irrigation schedule for next 5 days - include daily schedule; proposed application rates and amounts per irrigation event; changes made in gun sizes, nozzles, "o" rings, operating time, travel speed, etc. to meet proposed changes in application rates and amounts; and any other information for consideration PLAN ON IRRIGATING BY 8/4/24 PoA (5 Day) 2/21/00 3