HomeMy WebLinkAbout310148_lagoon fb_20240726I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): 31-148 2
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr./24 hr. storm & structural freeboard
c. line b - line a (inches in red zone) _
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c x line d x 7.48 alg lons _
12 ft3
18 inches
19 inches
4 inches
37600 ft2
_22499 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design
g. volume of waste produced according to structural design
h. actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i +i) x 7.48 x 30 days =
line f
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 5/20/2024_
m. (lines e + k) x line I =
1000
_180
days
40153
ft3
40153
ft3
0_
_21933_
_77401
2.78
ft3
ft3
gallons
Ib/1000 gal.
278 lb PAN
PoA (30 Day) 2/21/00 1
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY PLAN OF
ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
THIRTY (30) DAY DRAW DOWN PERIOD
1. structure ID: 2 line m = 278 lb PAN
2. structure ID: line m = lb PAN
3. structure ID: line m = lb PAN
4. structure ID: line m = lb PAN
5. structure ID: line m = lb PAN
6. structure ID: line m = lb PAN
n. lines 1 +2+3+4+5+6 = 278 lb PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAYDRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CAN NOT BE APPLIED DURING THIS 30 DAY PERIOD.
o. tract #
p. field #
q. crop
r. acres
s. remaining
IRR-2 PAN
balance
(lb/acre)
t. TOTAL PAN
BALANCE
FOR FIELD
(Ibs.)
column r x s
u.
application
window'
3255
1
BP
4.38
206.23
903
Sept -May
3255
2
BP
25.5
79.52
2028
Sept -Ma
3255
3
BP
6.75
206.23
1392
Sept -May
3255
4
BP
9.43
206.23
1944
Sept -May
'State current crop ending application date or next crop application beginning date for available receiving
crops during 30 day drawn down period
v. Total PAN available for all fields (sum of column t) = 6267 lb. PAN
PoA (30 Day) 2/21/00 2
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) = 278 lb. PAN
x. Crop's remaining PAN balance (line v from section III) _ _6267 lb. PAN
y. Overall PAN balance (w - x) _ <5989> lb. PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of action here
including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd
reduction options, recalculate new PAN based on new information. If new fields are to be
included as an option for lowering lagoon level, add these fields to the PAN balance table and
recalculate the overall PAN balance. If animal waste is to be hauled to another permitted
facility provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
NARRATIVE:
We are working diligently to reduce lagoon back to acceptable level as soils, crops and
weather allow.
PoA (30 Day) 2/21/00 3