HomeMy WebLinkAbout310390_lagoon fb_20240726PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY (30) DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): _31-390 1 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) _ d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c x line d x 7.48 alg lons _ 12 ft 17 inches 19 inches _2 inches 52796 ft2 _65819 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 g. volume of waste produced according to structural design h. actual waste produced = current herd # x line g = certified herd # 71384 61612 days ft3 ft3 i. volume of wash water according to structural design 0 ft3 j. excess rainfall over evaporation according to design 32667_ ft3 k. (lines h + i +i) x 7.48 x 30 days = 117534_ gallons line f 4. Total PAN to be land applied during draw down period I. current waste analysis dated 05/20/2024 2.83 Ib/1000 gal. m. (lines e + k) x line 1 = 519 lb PAN 1000 REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE PoA (30 Day) 2/21/00 1 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 1. structure ID: 1 line m = 519 lb PAN 2. structure ID: line m = lb PAN 3. structure ID: line m = lb PAN 4. structure ID: line m = lb PAN 5. structure ID: line m = lb PAN 6. structure ID: line m = lb PAN n. lines 1 +2+3+4+5+6 = 519 Ib PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAYDRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CAN NOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining IRR-2 PAN balance (lb/acre) t. TOTAL PAN BALANCE FOR FIELD (Ibs.) column r x s u. application window' 3879 1 BH 1.75 210 367 Mar -Sep 3879 2 BH 2.54 207 525 Mar -Sep 3879 3 BH 2.94 275 808 Mar -Sep 3879 4 BH .89 255 226 Mar -Sep 3879 5 BH .46 251 115 Mar -Sep 3879 6 BH .84 270 226 Mar -Sep 3879 7 BH 1.45 270 391 Mar -Sep 73874 1 HW BH .87 275 239 Mar -Sep 73874 14AW BH 2.75 275 756 Mar -Sep 73874 15AW SB 16 118 1888 Apr -Sep 15 73843 2 BP 9.39 205 1924 Mar -Sep 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day drawn down period v. Total PAN available for all fields (sum of column t) = 7465 lb. PAN PoA (30 Day) 2/21/00 2 IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 519 lb. PAN x. Crop's remaining PAN balance (line v from section III) _ _7465 lb. PAN y. Overall PAN balance (w - x) _ <6946> lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: We are working to reduce lagoon to acceptable level as the weather, soils and crops allow. PoA (30 Day) 2/21/00 3