Loading...
HomeMy WebLinkAbout310252_Compliance Evaluation Inspection_20240801 ision of Water Resources Facility Number ] - O Division of Soil and Water Conservation O Other Agency Type of Visit: omp iance Inspection Operation Review O Structure Evaluation O Technical Assistance Reason for Visit: C- utine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access Date of Visit: r - j 1� Arrival Time: Departure Time: County: ��1Q>! Region:W t -0 Farm Name: RA-\ Cs_ F- , Owner Email: Owner Name: �� �,� C Phone: Mailing Address: Physical Address: Facility Contact: Title: Phone: Onsite Representative: �cMCJ_wx �� Integrator: Certified Operator: ! C(ti' `'Yj�l' S ( U '�1 Certification Number: ( l Back-up Operator: Certification Number: Location of Farm: Latitude: Longitude: Design Current Design Current Design Current Swine Capacity Pop. Wet Poultry Capacity Pop. Cattle Capacity Pop. Wean to Finish I 11-ayer Dairy Cow Wean to Feeder I jNon-Layer I Dairy Calf Feeder to Finish Dairy Heifer Farrow to Wean Design Current Dry Cow Farrow to Feeder Dry Poultry Capacity Pop. Non-Dairy Farrow to Finish Layers Beef Stocker Gilts Non-Layers Beef Feeder Boars Pullets Beef Brood Cow Turkeys Other Turkey Poults Other Discharees and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes No ❑ NA ❑ N I Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ No ❑ NA ❑ N I b. Did the discharge reach waters of the State?(If yes, notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State(gallons)? d. Does the discharge bypass the waste management system?(If yes,notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes rN ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes ❑ NA ❑ NE of the State other than from a discharge? Page 1 of 3 511212020 Continued Facilit Number: I jDate of Inspection: F, Waste Collection&Treatment 4. Is storage capacity(structural plus storm storage plus heavy rainfall)less than adequate? ❑ Yes o ❑ NA ❑ NE a.If yes, is waste level into the structural freeboard? [—] Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard(in): Observed Freeboard(in): 5.Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes ([� „' ❑ NA ❑ NE (i.e., large trees,severe erosion,seepage,etc.) 6.Are there structures on-site which are not properly addressed and/or managed through a ❑ Yes E�Xo ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes,and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes o ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes UX0/ ❑ NA ❑ NE (not applicable to roofed pits,dry stacks,and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes b ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers,setbacks,or compliance alternatives that need ❑ Yes [DAo ❑ NA ❑ NE maintenance or improvement? 1 1. Is there evidence of incorrect land application?If yes,check the appropriate box below. ❑ Yes No ❑ NA NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals(Cu,Zn,etc.) ❑ PAN ❑ PAN> 10%or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12.Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes > ❑ NA NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes ro ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes Lill-NO ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes [D/lo ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes ❑jo 0 NA ❑ NE Required Records&Documents 19. Did the facility fail to have the Certificate of Coverage&Permit readily available? ❑ Yes LI o ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes,check ❑ Yes 12-VU ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑Design [:]Maps [—] Lease Agreements ❑Other: 21. Does record keeping need improvement?If yes,check the appropriate box below. ❑ Yes E; o ❑ NA ❑ NE ❑Waste Application ❑Weekly Freeboard ❑Waste Analysis ❑Soil Analysis ❑Waste Transfers ❑Weather Code ❑Rainfall ❑Stocking ❑Crop Yield ❑120 Minute Inspections ❑Monthly and V Rainfall Inspections ❑Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ©-ISO ❑NA ❑ NE 23. If selected,did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ff tV o ❑ NA ❑ NE Page 2 of 3 511212020 Corti ,� d Faseili Number: - Date of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes L>e ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes,check [:] Yes NA ❑ NE the appropriate box(es)below. ❑Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels ❑Non-compliant sludge levels in any lagoon List structure(s)and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? Yes ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments(PLAT)certification? D Yes ❑ No E5,dn ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document Yes EU W) NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? Yes ❑ ❑ NA ❑ NE If yes,contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes i l4) ❑ NA ❑ NE permit?(i.e.,discharge,freeboard problems,over-application) 31. Do subsurface tile drains exist at the facility?If yes,check the appropriate box below. Yes ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32.Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ Ko ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on-site representative? ❑ Yes E<O ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes EKo ❑ NA ❑ NE Comments(refer to question ft Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations(use additional pages as necessary). Reviewer/Inspector Name: Phone: (�/�o�:`( 06 7 Reviewer/Inspector Signature: /' Date: Page 3 of 3 511212020