Loading...
HomeMy WebLinkAboutSW6231103_Emails_20240801 Beeker, Jacob I From: Beeker, Jacob I Sent: Thursday, August 1, 2024 11:56 AM To: zach.angle@gmail.com Cc: Joyner, Melissa; Don Curry; svc_post_construction_stormwater; Hines, Lee R; cumberlandplanning@cumberlandcountync.gov Subject: Re: [External] RE: SW6231103; Godwin Subdivision (Cumberland) Good afternoon, The Division of Energy, Mineral, and Land Resources (DEMLR), received a complete Stormwater Management Permit Application for the subject project on July 2,2024. Staff review of the plans and specifications has determined that the project,as proposed,will comply with the Stormwater Regulations set forth in Title 15A NCAC 21-1.1000 - 1062 rules.We are forwarding Permit No.SW6231103, dated August 1 st, 2024,for the construction,operation and maintenance of the built-upon areas (BUA) and vegetated conveyances or areas associated with the subject project.This permit shall be effective from the date of issuance and shall be subject to the conditions and limitations as specified therein, and does not supersede any other agency permit that may be required. The original signed permit package and approved plans are being mailed to the permittee,Susan Tart Property, LLC, at the following address(NOTE:An electronic version of this permit can be found in our online repository: https://edocs.deq.nc.gov/WaterResources/Browse.aspx?id=494276&dbid=0&repo=WaterResources): Susan Tart Property, LLC Attn:Zach Angle, Manager 126 N. Ennis St. Fuquay-Varina, NC 27526 1 will hold onto our hard copies of these projects for 30 days (in case any issues/typos with the permit are noticed and corrections need to be made)after which point,they will be kept on file at the Fayetteville Regional Office. If you have any questions, or need additional information concerning this matter, please contact Jacob Beeker at postconstructionCcbdeq.nc.gov. Thankyou, Jacob Beeker(He/Him) Environmental Engineer North Carolina Department of Environmental Quality Office: (919) 707-9214 Jacob.Beeker(a-)deq.nc.gov Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. 1 From: Don Curry<don@curryeng.com> Sent:Wednesday,June 5, 2024 4:31 PM To: Holland, Brianna <brianna.holland@deq.nc.gov>; Peck, Kaitlin <kaitlin.peck@deq.nc.gov>; zach.angle@gmail.com <zach.angle@gmail.com> Cc: Farkas,Jim J <Jim.Farkas@deq.nc.gov>;Joyner, Melissa <melissa.joyner@deq.nc.gov>; svc_post_construction_stormwater<postconstruction@deq.nc.gov> Subject: [External] RE: SW6231103; Godwin Subdivision (Cumberland) Some people who received this message don't often get email from don@curryeng.com. Learn why this is important CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Brianna, These comments are easily addressed and I can have the revisions back to you in short order.What is the turnaround time for reviewing these 3 comments?Can we expect a quick approval? Thanks. DON CURRY, PE President CUITyENGINEERING 205 S. Fuquay Ave. Fuquay-Varina, NC 27526 wk (919)552.0849 x101 dir (984)225.4149 cell (919)880.9857 don(&curryeng.com www.currveng.com Please Note: Our office will close at noon on Fridays in June, July, and August. From: Holland, Brianna <brianna.holland@deq.nc.gov> Sent:Wednesday,June 5, 2024 4:28 PM To: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>; Don Curry<don@curryeng.com>; zach.angle@gmail.com Cc: Farkas,Jim J <Jim.Farkas@deq.nc.gov>;Joyner, Melissa <melissa.joyner@deq.nc.gov>; svc_post_construction_stormwater<postconstruction@deq.nc.gov> Subject: RE: SW6231103; Godwin Subdivision (Cumberland) Good afternoon, The Division of Energy, Mineral and Land Resources (DEMLR), received additional information for a Stormwater Management Permit Application for SW6231103 on March 8, 2024. A review of that information has determined that the application is not complete. Attached is a letter describing the items that need to be submitted. When responding to this request, please mail all requested documents to the address provided in the letter. Please upload all documents that you mailed into our office through the link provided below. Be sure to choose the Central Office as the Primary Contact office. 2 https://edocs.deg.nc.gov/Forms/SW-Supplemental-Upload If you have any questions, please feel free to contact me. My contact information is listed below. Thank you, Brianna Holland Environmental Engineer Post-Construction Stormwater Permitting Group North Carolina Department of Environmental Quality postconstruction@deg.nc.gov From: Holland, Brianna Sent:Tuesday, February 6, 2024 3:31 PM To: Peck, Kaitlin <kaitlin.peck@deg.nc.gov>; Don Curry<don@currveng.com>; zach.angle@gmail.com Cc: Farkas,Jim J <Jim.Farkas@deg.nc.gov>;Joyner, Melissa<melissa.ioyner@deg.nc.gov>; svc_post_construction_stormwater<postconstruction@deg.nc.gov> Subject: RE: SW6231103; Godwin Subdivision (Cumberland) Good afternoon, The Division of Energy, Mineral and Land Resources (DEMLR), received additional information for a Stormwater Management Permit Application for SW6231103 on November 9, 2023. A review of that information has determined that the application is not complete. Attached is a letter describing the items that need to be submitted. When responding to this request, please mail all requested documents to the address provided in the letter. Please upload all documents that you mailed into our office through the link provided below. Be sure to choose the Central Office as the Primary Contact office. https://edocs.deg.nc.gov/Forms/SW-Supplemental-Upload If you have any questions, please feel free to contact me. My contact information is listed below. Thank you, Brianna Holland Environmental Engineer Post-Construction Stormwater Permitting Group North Carolina Department of Environmental Quality postconstruction@deg.nc.gov From: Peck, Kaitlin <kaitlin.peck@deg.nc.gov> Sent:Thursday, November 9, 2023 11:01 AM To: Don Curry<don@currveng.com>; zach.angle@gmail.com Cc: Farkas,Jim J <Jim.Farkas@deg.nc.gov>;Joyner, Melissa <melissa.ioyner@deq.nc.gov>; svc_post_construction_stormwater<postconstruction@deg.nc.gov>; Holland, Brianna <brianna.holland@deq.nc.gov> Subject: SW6231103; Godwin Subdivision (Cumberland) 3 Good Morning, We received your post-construction stormwater permit application for the subject project on 11/9/23. Reviews under the Standard permitting process can take up to 90 calendar days to complete. You can see where this project stands in the review queue by emailing postconstruction@deg.nc.us (We have an autoreply set up that has the review queue on it). Please upload all documents that you mailed into our office through the link provided below. Be sure to choose the Central Office as the Primary Contact office. https://edocs.deg.nc.gov/Forms/SW-Supplemental-Upload IMPORTANT NOTE: Please ensure that each file is uploaded under its appropriate file type. Additional file types can be entered into the electronic form by clicking on the "Add Another Post-Construction File Upload" link directly below the "State Stormwater Information Uploads" section of the form. YOU MUST CLICK ON THE"ADD ANOTHER POST- CONSTRUCTION FILE UPLOAD"TO ADD ADDITIONAL FILE TYPES TO THE SUBMISSION. Merely changing the file type dropdown as you upload the various files (without adding additional file uploads)will upload all of the files as the last file type selected, the submission will get flagged during review, and you will need to resubmit the files. Please do not upload entire plan sets through this form, but rather upload the relevant individual sheets under the appropriate file type. Selecting the correct file type ensures that the files are properly named in the electronic repository and it helps expedite the review process. NOTE:We do not require and we discourage the upload/submission of extraneous plan sheets (such as lighting plans, utility plans, striping plans, sight distance plans, etc...) as these files are not needed for review. Please type in permit#: SW6231103 This project will be reviewed by Brianna Holland, if you have any questions, please contact them at postconstruction@deg.nc.gov or at 919-707-9218. Thank you, Kaitlin Peck Environmental Specialist Post-Construction Stormwater Permitting Group North Carolina Department of Environmental Quality postconstruction@deg.nc.gov D_ E NORTH CAROLINA Department of Environmental Quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Peck, Kaitlin Sent: Monday, November 6, 2023 9:44 AM To: Don Curry<don@currveng.com> Cc: Farkas,Jim J <Jim.Farkas@deg.nc.gov>;Joyner, Melissa<melissa.ioyner@deq.nc.gov>; 4 svc_post_construction_stormwater<postconstruction@deg.nc.gov>; zach.angle@gmail.com Subject: RE: [External] RE: Godwin Subdivision; Godwin, Cumberland County Don, • You can do either option. If a check for$1000 is provided, the original check for$505 will be voided and returned. • Yes, as it is a requirement for review, please sign and seal the plan sheets. Take care, Kaitlin Peck Environmental Specialist Post-Construction Stormwater Permitting Group North Carolina Department of Environmental Quality postconstruction@deq.nc.gov NORTH CAROLINA Department of Environmental Quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Don Curry<don@curryeng.com> Sent: Monday, November 6, 2023 9:41 AM To: Peck, Kaitlin <kaitlin.peck@deq.nc.gov> Cc: Farkas,Jim J <Jim.Farkas@deq.nc.gov>;Joyner, Melissa <melissa.ioyner@deq.nc.gov>; svc_post_construction_stormwater<postconstruction@deg.nc.gov>; zach.angle@gmail.com Subject: [External] RE: Godwin Subdivision; Godwin, Cumberland County CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Good morning, Kaitlin.Thanks for the initial review. Please see my comments/questions below: 1. Should we provide a check for the difference or a new check for the new fee of$1000?Submitted fee was $505. 2. Noted that the deed restrictions were not signed. We can get that to you. 3. We can seal the plans. We don't typically like to do that for an initial review,just to minimize copies of sealed review plans floating around, but we can accommodate. Sincerely, DON CURRY, PE President 5 CUITyENGINEERING 205 S. Fuquay Ave. Fuquay-Varina, NC 27526 wk (919)552.0849 x101 dir (984)225.4149 cell (919)880.9857 don(&curryenq.com www.currveng.com From: Peck, Kaitlin <kaitlin.peck@deg.nc.gov> Sent: Monday, November 6, 2023 8:31 AM To: zach.angle@gmail.com; Don Curry<don@curryeng.com> Cc: Farkas,Jim J <Jim.Farkas@deg.nc.gov>;Joyner, Melissa <melissa.ioyner@deg.nc.gov>; svc_post_construction_stormwater<postconstruction@deg.nc.gov> Subject: Godwin Subdivision; Godwin, Cumberland County Good Morning, We received your application for a new post-construction stormwater permit on 11/3/23. At this time, the submission is not administratively complete and cannot be accepted for review in its current condition. Please provide the following submittal items within 30 calendar days (by close of business on 12/6/23) so that we may accept the project and begin the review process, otherwise, the project will be returned as administratively incomplete. • 1x application fee check in the correct amount (this item is required per Session Law 2023-134, Section 12.14(e)(2)): • Please be aware that, effective October 3, 2023, our permit application fee structure is as follows: • New Permit or Major Modification for a project with one (1) or fewer SCMs=$1,000 • New Permit or Major Modification for a project with two (2) SCMs=$1,250 • New Permit or Major Modification for a project with three (3) SCMs=$1,750 • New Permit or Major Modification for a project with four(4) or more SCMs= $2,250 • Minor Modification =$250 • Renewal =$750 • Transfer=$750 • Renewal &Transfer Combination =$1,500 • General Permit=$700 • Per the submittal items, this project will require an application fee of$1000 as this application is for a New Permit for a project with 1 SCM. Please provide a new application fee check in this amount so that we may process your application. We will void and return the provided application fee check to the permittee(unless a different return address is indicated by close of business tomorrow). • 2x hard copies (one original) of the deed restriction document(This item is required per 15A NCAC 02H .1003(7), 15A NCAC 02H .1042(2)(k), and Sections VI, 2 &VII). More information can be found on our website: https://deg.nc.gov/about/divisions/energy-mineral-and-land-resources/stormwater/stormwater- 6 program/post-construction-program/post-construction-forms NOTE:The deed restrictions provided were not signed or notarized. • 2x signed &sealed hard copies of the plan sheets. NOTE:The provided site plans were not signed. NOTE: Please only provide the pages of the plans that are relevant to the stormwater permit application. NOTE:This is an administrative completeness review, not a detailed engineering review, there may be other issues that may be brough up during the engineering review. If these items are received within the stipulated timeframe, we can accept the project and begin the review process. Once accepted, reviews under the standard permitting process can take up to 90 calendar days per statute (one of our two reviewer positions is currently vacant). Hard copies should be mailed to the following address: For Fed Ex/UPS: Jim Farkas 512 N. Salisbury Street, Office 640E Raleigh, NC 27604 For USPS: Jim Farkas 1612 Mail Service Center Raleigh, NC 27699-1612 If you have any questions, please contact Kaitlin Peck at post-construction@nc.deg.gov or at(919) 707-9209. Thank you, Kaitlin Peck Environmental Specialist Post-Construction Stormwater Permitting Group North Carolina Department of Environmental Quality postconstruction@deg.nc.gov i�7,�� D E Q NORTH CAROLINA Department of Environmental Quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official. 8