HomeMy WebLinkAboutNCG021042_Scanned Site Plans 4 _20240730 Legend
—— ————————- Adjacent Property Lines
Property Lines & Permit Limits
---- --- Permit Limits Only
_________________ Limits of Disturbance (25 Years)
VEGETATION PLAN
Perenial Stream " _ i 1. Spread topsoil over disturbed areas and leave surface reasonably smooth
Scale: 1 — 2 00' 2. and uniform.
� Scarify surface to prepare a seedbed 4 to 6 inches deep. Use such equipment
Intermittentl Stream a g g g
as tilling,discin or tracing with the teeth on a front end loader.
; 3. Mix time and fertilizer with the soil during seedbed preparation.
_._._._._._.—.—._._.—._._._ Wetland Limits 4 ; 4. Seed on freshly prepared seedbed following the application rates for the
�.1 "
—— — 1 appropriate season.
� ------7 1 5. Mulch all seeded areas Immediately.
100 Year Flood Plain Limits
i i / 1 6. Tack mulch on slopes 3:1 (H:V)or steeper by spraying with emulsified
Mine P mmit Limit and Pr asphalt. Use an anchoring tool such as a farming disc set in a vertical
�- Existing bloodline _ ���`` %h �\ `" operty L e / J�" positing on slopes less than 3:1. Mulch netting may also be used on slopes.
i a4Q� j 7. Inspect seeded areas and make repairs within the planting season. If
qj
Topographic Lines with Designated Elevation —————— ,IQ / vegetation is over 600/b damaged,repeat steps 2 through 5.
_ —
; •-' �°" ,� — —————— \ft. "' �' � r — ---— r r ---� ,/�� ' \` � � 8. Permanent-eve etation shall be accomplished at the specified times of
i - �,�' �— ,---- - -- -------, - at. %� , Y Temporary g p pp p p
Proposed Soil Berm / -- -- ———————— — the year. Tem or vegetation shall be applied outside of the optimal times
— —
p , ——— —- --— —-——— �� ®/ / — —— ——— r r +�/ >\ for establishment of permanent vegetation.
———— —— —— / - —rrr - dQ / - -- ------ --
�ffe r r rrr r--. < �� V"� /•t -
Proposed Temporary Silt Fence — , ' — -- r-— -—— — -
-—J — -— - -——
— —
A �� - ��� i �- -- � r---- � � --------- -- -------- � rrr-- , � � TEMPORARY SEEDING SCHEDULE
� — -
--- —
Proposed Sediment Basin —————————— —— — ——— \\ ----------------- -—- - — = - ——— — r_ r r Seeding Date: Dec. 1 -Apr. 15
— r
—— ——————r r--—-—-——r— -—— —r— —r r———
SECONDARY , — ——r �,ti
—- \ ` ` r r — I Seed Type Rate
SPILLWAY / —r rrr r r \ ` 1 —r— ——.r r —r ——— — r r— —— ——— — — —r— — — — I yp
Proposed Baffles , — \ — r — —r — I I y (grain)
/ — — --- \,._ --- i-- --- r--- -r— - - — - -- - - ---r--,--- .- � Rye1201bs/acre
/ -r------ — --- --rr-- -- ------ -------- —— —————————————— — — —--- -- - --,-r,rrrrrr� r,� r ----- --r ,- r rrrr-rrr--,---- / �� Kobe lespedeza 501bs/acre
— — —— --- -- --- --- -� —r r—r —r-- --- --- - ---- - r— r -- r - r- --,--"-- r / /.� 10-10-10Fertilizer 750lbs/acre
SKIMMER AND — —— — — — —r r— r—r— `_'-.' - \ rrr—— .—————r r—— r ——r rrr —— rrrr — — r — ———r r — —r —r r rrr r r———r r —
PRIMARY OUTLET F 4` / r r .---— — — � e \ — — — — —— �_—— "' '-' _ — — — Lime 2,000 lbs/acre
— r——— r r — r r —— \ —— r r r r —r—r r--—— r r r— ——— r r— — r r -r r r r ——— 11
/ 1 rrr r rr ,- tm \ --rrrr r rr—r r r r rr - r .--•rr,� a rrrr ,- rrr rrr /�a��•� Mulch 4,000lbs/acre
/ J. r r r r r r r r r r r r t ') ` ✓ \ r r r--m e r e—m e r e---,- r r r r r r r r r r r r r r r r r r-- r r r r r 1.L�., .�r r r r r.--�r r r r �l
\ . — ,--- --- - - - - "---- - �n � \ rr �r_ r -- �rr_-r_— �— _..�,� .�- --- rrr .-,r-_-r_--- ----- --rrr, -- --- r � i Seeding Date: Apr. 15 - Aug. 15
Proposed Soil Berm ;c, \ \ ———— ——— ——— \'� ® 7 \ _ _ —————— _ ——— ——— — —-- ——— — — ———— ——— — ,
—— \ — •--"-r r r-. -r r r r-r r-r r r r r,�r r r � / \
r 9 " � —-— _-- — — — �_ —— ——- - _ �� °'I Seed Type Rate
9, r - — ___ _ _ _ __ r _ r - German Millet 40 lbs/acre
--- ♦\ ��� ----- --- — ----- \ G� ��\--- --- - - ------ ----- -- ---- - - rrrr ---------- - ------- / � 10-10-10Fertilizer 7501bs/acre
��.- -- r—rr—,---rrr---rrr \ ♦ r r rrrr. —rrrr rrrr---•--"r rrr, ,-err rrr rr r,- Jrr,�r —rrrr, rrrrr�—rrr— --� rr rr rr ,-�
7 ` / j Lime 2,000]bs/acre
—rrrr.-� r r .--rrrr \ � \ r ,rrrrrrrr rrr rrr.-ter rrrr.--r rrr r.-�.-".-- rrrr.-" .-"r rr-rrrr r rr.-� rrrr
—rrrr rrrr \ \ rrrr r rrr rrr - rrr - — rrr rrr r-rr r --r / Mulch 4,000lbs/acre
.� � • ` � — \ ------r-r —_—_ - --rrrr.-�rr- --,�rr,-r—rr ---rrrrr_—_--_�---r--r ---r r--- �r� /
, ` 1 r — —r— r- - -rr— rr� rrr rr.-� — — "-'
/ ---� - r-- — \ � \ ' ` — �—� --- -- r—� --� ,-r —� _ —��—� � t Seeding Date: Aug.lStoDec. 1
—r \ \ — r i 1 ———— r—r r
QUO r r r---_—_— _ \ ` \ — �� �i ♦` , - - --- _—_-- -- - — - --f— --r 1 1 Seed Type Rate
—————— - \ \ —— � ` , ` r ———————— — —r-- r r r——— _ —— - - — —r r—� — r r— -— ——— ,` r r r _ r— r — _ _ — — — _ —— — — 1 Rye(grain) 1201bs/acre
r- -r -rr -r--r- -r \ — ��' i�' ` ------r -- - ---,-- --------- -r ��- ��♦— —r,=,-,=— ---- 10-10-lO Fertilizer 1,000 lbs/acre
'V� — -------_—_--- —` — \ 1 r ,/ �� ----- rrr-- --rrrrr---------
--r r—r r r r r r —r r r r r r r r r r r—-- A, \ —rrrr--— r—rrr--r r rrr——rrrr 1 Lime 2,0001bs/acre
—- -- —- t 1et�i — — — — - - — �' ' , __—_ _ ——-—_ —_— ,-r r —r- r 1 1 Mulch 4,000 lbs/acre
--r r r r—- / `
— —————— — ` , �, 1 ' / —————— ——— —— ————————— — '` —— ————— - — ,--———————————
——— ————_ —' —— —rrrr — , Qj 1 ——————————— ———————————— — / A.\, "�. — ————— —— — —— ———————————
` ' — —————--— —————— ——-— —— ,/ e6VV® ,O �\ —-——— —— — ———-—————-——— —
Q Z./ — _ _ rr_�—r---_rrrr—� ,��i 1 — rrrrrrrr—_- -rrr— - -- // �a\ ,•�;�� r�r- --.- ----_—_____ - —__ 1 PERMANENT SEEDING SCHEDULE
Linear Welland �% — _ _--- --- ———— ,� Qj�� � � � - --rrr--- —� -- rr- — /// �J ®a�6 \\ ---.---�- -•-�f --_ _ 1 1
---- — ----rrr ------ — /' Q 1 ' --� - ----rrrr r `'i''�e� �\ �- ----------- � — --- 1 Seeding Date: Apr. 1 -July 15
♦, ,--,-�———— — — — —— �/ ✓ \ ——_— —_—•—-- ————_—_—_——_
———r—-— ———————_—————r ' ` , / ——r__r_—-_-——_— rrr ,/� ''`v, ` —r——. -— r r—————_—— ———-
-—— 1 1 Seed Type Rate(lb/ac)
50
I`'� --�•�-,-— --- ---- r-.- f / —�'---------- / i - I ------� --rrr.-- r--- i `
``` n(� r— r •- —— r r——r———-—— r \ ` ♦ �1 / —_——————r-�—— — — / I —r——•- —— —r—r--�— ————— Sericea Pensacola pedBahez raSS
_ \ / I ---�-_ ---- -_---- � — -- / � Centipede grass 5
— ---
— —r German millet 1
_--- --- `\ t r r —rrr t - I --- - --- —
/ ——--———---—�— � ` ` ` �` --1— ——— — t t"- I
_ r — \ ♦ . � � ♦ - / ,� — --�� Soil Ammendmentc:
♦ �, ' -, ♦ ♦\ —— - —— -- - �:�� Apply lime and fertilizer according to soil test,or apply
/ V \ -- --— --- - `♦ ��`♦ r -----— \ f + — wo 3;,D00 lb/acre ground agricultural limestone and 500 lb/acre-
Existing
Culvert 2 / `%\\ r _ rrr--r r—_-rrr - -r r \\��` �`o -———— - \\ , —,, so 10-10-10 fertilizer.
♦ \` - ------- -- `\ ♦ _------ \r'S �� Mullch:
♦ ,\ �d\ r r r r r \� � Applyy 4,000 lb/acre grain straw or equivalent cover of another
a ♦� —------ \ �m „ su,rtable mulch.Anchor by tacking with asphalt,roving,or netting
or by crimping with a mulch anchoring tool.A disk with blades
' 25ff.Undistury� sett nearly straight can be used as a mulch anchoring tool.
— r— �. �� ooaofo
25 ft. Unexcavated Buffer , / ,j - , Mln epermit Limit '---- � Maintenance:
/ z ,� `\\ �' Refertilize the following April with 50 lb/acre nitrogen.Repeat as
L, ` \`p J growth requires.May be mowed only once a year.Where a neat
♦ r —rrr -
Existing Culvert 1 / 7
�"� ��♦\ —— - ` _ appearance is desired,omit sericea and mow as often as needed.
1) Ground Stabilization*
---� Site Area Stabilization Stabilization Time
Description Time Frame Frantic Exceptions
• Perimeter dikes,
swales,ditches 7 days None
and slopes
• high Quality
Water(HQW) 7 days None
•�`` Zones
If slopes are 10' or
Slopes steeper` less in length and are°year • than 3:1 7 days not sleeper than 2:1,
1° 14 days are allowed.
7-days for slopes
` I • Slopes 3:1 or tlutter 14 days greater than 50 feet
in length
` I F • A II other areas None
with slopes M (exceptforutter 14 days perimeters and
than 4:1 I IQW Zones)
" '•Extensions uftimc may be approved by the permitting authority
based on weather or other site-specific conditions that make compliance
i mprac ti cable."(Section II.B(2)(b))
CROSS-SECTION A-A' (NTS) '
AReclamation Considerations
1. Maintain undisturbed buffer of at least 50ft from wetlands ENGINEERING & ENVIRONMENTAL DATE:
E E E W and natural bodies of water. ^/� 08/11/23
L` SCIENCE COMPANY
L 25r aJi Cl) 2. Perimeter mine excavation slopes shall 3:1 (Horizontal to Vertical) or flatter. 3008 Anderson Drive DRAWN:
N V rJ
C: c 25' Raleigh, NC 27609
tl BuffetZ W c, — 3. GGrade mine floor for sheet water flow towards the lakes. (919) 781-7798 TPS
50' 50' c Buffer
— 4.Pelrimeter berms, haul roads, and stock pile areas shall be removed and the ��„tni►rttn�, ---- REVISED:
°� �' Buffer Wetland Buffer v, \\�\ I1A CAR�`''�/• o�/2s/24
p o o Mn ground smoothed and sloped to promote gravity drainage. The road near NC HWY I I I \•``�0 .........
•� /r'� RECLAMATION PLAN
E Surface Water' o will remain in-place.
� Surface Water :Q � OH •9 � SCALE:
��
Itnov SEAL
c See Drawing
E ♦ 4 Min. / 4 Min. / 5. Rcevegetation per the Schedule below. _ {�
` , 1S 11 :
` - - - - - - - - - - - `` - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - �� TOISNOT PIT Sheet No.
' O.� ••�N N C HWY 111
INE
% ;Ni��,� \ STANTONSBURG, NC
W I LSON COUNTY