Loading...
HomeMy WebLinkAboutSW6130203_Emails_20240729 Beeker, Jacob I From: Beeker, Jacob I Sent: Monday, July 29, 2024 4:24 PM To: efw@weavercompanies.com Cc: svc_post_construction_stormwater;jhilliard hilliardengineering.com; Sikes, Jay;Joyner, Melissa; Hines, Lee R Subject: Re: [External] RE: SW6130203; O'Reilly AutoParts Area Infiltration Basin (FDS #705283) (Harnett) Attachments: SW6130203_Permit_20240729.pdf Good afternoon, The Division of Energy, Mineral, and Land Resources (DEMLR), received a complete Stormwater Management Permit Application for the subject project on July 26, 2024. Staff review of the plans and specifications has determined that the project,as proposed,will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000 - 1062 rules.We are forwarding Permit No.SW6130203, dated July 29, 2024,for the construction,operation and maintenance of the built-upon areas (BUA) and vegetated conveyances or areas associated with the subject project.This permit shall be effective from the date of issuance and shall be subject to the conditions and limitations as specified therein, and does not supersede any other agency permit that may be required. The original signed permit package and approved plans are being mailed to the permittee,Allied Investors, Inc., at the following address(NOTE:An electronic version of this permit can be found in our online repository: https://edocs.deq.nc.gov/WaterResources/Browse.aspx?id=494276&dbid=0&repo=WaterResources): Allied Investors, Inc. Attn: E. Frank Weaver, III, President 350 Wagoner Drive Fayetteville, NC 28303 1 will hold onto our hard copies of these projects for 30 days (in case any issues/typos with the permit are noticed and corrections need to be made)after which point,they will be kept on file at the Fayetteville Regional Office. If you have any questions, or need additional information concerning this matter, please contact Jacob Beeker at postconstructionCa)deq.nc.gov. Thankyou, Jacob Beeker(He/Him) Environmental Engineer North Carolina Department of Environmental Quality Office: (919)707-9214 Jacob.Beeker(a)deq.nc.gov i o.aa�..a,EroDe Q Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From:jhilliard hilliardengineering.com <jhilliard@hilliardengineering.com> Sent: Friday,July 26, 2024 9:24 AM To: Beeker,Jacob I <jacob.beeker@deq.nc.gov> Cc: efw@weavercompanies.com <efw@weavercompanies.com>; svc_post_construction_stormwater <postconstruction@deq.nc.gov> Subject: RE: [External] RE: SW6130203; O'Reilly AutoParts Area Infiltration Basin (FDS#705283) (Harnett) You don't often get email from jhilliard@hilliardengineering.com. Learn why this is important CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. See attached revised sheet. Uploading to repository now. Thanks again for the review. Should you have any questions, or need additional information, please don't hesitate to contact me at this office. Respectfully, Jarrod E. Hilliard, PE, CFM HILLIARD NC Firm License No: P-0836 PO Box 249, Sanford, NC 27331 (919) 352-2834 From: Beeker,Jacob I <jacob.beeker@deq.nc.gov> Sent:Thursday,July 25, 2024 2:56 PM To:jhilliard hilliardengineering.com <jhilliard@hilliardengineering.com> Cc: efw@weavercompanies.com; svc_post_construction_stormwater<postconstruction@deq.nc.gov> Subject: Re: [External] RE: SW6130203; O'Reilly AutoParts Area Infiltration Basin (FDS#705283) (Harnett) Good afternoon Mr. Hilliard, I looked over the additional information you provided on April 26, 2024. Everything looks good except for a few small issues: Please correct the following: 2 On the Infiltration System page of the Supplement-EZ form, please revise the following as needed: 1. Line 23 - Please make sure this is listed as being greater than 124 inches, not less than. 2. Line 45 -The drawdown time listed here is no longer consistent with the updated values presented on the Supplement-EZ form.Your sizing is fine,this number just needs to be updated with the actual drawdown time. Since this is only one page of the Supplement-EZ form, and is not a sheet that requires a signature,an electronic copy of the revised page can be uploaded to the repository and emailed to me, and I can print it to add to the physical copy we will send in. Electronic copies should be uploaded at the following location: https://edocs.deq.nc.gov/Forms/SW-Supplemental-Upload Since these are minor issues, once we receive the updated form and the documents are uploaded to Laserfiche (provided everything is in order),we should be able to issue the permit in a timely manner,subject to reviewer availability. Let me know if you have any questions. Thank you, Jacob Beeker(He/Him) Environmental Engineer North Carolina Department of Environmental Quality Office: (919)707-9214 Jacob.Beeker(-)deq.nc.gov �a,�.,o,EroDe Q Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From:jhilliard hilliardengineering.com <ihilliard@hilliardengineering.com> Sent:Wednesday, April 17, 2024 1:26 PM To: Peck, Kaitlin <kaitlin.peck@deg.nc.gov> Cc: Frank Weaver<efw@weavercompanies.com>; Farkas,Jim J <Jim.Farkas@deg.nc.gov>; svc_post_construction_stormwater<postconstruction@deg.nc.gov> Subject: RE: [External] RE: SW6130203; O'Reilly AutoParts Area Infiltration Basin (FDS#705283) (Harnett) CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. o.k.,thanks. We will await a response from Jim to set up a quick call. Mainly wanted to verify the impervious and drainage area/project area figures to go in the app and EZ supplement, and talk through the size of the basin which is not only setup for the Phase II storm requirements, but also sized to meet County requirements and how we go about listed the numbers you need in the form to reflect that as it is currently designed to meet both from a volume and surface area standpoint. 3 Should you have any questions, or need additional information, please don't hesitate to contact me at this office. Respectfully, Jarrod E. Hilliard, PE, CFM HILLIARD NC Firm License No: P-0836 PO Box 249, Sanford, NC 27331 (919) 352-2834 From: Peck, Kaitlin <kaitlin.peck@deg.nc.gov> Sent:Wednesday, April 17, 2024 12:42 PM To:jhilliard hilliardengineering.com <ihilliard@hilliardengineering.com> Cc: Frank Weaver<efw@weavercompanies.com>; Farkas,Jim J <Jim.Farkas@deg.nc.gov>; svc_post_construction_stormwater<postconstruction@deg.nc.gov> Subject: RE: [External] RE: SW6130203; O'Reilly AutoParts Area Infiltration Basin (FDS#705283) (Harnett) Jim would be the most helpful, since it is in his technical review at the moment. Take care, Kaitlin Peck Environmental Specialist North Carolina Department of Environmental Quality Office: (919) 707-9209 Kaitlin.Peck@deg.nc.gov ,zx. D.E Q:> NORTH OAHOLINA Department of Environmental Quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From:jhilliard hilliardengineering.com <ihilliard@hilliardengineering.com> Sent:Wednesday, April 17, 2024 12:36 PM To: Peck, Kaitlin <kaitlin.peck@deg.nc.gov> Cc: Frank Weaver<efw@weavercompanies.com>; Farkas,Jim J <Jim.Farkas@deg.nc.gov>; svc_post_construction_stormwater<postconstruction@deg.nc.gov> Subject: Re: [External] RE: SW6130203; O'Reilly AutoParts Area Infiltration Basin (FDS#705283) (Harnett) 4 CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. no problem. are you or jim available for a quick call today? had a question about the project in order to submit bcak. Jarrod Hilliard, PE, CFM Hilliard Engineering PLLC (919) 352-2834 On Apr 15, 2024, at 9:19 AM, Peck, Kaitlin <kaitlin.peck@deg.nc.gov>wrote: Jill, I apologize. You are correct. I have processed said check.The#2848 1 was referencing was the original check that was replaced by the $1000 after the fee change. Thank you, Kaitlin Peck Environmental Specialist Post-Construction Stormwater Permitting Group North Carolina Department of Environmental Quality postconstruction@deg.nc.gov <i mage002.png> From:jhilliard hilliardengineering.corn <ihilliard@hilliardengineering.com> Sent: Monday, April 15, 2024 9:00 AM To: Peck, Kaitlin <kaitlin.peck@deg.nc.gov>; Frank Weaver<efw@weavercompanies.com> Cc: Farkas,Jim J <Jim.Farkas@deq.nc.gov>; svc_post_construction_stormwater <postconstruction@deg.nc.gov> Subject: [External] RE: SW6130203; O'Reilly AutoParts Area Infiltration Basin (FDS#705283) (Harnett) CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Good morning. We provided a check in the amount of$1,000(1 SCM) (check no. 5002)for the major modification on January 10t", 2024. Will that one not work? Should you have any questions, or need additional information, please don't hesitate to contact me at this office. Respectfully, Jarrod E. Hilliard, PE, CFM <image004Jpg> 5 NC Firm License No: P-0836 PO Box 249, Sanford, NC 27331 (919) 352-2834 From: Peck, Kaitlin <kaitlin.peck@deg.nc.gov> Sent: Monday, April 15, 2024 8:40 AM To:jhilliard hilliardengineering.com <ihilliard@hilliardengineering.com>; Frank Weaver <efw@weavercompanies.com> Cc: Farkas,Jim J <Jim.Farkas@deg.nc.gov>; svc_post_construction_stormwater <postconstruction@deg.nc.gov> Subject: RE: SW6130203; O'Reilly AutoParts Area Infiltration Basin (FDS#705283) (Harnett) Good Morning, The check(#2848) provided for the Major Modification of the project, has since expired since its original submittal and is unable to be processed. Please provide a new check for$505. We will then VOID the expired check and return it to you. Let me know if you have any questions. Take care, Kaitlin Peck Environmental Specialist Post-Construction Stormwater Permitting Group North Carolina Department of Environmental Quality postconstruction@deg.nc.gov <i mage002.png> From: Farkas,Jim J <Jim.Farkas@deg.nc.gov> Sent:Wednesday, April 10, 20244:07 PM To:jhilliard hilliardengineering.com <ihilliard@hilliardengineering.com>; Frank Weaver <efw@weavercompanies.com> Cc:Joyner, Melissa<melissa.ioyner@deq.nc.gov>; Peck, Kaitlin <kaitlin.peck@deg.nc.gov> Subject: RE: SW6130203; O'Reilly AutoParts Area Infiltration Basin (FDS#705283) (Harnett) Good Afternoon, The Division of Energy, Mineral and Land Resources (DEMLR), received additional information for a Stormwater Management Permit Application for the subject project on January 11,2024.A review of that information has determined that the application is not complete.Attached is a letter describing the items that need to be submitted. If you have any questions, please feel free to contact me. My contact information is listed below. NOTE:The renewal has been approved and is effective 4/10/24,see add info letter for more details. Jim Farkas State Stormwater Engineer 6 North Carolina Department of Environmental Quality Office: (919)707-3646 Jim.farkasCa)deq.nc.gov <image005.png> From: Peck, Kaitlin <kaitlin.peck@deg.nc.gov> Sent:Tuesday,January 16, 2024 9:52 AM To:jhilliard hilliardengineering.com <jhilliard@hilliardengineering.com>; Frank Weaver <efw@weavercompanies.com> Cc: Farkas,Jim J <Jim.Farkas@deg.nc.gov>;Joyner, Melissa <melissa.ioyner@deg.nc.gov> Subject: SW6130203; O'Reilly AutoParts Area Infiltration Basin (FDS#705283) (Harnett) Good Morning, We received your post-construction stormwater permit renewal application for the subject project on 1/11/24. Reviews under the Standard permitting process can take up to 90 calendar days to complete. You can see where this project stands in the review queue by emailing postconstruction@deg.nc.gov(We have an autoreply set up that has the review queue on it). Please upload all documents that you mailed into our office through the link provided below. Be sure to choose the Central Office as the Primary Contact office. https://edocs.deg.nc.gov/Forms/SW-Supplemental-Upload IMPORTANT NOTE: Please ensure that each file is uploaded under its appropriate file type. Additional file types can be entered into the electronic form by clicking on the "Add Another Post-Construction File Upload" link directly below the "State Stormwater Information Uploads" section of the form. YOU MUST CLICK ON THE"ADD ANOTHER POST-CONSTRUCTION FILE UPLOAD"TO ADD ADDITIONAL FILE TYPES TO THE SUBMISSION. Merely changing the file type dropdown as you upload the various files (without adding additional file uploads)will upload all of the files as the last file type selected, the submission will get flagged during review, and you will need to resubmit the files. Please do not upload entire plan sets through this form, but rather upload the relevant individual sheets under the appropriate file type. Selecting the correct file type ensures that the files are properly named in the electronic repository and it helps expedite the review process. NOTE:We do not require and we discourage the upload/submission of extraneous plan sheets (such as lighting plans, utility plans, striping plans, sight distance plans, etc...) as these files are not needed for review. Please type in permit#: SW6130203 This project will be reviewed by Jim Farkas, if you have any questions, please contact them at postconstruction@deg.nc.gov or at 919-707-3646. Thank you, Kaitlin Peck Environmental Specialist Post-Construction Stormwater Permitting Group North Carolina Department of Environmental Quality postconstruction@deg.nc.gov <image002.png> From: Farkas,Jim J <Jim.Farkas@deg.nc.gov> Sent:Tuesday,January 2, 2024 2:12 PM To:jhilliard hilliardengineering.com <jhilliard@hilliardengineering.com>; Frank Weaver <efw@weavercompanies.com> Cc: Lawyer, Mike<mike.lawyer@deg.nc.gov>; Peck, Kaitlin <kaitl in.peck@ deg.nc.gov> Subject: RE: [External] O'Reilly's stormwater permit submittal All, Since we received the initial submission for this project prior to the new fee structure taking effect, the permitting fee for this review(the renewal of SW6130203 since it expired in 2021)will be$505 (the old fee). Please note that the previously provided check(dated 5/15/23) has expired and a new review fee ($505)will need to be provided before we begin review of the renewal application. We will void and return the expired check. Aside from the review check, the renewal application is administratively complete. To modify the permit(after it has been renewed), the new fee will be required since it is a separate permitting action. You can submit the modification for review concurrently with the renewal, but we will not be able to process the modification until the renewal has been approved.The following items will need to be provided to complete the modification application that we have received: 1. 1x application fee check in the correct amount (this item is required per Session Law 2023-134, Section 12.14(e)(2)): 1. Please be aware that, effective October 3, 2023, our permit application fee structure is as follows: 1. New Permit or Major Modification for a project with one (1) or fewer SCMs= $1,000 2. New Permit or Major Modification for a project with two (2) SCMs=$1,250 3. New Permit or Major Modification for a project with three (3) SCMs=$1,750 4. New Permit or Major Modification for a project with four(4) or more SCMs= $2,250 5. Minor Modification =$250 6. Renewal =$750 7. Transfer=$750 8. Renewal &Transfer Combination =$1,500 9. General Permit=$700 2. 2x signed &sealed hard copies of a plan sheet showing the following corrected additions: 1. Wetland delineation or a note on the plans stating that there are no wetlands located on-site.This item is required per 15A NCAC 02H .1042(2)(g)(iii) &Section VI, 8m of the Application. Please also list the name of the individual that made this determination in a note on the plans. NOTE:This is only required for the new area that will be added to the permit. 8 2. Project boundary delineation labeled with accurate bearings and distances (Required per Section VI, 8i of the Application and 15A NCAC 02H .1042(2)(g)(ii)). NOTE: It is noted that the project area is shown, however the bearings and distances are not included. If these items are received within the stipulated timeframe, we can accept the project and begin the review process. Once accepted, reviews under the standard permitting process can take up to 90 calendar days per statute. Hard copies should be mailed to the following address: For USPS: Jim Farkas 1612 Mail Service Center Raleigh, NC 27699-1612 For Fed Ex/UPS: Jim Farkas 512 N. Salisbury Street, Office 640E Raleigh, NC 27604 If you have any questions, please contact us at post-construction@nc.deq.gov or at(919) 707-3646. Thank you, Jim Farkas State Stormwater Engineer North Carolina Department of Environmental Quality Office: (919) 707-3646 Jim.farkas@deq.nc.gov <i mage005.png> From:jhilliard hilliardengineering.com <jhilliard@hilliardengineering.com> Sent:Wednesday, December 13, 2023 2:03 PM To: Frank Weaver<efw@weavercompanies.com> Cc: Lawyer, Mike<mike.lawyer@deq.nc.gov>;jhilliard hilliardengineering.com <jhilliard@hilliardengineering.com>; Farkas,Jim J <Jim.Farkas@deg.nc.gov> Subject: [External] O'Reilly's stormwater permit submittal CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Frank, It was good talking to you today. Per our conversation, I understand you are o.k.with moving forward with the Stormwater permit No. SW6130203 with the understanding that you would be responsible for all upstream stormwater runoff once lots are sold. No transfer application would be needed with this option even though the property in the original permit has been transferred to someone else and the proposed O'Reillys property would be transferred also in the future. 9 Also, Mike is going to check on it for us, but there is a possibility that part of the submittal may fall under new permit fee schedule. If that is the case,we'll get Mike a check for any additional fees and pass them through once we hear back. Mike, Please, let me know if you need anything else from us in order to proceed with the review. Should you have any questions, or need additional information, please don't hesitate to contact me at this office. Please note the following holiday office hours: 1211 8123-111124:Closed for Christmas and New Year's Holiday Respectfully, Jarrod E. Hilliard, PE, CFM <image004.jpg> PO Box 249, Sanford, NC 27331 (919) 352-2834 jhilliard@hilliardengineering.com www. hilliardengineering.com Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official. 10