Loading...
HomeMy WebLinkAboutGW1--04332_Well Construction - GW1_20240722 WF+>G�L CONSTRUCTION RECORD(GW-1) For Internal Use Only: 1.Well Contractormation: /n+ �.1.4i WATE{t`ZONES'%? -,i,:„t'-.' W OM TO DESCRIPTION Well Contractor Name 401. ['Q ft v-�-4t ft J IL NC Well Contractor Certification Number :;:liJO :GilSIIVG`(foriiirilfi>'easeIl"wells'ORLYNE$;rf3f• licatde Yadkin Well Company, Inc. FROM TW DKIER I IM ft ft. in. Company Named it Vt p `l !GASING:OR;TQB G:'' otliermal dosed ISo 2.Well Construction Permit#: (1SbG � 2(,2* ^ 9 O T 2 t To DIAMETER 'rl�tS4vass %eTESftIAI. List a0 applicable wnQ corrstrucdonpermitr rl.e.U1C,County,State,Variance,etc) �.. in. (/2 V& 3.Well Use(check well use): ft. Water Supply Well: FROM TO D AMETER SLOT SUM TFll s MAT ❑Agricultural ❑M cipal/Public It 9n. ❑Geothermal(Heating/Cooling Supply) dential Water Supply(single) ft in. ❑Industrial/Commetraal ❑Residential Water Supply(shared) ❑lrri ation ❑Wells>100.000 GPD TO y ATE �� oD&AMOUNT Non-Water Supply Well: ft❑Monitoring ❑Recovery ft Injection WeV ft. fL ❑Aquifer Recharge ❑Groundwater Remediation �.,:.... .._ ❑Aquifer Storage and Recovery ❑Salinity Barrier FRoM ft. To 14IA F1v1PI A METaoD ❑Aquifer Test ❑Stonnwater Drainage ft ❑Experimental Technology ❑Subsidence Control ft ❑Geothermal(Closed Loop) ❑Tracer '•20 DRI>T�2ICtI OG arirch`iaditional'sheeti riecrss Vt, TO DESCRU'TTON color,hardness sail/rock e, size,eta ❑Geothermal(Heating/Coolin Return) ❑Other(explain under#21 Remarks) S ft Date Well Started - n� ^ 4.Date Well(s)Completed:6, q- y Well ID#AAA-2�/ Y 2 0 f '� r- 5a Well Location: Phone#:A4 �-Yki^3X.2 t% ft ��. 1, !./d 'L,,, �--70 y._ S''Sq-S3qk p a d Tim�v Ti-i i/�T�- r`, Facility/Owner ame // / (� t Facility ID#(if applicable) ft , i4lQ ZJC-" L✓ -e ay RA N f,t�h L7f'Of/t► ft. ft ,�. a.. : V1.r Physical Address,City,and Zip Oiv 1 qU 9-11 ft ft J U L 2 G ?U 4 County Parcel Identification No.(PIN) ifrv:' +• J J v "7'Jt i 5b.Latitude and longitude in degreeslminutes/seconds or decimal degrees: (if well field,one lat/long is sufficient) 22.Certification: .-� 6.Ts(are)the well(s): ermanent or ❑Temporary Signature of Certified Well Contractor Date � � By signing this form,I hereby certify that the weD(s)was(were)constructed in accordance with 7.Is this a repair to an e3isting weIl: ❑Yes or V. 15ANCAC 02C.0100 or 15ANCAC 01C.0100 Well Construction Standards and that a copy If this is a repair,fill out known well construction information and explain the nature of the of this record has been prov/ded to the well owner. repair tinder#21 remarla section or on the back of thisform 23.Site diagram or additional well details: 8.For Geoprobe/DPT or Closed-Loop Geothermal Wells having the same You may use the back of this page to provide additional well construction info construction,only 1 GW-1 is needed. Indicate TOTAL NUMBER of wells (add'See Over'in Remarks Box).You may also attach additional pages if necessary. drilled: 1 24.SUBMITTAL INSTRUCTIONS 9.Total well depth below land surfacer (ft) Submit this GW-1 within 30 days of well completion per the following: For multiple wells list all depths if different(example-3@200'and 2 r@100D 24a. For All Wells: Original form to Division of Water Resources (DWR), 10.Static water level below top of casing: 775 (ft) Information Processing Unit,1.617 MSC,Raleigh,NC 27699-1617 If water level is above casing,use"+" 24b.For Injection Wells:Copy to DWR,Underground Injection Control(IUC) 11,Borehole diameter: ( •)Bit Cffi.�fl.()2 2 Program,1636 MSC,Raleigh,NC 27699-1636 12.Well construction method: 64 Y!4 24c.For Water Supply and Open-Loop Geothermal Return Wells:Copy to the Z (i.e.auger,rotary,cable,direct push,etc.) county environmental health department of the county where installed FOR WATER SUPPLY WELLS ONLY: 24d.For Water Wells producing over 100,000 GPD:Copy to DWR,CCPCUA r Permit Program,1611 MSC,Raleigh,NC 27699-1611 13a.Yield(gpm) Method of test: A _ U c Date Site Visited: -) -2 T v 13b.Disinfection type: 70�o hth Amount: OZ Site Visited By: D � 6 Form GW-1 North(—Iz, .r,--- -- 'onrneatal Quality-Division of Water Resources Revised 6-6-2018 Price:_