HomeMy WebLinkAboutNCC200745_NOT Closeout Documents_20240725 HOLLY Town of Holly Springs
s SPRINGS Utilities and Infrastructure Department
\**.oso Discover the Source.
Certificate of Completion For
Erosion and Sedimentation Control
July 1, 2024
PROJECT Mills at Avent Ferry Ph 3 and 4 PHASE n/a
ENVIRONMENTAL DEVELOPMENT PERMIT NO. 12-2017
FINANCIALLY RESPONSIBLE PARTY Lennar Carolinas, LLC
This is to certify that on the above referenced project the grading has been
completed, all utilities and streets have been installed, and permanent stabilization
has been successfully achieved in or along all roads and utilities in accordance with
the approved erosion control plan. With this certificate, the Town of Holly Springs
Engineering Department certifies that the above referenced project is in final
compliance with the Town's Soil Erosion and Sedimentation Control Ordinance
and therefore closes the active erosion control file for the above referenced project.
///
Jeff Peters,Engineering Technician
Note: This document does not preclude the Town from taking action on future land disturbance or other erosion or
sedimentation issues at this site.