Loading...
HomeMy WebLinkAboutGW1--04269_Well Construction - GW1_20240719 1,viv.11 contractor lnfarmarwn: Robert Teague 14.SLATER wIm ze�-C--1 2857-A NC Wei cww UTERCASING far amid-caawwdit EX FROM To DIAMETER 1p Nr-" M'T1R1AL 8&K Well Drilling Inc M SUR-21 PVC Cot my Nmr�e1 16.INNLR CAS6413 OR TURING I Mom 1 TO ER L 2,win consiTuetw.P"'.if if: I -R. _T- I "'-ESS ',"*T IA 0c,C­"Y'sr�" f in. ell Vat(rherk well ast): W*trrSapp!y`A'tN; - 11 FRO.1 1 10 DIAMETER SI MATERIAL A�nCultunt �MunioipaUPublic ft. to IR cfWaIermal('"MongCoohrij Suppiy) oResidenual Water Supply(single) f.L ft In. (3Residerinal W3ter,',upply fsh,]aved) I&GROUT FROM TO i MATERIAL FM PLACT.VIT NT y!El HOD&AMOUNT Non-1411it"Supply Well: J- M(mitenng r3licco'cry n. M i OGmundwatcr RcmCd1aum feagtora J Recovv) []Sahniry Barrier 19.&ANWGRAVEL PACK(ff*0vJ!c*W,) 0storinwister Drain N!O TO MATERIAL EMPLACEMENT METHOD Aquifer Drainage hoology 13Subsidence Control ft. LOOP) OTracer 29.DRILLING LOG attach addidocut]theeb If nnES&W Geothwinal(HeigingCooling Return) rJOthOr(Cittilain under V21 Pemanksj s'uom To DF-SCRI F1 IOnt r.h*rds DVr�k!�-6 a-1. k- 4-Date Weiho cowplettd:c- 5--�q "eliffm Sa Wa Locabow ility Mfs ft. Den vc K ft. ii. ft. ft. ZL REMARKS Pat l Tdcf,fivi,n No.(Pf\) 56*L4dtudr and longitude in deVve3/n1mUtWseconds or decimal degrees: EZ4 ox 4t ff "jo"a� 'j'n'4 22,Certifii:2 N 6.IS(&")the W'ejJ(r')0P11ntn1 or [)Ternporan signature Or Cemficd Well Con zor Date 7*14 all$0 repair to an exiisting wen; By xig>ttng this h""6' ,,,jjy Thal the �o - 4 15ANC4C 02C-0100 or JJA NCAC QC.0200 Well C,nsrmctjon Stod,,ds and that 7Wallfill OVIAm" he6.ck ,A4Tfo, YftLe 4 the cOPY 00441 record has tw,,p,,.jtrd a he ell Oj� t? For Gino 23,Site diagram or additional well details: prvb"PT or cjo'ed.Loop Geothermal WEDS having the same YOU May use the back of this Page to Provide additional well site details co"tt'"TIOIL-)Y I GW-1 js needed. indicate TOTAL NUMBER of,,,,, '/� — construction details. YOU may also attach additional pages jfM,,,ay. or well dTsfietf: 'low jaind surface: &OMITIAL INSTROCTIQNS 0 24a. Fot All Wells: submit this form Within 30 days of completion of '0'St2tIc wafer level below top at cuifilz.,40 construction to the following: well (ft.) DiVision of Water Resources,InOrInStion Processing Unit, 11,84rchOle ditn*tt,, 6 1/8 1617 Mail S I Service Center,110eigh,NC 27699-161-t 12-Well corstUruction Air Rotary 24b, Eo�"tln trice-won in addition to S�nding the form to the d c4bie'a �'60%'c� also Submit one copy of this 4 drts6 24a Form Within 30 day construction to the following� s of ct)m FOR WATER 8 Pletion of well UPPLY WELD.` Dlv'$'Ofl Of Water Resources,Underground lnjectiOu Coutrol Program. 'Vm) 1636 Mail Si�Icthod or Air Flow Service Center,RAltigh,NC 276"wIW 136,DbWeetioa type, Chior Tabs 24-c. 1 V2 LZ5 the 7ss(cs) above, ]so in!ction e af�Stibmit [11 adcht�Ori to scodiag the form to aompletfon of this form wfthin 30 days of where cOnStror well corstrUction tL) the co""t' Icted Y beilith dePantrient of the county ...........