Loading...
HomeMy WebLinkAboutGW1--04241_Well Construction - GW1_20240719 WELL CONSTRUCTION RECORD (GW-1) For Internal Use Only: 1.Well Contractor Information:/ �'e FF� �u G/�P / 0.y f vJ t�Q C�1'SO 14.WATER ZONES FROM TO DESCRIPTION Well Contractor Na k'l & o t) ft. ft.fL g v 1 O ft. rt. yNNC/1 Well Contractor Certification Number / 15.OUTER CASING lti for mu -cased wells OR LINER ifs citable �. t•/LC!(/ S W e L� �f�t,�` r /') �y , FROM /� _N I ft. DL4NETER in. THICK el NESS MA RIAL l � Company Name "1 - _21_5 P G /�Q 16.INNER CASING OR TUBING eothermaI closed-loop) 2.Well Construction Pergrit#: FROM TO DIAMETER I THICKNESS I MATERIAL. Litt all applicable well construction permits(i.e.UIC,County.State,Variance,etc.) ft. R. in. 3.Well Use(check well use): ft R' in. Water Supply Well: 17.SCREEN FROM TO DIAMETER SLOT SIZE THICKNESS MATERIAL ❑Agricultural ❑MunicipaUPublic M @. in. ❑Geothermal(Heating/Cooling Supply) C91t9idential Water Supply(single) M ft, in. ❑Industrial/Commercial ❑Residential Water Supply(shared) 18.GROUT ❑Irri ation ❑Wells>100,000GPD FROM TO MATERIAL EMPLACEMENT METHOD&AMOUNT Non-Water Supply Well: 0 ft- U tt ❑Monitoring ❑Recovery ft. fL Injection Well: ❑Aquifer Recharge ❑Groundwater Remediation 19.SAND/GRAVEL PACK it applicable) OAquifer Storage and Recovery ❑Salinity Barrier FROM TO MATERIAL EMPLACEMENT METHOD ❑Aquifer Test ❑Stormwater Drainage ft. ft. ❑Experimental Technology ❑Subsidence Control ft. ft. ❑Geothermal(Closed Loop) ❑Tracer 20.DRILLING LOG attach additional sheets if necessary) OGeothermal(Heating/Cooling Return) ❑(Other(ex lain under#21 Remarks) FROM fL ! O R. L TO DESCRIPTION Color,bards���� c l solllrock in size.etc.) 4.Date Well(s)Completed: �-.f 7- '2-I Well ID# IL 1141 ft' e .5'1" e Sa.Well Location: '7 , �O d ' KJ��t G iL�'r�' 1> �-). �� u� laa� LL- ft ft Facility/Owner Name Facility llNi(ifapplicable) --- (� o5 Av_C, a o 5 fL _ s Physical Address,City,and Zip ft ft.tz 17 t D n O/ ,t rt I O/rl C 21.REMARKS County Parcel Identification No.(PIN) 5b.Latitude and longitude in degrees/minutes/seconds or decimal degrees: (if well field,one IaUlong is sufficient) 22.Certification: 3,5, l 3�Y,S ( N go, 3 &3 W 6.Is(are)the well(s): ermanent or ❑Temporary ftafolie.415Certified Well Contractor Date Av signing this form,I hereby cerdfv that the wells)was(were)constructed in accordance with 7.Is this a repair to an existing well: OYes or 01<0 /SA NCAC 02C.0100 or 15A NCAC 02C.0100 Well Construction Standards and that a copy If this is a repair,fill out known well construction information and explain the nature of the of this record has been provided to the ivell owner. repair wider#21 remarks section or on the back of this form. 23.Site diagram or additional well details: 8.For Geoprobe/DPT or Closed-Loop Geothermal Wells having the same You may use the back of this page to provide additional well construction info construction,only 1 GW-1 is needed. Indicate TOTAL NUMBER of wells (add'See Over'in Remarks Box).You may also attach additional pages if necessary. drilled: D 24.SUBMITTAL INSTRUCTIONS 9.Total well depth below land surface: "/ (ft.) Submit this GW-I within 30 days of well completion per the following: For multiple ivelis list all depths ifdifferent(example-3©200'and 2@1001 24a. For All Wells: Original form to Division of Water Resources (DWR), 10.Static water level below top of casing: 35 (ft) Information Processing Unit,1617 MSC,Raleigh,NC 27699-1617 if tuater level is above casing,use"+" 11.Borehole diameter: (in.) 24b.For Infection Wells:Copy to DWR,Underground Injection Control(IUC) p Program, 1636 MSC,Raleigh,NC 27699-1636 12.Well construction method: D AG Y(/ 24c.For Water Supply and Open-Loop Geothermal Return Wells:Copy to the (Le.auger,rotary,cable,direct push,etc.) county environmental health department of the county where tnstailed FOR WATER SUPPLY WELLS ONLY: 24d.For Water Wells producing over 100,000 GPD:Copy to DWR,CCPCUA /J Permit Program,1611 MSC,Raleigh,NC 27699-1611 13a.Yield(gpm) '"7 Method of test: !7 / )� 13b.Disinfection type: Y 7-11 Amount: 3 t