Loading...
HomeMy WebLinkAboutNCC242285_ESC Approval Submitted_20240729 Dennis Gilbert From: SVC_DoNotReply-DEQPermits <DoNotReply-DEQPermits@deq.nc.gov> Sent: Thursday, July 25, 2024 1:43 PM To: Onsite Homes, LLC Cc: Dennis Gilbert; Debra Ensminger Subject: NC DEMLR - FROF Application Approval CRM:0177111 Attachments: Certificate of Approval - Thursday, July 25, 2024 138 PM.docx; Application Report - Thursday, July 25, 2024 138 PM.pdf; Letter of Approval - Thursday, July 25, 2024 138 PM.docx tH STATF°� t7' 'rat ist I II 15 sss,QUAMV19k;0, North Carolina Department of Environmental Quality Division of Energy, Mineral & Land Resources Land Quality Section Roy Cooper Governor Elizabeth S. Biser Secretary William Vinson Jr. (Acting) Director 07-25-2024 LETTER OF APPROVAL Onsite Homes, LLC 2931 Breezewood Avenue, Suite 202 Fayetteville, NC 28303 RE: Project Name: Seven Lakes West, Country Club Section 2— Lot 6030 Acres Approved: 0.34 Application ID: PA-006024 Permit Number: MOORE-2025-0182 Address: 178 Longleaf Drive City: Mineral Springs Township County: Moore River Basin: Cape Fear Stream Classification: HQW: High Quality Waters; WS-II: Water Supply II Plan Type: New Plan Dear Onsite Homes, LLC, This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The Certificate of Approval must be posted at the job site. This plan approval shall expire three (3) years following the date of approval, if no land-disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $120 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOl form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOl form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility/Ownership Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, Chris Baker, Assistant Regional Engineer cc: 2 Dennis Gilbert, P. E., Moorman, Kizer & Reitzel, Inc. Debra Ensminger, Moore County Inspection Office Fayetteville Regional Office North Carolina Department of Environmental Quality Division of Energy.Mineral and Land Resources Fayetteville Regional Office 225 Green Street,Suite 714 Fayetteville NC,28301-5095 910-433-3300 [mail correspondence to and from this address may be subject to the North Carolina Public Records I.aw and inay he disclosed to third patties by an authorized ,state official 3