Loading...
HomeMy WebLinkAboutWQ0045652_Application (FTSE)_20240712Of Entity Requesting Allocation: Brunswick Cc Project Name for which flow is being requested: State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking for Sewer Extension Applications (FTSE 10-23) line Phase 2B More than: one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: b. WWTP Facility Permit # SEA TRAIL WWTF 0012748 A11 flows are in MGD c. WWTP facility's permitted flow 0.300 d. Estimated obligated flow not yet tributary to the WWTP 0.679 e. WWTP facility's actual avg. flow 0.155 f. Total flow for this specific request 0.00903 g. Total actual and obligated flows to the facility 0.843 h. Percent of permitted flow used 281 % II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Approx. Obligated, Total Pump Pump Average Current Not Yet Current Flow Station Station Firm Daily Flow** Avg. Daily Tributary Plus (Name or Permit Capacity, * (Firm / p fl, Flow, Daily Flow, Obligated Available Number) No. MGD MGD MGD MGD Flow Capacity*** Sands at W 0045180 0.6336 0.253 0 0.2353 0.2353 0.0177 Bayline * The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): Ba line Phase 2 Downstream Permit Number: WQ0045214 Page 1 of 8 FTSE 1.0-23 III. Certification Statement: I William L. Pinnix, PE, certify to the best of my knowledge that the addition of Director of Engineering Services the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. Signing Official Signature Title of Signing Page 2 of 8 FTS E 10-23