Loading...
HomeMy WebLinkAboutSW5240202_Response To Comments_20240726 TIMMONS GROUP YOUR VISION ACHIEVED THROUGH OURS. Project: Wrenn Villas (54949) Date: 07/25/2024 Project Contact: Ryan Wadsworth Project ID: SW5240202 Phone: 919-866-4516 Email: ryan.wadsworth@timmons.com Responses to NCDEQ DEMLR comments received 05/19/2024 below in bold: 1. Wet ponds are listed as primary SCMs per DEQ Design Manual. SNAP tool printout is provided to show that the wet pond will remove TSS and nutrients per NSW requirements. 2. Supplemental EZ form has been revised.This site proposes Runoff Treatment in which the increase in BUA of POI 1 is captured and routed through the SCM for treatment. 3. The future roadway is only a NCDOT easement dedication.This road part of a future development plan out to 2050, so rather than consider this area as roadway it is analyzed in its existing condition. Any future development from NCDOT that may occur there will require a management on from NCDOT. 4. Stormwater draining to the stream and vegetated setback is routed through the SCM. 5. No offsite area is directed to the SCM. Drainage area map has been revised. 6. Stream buffers are now labeled on the plans. 7. Max impervious area per lot has been revised to 2,050 sf. All forms, plans, and documents have been revised to match. 8. BUA captured in SCMs and bypassing SCMs is now shown on sheet C2.01. 9. Areas on the cover are correct. Project only consists of part of the existing tract area. Bearings and distances are show on sheet C1.0. 10. a. Line 7 revised to 50'to match plans. b. Line 21 revised to Simple Method. c. Line 2 revised to revised treat volume of 38,644 cf. Pond calc sheet has been updated. d. Line 13 revised to N/A. e. Line 42 revised to No. 11. SCM drainage area is now shown on sheet C4.0. 12. Line 35 revised to total design volume of 76,372 cf. 13. 5b. Forebay has been revised. Calcs and Supp-EZ form have been updated. 11a. Label added to sheet C6.0 to line slopes with non-clumping turf grass. 11b. !tea Virginica has been replaced with Chelone Glabra from the MDC list. 14. Drawdown pipe has been removed. 15. NCSOS documents are provided with this submittal. 16. This response letter is provided with submittal. 17. PDFs of all revised documents are provided with this submittal. 5410 TRINITY ROAD, SUITE 102 • RALEIGH, NC 27607 • PHONE 91 9.866.4951 • FAX 91 9.859.5663• WWW.TIMMONS.COM