Loading...
HomeMy WebLinkAboutNCG170369_Cover Letter and Inspection Report_20240729 SrAli ROY COOPER n Governor ELIZABETH S.BISER ' � Secretary ' WILLIAM E. TOBY VINSON,JR NORTH CAROLINA Env# nmental a alifty Interim Director July 29, 2024 American Fiber& Finishing, Inc. Attention: Dan Billips 225 North Depot Street Albemarle, North Carolina 28001 Subject: Stormwater Inspection Report NPDES Certificate of Coverage NCG170369 Stanly County, North Carolina Dear Mr. Billips: Enclosed please find a copy of the Compliance Inspection Report for the inspection conducted at the American Fiber& Finishing facility located at 225 North Depot Street on May 15, 2024. The report should be self-explanatory,however, should you have any questions concerning these reports,please do not hesitate to contact Joshawa Billiot at(704) 235-2100 or by email at Joshawa.BilliotCc�deq.nc.gov. Sincerely, U! �s Kathryn S. Peterson Assistant Regional Engineer Land Quality Section JAB/KSP Enclosure: Inspection Report cc: Stormwater Laserfiche, Certificate of Coverage NCG170369 MRO-Land Quality Section, Stormwater Files ' North Carolina Department of Environmental Quality Division of Energy,Mineral,and Land Resources Mooresville Regional Office 610 East Center Avenue,Suite 301 Mooresville,North Carolina 28115 704-235-2100 Compliance Inspection Report Permit:NCG170369 Effective: 08/01/19 Expiration: 05/31/24 Owner: American Fiber&Finishing Inc SOC: Effective: Expiration: Facility: American Fiber&Finishing County: Stanly 225 N Depot St Region: Mooresville Albemarle NC 28001 Contact Person:Dot Whitt Title: Phone: 704-984-9217 Directions to Facility: System Classifications: SWNC, Primary ORC: Certification: Phone: Secondary ORC(s): On-Site Representative(s): Related Permits: Inspection Date: 05/15/2024 Entry Time 02:OOPM Exit Time: 03:30PM Primary Inspector:Joshawa Billiot Phone: 704-663-1699 Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Textile Mill Products Stormwater Discharge COC Facility Status: 0 Compliant ❑ Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG170369 Owner-Facility:American Fiber&Finishing Inc Inspection Date: 05/15/2024 Inspection Type:Compliance Evaluation Reason for Visit: Routine Inspection Summary: The Stormwater Pollution Prevention Plan (SWPPP)was available and complete. The facility has conducted qualitative monitoring and records were available.All outfalls detailed in the SWPPP were observed during the inspection.Please continue to maintain records and perform qualitative monitoring as required the NCG17 permit. If you have any questions, contact me at Joshawa.Billiot@deq.nc.gov. Page 2 of 3 Permit: NCG170369 Owner-Facility:American Fiber&Finishing Inc Inspection Date: 05/15/2024 Inspection Type:Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ❑ El #Does the Plan include a General Location (USGS)map? E ❑ 0 El #Does the Plan include a"Narrative Description of Practices"? 0 El ❑ ❑ #Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ #Does the Plan include a list of significant spills occurring during the past 3 years? E ❑ 0 El #Has the facility evaluated feasible alternatives to current practices? ❑ ❑ #Does the facility provide all necessary secondary containment? #Does the Plan include a BMP summary? #Does the Plan include a Spill Prevention and Response Plan (SPRP)? #Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? #Does the facility provide and document Employee Training? #Does the Plan include a list of Responsible Party(s)? E ❑ # Is the Plan reviewed and updated annually? 0 n ❑ #Does the Plan include a Stormwater Facility Inspection Program? 0 ❑ 0 ❑ Has the Stormwater Pollution Prevention Plan been implemented? 0 ❑ El n Comment: The Stormwater Pollution Prevention Plan (SWPPP) was available and complete Qualitative Monitorinq Yes No NA NE Has the facility conducted its Qualitative Monitoring? 0 El El El Comment: The facility has conducted qualitative monitoring and records were available Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? #Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ Comment: The permit does not require analytical monitoring to be conducted unless the facility uses more than 55 gallons of new motor oil and/or hydraulic oil per month. The facility currently uses no motor oil or hydraulic oil. Permit and Outfalls Yes No NA NE #Is a copy of the Permit and the Certificate of Coverage available at the site? 0 El ❑ #Were all outfalls observed during the inspection? #If the facility has representative outfall status, is it properly documented by the Division? #Has the facility evaluated all illicit(non stormwater)discharges? Comment: All outfalls detailed in the SWPPP were observed during the inspection Page 3 of 3