Loading...
HomeMy WebLinkAboutSW1231201_Emails_20240726 Beeker, Jacob I From: Beeker, Jacob I Sent: Friday, July 26, 2024 11:46 AM To: Kleinmaier, Brad Cc: Smith, Mike M; mike.owen@tconc.org; svc_post_construction_stormwater; Ben Cathey Subject: Re: [External] RE: SW1231201; Bobby N Setzer State Fish Hatchery Renovation (Transylvania) Good afternoon, The Division of Energy, Mineral, and Land Resources (DEMLR), received a complete Stormwater Management Permit Application for the subject project on June 28, 2024. Staff review of the plans and specifications has determined that the project,as proposed,will comply with the Stormwater Regulations set forth in Title 15A NCAC 21-1.1000 - 1062 rules.We are forwarding Permit No.SW1231201, dated July 26, 2024,for the construction,operation and maintenance of the built-upon areas (BUA) and vegetated conveyances or areas associated with the subject project.This permit shall be effective from the date of issuance and shall be subject to the conditions and limitations as specified therein, and does not supersede any other agency permit that may be required. The original signed permit package and approved plans are being mailed to the permittee, United States Forest Service,at the following address(NOTE:An electronic version of this permit can be found in our online repository: https://edocs.deq.nc.gov/WaterResources/Browse.aspx?id=494276&dbid=0&repo=WaterResources): United States Forest Service Attn: Brad Kleinmaier, PE,Capitol Projects Coordinator 1720 Mail Service Center Raleigh, NC 27699 1 will hold onto our hard copies of these projects for 30 days (in case any issues/typos with the permit are noticed and corrections need to be made)after which point,they will be kept on file at the Asheville Regional Office. If you have any questions, or need additional information concerning this matter, please contact Jacob Beeker at postconstruction(a-)deq.nc.gov. Thankyou, Jacob Beeker(He/Him) Environmental Engineer North Carolina Department of Environmental Quality Office: (919)707-9214 Jacob.Beeker(a-)deq.nc.gov i Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Ben Cathey<Ben.Cathey@mcgillassociates.com> Sent: Monday,June 24, 2024 4:19 PM To: Farkas,Jim J <Jim.Farkas@deq.nc.gov>; Nathan Sawyer<nathan.sawyer@mcgillassociates.com>; Kleinmaier, Brad <brad.kleinmaier@ncwildlife.org> Cc: Smith, Mike M <michael.smith@deq.nc.gov>; svc_post_construction_stormwater<postconstruction@deq.nc.gov>; Peck, Kaitlin <kaitlin.peck@deq.nc.gov> Subject: [External] RE: SW1231201; Bobby N Setzer State Fish Hatchery Renovation (Transylvania) CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Thankyou, Jim! We will make the correction and get it back to you quickly. IFFA40 urr'" Mcgili Shaping Communities Together' Ben Cathey, PE Practice Area Leader McGill Associates, PA 55 Broad Street, Asheville, NC 28801 T 828.252.0575 C 828.310.1456 ben.cathey(EDmcgillassociates.com mc.gillassociates.com From: Farkas,Jim J <Jim.Farkas@deq.nc.gov> Sent: Monday,June 24, 2024 4:06 PM To: Nathan Sawyer<nathan.sawyer@mcgillassociates.com>; Kleinmaier, Brad <brad.kleinmaier@ncwildlife.org>; Ben Cathey<Ben.Cathey@mcgiII associates.com> Cc: Smith, Mike M <michael.smith@deq.nc.gov>; svc_post_construction_stormwater<postconstruction@deq.nc.gov>; Peck, Kaitlin <kaitlin.peck@deq.nc.gov> Subject: RE: SW1231201; Bobby N Setzer State Fish Hatchery Renovation (Transylvania) Ben, I was looking over the additional information you provided on 3/27/24. Everything looks good except for a few small issues: Please correct the following: • Stormwater Wetland MDC 6—As designed,the forebay is too deep. Per the plans,the bottom of the forebay near the entrance is at elevation 2329.17'and the permanent pool surface is at elevation 2333.0' (a difference of 46"which is larger than the maximum forebay depth of 40" per the MDC). Please revise as needed. 2 • Please note that the following language (or similar language)will be included in this permit, no further action is needed. "ALTERNATIVE DESIGNS. The stormwater system is permitted as a variation to the requirements per 15A NCAC 02H.1003(6). Untreated stormwater runoff is being discharged through the Davidson River vegetated setback,as it was in existing conditions, due to topographical site constraints. To mitigate this, the proposed SCM has been designed to capture and treat 1.18 acres of existing BUA that would otherwise not be required to be captured and treated in an SCM for this project. In addition, Headwalls A&C have been outfitted with 6 inch by 6 inch by 6 foot long impact curbs to distribute the flow and reduce the potential for downstream erosion from these outfalls. The proposed system has been found to provide equal or better stormwater control and equal or better protection of surface waters. If the proposed design fails and no longer meets the intent of the stormwater rules,a modification must be submitted to either meet the requirements or propose another variation from the rules. This is based on a case-by-case decision and should not be used as a precedent for future permitting actions. The issuance of this permit does not preclude the permittee from obtaining and complying with any and all other permits or approvals that are required for this development to take place, as required by any statutes,rules, regulations, or ordinances, which are imposed by any other Local, State or Federal government agency having jurisdiction,in particular, water quality standards with regard to surface waters classified as "Trout waters"per 15A NCAC 02B.0101. Any activities undertaken at this site that cause a water quality violation or undertaken prior to receipt of the necessary permits or approvals to do so are considered violations of NCGS 143-215.1,and subject to enforcement procedures pursuant to NCGS 143- 215.6." Please provide the following: • 1x hard copy & 1x electronic copy of the revised pages of the Supplement-EZ Form. • 2x hard copies & 1x electronic copy of the revised plan sheets. • 1x hard copy (2x hard copies for plans) & 1x electronic copy of any items needed to address these comments. Hard copies should be mailed to me at the following address: For Fed Ex/UPS: Jim Farkas 512 N. Salisbury Street, Office 640M Raleigh, NC 27604 For USPS: Jim Farkas 1612 Mail Service Center Raleigh, NC 27699-1612 Hand Delivery: Please reach out to me prior to hand delivering a submission to make sure that I (or someone else in my group) will be able to receive the submission. Do not leave the package in the foyer with the security guard. NOTE: Hard copies should not be sent to a Regional Office. Doing so will delay the review process and the submission package may be lost while being sent from the Regional Office to me in the Central Office. Electronic copies should be uploaded at the following location: https://edocs.deg.nc.gov/Forms/SW-Supplemental-Upload Since these are really minor things, once I get the hard copies, anything else that may have changed from addressing these issues, and the documents are uploaded to Laserfiche (Provided everything is still in order), we can issue the permit without doing another formal review.The quickness of the next review for this project is dependent on reviewer availability. 3 Let me know if you have any questions. Jim Farkas State Stormwater Engineer North Carolina Department of Environmental Quality Office: (919)707-3646 Jim.farkasCc-0deq.nc.9ov D- E � NORTH CAROLINA7AM Q ClAi Department of Environmental Quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Farkas,Jim J Sent: Monday, March 4, 2024 12:13 PM To: Nathan Sawyer<nathan.sawyer@mcgillassociates.com>; Kleinmaier, Brad<brad.kleinmaier@ncwildlife.org>; Ben Cathey<ben.cathev@mcgillassociates.com> Cc: Smith, Mike M <michael.smith@deg.nc.gov>; svc_post_construction_stormwater<postconstruction@deg.nc.gov> Subject: RE: SW1231201; Bobby N Setzer State Fish Hatchery Renovation (Transylvania) Good Afternoon, The Division of Energy, Mineral and Land Resources (DEMLR), received additional information for a Stormwater Management Permit Application for the subject project on December 8, 2023.A review of that information has determined that the application is not complete.Attached is a letter describing the items that need to be submitted. If you have any questions, please feel free to contact me. My contact information is listed below. Jim Farkas State Stormwater Engineer North Carolina Department of Environmental Quality Office: (919)707-3646 Jim.farkasPdeq.nc.gov D- E � NORTH CAROLINA74M Q kipi Department of Environmental Quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. 4 From: Peck, Kaitlin <kaitlin.peck@deg.nc.gov> Sent:Tuesday, December 12, 2023 10:21 AM To: Nathan Sawyer<nathan.sawyer@mcgillassociates.com>; Kleinmaier, Brad<brad.kleinmaier@ncwildlife.org>; Ben Cathey<ben.cathev@mcgillassociates.com> Cc: Farkas,Jim J <Jim.Farkas@deg.nc.gov>; Smith, Mike M <michael.smith@deg.nc.gov>; svc_post_construction_stormwater<postconstruction@deg.nc.gov> Subject: SW1231201; Bobby N Setzer State Fish Hatchery Renovation (Transylvania) Good Morning, We received your post-construction stormwater permit application for the subject project on 12/8/23. Reviews under the Standard permitting process can take up to 90 calendar days to complete. You can see where this project stands in the review queue by emailing postconstruction@deg.nc.gov(We have an autoreply set up that has the review queue on it). Please upload all documents that you mailed into our office through the link provided below. Be sure to choose the Central Office as the Primary Contact office. https://edocs.deg.nc.gov/Forms/SW-Supplemental-Upload IMPORTANT NOTE: Please ensure that each file is uploaded under its appropriate file type. Additional file types can be entered into the electronic form by clicking on the "Add Another Post-Construction File Upload" link directly below the "State Stormwater Information Uploads" section of the form. YOU MUST CLICK ON THE"ADD ANOTHER POST- CONSTRUCTION FILE UPLOAD"TO ADD ADDITIONAL FILE TYPES TO THE SUBMISSION. Merely changing the file type dropdown as you upload the various files (without adding additional file uploads)will upload all of the files as the last file type selected, the submission will get flagged during review, and you will need to resubmit the files. Please do not upload entire plan sets through this form, but rather upload the relevant individual sheets under the appropriate file type. Selecting the correct file type ensures that the files are properly named in the electronic repository and it helps expedite the review process. NOTE:We do not require and we discourage the upload/submission of extraneous plan sheets (such as lighting plans, utility plans, striping plans, sight distance plans, etc...) as these files are not needed for review. Please type in permit#: SW1231201 This project will be reviewed by Jim Farkas, if you have any questions, please contact them at postconstruction@deg.nc.gov or at 919-707-3646. Thank you, Kaitlin Peck Environmental Specialist Post-Construction Stormwater Permitting Group North Carolina Department of Environmental Quality postconstruction@deg.nc.gov 5 D7 E NORTH CAHOLINA Department of Environmental Quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Nathan Sawyer<nathan.sawyer@mcgillassociates.com> Sent:Thursday, December 7, 2023 1:25 PM To: Peck, Kaitlin <kaitlin.peck@deg.nc.gov> Subject: [External] FW: Bobby N Setzer State Fish Hatchery Renovation; Pisgah Forest, Transylvania County CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Good afternoon Kaitlin, Our resubmittal package for the Setzer Hatchery Renovation project is in the mail and should arrive tomorrow. Thanks, lll Shaping Communities Together® Nathan Sawyer, PE Project Manager McGill Associates, P.A. 55 Broad Street Asheville, NC 28801 T 828.252.0575 x128 DD 828.412.4628 C 828.329.1008 nathan.sawyer(camcgillassociates.com mcgillassociates.com From: Peck, Kaitlin <kaitlin.peck@ deg.nc.gov> Sent:Thursday, November 9, 2023 8:38 AM To: Kleinmaier, Brad <brad.kleinmaier@ncwildlife.org>; Ben Cathey<Ben.Cathey@mcgiIlassociates.com> Cc: Farkas, Jim J <Jim.Farkas@deg.nc.gov>; Smith, Mike M <michael.smith@deg.nc.gov>; svc_post_construction_stormwater<postconstruction@deg.nc.gov> Subject: Bobby N Setzer State Fish Hatchery Renovation; Pisgah Forest, Transylvania County Good Morning, We received your application for a new post-construction stormwater permit on 11/8/23. At this time, the submission is not administratively complete and cannot be accepted for review in its current condition. Please provide the following 6 submittal items within 30 calendar days (by close of business on 12/9/23) so that we may accept the project and begin the review process, otherwise, the project will be returned as administratively incomplete. • The current proposed SCM for this project is a Wet Pond. Wet Ponds are not appropriate SCMs for Trout Waters (per 15A NCAC 02H .1017(9)(b)) as they have poor protection of stream temperatures. Please select a different primary SCM for this project and revise referencing documents. • 2x hard copies of the Application with the following corrections made (These items are required per 15A NCAC 02H .1042(2)(a) and per Section VI, 1 of the Application): o Section IV, 8—The percent impervious area for the project area does not appear to be calculated correctly. Project density calculation information can be found in 15A NCAC 02H .1003(1). o Section IV, 10—Please use the information for the first named surface water("Davidson River", "WS-V, 13'Tr, HQW", &"6-34-(1)")for the receiving stream name, classification and index number. o Section VI—Please initial indicating that you have submitted all the required information relevant to the project's application. • 1x hard copy of the complete, original signed Supplement-EZ Form (This item is required per Sections V&VI, 3 of the Application).This form can be found on our website at the following address: https://deg.nc.gov/about/divisions/energy-mineral-and-land-resources/stormwater/stormwater- program/stormwater-design. Please note that a complete Supplement-EZ form will have 3 or more pages and uses macros to generate the relevant sheets based on the information entered into the cover page. • 1x original, signed & notarized hard copy of the O&M Agreement Form (This item is required per 15A NCAC 02H .1042(2)(j) and per Sections V &VI, 3 of the Application).This form can be found on our website at the following address: https://deg.nc.gov/about/divisions/energy-mineral-and-land-resources/stormwater/stormwater- program/stormwater-design. Please note that a complete O&M Agreement Form will have 2 or more pages and uses macros to generate the relevant sheets based on the information entered into the cover page. NOTE: It is recommended to get a second copy of this form signed & notarized for the Applicant's records (it will be helpful when they go to record it with the Register of Deeds). NOTE:The provided O&M was not completely filled out, nor signed and notarized. • 1x hard copy of a USGS topographic map identifying the site location. If the receiving stream is reported as class SA or the receiving stream drains to class SA waters within % mile of the site boundary, include the% mile radius on the map.This item is required per 15A NCAC 02H .1042(2)(d) and per Section VI, 6 of the Application. • 1x hard copy of the property deed.This item is required per Section VI, 10 of the Application. • 2x signed &sealed hard copies of a plan sheet showing the following corrected additions: o Project boundary delineation labeled with accurate bearings and distances (Required per Section VI, 8i of the Application and 15A NCAC 02H .1042(2)(g)(ii)). NOTE:This is an administrative completeness review, not a detailed engineering review, there may be other issues that may be brough up during the engineering review. If these items are received within the stipulated timeframe, we can accept the project and begin the review process. Once accepted, reviews under the standard permitting process can take up to 90 calendar days per statute (one of our two reviewer positions is currently vacant). Hard copies should be mailed to the following address: For Fed Ex/UPS: Jim Farkas 512 N. Salisbury Street, Office 640E Raleigh, NC 27604 For USPS: Jim Farkas 1612 Mail Service Center Raleigh, NC 27699-1612 If you have any questions, please contact Kaitlin Peck at post-construction@nc.deg.gov or at(919) 707-9209. Thank you, Kaitlin Peck Environmental Specialist Post-Construction Stormwater Permitting Group North Carolina Department of Environmental Quality postconstruction@deg.nc.gov NORTH CAROL NA Department of Environmental Quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official. 8