Loading...
HomeMy WebLinkAboutNC0020290_PAR_review_20240726Docusign Envelope ID: 354C5BD3-9275-4634-8FF5-8662434C04EB Regional Pretreatment Annual Report (PAR) Review Is the PAR on time? Does it have two copies? Did they send any other submissions with it? Included? ADEQUATE? POTW noted Corrections? Narrative ® YES ❑ NO ❑ NA ® YES ❑ NO ❑ NA PPS Form ® YES ❑ NO ® YES ❑ NO SNCR ® YES ❑ NO ® YES ❑ NO IDSF ® YES ❑ NO ® YES ❑ NO Allocation Table ® YES ❑ NO ® YES ❑ NO Compliance Schedules ❑ YES ❑ NO ® NA ❑ YES ❑ NO ® NA Public Notice ❑ YES ❑ NO ® NA ❑ YES ❑ NO ® NA Program Information ® YES ❑ NO ❑ YES ❑ NO ❑ YES ❑ NO Historical SNC ® YES ❑ NO ❑ NA ® YES ❑ NO ❑ NA ❑ YES ❑ NO ❑ NA Regional Office: ARO POTW: Town of Burnsville NPDES Permit No. NCO020290 Report Period: 01/2023 to 12/2023 ® Full ❑ Modified For modified programs evaluate shaded items only. A Narrative is required for a modified program only if there are SIUs in SNC. If No, check recommendation below; 1. Have at least 90% of SIU permits been issued within 180 ® Yes ❑ No ❑ Not req'd ❑ NOD ❑ NOV ❑ QNCR ❑ NCP ❑ Civil Penalty days of expiration? See Allocation Table). Assessment 2. Were at least 80% of SIUs inspected? (See PPS Form) ❑ Yes ❑ No ❑ Not req'd ❑ NOD ❑ NOV ❑ QNCR ❑ NCP ❑ Civil Penalty Assessment 3. Has effective enforcement been taken against industries in ❑ Yes ❑ No ® NA ❑ NOD ❑ NOV ❑ QNCR ❑ NCP ❑ Civil Penalty SNC, including those causing pass -through or interference? (See Assessment Narrative and SNCR Form 4. Does public notice cover all SIUs in SNC? ❑ Yes ❑ No ® NA ❑ NOD ❑ NOV ❑ QNCR ❑ NCP ❑ Civil Penalty Assessment voie: txceimons snoula De exmaineo in me comment section Deiow: Reviewed By: Rachel Rose Date: 07/26/2024 Ev DocuSi�gn�ejd bey: 5ACE19D3940C494... Regional Pretreatment Annual Report Review $db9d2I cOaa6a$8064893A726F43D69B692103BDC38F41.docx 16