HomeMy WebLinkAboutNC0020290_PAR_review_20240726Docusign Envelope ID: 354C5BD3-9275-4634-8FF5-8662434C04EB
Regional Pretreatment Annual Report (PAR) Review
Is the PAR on time? Does it have two copies?
Did they send any other submissions with it?
Included?
ADEQUATE?
POTW noted Corrections?
Narrative
® YES
❑
NO
❑ NA
® YES
❑
NO
❑ NA
PPS Form
® YES
❑
NO
® YES
❑
NO
SNCR
® YES
❑
NO
® YES
❑
NO
IDSF
® YES
❑
NO
® YES
❑
NO
Allocation Table
® YES
❑
NO
® YES
❑
NO
Compliance Schedules
❑ YES
❑
NO
® NA
❑ YES
❑
NO
® NA
Public Notice
❑ YES
❑
NO
® NA
❑ YES
❑
NO
® NA
Program Information
® YES
❑
NO
❑ YES
❑
NO
❑ YES ❑ NO
Historical SNC
® YES
❑
NO
❑ NA
® YES
❑
NO
❑ NA
❑ YES ❑ NO ❑ NA
Regional Office: ARO
POTW: Town of Burnsville
NPDES Permit No. NCO020290
Report Period: 01/2023 to 12/2023
® Full ❑ Modified
For modified programs evaluate shaded
items only. A Narrative is required for a
modified program only if there are SIUs
in SNC.
If No, check recommendation below;
1. Have at least 90% of SIU permits been issued within 180
® Yes ❑ No ❑ Not req'd
❑ NOD
❑ NOV
❑ QNCR
❑ NCP
❑ Civil Penalty
days of expiration? See Allocation Table).
Assessment
2. Were at least 80% of SIUs inspected? (See PPS Form)
❑ Yes ❑ No ❑ Not req'd
❑ NOD
❑ NOV
❑ QNCR
❑ NCP
❑ Civil Penalty
Assessment
3. Has effective enforcement been taken against industries in
❑ Yes ❑ No ® NA
❑ NOD
❑ NOV
❑ QNCR
❑ NCP
❑ Civil Penalty
SNC, including those causing pass -through or interference? (See
Assessment
Narrative and SNCR Form
4. Does public notice cover all SIUs in SNC?
❑ Yes ❑ No ® NA
❑ NOD
❑ NOV
❑ QNCR
❑ NCP
❑ Civil Penalty
Assessment
voie: txceimons snoula De exmaineo in me comment section Deiow:
Reviewed By: Rachel Rose Date: 07/26/2024
Ev DocuSi�gn�ejd bey:
5ACE19D3940C494...
Regional Pretreatment Annual Report Review
$db9d2I cOaa6a$8064893A726F43D69B692103BDC38F41.docx 16