HomeMy WebLinkAboutWQ0045522_Application (FTSE)_20240725VL GENERAL REQUIREMENTS
I. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached?
❑ Yes ❑ No ® N/A
2. If the Applicant is a Developer of lots to be sold, has a Developer's Op rational Acrcemcnt (FORM: DLb� been attached?
❑ Yes ❑ No ® N/A
3. If the Applicant is a Home/Property Owners' Association, has an FICA iPOA Operational .Agreement ( FORM: HOA) and
supplementary documentation as required by I5A NCAC 02T.0I 15(c) been attached?
❑ Yes ❑ No ® N/A
4. Origin of wastewater: (check all that apply):
® Residential (Individually Owned) ❑ Retail (stores, centers, malls) ❑ Car Wash
❑ Residential (Leased) ❑ Retail with food preparation/service ❑ Hotel and/or Motels
❑ School / preschool / day care ❑ Medical / dental / veterinary facilities ❑ Swimming Pool/Clubhouse
❑ Food and drink facilities ❑ Church ❑ Swimming Pool/Filter Backwash
❑ Businesses / offices / factories ❑ Nursing Home ❑ Other (Explain in Attachment)
5. Nature of wastewater : 100 % Domestic % Commercial % Industrial (See 15.A ACAC 02T .0103(20))
If Industrial, is there a Pretreatment Program in effect? ❑ Yes❑ No
6. Has a flow reduction been approved under 15.1, NCAC 021 .01 141 fl? ❑ Yes ❑ No
> If yes, provide a copy of Row reduction approval letter with this application
7. Summarize wastewater generated by project:
Establishment Type (see 02T.0114(o)
Daily Design Flow'"
No. of Units
Flow
Single Family Townhome 3 BR
225 gal/unit
13
1925 GPD
Commercial
225 gal/unit
1
225 GPD
gal/
GPD
gal/
GPD
gal/
GPD
gal/
GPD
Total
3, 150 GPD
a See I5.-A NCAC 02T .01 14(b). Id), le)(1 ) and le)(' 1 for caveats to wastewater design flow rates (i.e., minimum Flow per
dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas;
and residential property located south or east of the .Atlantic Intracoastal Waterway to be used as vacation rentals as defined
in G.S,_12A-4).
b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table I5A NCAC 02T.01 14] shall be
determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data.
S. Wastewater generated by project: 3 l50 GPD (per 15 A SC. -AC 02T .01 14)
Do not include future flows or previously permitted allocations
If permitted flow is zero, please indicate why:
❑ Pump Station/Force Main or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line.
Please provide supplementary information indicating the approximate timeframe for permitting upstream sewers with flow.
❑ Flow has already been allocated in Permit Number: Issuance Date:
❑ Rehabilitation or replacement of existing sewers with no new flow expected
❑ Other (Explain):
FORM: FTA 06-21 Page 2 of 5
State of North Carolina
Department of Environmental Quality
Division of Water Resources
Flow Tracking for Sewer Extension Applications
(FTSE 10-18)
Entity Requesting Allocation: Town of Southern Pines
Project Name for which flow is being requested: Bradford Village Townhouses
More than one FTSE may he required for a single project if the owner of the WWTP is not responsible for all pump
stations along the route of the proposed wastewater flow.
1. Complete this section only if you are the owner of the wastewater treatment plant.
a. WWTP Facility Name: Moore County Water Pollution Control Plant
b. WWTP Facility Permit k NC O037508
All flows are in MGD
c. WWTP facility's permitted flow 10.0000
d. Estimated obligated flow not yet tributary to the WWTP 1.03259
e. WWTP facility's actual avg. flow 5.00900
f. Total flow for this specific request 0.00315
g. Total actual and obligated flows to the facility 6.04474
It. Percent of permitted flow used 60.4474
11. Complete this section for each pump station you are responsible for along the route of this proposed
wastewater flow.
List pump stations located between the project connection
point and the WWTP:
(A)
(B) (C) (D)=(B+C)
(F)=(A-D)
Design
Obligated,
Pump Pump Average
Approx. Not Yet Total Current
Station Station Finn Daily Flow**
Current Tributary Flow Plus
(Name or Permit Capacity, * (Firm / pf),
Avg. Daily Daily Flow, Obligated
Available
Number) No, MGD MGD
Flow, MGD MGD Flow
Capacity***
SP-4 5.0000 2.0000 0.8824 0.1664 1.0488 0.9512
* The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow
that can be achieved with the largest pump taken out of service.
** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor
(pt) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria.
*** A Planning Assessment Addendum shall be attached for each pump station located
between the project connection point and the WWTP where the Available Capacity is < 0.
Downstream Facility Name (Sewer): Moore County Public Utilities
Downstream Permit Number: WQCS00034
Page 1 of 6
FTSE 10-18
11I ����t�l���i;1���� �t����[i��,i�;
I���G ;l
I l� {� IY
Ulvlston of Water Resources
State of North Carolina
Department of Environmental Quality
Division of Water Resources
Flow Tracking for Sewer Extension Applications
(FTSE 10-18)
Entity Requesting Allocation: Town of Southern Pines
Project Name for which flow is being requested: Bradford Village Townhouses
More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump
stations along the route of the proposed wastewater flow.
1. Complete this section only if you are the owner of the wastewater treatment plant.
a. WWTP Facility Name: Moore County Water Pollution Control Plant
b. WWTP Facility Permit #: NC 0037508
c. WWTP facility's permitted flow
d. Estimated obligated flow not yet tributary to the WWTP
e. WWTP facility's actual avg. flow
f Total flow for this specific request
g. Total actual and obligated flows to the facility
h. Percent of permitted flow used
A11 flows are in AIGD
.00315
II. Complete this section for each pump station you are responsible for along the route of this proposed
wastewater flow.
List pump stations located between the project connection point and the WWTP:
(A)
(B)
(C)
(D)=(B+C) (E)=(A-D)
Design
Obligated,
Pump
Pump
Average
Approx.
Not Yet
Total Current
Station
Station
Firm Daily Flow**
Current
Tributary
Flow Plus
(Name or
Permit
Capacity, * (Firm / pi),
Avg. Daily
Daily Flow,
Obligated Available
Number)
No.
MGD MOD
Flow, MOD
MGD
Flow Capacity***
* The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow
that can be achieved with the largest pump taken out of service.
** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor
(pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria.
*** A Planning Assessment Addendum shall be attached for each pump station located
between the project connection point and the WWTP where the Available Capacity is < 0.
Downstream Facility Name (Sewer): Moore County Public Utilities
Downstream Permit Number: WQCS00034
Page 1 of 6
FTSE 10-18
III 1,Ilfl��ll�i ��tl���t
Il��� � �1 ti
_ .. ..