HomeMy WebLinkAboutNC0023981_PAR_review_form_20240724Docusign Envelope ID: B1C61C97-4CC2-405E-924E-FOEFOE598421
Regional Pretreatment Annual Report (PAR) Review
Is the PAR on time? Does it have two copies?
Did they send any other submissions with it?
Included?
ADEQUATE?
POTW noted Corrections?
Narrative
® YES
❑
NO
❑ NA
® YES
❑
NO
❑ NA
PPS Form
® YES
❑
NO
® YES
❑
NO
SNCR
® YES
❑
NO
® YES
❑
NO
IDSF
® YES
❑
NO
® YES
❑
NO
Allocation Table
® YES
❑
NO
® YES
❑
NO
Compliance Schedules
❑ YES
❑
NO
® NA
❑ YES
❑
NO
® NA
Public Notice
❑ YES
❑
NO
® NA
❑ YES
❑
NO
® NA
Program Information
® YES
❑
NO
❑ YES
❑
NO
❑ YES ❑ NO
Historical SNC
® YES
❑
NO
❑ NA
® YES
❑
NO
❑ NA
❑ YES ❑ NO ❑ NA
Regional Office: ARO
POTW: City of Lenoir
NPDES Permit No. NCO023981
Report Period: 01/2023 to 12/2023
® Full ❑ Modified
For modified programs evaluate shaded
items only. A Narrative is required for a
modified program only if there are SIUs
in SNC.
If No, check recommendation below;
1. Have at least 90% of SIU permits been issued within 180
® Yes ❑ No ❑ Not req'd
❑ NOD
❑ NOV
❑ QNCR
❑ NCP
❑ Civil Penalty
days of expiration? See Allocation Table).
Assessment
2. Were at least 80% of SIUs inspected? (See PPS Form)
❑ Yes ❑ No ❑ Not req'd
❑ NOD
❑ NOV
❑ QNCR
❑ NCP
❑ Civil Penalty
Assessment
3. Has effective enforcement been taken against industries in
❑ Yes ❑ No ® NA
❑ NOD
❑ NOV
❑ QNCR
❑ NCP
❑ Civil Penalty
SNC, including those causing pass -through or interference? (See
Assessment
Narrative and SNCR Form
4. Does public notice cover all SIUs in SNC?
❑ Yes ❑ No ® NA
❑ NOD
❑ NOV
❑ QNCR
❑ NCP
❑ Civil Penalty
Assessment
voie: txceimons snoula De emiaineo in me comment section Deiow:
Reviewed By: Rachel Rose Date: 07/24/2024
Ev DocuSi�gn�ejd bey:
5ACE19D3940C494...
Regional Pretreatment Annual Report Review
$d784bal23f39$5A85D86B21170402138CE1713DI2F7A43377.docx16