Loading...
HomeMy WebLinkAboutNC0023981_PAR_review_form_20240724Docusign Envelope ID: B1C61C97-4CC2-405E-924E-FOEFOE598421 Regional Pretreatment Annual Report (PAR) Review Is the PAR on time? Does it have two copies? Did they send any other submissions with it? Included? ADEQUATE? POTW noted Corrections? Narrative ® YES ❑ NO ❑ NA ® YES ❑ NO ❑ NA PPS Form ® YES ❑ NO ® YES ❑ NO SNCR ® YES ❑ NO ® YES ❑ NO IDSF ® YES ❑ NO ® YES ❑ NO Allocation Table ® YES ❑ NO ® YES ❑ NO Compliance Schedules ❑ YES ❑ NO ® NA ❑ YES ❑ NO ® NA Public Notice ❑ YES ❑ NO ® NA ❑ YES ❑ NO ® NA Program Information ® YES ❑ NO ❑ YES ❑ NO ❑ YES ❑ NO Historical SNC ® YES ❑ NO ❑ NA ® YES ❑ NO ❑ NA ❑ YES ❑ NO ❑ NA Regional Office: ARO POTW: City of Lenoir NPDES Permit No. NCO023981 Report Period: 01/2023 to 12/2023 ® Full ❑ Modified For modified programs evaluate shaded items only. A Narrative is required for a modified program only if there are SIUs in SNC. If No, check recommendation below; 1. Have at least 90% of SIU permits been issued within 180 ® Yes ❑ No ❑ Not req'd ❑ NOD ❑ NOV ❑ QNCR ❑ NCP ❑ Civil Penalty days of expiration? See Allocation Table). Assessment 2. Were at least 80% of SIUs inspected? (See PPS Form) ❑ Yes ❑ No ❑ Not req'd ❑ NOD ❑ NOV ❑ QNCR ❑ NCP ❑ Civil Penalty Assessment 3. Has effective enforcement been taken against industries in ❑ Yes ❑ No ® NA ❑ NOD ❑ NOV ❑ QNCR ❑ NCP ❑ Civil Penalty SNC, including those causing pass -through or interference? (See Assessment Narrative and SNCR Form 4. Does public notice cover all SIUs in SNC? ❑ Yes ❑ No ® NA ❑ NOD ❑ NOV ❑ QNCR ❑ NCP ❑ Civil Penalty Assessment voie: txceimons snoula De emiaineo in me comment section Deiow: Reviewed By: Rachel Rose Date: 07/24/2024 Ev DocuSi�gn�ejd bey: 5ACE19D3940C494... Regional Pretreatment Annual Report Review $d784bal23f39$5A85D86B21170402138CE1713DI2F7A43377.docx16