Loading...
HomeMy WebLinkAboutSW3240701_Stormwater Report_20240724 STORMWATER MANAGEMENT REPORT QuikTrip #1069 East Marshville Boulevard Marshville, NC Union County ���`�O�•* E.S S l O"•.�9'�: • -9 • • :Q � : . • : _ ' NO. 0476 6 `N‘ May 10, 2024 Prepared by: Freeland and Kauffman, Inc. Engineers — Landscape Architects 209 West Stone Ave. Greenville, SC 29609 864-233-5497 Table of Contents I. STORMWATER MANAGEMENT 1 Pre-Development 1 Pre-Developed Peak Flow Rates 2 Post-Development 2 Post-Development Peak Flow Rates 4 Water Quality 5 Downstream Analysis 6 Downstream Analysis Peak Flow Rates 6 II. EROSION & SEDIMENT CONTROL 7 Skimmer Sediment Basin Calculations: 7 Diversion Ditch Calculations: 8 III. STORM DRAIN CALCULATIONS 8 IV. OPERATIONS & MAINTENANCE PLAN 9 APPENDICES Maps Aerial Soils Map USGS Topographic Map FEMA Flood Map Pre-Development Drainage Map Post-Development Drainage Map Rainfall Data NOAA Precipitation Depth NOAA Precipitation Intensity Hydraflow Summaries Hydraflow Table of Contents Downstream Analysis USGS StreamStats Report Hydraflow Express Report — 1-yr Hydraflow Express Report — 1 0-yr Hydraflow Express Report — 25-yr Erosion Control Calculations Phase 1 B Drainage Map HydoCAD Report Diversion Ditch #1 —Worksheet Diversion Ditch #2 —Worksheet Storm Drain Storm Drain Drainage Map Hydraflow Storm Sewer Summary Report — 10-yr Hydraflow Storm Sewer Summary Report — 25-yr Hydraflow Storm Sewer Summary Report— 100-yr Water Quality Contech Jellyfish Filter Manufacturer Data QT Store #81-1069 I. STORMWATER MANAGEMENT The site is on a proposed 3.32-acre lot located at the southwest corner of the intersection between Marshville Boulevard and White Street in Marshville, NC. The proposed parcel encompasses four existing parcels that will be combined into a single lot. The site is currently comprised of multiple commercial buildings, associated parking, and assortment of grassland and trees. In the existing conditions, the site drains to an existing ditch flowing southeast through the middle of the lot and also to an existing catch basin along White Street. The property will be developed into a±5,312 square foot convenience store building,gas canopy, diesel canopy,associated parking,and landscaped areas. Per FEMA map #3710549500J the site is located in flood zone 'X'. The project site is located in the Yadkin Pee-Dee River Basin, which is a sub-basin of the French Broad River. Stormwater runoff from the site will discharge into a classification 'C' receiving water, Lick Branch.An underground detention system in conjunction with an above ground detention pond will be constructed to provide storm water management for the proposed QuikTrip. Discharge from the detention system has been designed to meet the requirements of the Town of Marshville and NCDENR. Detention will be designed to attenuate the 1-yr, 2-yr, 10- yr, 24-hour storm events and reduce the developed peak flow rates to pre-development peak runoff rates. In addition, a proprietary water quality device will be employed to achieve water quality requirements per Town of Marshville for the proposed improvements. Detention and ponding calculations for this site were completed with Hydraflow Hydrographs using the SCS Method. Rainfall data was taken from the NOAA precipitation data frequency server. Per NRCS Web Soil Survey, the site is comprised of Badin-Urban land complex (HSG D) and Cid-Urban land complex (HSG C). As such, curve numbers affiliated with HSG D were employed for calculations. (See attached Soils Map). Pre-Development The existing drainage pattern for this site diverges and drains to two locations. This creates two distinct drainage basins in the pre-developed condition as well as two analysis points that will be utilized to accurately model runoff leaving the site. Runoff from the first drainage basin flows to an existing ditch running through the middle of the site and continues southeast. This spot along the ditch will be referenced as "Analysis Point #1." Runoff from the remainder of the site ultimately empties into an existing curb inlet located along White Street and will be referenced as "Analysis Point #2." Refer to the attached Pre-Development Drainage Map for additional information. The following is a breakdown of the pre-development condition: To Analysis Point#1 This point of interest is located southeast along an existing ditch. This basin is comprised of multiple commercials building and associated parking lots but consists primarily of grass and woodlands. Table 1 below provides a breakdown of the drainage basin. Ground Asphalt/Buildings Gravel Lawn, Fair Woods/Grass Combo, Total Area Weighted Covering (CN=98) (CN=91) Condition Fair Condition (Ac,) CN value (CN=84) (CN=82) Pre-Dev, 0.39 0.35 1.18 0.74 Total 2.65 86.4 Table 1. —The above table depicts ground coverings and weighted curve number. 1 100'of sheet flow at 6.3%slope Tc= 12.76 158'of shallow concentrated flow at 7.5%slope Tc=0.60 358'of channel flow at 1.1%slope Tc=2.87 Total =16,20 minutes Table 2. —The above table demonstrates the time of concentration. To Analysis Point#2 The point of analysis for stormwater runoff is assumed to be a curb inlet southeast of the site and is a part of the storm system that runs along White Street. The area draining to this structure consists of woods and grass, as well as gravel and impervious surfaces. The following is a detailed breakdown of the basin. Ground Asphalt/Buildings Gravel Lawn, Fair Woods/Grass Combo, Total Area Weighted Covering (CN=98) (CN=91) Condition Fair Condition (Ac,) CN value (CN=84) (CN=82) Pre-Dev. 0.27 0.20 0.36 0.03 Total 0.86 90,0 Table 3. -The above table depicts ground coverings and weighted curve number. 100'of sheet flow at 2.2%slope Tc=8.87 744'of shallow concentrated flow at 1.4%slope Tc=5.16 Total TT=14,00 minutes Table 4. —The above table demonstrates the time of concentration. Pre-Developed Peak Flow Rates To Analysis Point#1 To Analysis Point#2 Rainfall Event (cfs) (cfs) 1 yr,24-hr. 5.66 2.13 2-yr,24-hr. 7.46 2.73 10-yr,24-hr, 12.44 4.34 Table 5. — Pre-Development Peak Flow Rates. Post-Development Post-development utilizes the same two analysis points as the pre-development investigation. The following is a breakdown of drainage in the post-developed condition: The "To Detention" area is routed through the proposed detention pond and underground system to generate the projected pond outflows, which will then be combined with the "Bypass A" and "Bypass B" outflows to create the total post-development outflow rates to Analysis Point#1. To Analysis Point#1 To Detention This area is associated with the QuikTrip store, parking, and landscaped areas. It is comprised of the areas that drain directly to the detention system and includes the existing development as well as proposed construction. 2 Ground Impervious Area Lawn, Good Total Area Weighted CN value Covering (CN 98) Condition (Ac.) (CN=80) Post-Dev. 2.07 0.30 Total 2.37 95.7 Table 6. -The above table depicts ground coverings and weighted curve number. The minimum TT was assumed for this basin Tc=5 minutes Total Tc=5 minutes Table 7. -The above table demonstrates the calculated time of concentration. Bypass A This area bypasses detention and is primarily comprised of newly landscaped areas. However, a portion of the constructed drives will bypass detention and drain directly to the DOT right-of-way. Ground Impervious Area Lawn, Good Total Area Weighted CN value Covering (CN=98) Condition (Ac.) (CN=80) Post-Dev. 0.09 0.15 Total 0,24 86.5 Table 8. - The above table depicts ground coverings and weighted curve number. 85'of sheet flow at 1.0%slope Tc= 15.55 76'of shallow concentrated flow at 3.0%slope Tc=0.36 47'of channel flow at 1.0%slope Tc=0.17 104'of channel flow at 1,2%slope T =0.31 261'of channel flow at 1,0% Tc=0.60 197'of shallow concentrated flow @ 0.75%slope Tc= 1.86 Total =18.80 minutes Table 9. -The above table demonstrates the time of concentration. Bypass B This area is comprised entirely of newly landscaped areas and bypasses detention via drainage swale along the south side of the property. Ground Impervious Area Lawn, Good Total Area Weighted CN value Covering (CN=98) Condition (Ac,) (CN=80) Post-Dev, 0.00 0.31 _ Total 0.31 80.1 Table 10. -The above table depicts ground coverings and weighted curve number. 90'of sheet flow at 2.2%slope Tc= 11.83 25'of shallow concentrated flow at 33%slope Tc=0.04 254'of shallow concentrated flow at 5.5%slope Tc= 1.12 144'of shallow concentrated flow at 060%slope Tc= 1.92 Total Tc=14,90 minutes Table 11. -The above table demonstrates the calculated time of concentration. 3 To Analysis Point#2 This area is associated with the portion of the site that surface drains to the southeast along White Street to an existing curb inlet. This drainage area consists primarily of newly installed lawn but also includes a portion of the constructed drive and associated sidewalk. Ground Impervious Area Lawn, Good Total Area Weighted CN value Covering (CN=98) Condition (Ac.) (CN=80) Pre-Dev. 0.24 0.36 Total 0.60 87.1 Table 12. -The above table depicts ground coverings and weighted curve number. 75'of sheet flow at 3.5%slope T =8.52 742'of shallow concentrated flow at 1.4%slope Tc=5.14 Total Tc=13.70 minutes Table 13. -The above table demonstrates the time of concentration. Post-Development Peak Flow Rates Drainage Basin 1-yr,24-hr. 2-yr,24-hr. 10-yr,24-hr. 100-yr,24-hr, To Detention 9.19 11.26 16.84 26.05 Through Pond 2.99 5.33 8.91 10.92 Bypass A 0.47 0.63 1.04 1.74 Bypass B 0.49 0.68 1.24 2.21 Total To AP#1(Post-Dev) 3.95 6.61 11.17 14.83 To AP#1(Pre-Dev) 5.66 7.46 12.44 20.71 To AP#2(Post-Dev) 1.32 1.73 2.86 4.73 To AP#2(Pre-Dev) 2.13 2.73 4.34 7.00 Table 14. - Post-Development Peak Flow Rates. *100-yr storm event not required to be detained to pre- development rates As indicated in the above table, the post-development discharges will be decreased from the pre-development rates for the 1-yr, 2-yr, and 10-yr, events for the 24-hr duration storms via the detention system. The table below displays the water elevation in the pond related to each storm event. Rainfall Event Peak Elevation(ft,) 1 yr,24-hr, 536.37 2yr,24-hr, 536.54 10yr,24-hr, 536.92 100yr,24-hr, 537.49 Table 15. - Post-Development peak pond elevations 4 Water Quality Per the Marshville Development Ordinance—Article 19,water quality must be provided in the form of 85%average removal of Total Suspended Solids (TSS). Due to spatial limitations, a conventional above ground sand filter is not realistically feasible. Additionally, due to the nature of a fuel dispensing location, QuikTrip prefers to eliminate infiltration practices from their sites. These factors rule out many conventional BMP treatment options. However, Contech's JellyFish is a viable proprietary system that can achieve the required water quality standards. Additional testing literature is included in this report. The proprietary system will be designed to achieve the required primary treatment per Marshville stormwater ordinance. Town of Marshville and NCDEQ define the permanent water quality volume as the runoff generated by 1-inch of rainfall over the developed portion of the site. In the post-development condition, the developed portion of the site will be routed to a detention system comprised of both underground and above ground storage. The underground system will provide the majority of storage. The system has been designed to release the water quality volume over a minimum of 48 hours. The Simple Method for runoff volume calculation was employed to generate the water quality treatment volume. The following are the associated calculations: Rv = 0.05 + 0.9 'A = 0.05 + 0.9 * 0.87 = 0.836 Where IA = % impervious (100%) W Qv = Rv * Rd *A * 3630 = 0.836 * 1.0 * 2.37 * 3630 = 7,192 ft3 Where Rd = Design storm depth (1.0") The water quality volume occurs at an elevation of 535.99' within the system. A weir will be placed at elevation 536.00 while the water quality orifice will be placed at 534.20. The following are the calculations to size the orifice to drawdown this volume in a minimum of 48 hours: Total time to Drawdown for the volume control must be a minimum of 48 hours (172,800 sec.). Therefore, the needed average orifice flow rate will be: 7,192 cf 172,800 sec. = 0.0416 c f s The resulting orifice area to provide this drawdown rate is: Where h = s36.00Zs34.zo = 0.90', average depth Q = CAV2gh 0.0416 A = Q = = 0.0091 f t2 C✓2gh 0.6,12 * 32.2 * 0.90 4A D = — = 0.1077ft = 1.29in rt- Therefore a 1.25" orifice will be utilized to provide the minimum 48-hour drawdown time for the water quality volume. Employing a 1.25" orifice the WQv will dewater in ±51 hours. 5 Downstream Analysis Downstream analysis has been performed as part of this design. This evaluation will employ the same analysis point, Analysis Point#1, previously utilized for Pre-and Post-Development. As no surveyed data was available far outside of the property, topographic information was collected from NOAA Lidar. Using USGS StreamStats (see attached report), a drainage basin was estimated. The area in question drains to the existing 30" CMP that outfalls to the existing channel running through the middle of the site. For calculation purposes the "site area," previously covered in the Pre-Development and Post-Development sections of this report will be removed from the total drainage area to the downstream channel: assumptions will be made as to the composition of the remaining area. This remaining area will then be routed through Hydraflow and combined with the pre- and post-development flowrates, respectively, assessing the 1-yr, 10-yr, and 25-yr storm events. This approach will allow the effects of the proposed detention structures to be represented in this analysis. The following is a breakdown of the "remaining" or offsite area as it will now be referred. Offsite Ground Impervious Surfaces Pervious surfaces Total Area Weighted CN value Covering (CN=98) (CN=74) (ac.) Pre-Dev. 15.40 4.57 Total 19.97 92,5 Table 16. —The above table depicts ground coverings and weighted curve number. 100'of sheet flow at 2.5%slope Tc= 10.61 357'of shallow concentrated flow at 0.60%slope Tc=4.76 85'of shallow concentrated flow at 0.75%slope Tc=0.80 706'of channel flow at 1.0%slope Tc=2.36 163'of channel flow at 1.0%slope Tc=0.41 166'of channel flow at 1.75%slope Tc=0.44 358'of shallow concentrated flow at 1.0%slope Tc=3.70 Total Tc=23,10 minutes Table 17. —The above table demonstrates the calculated time of concentration. Downstream Analysis Peak Flow Rates Drainage Basin 1-yr,24-hr, 10-yr,24-hr, 25-yr,24-hr. Offsite 46.36 90.40 110.18 Downstream Analysis(Pre-Dev) 51.45 101.37 123.84 Downstream Analysis(Post-Dev) 50.11 100.94 122.34 Table 18. — Downstream Analysis Peak Flow Rates. The downstream analysis values were determined by routing the "Offsite area" with the previously calculated pre- development and post-development hydrographs. As depicted above, the ultimate downstream flowrate will be reduced by the proposed improvements. The channel was also analyzed for its capacity and depth of flow utilizing the above flowrates. Attached is the summary report from Hydraflow Express for the breakdown of each storm 6 event. The downstream channel displayed sufficient capacity, as well as freeboard, for each storm event and therefore the channel will not be affected negatively by the development of this site. II. EROSION &SEDIMENT CONTROL The following is the report of the sediment and erosion control devices to be used on this project. The erosion will be controlled via silt fence, temporary diversion ditch, inlet protection, temporary skimmer sediment basin, and a stone construction entrance. These items will be implemented per the North Carolina DEQ Erosion and Sediment Control Planning and Design Manual and maintained on a regular basis to ensure their proper operation. Construction will occur in two phases for this project. Phase one will include implementation of the skimmer sediment basin, demolition and removal of all existing impervious surfaces, and construction of the construction exit, and miscellaneous grading required to implement erosion control measures. Phase two will consist of construction of the QT convenience store, associated parking, canopies, and utilities, and miscellaneous earthwork. The entirety of the project will result in approximately±3.33 acres of graded area(this total disturbed area is inclusive of both on and off-site areas.) During phase one, the skimmer sediment basin will be responsible for the majority of sediment control. A diversion ditch and silt fence will accompany the basin and they will be designed in conjunction with rock filter dams to treat the disturbed area in phase one. Upon completion of phase one additional silt fence and rolled erosion control products will be implemented to allow the remaining demolition, mass grading, and construction of the convenience store. As installation of the storm drains, underground detention system, and grading proceeds, inlet protection will be installed around all inlets as the site is brought to grade. Once the base course is ready for installation, the remaining storm drain system will be installed. Catch basin inlet protection will be installed and maintained at all inlets from this point forward until final stabilization. Skimmer Sediment Basin Calculations: Based on the North Carolina DEQ Manual, there should be sediment storage provided to handle sediment at a rate of 1,800 cf per disturbed acre for this BMP while also providing 325 sf of surface area per cubic feet per second of flow for the 10-year storm. The basin will have 2.51 AC draining to it during phase one of construction. This equates to: 2.51 acres x 1,800 cf/ ac=4,510 cf(required volume) The volume provided will be 6,837 cf as designed at elevation 536.50'. See attached HydroCAD report. To provide a three-day drawdown a skimmer is needed to provide a drawdown rate of: 4,510 cf/ 3 day=0.0174 cfs 7 However, a Faircloth skimmer with a 1.5" orifice is chosen providing 0.02 cfs dewatering rate. Based upon this rate, the basin is expected to dewater the 4,510 cf in ±62.6 hrs, which is within the 2 to 5 day required range. The 10-yr peak flow rate was calculated to be 8.2 cfs. A rational coefficient of 0.45 was employed for bare soil. Additionally, the minimum time of concentration of 5 minutes was assumed. Therefore, the required surface area will be 325 x 8.2 = 2,664 sf. As designed the proposed sediment basin will have a surface area of 3,771 sf at elevation 536.50' with dimensions as indicated on the plans. Diversion Ditch Calculations: Based on the North Carolina DEQ Manual, the diversion should be designed for the 10-yr storm event. The cross section is designed as a trapezoidal section with 2' depth, 2:1 side slopes, and 2' bottom width. Peak flow rates will be calculated using the Rational Method and assuming the minimum Time of Concentration of 5 minutes. Per NOAA, the rainfall intensity is 7.27 in/hr at 5 minutes. The following are calculations for each temporary diversion: Diversion Ditch #1 (1.85 AC Phase 1) Q=CIA=0.45 (bare soil) * 7.27 in/hr* 1.85 AC=6.05 cfs Using the cross-section specifications mentioned above and a 3.5% running slope and roughness coefficient of 0.025 (rough earth), the diversion will have a flow depth of 0.51' (1.49' freeboard which is greater than the 0.3' minimum) and velocity of 3.93 ft/s. See attached Calculation Worksheet. Diversion Ditch #2 (0.28 AC Phase 1) Q=CIA=0.45 (bare soil) * 7.27 in/hr* 0.28 AC=0.92 cfs Using the cross-section specifications mentioned above and a 1.0% running slope and roughness coefficient of 0.025 (rough earth), the diversion will have a flow depth of 0.26' (1.74' freeboard which is greater than the 0.3' minimum) and velocity of 1.40 ft/s. See attached Calculation Worksheet. III. STORM DRAIN CALCULATIONS Included in this report are the pipe sizing calculations for the on-site storm sewer pipes and the NCDOT bypass system. These runoff rates are generated by the rational method and are based on the 100-year intensity for all storm drain structures flowing to the pond. These calculations show the total flow for each pipe section, velocity, and hydraulic grade elevations. The hydraulic grade lines have also been placed on the storm drain profiles. The storm drains have been analyzed for the 10-yr, 25-yr,and 100-yr storm events using the NOAA rainfall intensity information. The outfall pipes have been assumed to possess normal elevations for the HGL calculations with all pipes upstream of the underground detention with a starting HGL of the 100-yr,24-hr storm event storage elevation in the detention system 537.49'. Attached is the summary report from Hydraflow Storm Sewers for the analysis. All HGL elevations are below the RIM elevations and therefore the proposed pipes are sufficient. 8 It is noted for certain pipes, these calculations show the "Total Flow(cfs)" exceeding the listed "Capacity Full (cfs)." The Hydraflow Storm Sewers program calculates the "Capacity Full" using the Manning's pipe equation for full flow. This equation assumes the slope of the Energy Grade Line (EGL) equal to the slope of the pipe, and a flow depth equal to the diameter of the pipe. For this project, the pipe sizes are minimized, as such, certain pipes are allowed to flow under a surcharged condition. Surcharging a pipe places the Hydraulic Grade Line above the crown of the pipe, builds up head on the flow through the pipes, and thus puts pipes under pressure. The EGL becomes steeper than the pipe inverts and a flow greater than the full flow capacity is observed. This phenomenon is common and expected under these conditions. IV. OPERATIONS & MAINTENANCE PLAN Regular maintenance is necessary to keep the above-mentioned BMP's functioning properly. Proper maintenance activities and associated timelines are depicted below: Upon completion of the project QuikTrip Corporation will become responsible for the maintenance of the proposed BMP's. Underground Detention Typical Routine Maintenance Activity Schedule • Remove trash, debris, and sediment buildup in the underground trash racks, vaults, or tanks. • Check drainage areas for trash, erosion, and debris. • Clean underground detention if hazardous or foreign As needed substances are spilled in the contributing drainage area. • Perform structural repairs to inlet and outlets. • Follow manufacturers guidelines and develop/adjust plan for the underground detention. • Clean out underground detentions with vacuum or Annually boom trucks. • Clean sediment oil chambers. SNOUT Stormwater Activity Schedule • Monitor the system for sediment accumulation. As needed • Remove all sediment from the snout system. 9 Proprietary Water Quality Unit Maintenance Activity Schedule • Inspect unit and determine the level of accumulated solids stored in the 6 Months sump. • Remove all sediment trapped within the unit using a Commercial Vacuum Truck Annually • Remove all floatables and oil • Remove all sediment trapped within the unit using a Commercial After any spill Vacuum Truck events within • Remove all floatables and oil drainage area As required by • Replace cartridges as needed maintenance personnel 10 MAPS 1 2 I 3 I 4 I 5 I 6 I 7 I 8 I 9 I 10 I 11 I 12 I 13 I 14 I 15 J i jt 7 • ,a -..+ ` 1f tir• .... . - 'C ge • .i". 0ulM,914 V 11 •ilt . peEEss/o,ii,% Qq ` S. a c o s s . 4 7.7.-)t*....1......;;;,N4,0 00,47::c,"6 .:)1 ii0iii P ; - - AUsceniGFCL `e ChardAl it _ .£?biter$t J. �( - P • N SIGNATURE DATE:08/02/2023 c .4St •� • a N s . • h • 4 Y I! N c .ii4:pagirdiAlles -41 - SO -Sr, s , E Churct►5 . • •� C is Y • , • a 4 t" e '94 — F •BO i,fit 1 ,, ` sir m - W Unicn Sti - - -is-, ... —�-- — _ _ -' _ - - .- — ' tf, cb- C ,,� --- _ — ' ���--...-- ' i�d £t ' ,/ .-_ Q,_ •z-=_.-. '�'- tWO" � m v ip• • Ivf s ac •St i ` (� 1i3.iii 5t _ Cha 04,. .t2 e, ;r r fl- lig ar -6 i s• 1 IA ..' F. Ma hville glv -`� .•ar'.(er St r �.. a - _ •� w l lat ,,_ .. . 1 ,-0 ,i Ili - - _ - _ cc, ;,-, nips si ` T o" �» A. Ai _ s r Al "n fV Green'` i'' \'� t',�,rS` q . �o. 4 .,� G i1• �' L •. - . , G 1110. N��L \ Gr oro�.NY COPYRIGHT - Aat. St ari �2`� \ / . ►ffjr.ILn. - :s • WHOLEO..NPART.IS=TRIRLYFO.emZED USE, .PUBLICATION,DISTRIBUTION,OR SALE IN — I - - PROTOTYPE:P-113(02101/23) F . - r _ TTT��� • `.- DIVISION: F A 1 VERSION:001 J , 'fie ' •� DESIGNED BY:JES/WDE -• - It ee. 1 G DRAWN BY:TES —• " _( St., �• REVIEWED BY:WDE Nit- z E . - r I • E M N F \ O m • • , N \ N w o o D 9 •i a F D ..7 - .. , . ! . .9,-sittiii:\ , 0 w J vi 14(lillhf .. 0 s• 1 .- 1 re �� A,' �,' ` SHEET TITLE: I I.• 1 B At « . / • ' �, 0 0 © 0 AERIAL B �It + ` I 3 • '� • eri3r;11 i SHEET NUMBER: ' , N • c r ''• i, ‘ T4(411:1.1. a 1 1 2 I 3 I 4 I5 I 6 I 7 I 8 I9 I10 I11 I12 I 13 I 14 I15 Hydrologic Soil Group—Union County, North Carolina N 557650 557670 557690 557710 557730 557750 557770 557790 557810 557830 557850 34°59'9"N yy�� 34°59'9"N _ . . ' 5 Nklik- ' R. • — t ,' _g . N . .A I ap . all iii . ilk I- 1h 5 ) : 4, T,-oI Play.)Fna'v TOot1 I5�eaOocJ "IQ KI-do ocoalll@° 34°59'5"N 34°59'5"N 557650 557670 557650 557710 557730 557750 557770 557790 557810 557830 557850 to 3 3 N Map Scale:1:945 if printed on A landscape(11"x 8.5")sheet N N Meters 0 10 20 40 6o $ Feet 0 45 90 m 180 270 Map projection:Web Merc for Coer coordinates:WG584 Edge tics:UTM Zone 17N WGS84 USDA Natural Resources Web Soil Survey 7/25/2023 011. Conservation Service National Cooperative Soil Survey Page 1 of 4 Hydrologic Soil Group—Union County,North Carolina MAP LEGEND MAP INFORMATION Area of Interest(AOI) p c The soil surveys that comprise your AOI were mapped at Area of Interest(AOI) 1:24,000. 0 CID Soils • D Warning:Soil Map may not be valid at this scale. Soil Rating Polygons l A p Not rated or not available Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil n A/D Water Features line placement.The maps do not show the small areas of Streams and Canals contrasting soils that could have been shown at a more detailed n B scale. Transportation Q B/D r4-1. Rails Please rely on the bar scale on each map sheet for map n C measurements. ti Interstate Highways n CID US Routes Source of Map: Natural Resources Conservation Service Web Soil Survey URL: 0 D Major Roads Coordinate System: Web Mercator(EPSG:3857) n Not rated or not available Local Roads Maps from the Web Soil Survey are based on the Web Mercator Soil Rating Lines Background projection,which preserves direction and shape but distorts • • A distance and area.A projection that preserves area,such as the 1111 Aerial Photography Albers equal-area conic projection,should be used if more • • A/D accurate calculations of distance or area are required. ^r B This product is generated from the USDA-NRCS certified data as .v B/D of the version date(s)listed below. • r C Soil Survey Area: Union County, North Carolina Survey Area Data: Version 23,Sep 12,2022 • • CID Soil map units are labeled(as space allows)for map scales • • D 1:50,000 or larger. • w Not rated or not available Date(s)aerial images were photographed: Apr 17,2022—May Soil Rating Points 20,2022 p A The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background O A/D imagery displayed on these maps.As a result,some minor • B shifting of map unit boundaries may be evident. • B/D USDA Natural Resources Web Soil Survey 7/25/2023 Conservation Service National Cooperative Soil Survey Page 2 of 4 Hydrologic Soil Group—Union County, North Carolina Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI BuB Badin-Urban land C 1.5 46.1% complex,2 to 8 percent slopes CnB Cid-Urban land D 1.7 53.9% complex, 1 to 5 percent slopes Totals for Area of Interest 3.2 100.0% Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential)when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential)when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (ND, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. USDA Natural Resources Web Soil Survey 7/25/2023 Conservation Service National Cooperative Soil Survey Page 3 of 4 Hydrologic Soil Group—Union County, North Carolina Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff.None Specified Tie-break Rule: Higher USDA Natural Resources Web Soil Survey 7/25/2023 Conservation Service National Cooperative Soil Survey Page 4 of 4 Ua SGS U.S.DEU.SRGOOCL URyyERIOR U s S Topo MARS IE QUADRANGLE NORTH UROI.A 7.5-MINUTE SERIES 80 15.0000 sD Frm, S8E 00 59 60 61 62 eo ss 63 64 65 66 6) 68 ss.DDDD 0 • g 4 €" w" ev5690m e 6" �m e ® © ©sue` ,� `mated0. ao 72 cUVYUM3 u11 II1 ® VU R�hdaal w •iy�y�:,'. • Y ® UEM EU m 44 V ® V ® ® ;I 0 ® cmm®� i a '6e m ® EU ® ® .. ,0. ,� ]0 ®® ® ® ® `� V V U '0 9V EU %® - YE Y V U 6' o V A 06 ' zra 0 69 V D 69 ® V 6 '1 V ®® �_�;y� p s fib ® ^Jw" CO' a5 @` 1 68 ® V V E �4U 6) 9 V V 'at �„a ® U e' ' ea ® 67 �® ® ® 6 H he 6 �® � 4R IV ®44 66 o-w G �m 66 �' m. v'0m g qP1�,m40 6 65 v0 ' 9 ® � 00 0 a 65 U U V EU 1 V R ®m 4, 9 6 6 ® / C 4 1 aD 64 ® V / 5 �, 6 U AU ® ® �® �®VU ® 6 e® •Y° U 4 63 'OVN`v"�i cxmAWIDeU 2. ® 63 4C 6i eG &a ., 62 Iti A ®�� • N 1. f V R V 0 V CV V V tU 4 60 ® V® ® 44 U0m'C V N-+x.Cu�3® R 4 a> V _ kt - V 3a p2 58 59 60 61 62 63 64 65 66 67 '6844, KW Produced by the UTIDEd States GeoiaCui Survey SCALE 1:24 000 ROAD cu w w ,wx wx ww mw ww ww ww C.101.41.0WIN �CDIVREIA 0ECREDU Om�arvamp..vx xna.m V r woes 11%." a.e�w.aam.a�ian,w 1 6699., rvx x.��,xc o�p.x.n�.m us.a�v�was..m.,a. 6 z a wa WARSHVILLE,NC �� za2z National Flood Hazard Layer FIRMette FEMA _Legend 80°22'22"W 34°59'23"N SEE EIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT .ter.- .,4rrt �' . - lri Without Base Flood Elevation(BFE) r ' ... 4-` • r t • i - ' -f' .,, I Zone A,V A99 4 * r I • "` With BFE or Depth Zone AE,AO,AH,VE,AR SPECIAL FLOOD ' �.. 7� ' HAZARD AREAS Regulatory Floodway A •'l / i ` I } ) jr. ' 4 - ,'„x • �� {^'�� f j 0.2%Annual Chance Flood Hazard,Areas t , t _ of 1%annual chance flood with average 4. � • ; �+ h • ! a, depth less than one foot or with drainage • • .• areas of less than one square mile zone x ,•,-._ • 111164 •tfi: r.7 ` �' Future Conditions 1%Annual Chance Flood Hazard zone x .. __I -1 x' - !" Area with Reduced Flood Risk due to R - . ti = ^'� Levee.See Notes.zone x i �� - '� THER AREAS OF -' — • •• Jr.? FLOOD HAZARD �� Area with Flood Risk due to LeveezoneD .1 - Si • NO SCREEN Area of Minimal Flood Hazard zonex j c� ^ } , + J , 'r 1` � • r t IP y tit • Effective LOMRs f L i, h • I \ i s it OTHER AREAS Area of Undetermined Flood Hazard Zone D 1,41 S �' ' j, • 11."7'�' �•�r �, GENERAL ---' Channel,Culvert,or Storm Sewer • STRUCTURES I I I I 1 I Levee,Dike,or Floodwall f •• k , ,, . SAW `� 0 zos Cross Sections with 1%Annual Chance } � - 'IA` �+ .r ,, t�•s Water Surface Elevation • AREA OF MINIMAL FLOOD HAZARD• -4 - • TOWN OF MARSH\ ILLS • a a— Coastal Transect Z•• •'X7 T - -'-513-' -- Base Flood Elevation Line(BFE) (AREA�,OTi+ CL'UDED � ' ", Limit of Study 1' \ j }- j - Jurisdiction Boundary r• t.3•_ �.•4 O - --- Coastal Transect Baseline 3710548500J ' l , r '/` 3710549500J .,• . OTHER - Profile Baseline �� �,' • �, r ,�.. FEATURES Hydrographic Feature �� eff.'10/16/2008 l w Pff. 10/16/2008 A • v � �' • a N • ot Y '� '7 Digital Data Available N 7i No Digital Data Available ,_ a p �. '' MAP PANELS Unmapped 4. -,111. , x ( '4.. ' .: pi ' The pin displayed on the map is an approximate • point selected by the user and does not represent • • r141,a*Op'+y `./,4 i •� g y - an authoritative property location. ipi „ V ' ., • •• This map complies with FEMA's standards for the use of 4 + - ,I digital flood maps if it is not void as described below. M1 '. .>( The basemap shown complies with FEMA's basemap ' '. • t �• accuracy standards _ • .. r r k, -' ii, Ilk The flood hazard information is derived directly from the 1'• •, - �* r. _rauthoritative NFHL web services provided by FEMA.This map • :t :4�' '` 7 , r f was exported on 8/2/2023 at 4:24 PM and does not .. . -< •• reflect changes or amendments subsequent to this date and �� '•r 1 -�, ,'• . . time.The NFHL and effective information may change or A, • become superseded by new data over time. r 1 '. } �• . ' * This map image is void if the one or more of the following map elements do not appear:basemap imagery,flood zone labels, Z� t 1 /010 Al- w+ legend,scale bar,map creation date,community identifiers, 1 80°21'44"W 34°58'S3"N FIRM panel number,and FIRM effective date.Map images for Feet I.6 00o unmapped and unmodernized areas cannot be used for 0 250 500 1,000 1,500 2,000 regulatory purposes. Basemap Imagery Source:USGS National Map 2023 1 I 2 I 3 I 4 I 5 I 6 I 7 I 8 I 9 I 10 I 11 I 12 I 13 I 14 I 15 Q PRE-DEVELOPMENT DRAINAGE PRE-DEVELOPMENT LEGEND S/e,z0Essi°4\ Q IMPERVIOUS PERVIOUS TOTAL AREA WEIGHTED _ N0. 047666 ANALYSIS BASIN BUILDINGS/ASPHALT GRAVEL GRASS,FAIR COND. WOODS/GRASS COMBO (AC.) CN A = BASIN DESIGNATION (CN=98) (CN=91) (CN=84) (CN=82) B = BASIN AREA (AC) F, R- POINT To AP#1 0.39 0.35 1.18 0.74 2.65 86.4 w C = CURVE NUMBER '�F<4'GINEF',�'`O To AP#2 0.27 0.20 0.36 0.03 0.86 90.0 ,,, p7jrgti/D11M''1pS P °r Ins - . . . - BASIN BOUNDARY P \ SIGNATURE DATE:01/17/2024 To TIME OF CONCENTRATION PATH U s N ANALYSIS \° M�e 11s POINT #2 / i -�l1 N D / r� / !ill AAA\ ;e c 1IOWg * — — 07 �I uJ \ PIN:023>100Q I IJ1e I / M \ N OB Zonp05B 3$4 014111111.1 MI MI - F..PIN 02211005 \ \ ier;riot.\\ *##N \'‘,N\\ \ \ ___---1-tt--2' R., I 1 'T, . L \�\ \ / /// I iry I,no'wire, F ..� cn L di TI �v\\,/ -\ \\\\I i � �/ i//I//I 4��,,v v \ N.� �1yP axe \ A v — v v v�y,"°" o \ 'cT A0 K A ,o ,� /i U�/p ��� V AV Rvv\ �C \ \ A A / �. m w K ��. s �� ���1 'lR " ��/�� ���� V wo �A \ \ \ t \ 4. `` — v v v �� ` sea ET > J Aso I \ \ _ \ s�� / aa/ �1r ��/� � a o�\\ \ \ — — \ \ \ ENE SERE Q = F!? 7_2_,,,::,,,4______ _____ z__ _ '� // — — ' 2111''', 'C r°" ORE < re S„:`>;4. / �a a41//// — \ \_\\ \ \� \ \ \ \ \ -%fir I L a .,,,, \ 04 c. v � //,/1� ,,� v v ��1/4 , — ( Ate_ / reo, I 1 F H \ ''P.\:"<,��V2 TO AP#2 t4PIf/ 71,„� A V �N\N 8�� 2.65 86 ___ ,,,,,. , . _ �� ��� I — �b Ao.8s 90 t �����I �.Q /� v,„ v� \V ri.-,--„,,j... A — \ v o w, • % v v he� ♦ vv v �i r 1 w ®wwRIGHTu REPRODUCTION,N201L - \ io se, — — _ 8 r` 1 WHOLE OR m PART,a STRICTLY FORBIDDEN PUBLICATION, BLICAUNAUTHORIZED M. \ // \ o //%/' / sw�e,��\ �x. ''''1' I �cAn x,00-nu ox,onsALe�x f \\ "y o ` / oo L \ \ I , I _<:1, PROTOTYPE:v-us(oz/ol/za) = \ \\ r • / \tV I r /' il VERSION:001 n o illi' y '^ Bui10,^ / e / \ DESIGNED BY:JES/WDE s ♦,• xe�Wt:siz s.r • I I I DRAWN BY:]ES a — R ,;\ \ \ I. roo:vri % \. \ I I /, 9pi 9` 2,61is sr. 6�S f'.� 1 rv-si�se -EVIEWED BY:WDE v ao ♦ z�F.�rao�: s IUD J �. m L E k • l• j ��, /am-//_/�� ��� �;r w I _.� M E \� alto ago .� ffia j,111141 _y ��I� J . . _r. 0\_ 06 di ,�� o D 4 �/ s e` Wt, - wte wtr o -_ c + a p ^— s ss— r I / / / -r m.w-s.nn UJ -ns 01 /55 ♦ au S t MARSHVILLE SQUEEVARD(U.S.Highway 74) . �♦ a 4 C o /(150 Foot Public Right-of-Way) \ '''.♦ o c z C o P \ ao a o 17 \ ♦ 5 i om ue5 Y o _ \ ♦ rc s .00 R; — \ _ — OBI z.er- s ee aa° worm u i� SHEET TITLE: B — • — — — Asphalted Over 15, �., _ — — — � Z � � o/� ® © ' PRE-DEVELOPED DRAINAGEB — — alto :. +:t �uro g•J¢�.,� ee �s, 9 .o — m:=�#>.:o ea Z orc xnw ea \\ SHEET NUMBER: xAw 88 \ A so 1� so so C121 A 1 I 2 I 3 I 4 I 5 I 6 I 7 I 8 I 9 I 10 I 11 I 12 I 13 I 14 I 15 1 I 2 I 3 I 4 I 5 I 6 I 7 I 8 I 9 I 10 I 11 I 12 I 13 I 14 I 15 ,1pu Iltpi We POST-DEVELOPMENT DRAINAGE POST-DEVELOPMENT LEGEND ���o�FEss�a.�'�y�'� Q IMPERVIOUS PERVIOUS TOTAL AREA WEIGHTED A �` Q�C �9< �= Q BASIN BUILDINGS/ASPHALT(CN=98) GRASS,GOOD COND.(CN=80) (AC.) CN gh B = BASIN DESIGNATIONEAC) = ANALYSIS B = BASIN AREA (AC) I _ NO. 047666 • To Detention 2.07 0.30 2.37 95.7 0o C = CURVE NUMBER , tp FN i N �' �` POINT #1 Bypass A 0.09 0.15 0.24 86.5 O� G 6 Bypass B 0.00 0.31 0.31 80.1 0,C • • BASIN BOUNDARY ��'/, CUp iiiiiiiii```\5.� P To AP#2 0.24 0.36 0.60 87.1 e^I zs2 Tc TIME OF CONCENTRATION PATH P I SIGNATURE DATE:01/17/2024 Z \ Z /7 s II® i1 0 N ANALYSIS X �ML as POINT #2 ° 2 , Y gg N BYPASS B i4 I it, o.a 1 \ \��\ \ 0.31 80 \ _ _ �� I\ 1 TI W /F \�� \ \ \ 'ie 0231103, 02.2 41,2'aw / hT V' M oeneld Men° \ OBZonp05 3$4 \ sj 618'.1 \ ^ P.•l— <° I tens.SFR-3 v 1 1 ' ) CII 40# ,, •,,\L I. CO z K e / Illi. !�_� 1 '� °1. \ �' �I;eau,°3 J 3 s° s. ' �mt/ ti� :11.1:11\‘: / c��� �� ® I ,1M1i= ®ie� it -„�66 gI.REE� v) > a6 3° 0 WV °„ to GRE a n� 100,1.1:#, ,':', 4 is 2 it M Wil a, t II\ \ '��' a is o; 3 = wisoFfr a • ° DETENTIONa H `:� TO AP#2 i 11 ——— 918C 2.37 96 aLM — �� 11I� H\\ s / O � �1 FT(—I'll / I u j,o,1 S • ,..ditiall `r: All t'''1 ''' .,„ N,,,,,, - IN �1 CC, . \ OE .ILA►Ca �� F ' UGT UGT �_� 11 i i USE,REPRODUCTION, 8 , ` 49 - _ WI ®wwnrGo vu�mu,Kmm wnvoxnn°ry zou— Q • • �� aEoamvnar, awaooErvlam: P � ANY�rnnorv.oma orv,asn.Lelrv-1111 �Li�� PROTOTYPE:P-113(02/01/23) ce F • 11 1_ � �JJ �1 ^ ,� i DMSION: p dz1I I VERSION:001 o ° _ .O IIr �`� , \ IDESIGNED BY:JES/WDE 1 i` L. �� J1/I ,11 /1, DRAWN BY:3ES \�� _ • ■ ®b. ��' % = I REVIEWED BY:WDE O ♦ o •m ,,� 17 Fro.f Setback • -.Mg,4, / ki, / I E OHE F / OHE` ' . _ ' I >�' - % 2 �_ •ik ,i •r.� 'limn i. sol 11 NO D — �# — - - — �1! � \ 32=541 56 ai e t �, 1_ MARSHVILLE�UEEVARD(U.S.Highway 74) ��' • `-0 a :1 C o (150 Foot Public Right-of-Way) \ =9 ''"k ° a z C sq- E \ \ — • ic - i �,a ar— °ve ee / sxe.m u SHEET TITLE: Asphalted Over B �. , �-66.; — — _ — — — __ —a �o Z \ ® I © ' POST-DEVELOPED B ° au° .' `: a• —,.: 9e ¢ .140 a serve ' i ,-',,. \ DRAINAGE MAP s,3 r^.�.re� ,e e 9 ,e,ry g se 9 .. 1) _ o — 14 r'o'._S.:°2 m I SHEET NUMBER: i ER FD \ A ® 30 15 0 30 60 Cl2 2 A 1 I 2 I 3 I 4 I 5 I 6 I 7 I 8 I 9 I 10 I 11 I 12 I 13 I 14 I 15 RAINFAT I , DATA NOAA Atlas 14,Volume 2,Version 3 es,""°,e4, Location name: Marshville, North Carolina, USA* ''''''°`° i If a Latitude:34.9856°,Longitude: -80.3674° norm I .. Elevation:541 ft** Nadi '�'*.Es o`o W *source:ESRI Maps **source:USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M.Bonnin,D.Martin,B.Lin,T.Parzybok,M.Yekta,and D.Riley NOAA,National Weather Service,Silver Spring,Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)1 Average recurrence interval(years) Duration 1 2 5 10 25 50 100 200 500 1000 5-min 0.432 0.510 0.592 0.651 0.718 0.765 0.807 0.845 0.889 0.920 (0.397-0.469) (0.468-0.556) (0.542-0.645) (0.596-0.707) (0.655-0.779) (0.694-0.830) (0.729-0.876) (0.760-0.918) (0.791-0.967) (0.813-1.00) 10-min 0.689 0.816 0.948 1.04 1.14 1.22 1.28 1.34 1.41 1.45 (0.634-0.750) (0.749-0.890) (0.868-1.03) (0.952-1.13) (1.04-1.24) (1.10-1.32) (1.16-1.39) (1.20-1.46) (1.25-1.53) (1.28-1.58) 1 5-min 0.862 1.03 1.20 1.32 1.45 1.54 1.62 1.69 I 1.77 I 1.82 (0.793-0.937) (0.942-1.12) (1.10-1.31) (1.20-1.43) (1.32-1.57) (1.40-1.67) (1.46-1.76) (1.52-1.84) (1.58-1.93) (1.61-1.98) 30-min 1.18 1.42 1.70 1.91 2.15 2.32 2.48 2.63 2.82 2.94 (1.09-1.28) (1.30-1.54) (1.56-1.86) (1.75-2.07) (1.96-2.33) (2.11-2.52) (2.24-2.69) (2.36-2.86) (2.51-3.06) (2.60-3.21) 60-min 1.47 1.78 2.18 2.48 2.86 3.15 3.42 3.69 4.04 4.30 (1.36-1.60) (1.63-1.94) (2.00-2.38) (2.27-2.70) (2.61-3.10) (2.86-3.41) (3.09-3.71) (3.32-4.01) I (3.60-4.40) (3.80-4.69) 2-hr 1.70 2.06 2.55 2.92 3.41 3.77 4.14 4.50 4.97 5.34 (1.56-1.86) (1.88-2.25) (2.33-2.79) (2.67-3.19) (3.09-3.71) (3.41-4.10) (3.72-4.50) (4.01-4.89) 1 (4.39-5.42) (4.67-5.82) 3-hr 1.80 2.18 2.72 3.14 3.70 4.14 4.59 5.05 5.68 6.18 (1.65-1.99) (1.99-2.40) (2.48-3.00) (2.85-3.44) (3.34-4.06) (3.72-4.53) (4.10-5.01) (4.47-5.51) (4.96-6.20) (5.34-6.76) 6-hr 2.16 2.60 3.25 3.76 4.45 5.00 5.56 6.14 6.94 7.57 _ (1.97-2.37) (2.38-2.86) (2.97-3.58) (3.42-4.12) (4.02-4.86) (4.49-5.45) (4.96-6.06) (5.42-6.68) (6.05-7.54) (6.52-8.24) 12-hr 2.54 3.07 3.85 4.47 5.34 6.03 6.75 7.51 8.56 9.42 (2.33-2.79) (2.81-3.38) (3.52-4.23) (4.08-4.91) (4.83-5.84) (5.41-6.58) (6.00-7.36) (6.60-8.18) I (7.41-9.32) (8.04-10.3) 24-hr 3.00 3.62 4.56 5.31 6.36 7.22 8.12 9.08 1 10.4 11.5 (2.76-3.26) (3.34-3.94) (4.19-4.96) (4.87-5.77) (5.80-6.92) (6.56-7.85) (7.35-8.84) (8.17-9.90) (9.32-11.4) (10.2-12.6) 2-day 3.53 4.25 5.31 6.16 7.35 8.32 9.34 10.4 11.9 13.2 (3.26-3.83) 1 (3.92-4.62) (4.90-5.77) (5.66-6.68) (6.74-7.98) (7.59-9.03) (8.48-10.2) (9.40-11.3) (10.7-13.1) (11.7-14.5) 3-day 3.74 4.50 5.59 6.46 7.68 8.68 9.72 10.8 12.4 13.7 (3.46-4.05) (4.16-4.87) (5.16-6.05) (5.96-6.99) (7.06-8.32) (7.94-9.40) (8.86-10.5) (9.80-11.8) (11.1-13.5) (12.2-15.0) 4-day 3.95 4.74 5.86 6.76 8.02 9.04 10.1 11.2 12.8 14.2 (3.67-4.27) (4.40-5.12) (5.43-6.33) (6.25-7.30) (7.38-8.66) (8.30-9.78) (9.23-10.9) (10.2-12.2) i (11.6-14.0) (12.7-15.4) 7-day I 4.56 5.45 6.64 7.61 8.95 10.0 11.1 12.3 14.0 15.4 (4.27-4.90) (5.10-5.85) (6.21-7.13) (7.09-8.16) (8.31-9.60) (9.28-10.8) (10.3-12.0) (11.3-13.3) (12.8-15.1) (13.9-16.7) 10-day 5.24 6.24 7.52 8.53 9.91 11.0 I 12.1 13.3 14.8 16.2 (4.92-5.60) (5.85-6.66) (7.04-8.02) (7.97-9.09) (9.23-10.6) (10.2-11.7) (11.2-12.9) (12.2-14.2) (13.6-15.9) (14.8-17.4) 20-day 7.05 8.32 9.84 11.0 12.7 14.0 15.3 16.6 18.5 19.9 (6.66-7.48) (7.85-8.83) (9.27-10.4) _(10.4-11.7) (11.9-13.5) (13.1-14.8) (14.3-16.2) (15.5-17.7) (17.1-19.7) (18.3-21.3) 30-day 8.67 10.2 11.9 13.2 14.9 16.2 17.6 18.9 20.6 22.0 (8.21-9.14) (9.66-10.8) (11.2-12.5) (12.5-13.9) (14.1-15.7) (15.3-17.1) (16.5-18.5) (17.7-20.0) (19.2-21.9) (20.4-23.4) 45-day 10.9 12.8 14.7 16.1 18.0 19.4 20.8 22.2 24.0 25.3 (10.4-11.5) (12.2-13.4) (13.9-15.4) (15.3-16.9) (17.0-18.9) (18.3-20.4) (19.6-21.9) (20.9-23.3) (22.5-25.3) (23.7-26.8) 60-day 13.0 15.2 17.3 18.8 20.9 22.4 23.8 25.3 27.1 28.5 (12.5-13.6) (14.5-15.9) (16.5-18.0) (18.0-19.7) (19.9-21.8) (21.3-23.4) I (22.6-25.0) (23.9-26.5) (25.6-28.5) (26.8-30.0) 1 Precipitation frequency(PF)estimates in this table are based on frequency analysis of partial duration series(PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90%confidence interval.The probability that precipitation frequency estimates (for a given duration and average recurrence interval)will be greater than the upper bound(or less than the lower bound)is 5%.Estimates at upper bounds are not checked against probable maximum precipitation(PMP)estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical PDS-based depth-duration-frequency (DDF) curves Latitude: 34.9856°, Longitude: -80.3674° Average recurrence rral 25 - ±yn.tee2ai rs) c_c 20I[/ a — 5 a) c 0 — 10 co 15 — 25 ro — 50 c_ 10 / — 100 a ', — 200 / 500 5 - l-iJ III — 1000 0 I I i I i I I I I I I I c c c c c L V '- I L >, >,7, >, a, >, >, >,>, E •E •E .E .E L L rl b rry t -Oro -O ro-O ro ro 17 ro ro ro ro ro A e V1 O ..-1 m Duration NiO� N m v V) 25 - c L 20 _ J_— Duration a)a ' — 5-min — 2-day v c 15 — 10-min — 3-day o II -� 15-min — 4-day a 10 - �— — 30-min — 7-day _______- — 60-min — 10-day Ii — 2fir — 20 day 5 -- — 3-hr — 30-day — 6-hr — 45-day J — 12-hr — 60-day 0_ • 1 I I I I — 24fir 1 2 5 10 25 50 100 200 500 1000 Average recurrence interval (years) NOAA Atlas 14,Volume 2,Version 3 Created(GMT):Tue Jul 25 21:41:13 2023 Back to Top Maps & aerials Small scale terrain Marshvill 3km , i 2mi Large scale terrain f" , 0 r tiN Winston-Salem • • Durham Greensboro • { t.flMitchell Raleigh Asheville NORTH CAROLINA •Chart:ate Fayetteville• ■— I Greenville SOUTH CAROLINA ni Q119 100km pia 0di 60mi Large scale map fiii„. Winston-Salem Greensboro Durham ",' Raleigh Ash II North Carolin a P arlotte I Fpyettevi Ile 0 - le imbia 100km II -th 60mi _,i na / Large scale aerial Winston-Salem Greensboro Durham . Raleigh Asheville • North Carolina Charlotte • Fayettevill: • Greenville • mbia 100km 60mi .ling Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring,MD 20910 Questions?:HDSC.Questions@noaa.gov Disclaimer NOAA Atlas 14,Volume 2,Version 3 °° Location name: Marshville, North Carolina, USA* ''''''°`° i If a Latitude:34.9856°,Longitude: -80.3674° norm I ;. Elevation:541 ft** lid) '�'*.Es o`o W *source:ESRI Maps **source:USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M.Bonnin,D.Martin,B.Lin,T.Parzybok,M.Yekta,and D.Riley NOAA,National Weather Service,Silver Spring,Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches/hour)1 Average recurrence interval(years) Duration 1 2 5 10 25 50 100 200 500 1000 5-min 5.18 6.12 7.10 7.81 8.62 9.18 9.68 10.1 10.7 I 11.0 (4.76-5.63) (5.62-6.67) (6.50-7.74) (7.15-8.48) (7.86-9.35) (8.33-9.96) (8.75-10.5) (9.12-11.0) (9.49-11.6) (9.76-12.0) 10-min 4.13 4.90 5.69 6.25 6.87 7.31 7.70 8.04 8.44 8.69 (3.80-4.50) (4.49-5.34) (5.21-6.19) (5.71-6.79) i (6.26-7.45) (6.63-7.93) (6.95-8.35) (7.22-8.74) (7.51-9.18) (7.68-9.49) 15-min 3.45 4.10 4.80 5.27 5.80 6.17 6.49 6.76 7.08 7.27 (3.17-3.75) (3.77-4.47) (4.39-5.22) (4.82-5.72) (5.29-6.30) (5.60-6.69) (5.86-7.04) (6.08-7.35) (6.30-7.70) (6.42-7.94) 30-min 2.36 2.83 3.41 3.82 4.30 4.65 4.97 5.26 5.63 5.89 (2.17-2.57) (2.60-3.09) (3.12-3.71) (3.49-4.15) (3.92-4.66) _(4.22-5.04) (4.49-5.39) (4.73-5.72) (5.01-6.13) (5.20-6.43) 60-min 1.47 1.78 2.18 2.48 ' 2.86 3.15 3.42 3.69 4.04 4.30 (1.36-1.60) (1.63-1.94) (2.00-2.38) (2.27-2.70) (2.61-3.10) I (2.86-3.41) (3.09-3.71) (3.32-4.01) (3.60-4.40) 1 (3.80-4.69) 2-hr 0.849 1.03 1.28 1.46 1.70 1.89 2.07 2.25 2.49 2.67 (0.779-0.929) (0.942-1.13) (1.17-1.39) (1.33-1.60) (1.55-1.85) (1.70-2.05) (1.86-2.25) (2.01-2.45) (2.20-2.71) (2.34-2.91) 3-hr 0.600 0.725 0.906 1.04 1.23 1.38 1.53 1.68 1.89 2.06 (0.548-0.661) (0.663-0.800) (0.826-0.997) (0.950-1.15) (1.11-1.35) (1.24-1.51) (1.36-1.67) (1.49-1.83) (1.65-2.07) (1.78-2.25) 6-hr 0.360 0.435 0.543 0.628 0.743 0.834 0.928 1.02 1.16 1.26 (0.329-0.396) (0.397-0.477) (0.495-0.597) (0.571-0.688) (0.672-0.811)1(0.749-0.909) (0.827-1.01) (0.905-1.12) (1.01-1.26) (1.09-1.38) 12-hr 0.210 0.254 0.319 0.371 0.442 0.500 0.560 0.622 0.710 0.781 (0.193-0.231) (0.233-0.280) (0.292-0.351) (0.338-0.407) (0.400-0.484) (0.449-0.546) (0.498-0.610) (0.547-0.678) (0.614-0.773) (0.666-0.851) 24-hr 0.125 0.150 0.190 0.221 0.265 0.300 0.338 0.378 0.434 0.480 (0.115-0.136) (0.139-0.164) (0.174-0.206) (0.202-0.240) (0.241-0.288) (0.273-0.327) (0.306-0.368) (0.340-0.412) (0.388-0.474) (0.426-0.526) 2-day 0.073 0.088 0.110 0.128 0.153 0.173 0.194 0.216 0.248 0.274 (0.067-0.079) (0.081-0.096) (0.102-0.120) (0.118-0.139) (0.140-0.166) (0.158-0.188) (0.176-0.211)1(0.195-0.236) (0.222-0.271) (0.243-0.301) 3-day 0.051 0.062 0.077 0.089 0.106 0.120 0.135 0.150 0.172 0.189 (0.048-0.056) (0.057-0.067) (0.071-0.084) (0.082-0.097) (0.098-0.115) (0.110-0.130) (0.123-0.146) (0.136-0.163) (0.154-0.187) (0.169-0.207)I 4-day 0.041 0.049 0.061 0.070 0.083 0.094 0.105 0.116 0.133 0.147 (0.038-0.044) (0.045-0.053) (0.056-0.065) (0.065-0.076) (0.076-0.090) (0.086-0.101) (0.096-0.113) (0.106-0.126) (0.120-0.145) (0.132-0.160) 7-day 0.027 0.032 0.039 0.045 0.053 0.059 0.066 0.073 0.083 0.091 (0.025-0.029) (0.030-0.034) (0.036-0.042) (0.042-0.048) (0.049-0.057) (0.055-0.064) (0.061-0.071) (0.067-0.078) (0.075-0.090) (0.083-0.099) 10-day 0.021 0.026 0.031 0.035 0.041 0.045 0.050 0.055 0.061 0.067 (0.020-0.023) (0.024-0.027) (0.029-0.033) (0.033-0.037) (0.038-0.043) (0.042-0.048) (0.046-0.053) (0.051-0.059) (0.056-0.066) (0.061-0.072) 20-day 0.014 0.017 0.020 0.023 0.026 0.029 0.031 0.034 0.038 0.041 (0.013-0.015) (0.016-0.018) (0.019-0.021) (0.021-0.024) (0.024-0.028) (0.027-0.030) (0.029-0.033) (0.032-0.036) (0.035-0.041) (0.038-0.044)i 30-day 0.012 0.014 0.016 0.018 0.020 0.022 0.024 0.026 0.028 0.030 (0.011-0.012) (0.013-0.014) (0.015-0.017) (0.017-0.019) (0.019-0.021) (0.021-0.023) (0.022-0.025) (0.024-0.027) (0.026-0.030) (0.028-0.032) 45-day 0.010 0.011 0.013 0.014 0.016 0.017 0.019 0.020 0.022 0.023 (0.009-0.010) (0.011-0.012) (0.012-0.014) (0.014-0.015) (0.015-0.017) (0.016-0.018) (0.018-0.020) (0.019-0.021) (0.020-0.023) (0.021-0.024) 60-day 0.009 0.010 0.011 0.013 0.014 0.015 0.016 0.017 0.018 0.019 (0.008-0.009) (0.010-0.011) (0.011-0.012) (0.012-0.013),(0.013-0.015) (0.014-0.016) (0.015-0.017) (0.016-0.018) (0.017-0.019)1(0.018-0.020) 1 Precipitation frequency(PF)estimates in this table are based on frequency analysis of partial duration series(PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90%confidence interval.The probability that precipitation frequency estimates(for a given duration and average recurrence interval)will be greater than the upper bound(or less than the lower bound)is 5%.Estimates at upper bounds are not checked against probable maximum precipitation(PMP)estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical PDS-based intensity-duration-frequency (IDF) curves Latitude: 34.9856°, Longitude: -80.3674° 101 I Average recurrence mtenal `�`\_ (years) -cc 1 • 2 Z' 100 •- \171 — 5 y \\ = 10 c 25 y \ — 50 10-1 _ — 100 a — 200 \\` 500a \ �- — 1000 10-2 - .E -E •E •E .E r e' L t L ro ro ro m l0 N N N r0 : i N f,1 V5 N � -O -O-O � 17 0 0 0 0 u1 O m Duration N N t` - N m Tt V) 101 L C Duration .' 10° c — 5-min — 2-day c — 10-nln — 3-day c 15-min — 4-day I10-1 — 3fir — 30-day — 6fir — 45-day 10-2 — 12-hr — 60-day 1 I I I 1 I i I — 24-hr 1 2 5 10 25 50 100 200 500 1000 Average recurrence interval (years) NOAA Atlas 14,Volume 2,Version 3 Created(GMT):Tue Jul 25 21:42-02 2023 Back to Top Maps & aerials Small scale terrain Marshvill 3km , i 2mi Large scale terrain f" , 0 r tiN Winston-Salem • • Durham Greensboro • { t.flMitchell Raleigh Asheville NORTH CAROLINA •Chart:ate Fayetteville• ■— I Greenville SOUTH CAROLINA ni Q119 100km pia 0di 60mi Large scale map fiii„. Winston-Salem Greensboro Durham ",' Raleigh Ash II North Carolin a P arlotte I Fpyettevi Ile 0 - le imbia 100km II -th 60mi _,i na / Large scale aerial Winston-Salem Greensboro Durham . Raleigh Asheville • North Carolina Charlotte • Fayettevill: • Greenville • mbia 100km 60mi .ling Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring,MD 20910 Questions?:HDSC.Questions@noaa.gov Disclaimer HYDRAFLOW SUMMARIES Hydraflow Table of Contents 1069-Stormwater.gpw Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Monday, 02/26/2024 Watershed Model Schematic 1 Hydrograph Return Period Recap 2 1 - Year Summary Report 3 Hydrograph Reports 4 Hydrograph No. 1, SCS Runoff, Pre-Dev To AP#1 4 Hydrograph No. 2, SCS Runoff, Pre-Dev To AP#2 5 Hydrograph No. 4, SCS Runoff, Post-Dev Bypass A 6 Hydrograph No. 5, SCS Runoff, Post-Dev Bypass B 7 Hydrograph No. 6, SCS Runoff, Post-Dev To Detention 8 Hydrograph No. 7, Reservoir, Thru Detention 9 Pond Report - Underground Detention + Dry Pond 10 Hydrograph No. 8, Combine, Total Post-Dev to AP#1 13 Hydrograph No. 9, SCS Runoff, Post-Dev to AP#2 14 Hydrograph No. 11, SCS Runoff, Offsite 15 Hydrograph No. 12, Combine, Downstream Analysis (Pre-Dev) 16 Hydrograph No. 13, Combine, Downstream Analysis (Post-Dev) 17 2 - Year Summary Report 18 Hydrograph Reports 19 Hydrograph No. 1, SCS Runoff, Pre-Dev To AP#1 19 Hydrograph No. 2, SCS Runoff, Pre-Dev To AP#2 20 Hydrograph No. 4, SCS Runoff, Post-Dev Bypass A 21 Hydrograph No. 5, SCS Runoff, Post-Dev Bypass B 22 Hydrograph No. 6, SCS Runoff, Post-Dev To Detention 23 Hydrograph No. 7, Reservoir, Thru Detention 24 Hydrograph No. 8, Combine, Total Post-Dev to AP#1 25 Hydrograph No. 9, SCS Runoff, Post-Dev to AP#2 26 Hydrograph No. 11, SCS Runoff, Offsite 27 Hydrograph No. 12, Combine, Downstream Analysis (Pre-Dev) 28 Hydrograph No. 13, Combine, Downstream Analysis (Post-Dev) 29 10 - Year Summary Report 30 Hydrograph Reports 31 Hydrograph No. 1, SCS Runoff, Pre-Dev To AP#1 31 Hydrograph No. 2, SCS Runoff, Pre-Dev To AP#2 32 Hydrograph No. 4, SCS Runoff, Post-Dev Bypass A 33 Hydrograph No. 5, SCS Runoff, Post-Dev Bypass B 34 Hydrograph No. 6, SCS Runoff, Post-Dev To Detention 35 Hydrograph No. 7, Reservoir, Thru Detention 36 Hydrograph No. 8, Combine, Total Post-Dev to AP#1 37 Hydrograph No. 9, SCS Runoff, Post-Dev to AP#2 38 Hydrograph No. 11, SCS Runoff, Offsite 39 Hydrograph No. 12, Combine, Downstream Analysis (Pre-Dev) 40 Contents continued... 1069-Stormwater.gpw Hydrograph No. 13, Combine, Downstream Analysis (Post-Dev) 41 25 - Year Summary Report 42 Hydrograph Reports 43 Hydrograph No. 1, SCS Runoff, Pre-Dev To AP#1 43 Hydrograph No. 2, SCS Runoff, Pre-Dev To AP#2 44 Hydrograph No. 4, SCS Runoff, Post-Dev Bypass A 45 Hydrograph No. 5, SCS Runoff, Post-Dev Bypass B 46 Hydrograph No. 6, SCS Runoff, Post-Dev To Detention 47 Hydrograph No. 7, Reservoir, Thru Detention 48 Hydrograph No. 8, Combine, Total Post-Dev to AP#1 49 Hydrograph No. 9, SCS Runoff, Post-Dev to AP#2 50 Hydrograph No. 11, SCS Runoff, Offsite 51 Hydrograph No. 12, Combine, Downstream Analysis (Pre-Dev) 52 Hydrograph No. 13, Combine, Downstream Analysis (Post-Dev) 53 100 - Year Summary Report 54 Hydrograph Reports 55 Hydrograph No. 1, SCS Runoff, Pre-Dev To AP#1 55 Hydrograph No. 2, SCS Runoff, Pre-Dev To AP#2 56 Hydrograph No. 4, SCS Runoff, Post-Dev Bypass A 57 Hydrograph No. 5, SCS Runoff, Post-Dev Bypass B 58 Hydrograph No. 6, SCS Runoff, Post-Dev To Detention. 59 Hydrograph No. 7, Reservoir, Thru Detention 60 Hydrograph No. 8, Combine, Total Post-Dev to AP#1 61 Hydrograph No. 9, SCS Runoff, Post-Dev to AP#2 62 Hydrograph No. 11, SCS Runoff, Offsite 63 Hydrograph No. 12, Combine, Downstream Analysis (Pre-Dev) 64 Hydrograph No. 13, Combine, Downstream Analysis (Post-Dev) 65 1 Watershed Model Schematic HydraflowHydrographsExtensionforAutodesk®Civil3D®byAutodesk, Inc.v2023 tt) e23. •• 12 •� 13 Legend Hyd. Origin Description 1 SCS Runoff Pre-Dev To AP#1 2 SCS Runoff Pre-Dev To AP#2 4 SCS Runoff Post-Dev Bypass A 5 SCS Runoff Post-Dev Bypass B 6 SCS Runoff Post-Dev To Detention 7 Reservoir Thru Detention 8 Combine Total Post-Dev to AP#1 9 SCS Runoff Post-Dev to AP#2 11 SCS Runoff Offsite 12 Combine Downstream Analysis(Pre-Dev) 13 Combine Downstream Analysis(Post-Dev) Project: 1069 - Stormwater.gpw Monday, 02/26/2024 2 Hydrograph Return Period Recap Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 I Hyd. Hydrograph Inflow Peak Outflow(cfs) Hydrograph No. type hyd(s) Description (origin) 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 1 SCS Runoff 5.662 7.459 12.44 15.54 20.71 Pre-Dev To AP#1 2 SCS Runoff 2.133 2.727 4.343 5.340 6.998 Pre-Dev To AP#2 4 SCS Runoff 0.474 0.625 1.044 1.305 1.740 Post-Dev Bypass A 5 SCS Runoff 0.485 0.679 1.240 1.599 2.207 Post-Dev Bypass B 6 SCS Runoff 9.190 11.26 16.84 20.29 26.05 Post-Dev To Detention 7 Reservoir 6 2.989 5.329 8.913 9.809 10.92 Thru Detention 8 Combine 4,5,7 3.945 6.612 11.17 12.68 14.83 Total Post-Dev to AP#1 9 SCS Runoff 1.322 1.731 2.860 3.561 4.730 Post-Dev to AP#2 11 SCS Runoff 46.36 58.25 90.40 110.18 143.10 Offsite 12 Combine 1, 11 51.45 64.91 101.37 123.84 161.22 Downstream Analysis(Pre-Dev) 13 Combine 8, 11, 50.11 64.16 100.94 122.34 157.45 Downstream Analysis(Post-Dev) Proj. file: 1069 - Stormwater.gpw Monday, 02/26/2024 3 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 5.662 2 722 15,877 Pre-Dev To AP#1 2 SCS Runoff 2.133 2 722 6,039 Pre-Dev To AP#2 4 SCS Runoff 0.474 2 724 1,481 Post-Dev Bypass A 5 SCS Runoff 0.485 2 722 1,378 Post-Dev Bypass B 6 SCS Runoff 9.190 2 716 20,332 Post-Dev To Detention 7 Reservoir 2.989 2 724 20,320 6 536.37 10,567 Thru Detention 8 Combine 3.945 2 724 23,180 4,5,7 Total Post-Dev to AP#1 9 SCS Runoff 1.322 2 722 3,710 Post-Dev to AP#2 11 SCS Runoff 46.36 2 726 162,860 Offsite 12 Combine 51.45 2 726 178,737 1, 11 Downstream Analysis(Pre-Dev) 13 Combine 50.11 2 726 186,040 8, 11, Downstream Analysis(Post-Dev) 1069 - Stormwater.gpw Return Period: 1 Year Monday, 02/26/2024 4 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Monday,02/26/2024 Hyd. No. 1 Pre-Dev To AP#1 Hydrograph type = SCS Runoff Peak discharge = 5.662 cfs Storm frequency = 1 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 15,877 cuft Drainage area = 2.650 ac Curve number = 86.4 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 16.20 min Total precip. = 3.00 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pre-Dev To AP#1 Q (cfs) Hyd. No. 1 -- 1 Year Q (cfs) 6.00 6.00 • 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 - - 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 5 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Monday,02/26/2024 Hyd. No. 2 Pre-Dev To AP#2 Hydrograph type = SCS Runoff Peak discharge = 2.133 cfs Storm frequency = 1 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 6,039 cuft Drainage area = 0.860 ac Curve number = 90 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 14.00 min Total precip. = 3.00 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pre-Dev To AP#2 Q (cfs) Hyd. No. 2 -- 1 Year Q (cfs) 3.00 - 3.00 2.00 ( 2.00 1.00 1.00 N 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 6 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Monday,02/26/2024 Hyd. No. 4 Post-Dev Bypass A Hydrograph type = SCS Runoff Peak discharge = 0.474 cfs Storm frequency = 1 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 1,481 cuft Drainage area = 0.240 ac Curve number = 86.5 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 18.80 min Total precip. = 3.00 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post-Dev Bypass A Q (cfs) Hyd. No. 4 -- 1 Year Q (cfs) 0.50 0.50 0.45 ____ 0.45 0.40 ____ 0.40 0.35 ____ 0.35 0.30 ____ 0.30 0.25 0.25 0.20 0.20 0.15 0.15 0.10 4 0.10 0.05 0.05 16.11.1 0.00 ---- 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 4 Time (min) 7 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Monday,02/26/2024 Hyd. No. 5 Post-Dev Bypass B Hydrograph type = SCS Runoff Peak discharge = 0.485 cfs Storm frequency = 1 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 1,378 cuft Drainage area = 0.310 ac Curve number = 80.1 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 14.90 min Total precip. = 3.00 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post-Dev Bypass B Q (cfs) Hyd. No. 5 -- 1 Year Q (cfs) 0.50 0.50 0.45 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 0.20 0.20 0.15 - 0.15 0.10 0.10 0.05 0.05 0.00 - — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 5 Time (min) 8 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Monday,02/26/2024 Hyd. No. 6 Post-Dev To Detention Hydrograph type = SCS Runoff Peak discharge = 9.190 cfs Storm frequency = 1 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 20,332 cuft Drainage area = 2.370 ac Curve number = 95.7 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.00 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post-Dev To Detention Q (cfs) Hyd. No. 6 -- 1 Year Q (cfs) 10.00 - 10.00 8.00 8.00 6.00 6.00 4.00 - 4.00 2.00 - 2.00 'r"-''.°'*'..." ' 0.00 — - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 6 Time (min) 9 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Monday,02/26/2024 Hyd. No. 7 Thru Detention Hydrograph type = Reservoir Peak discharge = 2.989 cfs Storm frequency = 1 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 20,320 cuft Inflow hyd. No. = 6 - Post-Dev To Detention Max. Elevation = 536.37 ft Reservoir name = Underground Detention + Dry Ilmd Storage = 10,567 cuft Storage Indication method used. Thru Detention Q (cfs) Hyd. No. 7 -- 1 Year Q (cfs) 10.00 - 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 - 0.00 0 360 720 1080 1440 1800 2160 2520 2880 3240 3600 3960 Time (min) Hyd No. 7 Hyd No. 6 II II Total storage used = 10,567 cuft Pond Report 10 Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Monday,02/26/2024 Pond No. 1 - Underground Detention + Dry Pond Pond Data Pond storage is based on user-defined values. Stage/Storage Table Stage(ft) Elevation(ft) Contour area(sqft) Incr.Storage(cuft) Total storage(cuft) 0.00 534.50 n/a 0 0 0.40 534.90 n/a 971 971 0.80 535.30 n/a 1,717 2,688 1.20 535.70 n/a 2,239 4,927 1.60 536.10 n/a 3,186 8,113 2.00 536.50 n/a 3,701 11,814 2.40 536.90 n/a 3,970 15,784 2.80 537.30 n/a 4,183 19,967 3.20 537.70 n/a 4,350 24,317 3.60 538.10 n/a 4,043 28,360 4.00 538.50 n/a 2,753 31,113 4.40 538.90 n/a 2,611 33,724 4.80 539.30 n/a 2,399 36,123 5.20 539.70 n/a 2,095 38,218 5.60 540.10 n/a 1,650 39,868 6.00 540.50 n/a 571 40,439 Culvert/Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise(in) = 18.00 1.25 0.00 0.00 Crest Len(ft) = 16.00 4.00 Inactive 0.00 Span(in) = 18.00 1.25 0.00 0.00 Crest El.(ft) = 543.00 536.00 880.00 0.00 No.Barrels = 1 1 0 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert El.(ft) = 534.20 534.20 0.00 0.00 Weir Type = 1 Rect Rect --- Length(ft) = 135.50 0.25 0.00 0.00 Multi-Stage = Yes Yes Yes No Slope(%) = 0.50 0.01 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000(by Wet area) Multi-Stage = n/a Yes No No TW Elev.(ft) = 0.00 Note:Culvert/Orifice outflows are analyzed under inlet(ic)and outlet(oc)control. Weir risers checked for orifice conditions(ic)and submergence(s). Stage(ft) Stage/ Discharge Elev(ft) 6.00 540.50 5.00 539.50 4.00 538.50 3.00 537.50 2.00 536.50 1.00 535.50 0.00 534.50 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 Total Q Discharge(cfs) Pond Report 10 Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Monday,02/26/2024 Pond No. 1 - Underground Detention + Dry Pond Pond Data Pond storage is based on user-defined values. Stage/Storage Table Stage(ft) Elevation(ft) Contour area(sqft) Incr.Storage(cuft) Total storage(cuft) 0.00 534.50 n/a 0 0 0.40 534.90 n/a 971 971 0.80 535.30 n/a 1,717 2,688 1.20 535.70 n/a 2,239 4,927 1.60 536.10 n/a 3,186 8,113 2.00 536.50 n/a 3,701 11,814 2.40 536.90 n/a 3,970 15,784 2.80 537.30 n/a 4,183 19,967 3.20 537.70 n/a 4,350 24,317 3.60 538.10 n/a 4,043 28,360 4.00 538.50 n/a 2,753 31,113 4.40 538.90 n/a 2,611 33,724 4.80 539.30 n/a 2,399 36,123 5.20 539.70 n/a 2,095 38,218 5.60 540.10 n/a 1,650 39,868 6.00 540.50 n/a 571 40,439 Culvert/Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise(in) = 18.00 1.25 0.00 0.00 Crest Len(ft) = 16.00 4.00 Inactive 0.00 Span(in) = 18.00 1.25 0.00 0.00 Crest El.(ft) = 543.00 536.00 880.00 0.00 No.Barrels = 1 1 0 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert El.(ft) = 534.20 534.20 0.00 0.00 Weir Type = 1 Rect Rect --- Length(ft) = 135.50 0.25 0.00 0.00 Multi-Stage = Yes Yes Yes No Slope(%) = 0.50 0.01 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000(by Wet area) Multi-Stage = n/a Yes No No TW Elev.(ft) = 0.00 Note:Culvert/Orifice outflows are analyzed under inlet(ic)and outlet(oc)control. Weir risers checked for orifice conditions(ic)and submergence(s). Stage/Storage/ Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 534.50 0.00 0.00 --- --- 0.00 0.00 --- --- --- --- 0.000 0.04 97 534.54 0.49 ic 0.01 ic --- --- 0.00 0.00 --- --- --- --- 0.008 0.08 194 534.58 0.49 ic 0.01 ic --- 0.00 0.00 --- --- --- 0.012 0.12 291 534.62 0.49 ic 0.01 ic --- --- 0.00 0.00 --- --- --- --- 0.014 0.16 388 534.66 0.49 ic 0.02 ic --- --- 0.00 0.00 --- --- --- --- 0.016 0.20 486 534.70 0.49 ic 0.02 ic --- --- 0.00 0.00 --- --- --- --- 0.018 0.24 583 534.74 0.49 ic 0.02 ic --- --- 0.00 0.00 --- --- --- --- 0.020 0.28 680 534.78 0.49 ic 0.02 ic --- --- 0.00 0.00 --- --- --- --- 0.022 0.32 777 534.82 0.49 ic 0.02 ic --- --- 0.00 0.00 --- --- --- --- 0.023 0.36 874 534.86 0.49 ic 0.02 ic --- --- 0.00 0.00 --- --- --- --- 0.025 0.40 971 534.90 0.49 ic 0.03 ic --- --- 0.00 0.00 --- --- --- --- 0.026 0.44 1,143 534.94 0.49 ic 0.03 ic --- --- 0.00 0.00 --- --- --- --- 0.027 0.48 1,314 534.98 0.49 ic 0.03 ic --- --- 0.00 0.00 --- --- --- --- 0.028 0.52 1,486 535.02 0.49 ic 0.03 ic --- --- 0.00 0.00 --- --- --- --- 0.030 0.56 1,658 535.06 0.49 ic 0.03 ic --- --- 0.00 0.00 --- --- --- --- 0.031 0.60 1,830 535.10 0.49 ic 0.03 ic --- --- 0.00 0.00 --- --- --- --- 0.032 0.64 2,001 535.14 0.49 ic 0.03 ic --- --- 0.00 0.00 --- --- --- --- 0.033 0.68 2,173 535.18 0.49 ic 0.03 ic --- --- 0.00 0.00 --- --- --- --- 0.034 0.72 2,345 535.22 0.49 ic 0.03 ic --- --- 0.00 0.00 --- --- --- --- 0.035 0.76 2,516 535.26 0.49 ic 0.04 ic --- --- 0.00 0.00 --- --- --- --- 0.036 0.80 2,688 535.30 0.49 ic 0.04 ic --- --- 0.00 0.00 --- --- --- --- 0.037 0.84 2,912 535.34 0.49 ic 0.04 ic --- --- 0.00 0.00 --- --- --- --- 0.038 0.88 3,136 535.38 0.49 ic 0.04 ic --- --- 0.00 0.00 --- --- --- --- 0.038 0.92 3,360 535.42 0.49 ic 0.04 ic --- --- 0.00 0.00 --- --- --- --- 0.039 0.96 3,584 535.46 0.49 ic 0.04 ic --- --- 0.00 0.00 --- --- --- --- 0.040 1.00 3,808 535.50 0.49 ic 0.04 ic --- --- 0.00 0.00 --- --- --- --- 0.041 1.04 4,031 535.54 0.49 ic 0.04 ic --- --- 0.00 0.00 --- --- --- --- 0.042 1.08 4,255 535.58 0.49 ic 0.04 ic --- --- 0.00 0.00 --- --- --- --- 0.043 Continues on next page... 11 Underground Detention+Dry Pond Stage/Storage/ Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 1.12 4,479 535.62 0.49 ic 0.04 ic --- --- 0.00 0.00 0.043 1.16 4,703 535.66 0.49 ic 0.04 ic --- --- 0.00 0.00 0.044 1.20 4,927 535.70 0.49 ic 0.04 ic --- --- 0.00 0.00 --- --- --- --- 0.045 1.24 5,246 535.74 0.49 ic 0.05 ic --- --- 0.00 0.00 --- --- --- --- 0.046 1.28 5,564 535.78 0.49 ic 0.05 ic --- --- 0.00 0.00 --- 0.046 1.32 5,883 535.82 0.49 ic 0.05 ic --- --- 0.00 0.00 --- --- --- --- 0.047 1.36 6,201 535.86 0.49 ic 0.05 ic --- --- 0.00 0.00 --- --- --- --- 0.048 1.40 6,520 535.90 0.49 ic 0.05 ic --- --- 0.00 0.00 --- --- 0.049 1.44 6,839 535.94 0.49 ic 0.05 ic --- --- 0.00 0.00 --- --- 0.049 1.48 7,157 535.98 0.49 ic 0.05 ic --- --- 0.00 0.00 --- --- --- --- 0.050 1.52 7,476 536.02 0.49 ic 0.05 ic --- --- 0.00 0.04 --- --- 0.088 1.56 7,794 536.06 0.49 ic 0.05 ic --- --- 0.00 0.19 --- --- 0.246 1.60 8,113 536.10 0.49 ic 0.05 ic --- --- 0.00 0.42 --- --- --- --- 0.473 1.64 8,483 536.14 0.76 ic 0.05 ic --- --- 0.00 0.70 --- --- --- --- 0.749 1.68 8,853 536.18 1.07 ic 0.05 ic --- --- 0.00 1.02 --- 1.067 1.72 9,223 536.22 1.42 ic 0.05 ic --- --- 0.00 1.37 --- --- --- --- 1.424 1.76 9,593 536.26 1.84 ic 0.05 ic --- --- 0.00 1.76 --- --- --- --- 1.814 1.80 9,963 536.30 2.24 ic 0.05 ic --- --- 0.00 2.19 --- --- --- --- 2.237 1.84 10,334 536.34 2.73 ic 0.05 ic --- --- 0.00 2.64 --- --- --- --- 2.686 1.88 10,704 536.38 3.18 ic 0.05 ic --- --- 0.00 3.12 --- --- --- --- 3.166 1.92 11,074 536.42 3.72 ic 0.05 ic --- --- 0.00 3.62 --- --- --- --- 3.670 1.96 11,444 536.46 4.20 ic 0.05 ic --- --- 0.00 4.15 --- --- --- --- 4.199 2.00 11,814 536.50 4.80 ic 0.05 ic --- --- 0.00 4.71 --- --- --- --- 4.755 2.04 12,211 536.54 5.36 oc 0.04 ic --- --- 0.00 5.29 --- --- --- --- 5.330 2.08 12,608 536.58 5.93 oc 0.04 ic --- --- 0.00 5.88 --- --- --- --- 5.926 2.12 13,005 536.62 6.54 oc 0.04 ic --- --- 0.00 6.50 --- --- --- --- 6.536 2.16 13,402 536.66 7.15 oc 0.03 ic --- --- 0.00 7.12 s --- --- --- --- 7.151 2.20 13,799 536.70 7.55 oc 0.03 ic --- --- 0.00 7.52 s --- --- --- --- 7.549 2.24 14,196 536.74 7.87 oc 0.03 ic --- --- 0.00 7.84 s --- --- --- --- 7.870 2.28 14,593 536.78 8.15 oc 0.03 ic --- --- 0.00 8.12 s --- --- --- --- 8.149 2.32 14,990 536.82 8.40 oc 0.03 ic --- --- 0.00 8.37 s --- --- --- --- 8.398 2.36 15,387 536.86 8.63 oc 0.03 ic --- --- 0.00 8.60 s --- --- --- --- 8.626 2.40 15,784 536.90 8.84 oc 0.02 ic --- --- 0.00 8.81 s --- --- --- --- 8.834 2.44 16,202 536.94 9.03 oc 0.02 ic --- --- 0.00 9.00 s --- --- --- --- 9.027 2.48 16,621 536.98 9.21 oc 0.02 ic --- --- 0.00 9.19 s --- --- --- --- 9.208 2.52 17,039 537.02 9.38 oc 0.02 ic --- --- 0.00 9.36 s --- --- --- --- 9.378 2.56 17,457 537.06 9.54 oc 0.02 ic --- --- 0.00 9.52 s --- --- --- --- 9.537 2.60 17,876 537.10 9.69 oc 0.02 ic --- --- 0.00 9.67 s --- --- --- --- 9.691 2.64 18,294 537.14 9.84 oc 0.02 ic --- --- 0.00 9.82 s --- --- --- --- 9.836 2.68 18,712 537.18 9.98 oc 0.02 ic --- --- 0.00 9.96 s --- --- --- --- 9.975 2.72 19,130 537.22 10.11 oc 0.02 is --- --- 0.00 10.09 s --- --- --- --- 10.11 2.76 19,549 537.26 10.24 oc 0.02 ic --- --- 0.00 10.22 s --- --- --- --- 10.24 2.80 19,967 537.30 10.37 oc 0.02 ic --- --- 0.00 10.35 s --- --- --- --- 10.36 2.84 20,402 537.34 10.49 oc 0.02 ic --- --- 0.00 10.47 s --- --- --- --- 10.49 2.88 20,837 537.38 10.61 oc 0.02 ic --- --- 0.00 10.59 s --- --- --- --- 10.60 2.92 21,272 537.42 10.72 oc 0.02 is --- --- 0.00 10.70 s --- --- --- --- 10.72 2.96 21,707 537.46 10.83 oc 0.01 ic --- --- 0.00 10.82 s --- --- --- --- 10.83 3.00 22,142 537.50 10.94 oc 0.01 ic --- --- 0.00 10.93 s --- --- --- --- 10.94 3.04 22,577 537.54 11.05 oc 0.01 ic --- --- 0.00 11.03 s --- --- --- --- 11.05 3.08 23,012 537.58 11.16 oc 0.01 ic --- --- 0.00 11.14 s --- --- --- --- 11.15 3.12 23,447 537.62 11.26 oc 0.01 ic --- --- 0.00 11.24 s --- --- --- 11.26 3.16 23,882 537.66 11.36 oc 0.01 ic --- --- 0.00 11.35 s --- --- --- 11.36 3.20 24,317 537.70 11.46 oc 0.01 ic --- --- 0.00 11.45 s --- --- --- --- 11.46 3.24 24,721 537.74 11.56 oc 0.01 ic --- --- 0.00 11.55 s --- --- 11.56 3.28 25,126 537.78 11.66 oc 0.01 ic --- --- 0.00 11.64 s --- --- 11.65 3.32 25,530 537.82 11.75 oc 0.01 ic --- --- 0.00 11.74 s --- --- --- --- 11.75 3.36 25,934 537.86 11.85 oc 0.01 ic --- --- 0.00 11.83 s --- --- --- --- 11.84 3.40 26,339 537.90 11.94 oc 0.01 ic --- --- 0.00 11.92 s --- --- 11.94 3.44 26,743 537.94 12.03 oc 0.01 ic --- --- 0.00 12.01 s --- --- --- --- 12.03 3.48 27,147 537.98 12.12 oc 0.01 ic --- --- 0.00 12.11 s --- --- --- --- 12.12 3.52 27,551 538.02 12.21 oc 0.01 ic --- --- 0.00 12.20 s --- --- 12.21 3.56 27,956 538.06 12.30 oc 0.01 ic --- --- 0.00 12.28 s --- --- 12.29 3.60 28,360 538.10 12.39 oc 0.01 ic --- --- 0.00 12.37 s --- --- --- --- 12.38 3.64 28,635 538.14 12.47 oc 0.01 ic --- --- 0.00 12.46 s --- --- 12.47 3.68 28,911 538.18 12.56 oc 0.01 ic --- --- 0.00 12.54 s --- --- 12.55 3.72 29,186 538.22 12.64 oc 0.01 ic --- --- 0.00 12.63 s --- --- --- --- 12.64 3.76 29,461 538.26 12.73 oc 0.01 ic --- --- 0.00 12.71 s --- --- --- --- 12.72 3.80 29,737 538.30 12.81 oc 0.01 ic --- --- 0.00 12.80 s --- --- 12.81 3.84 30,012 538.34 12.89 oc 0.01 ic --- --- 0.00 12.88 s --- --- --- --- 12.89 3.88 30,287 538.38 12.98 oc 0.01 ic --- --- 0.00 12.97 s --- --- --- --- 12.97 3.92 30,562 538.42 13.06 oc 0.01 ic --- --- 0.00 13.05 s --- --- --- --- 13.06 3.96 30,838 538.46 13.14 oc 0.01 ic --- --- 0.00 13.12 s --- --- --- --- 13.13 Continues on next page... 12 Underground Detention+Dry Pond Stage/Storage/ Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 4.00 31,113 538.50 13.22 oc 0.01 ic --- --- 0.00 13.20 s --- --- 13.21 4.04 31,374 538.54 13.30 oc 0.01 ic --- --- 0.00 13.28 s --- --- 13.29 4.08 31,635 538.58 13.38 oc 0.01 ic --- --- 0.00 13.36 s --- --- --- --- 13.37 4.12 31,896 538.62 13.46 oc 0.01 ic --- --- 0.00 13.44 s --- --- --- --- 13.45 4.16 32,157 538.66 13.53 oc 0.01 ic --- --- 0.00 13.52 s --- 13.53 4.20 32,419 538.70 13.61 oc 0.01 ic --- --- 0.00 13.59 s --- --- --- --- 13.60 4.24 32,680 538.74 13.69 oc 0.01 ic --- --- 0.00 13.68 s --- --- --- --- 13.69 4.28 32,941 538.78 13.76 oc 0.01 ic --- --- 0.00 13.74 s --- --- --- --- 13.75 4.32 33,202 538.82 13.84 oc 0.01 ic --- --- 0.00 13.83 s --- --- --- --- 13.84 4.36 33,463 538.86 13.91 oc 0.01 ic --- --- 0.00 13.90 s --- --- --- --- 13.91 4.40 33,724 538.90 13.99 oc 0.01 ic --- --- 0.00 13.97 s --- --- --- --- 13.98 4.44 33,964 538.94 14.06 oc 0.01 ic --- --- 0.00 14.05 s --- --- --- --- 14.05 4.48 34,204 538.98 14.14 oc 0.01 ic --- --- 0.00 14.13 s --- --- --- --- 14.14 4.52 34,444 539.02 14.21 oc 0.01 ic --- --- 0.00 14.20 s --- --- --- --- 14.21 4.56 34,684 539.06 14.28 oc 0.01 ic --- --- 0.00 14.27 s --- --- --- --- 14.28 4.60 34,923 539.10 14.36 oc 0.01 ic --- --- 0.00 14.34 s --- --- --- --- 14.34 4.64 35,163 539.14 14.43 oc 0.01 ic --- --- 0.00 14.42 s --- --- --- --- 14.43 4.68 35,403 539.18 14.50 oc 0.01 ic --- --- 0.00 14.49 s --- --- --- 14.50 4.72 35,643 539.22 14.57 oc 0.01 ic --- --- 0.00 14.55 s --- --- --- 14.56 4.76 35,883 539.26 14.64 oc 0.01 ic --- --- 0.00 14.63 s --- --- --- --- 14.64 4.80 36,123 539.30 14.71 oc 0.01 ic --- --- 0.00 14.70 s --- --- 14.71 4.84 36,333 539.34 14.78 oc 0.01 ic --- --- 0.00 14.77 s --- --- --- --- 14.78 4.88 36,542 539.38 14.85 oc 0.01 ic --- --- 0.00 14.84 s --- --- --- --- 14.84 4.92 36,752 539.42 14.92 oc 0.01 ic --- --- 0.00 14.91 s --- --- --- --- 14.92 4.96 36,961 539.46 14.99 oc 0.01 ic --- --- 0.00 14.98 s --- --- --- --- 14.98 5.00 37,171 539.50 15.06 oc 0.01 ic --- --- 0.00 15.05 s --- --- --- --- 15.06 5.04 37,380 539.54 15.13 oc 0.01 ic --- --- 0.00 15.12 s --- --- --- --- 15.12 5.08 37,590 539.58 15.20 oc 0.01 ic --- --- 0.00 15.18 s --- --- --- --- 15.18 5.12 37,799 539.62 15.26 oc 0.01 ic --- --- 0.00 15.24 s --- --- --- --- 15.24 5.16 38,009 539.66 15.33 oc 0.01 ic --- --- 0.00 15.32 s --- --- --- --- 15.33 5.20 38,218 539.70 15.40 oc 0.01 ic --- --- 0.00 15.37 s --- --- --- --- 15.37 5.24 38,383 539.74 15.46 oc 0.01 ic --- --- 0.00 15.45 s --- --- --- --- 15.45 5.28 38,548 539.78 15.53 oc 0.01 ic --- --- 0.00 15.51 s --- --- --- --- 15.51 5.32 38,713 539.82 15.60 oc 0.01 ic --- --- 0.00 15.57 s --- --- --- --- 15.58 5.36 38,878 539.86 15.66 oc 0.01 ic --- --- 0.00 15.63 s --- --- --- --- 15.63 5.40 39,043 539.90 15.73 oc 0.01 ic --- --- 0.00 15.72 s --- --- --- --- 15.72 5.44 39,208 539.94 15.79 oc 0.01 ic --- --- 0.00 15.78 s --- --- --- --- 15.79 5.48 39,373 539.98 15.86 oc 0.01 ic --- --- 0.00 15.82 s --- --- --- --- 15.83 5.52 39,538 540.02 15.92 oc 0.01 ic --- --- 0.00 15.90 s --- --- --- --- 15.90 5.56 39,703 540.06 15.99 oc 0.01 ic --- --- 0.00 15.97 s --- --- --- --- 15.97 5.60 39,868 540.10 16.05 oc 0.01 ic --- --- 0.00 16.04 s --- --- --- --- 16.04 5.64 39,925 540.14 16.12 oc 0.01 is --- --- 0.00 16.10 s --- --- --- --- 16.11 5.68 39,982 540.18 16.18 oc 0.01 ic --- --- 0.00 16.16 s --- --- --- --- 16.17 5.72 40,039 540.22 16.24 oc 0.01 ic --- --- 0.00 16.21 s --- --- --- --- 16.22 5.76 40,096 540.26 16.31 oc 0.01 ic --- --- 0.00 16.27 s --- --- --- --- 16.28 5.80 40,154 540.30 16.37 oc 0.01 ic --- --- 0.00 16.33 s --- --- --- --- 16.33 5.84 40,211 540.34 16.43 oc 0.01 ic --- --- 0.00 16.41 s --- --- --- --- 16.41 5.88 40,268 540.38 16.49 oc 0.01 ic --- --- 0.00 16.48 s --- --- --- --- 16.49 5.92 40,325 540.42 16.55 oc 0.01 ic --- --- 0.00 16.54 s --- --- --- --- 16.55 5.96 40,382 540.46 16.62 oc 0.01 ic --- --- 0.00 16.59 s --- --- --- --- 16.59 6.00 40,439 540.50 16.68 oc 0.01 ic --- --- 0.00 16.65 s --- --- --- --- 16.65 ...End 13 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Monday, 02/26/2024 Hyd. No. 8 Total Post-Dev to AP#1 Hydrograph type = Combine Peak discharge = 3.945 cfs Storm frequency = 1 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 23,180 cuft Inflow hyds. = 4, 5, 7 Contrib. drain. area = 0.550 ac Total Post-Dev to AP#1 Q (cfs) Hyd. No. 8 -- 1 Year Q (cfs) 4.00 - 4.00 3.00 3.00 2.00 - 2.00 1.00 1.00 I \ _ 0.00 ' 0.00 0 240 480 720 960 1200 1440 1680 1920 2160 2400 2640 2880 3120 Time (min) — Hyd No. 8 Hyd No. 4 Hyd No. 5 Hyd No. 7 14 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Monday,02/26/2024 Hyd. No. 9 Post-Dev to AP#2 Hydrograph type = SCS Runoff Peak discharge = 1.322 cfs Storm frequency = 1 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 3,710 cuft Drainage area = 0.600 ac Curve number = 87.1 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 13.70 min Total precip. = 3.00 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post-Dev to AP#2 Q (cfs) Hyd. No. 9 -- 1 Year Q (cfs) 2.00 - 2.00 1.00 - 1.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 9 Time (min) 15 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Monday,02/26/2024 Hyd. No. 11 Offsite Hydrograph type = SCS Runoff Peak discharge = 46.36 cfs Storm frequency = 1 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 162,860 cuft Drainage area = 19.970 ac Curve number = 92.5 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 23.10 min Total precip. = 3.00 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Offsite Q (cfs) Hyd. No. 11 -- 1 Year Q (cfs) 50.00 50.00 40.00 40.00 30.00 30.00 20.00 • 20.00 10.00 10.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 11 Time (min) 16 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Monday,02/26/2024 Hyd. No. 12 Downstream Analysis (Pre-Dev) Hydrograph type = Combine Peak discharge = 51.45 cfs Storm frequency = 1 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 178,737 cuft Inflow hyds. = 1, 11 Contrib. drain. area = 22.620 ac Downstream Analysis (Pre-Dev) Q (cfs) Hyd. No. 12 -- 1 Year Q (cfs) 60.00 60.00 50.00 $ 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 12 Hyd No. 1 Hyd No. 11 17 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Monday,02/26/2024 Hyd. No. 13 Downstream Analysis (Post-Dev) Hydrograph type = Combine Peak discharge = 50.11 cfs Storm frequency = 1 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 186,040 cuft Inflow hyds. = 8, 11 Contrib. drain. area = 19.970 ac Downstream Analysis (Post-Dev) Q (cfs) Hyd. No. 13 -- 1 Year Q (cfs) 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 , \suimmenow 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 13 Hyd No. 8 Hyd No. 11 18 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 7.459 2 722 20,999 Pre-Dev To AP#1 2 SCS Runoff 2.727 2 722 7,793 Pre-Dev To AP#2 4 SCS Runoff 0.625 2 724 1,958 Post-Dev Bypass A 5 SCS Runoff 0.679 2 722 1,908 Post-Dev Bypass B 6 SCS Runoff 11.26 2 716 25,257 Post-Dev To Detention 7 Reservoir 5.329 2 722 25,245 6 536.54 12,210 Thru Detention 8 Combine 6.612 2 722 29,112 4,5,7 Total Post-Dev to AP#1 9 SCS Runoff 1.731 2 722 4,883 Post-Dev to AP#2 11 SCS Runoff 58.25 2 726 206,676 Offsite 12 Combine 64.91 2 726 227,675 1, 11 Downstream Analysis(Pre-Dev) 13 Combine 64.16 2 726 235,788 8, 11, Downstream Analysis(Post-Dev) 1069 - Stormwater.gpw Return Period: 2 Year Monday, 02/26/2024 19 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Monday,02/26/2024 Hyd. No. 1 Pre-Dev To AP#1 Hydrograph type = SCS Runoff Peak discharge = 7.459 cfs Storm frequency = 2 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 20,999 cuft Drainage area = 2.650 ac Curve number = 86.4 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 16.20 min Total precip. = 3.62 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pre-Dev To AP#1 Q (cfs) Hyd. No. 1 -- 2 Year Q (cfs) 8.00 - 8.00 6.00 - 6.00 4.00 4.00 2.00 - 2.00 0.00 - N. ,- 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 20 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Monday,02/26/2024 Hyd. No. 2 Pre-Dev To AP#2 Hydrograph type = SCS Runoff Peak discharge = 2.727 cfs Storm frequency = 2 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 7,793 cuft Drainage area = 0.860 ac Curve number = 90 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 14.00 min Total precip. = 3.62 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pre-Dev To AP#2 Q (cfs) Hyd. No. 2 -- 2 Year Q (cfs) 3.00 - 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 21 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Monday,02/26/2024 Hyd. No. 4 Post-Dev Bypass A Hydrograph type = SCS Runoff Peak discharge = 0.625 cfs Storm frequency = 2 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 1,958 cuft Drainage area = 0.240 ac Curve number = 86.5 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 18.80 min Total precip. = 3.62 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post-Dev Bypass A Q (cfs) Hyd. No. 4 -- 2 Year Q (cfs) 1.00 - 1.00 0.90 0.90 0.80 0.80 0.70 0.70 0.60 0.60 0.50 0.50 0.40 - 0.40 0.30 - 0.30 0.20 0.20 0.10 0.10 0.00 - - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 4 Time (min) 22 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Monday,02/26/2024 Hyd. No. 5 Post-Dev Bypass B Hydrograph type = SCS Runoff Peak discharge = 0.679 cfs Storm frequency = 2 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 1,908 cuft Drainage area = 0.310 ac Curve number = 80.1 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 14.90 min Total precip. = 3.62 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post-Dev Bypass B Q (cfs) Hyd. No. 5 -- 2 Year Q (cfs) 1.00 - 1.00 0.90 0.90 0.80 0.80 0.70 0.70 0.60 0.60 0.50 0.50 0.40 - 0.40 0.30 - 0.30 0.20 0.20 0.10 0.10 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 5 Time (min) 23 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Monday,02/26/2024 Hyd. No. 6 Post-Dev To Detention Hydrograph type = SCS Runoff Peak discharge = 11.26 cfs Storm frequency = 2 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 25,257 cuft Drainage area = 2.370 ac Curve number = 95.7 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.62 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post-Dev To Detention Q (cfs) Hyd. No. 6 -- 2 Year Q (cfs) 12.00 - 12.00 10.00 - 10.00 8.00 - 8.00 6.00 - 6.00 4.00 - 4.00 2.00 2.00 0.00 - ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 6 Time (min) 24 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Monday,02/26/2024 Hyd. No. 7 Thru Detention Hydrograph type = Reservoir Peak discharge = 5.329 cfs Storm frequency = 2 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 25,245 cuft Inflow hyd. No. = 6 - Post-Dev To Detention Max. Elevation = 536.54 ft Reservoir name = Underground Detention + Dry Ilmd Storage = 12,210 cuft Storage Indication method used. Thru Detention Q (cfs) Hyd. No. 7 -- 2 Year Q (cfs) 12.00 - 12.00 10.00 - 10.00 8.00 - 8.00 6.00 - 6.00 4.00 I 4.00 2.00 Jk, 2.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 7 Hyd No. 6 111111111 Total storage used = 12,210 cuft 25 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Monday,02/26/2024 Hyd. No. 8 Total Post-Dev to AP#1 Hydrograph type = Combine Peak discharge = 6.612 cfs Storm frequency = 2 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 29,112 cuft Inflow hyds. = 4, 5, 7 Contrib. drain. area = 0.550 ac Total Post-Dev to AP#1 Q (cfs) Hyd. No. 8 -- 2 Year Q (cfs) 7.00 7.00 6.00 6.00 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 _ 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 8 Hyd No. 4 Hyd No. 5 Hyd No. 7 26 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Monday,02/26/2024 Hyd. No. 9 Post-Dev to AP#2 Hydrograph type = SCS Runoff Peak discharge = 1.731 cfs Storm frequency = 2 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 4,883 cuft Drainage area = 0.600 ac Curve number = 87.1 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 13.70 min Total precip. = 3.62 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post-Dev to AP#2 Q (cfs) Hyd. No. 9 -- 2 Year Q (cfs) 2.00 - 2.00 1.00 - 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 9 Time (min) 27 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Monday,02/26/2024 Hyd. No. 11 Offsite Hydrograph type = SCS Runoff Peak discharge = 58.25 cfs Storm frequency = 2 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 206,676 cuft Drainage area = 19.970 ac Curve number = 92.5 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 23.10 min Total precip. = 3.62 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Offs ite Q (cfs) Hyd. No. 11 --2 Year Q (cfs) 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 11 Time (min) 28 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Monday,02/26/2024 Hyd. No. 12 Downstream Analysis (Pre-Dev) Hydrograph type = Combine Peak discharge = 64.91 cfs Storm frequency = 2 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 227,675 cuft Inflow hyds. = 1, 11 Contrib. drain. area = 22.620 ac Downstream Analysis (Pre-Dev) Q (cfs) Hyd. No. 12 --2 Year Q (cfs) 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 12 Hyd No. 1 Hyd No. 11 29 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Monday,02/26/2024 Hyd. No. 13 Downstream Analysis (Post-Dev) Hydrograph type = Combine Peak discharge = 64.16 cfs Storm frequency = 2 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 235,788 cuft Inflow hyds. = 8, 11 Contrib. drain. area = 19.970 ac Downstream Analysis (Post-Dev) Q (cfs) Hyd. No. 13 --2 Year Q (cfs) 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 13 Hyd No. 8 Hyd No. 11 30 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 12.44 2 722 35,624 Pre-Dev To AP#1 2 SCS Runoff 4.343 2 722 12,710 Pre-Dev To AP#2 4 SCS Runoff 1.044 2 724 3,318 Post-Dev Bypass A 5 SCS Runoff 1.240 2 722 3,483 Post-Dev Bypass B 6 SCS Runoff 16.84 2 716 38,766 Post-Dev To Detention 7 Reservoir 8.913 2 722 38,754 6 536.92 15,955 Thru Detention 8 Combine 11.17 2 722 45,555 4,5,7 Total Post-Dev to AP#1 9 SCS Runoff 2.860 2 722 8,219 Post-Dev to AP#2 11 SCS Runoff 90.40 2 726 328,151 Offsite 12 Combine 101.37 2 726 363,775 1, 11 Downstream Analysis(Pre-Dev) 13 Combine 100.94 2 726 373,705 8, 11, Downstream Analysis(Post-Dev) 1069 - Stormwater.gpw Return Period: 10 Year Monday, 02/26/2024 31 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Monday,02/26/2024 Hyd. No. 1 Pre-Dev To AP#1 Hydrograph type = SCS Runoff Peak discharge = 12.44 cfs Storm frequency = 10 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 35,624 cuft Drainage area = 2.650 ac Curve number = 86.4 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 16.20 min Total precip. = 5.31 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pre-Dev To AP#1 Q (cfs) Hyd. No. 1 -- 10 Year Q (cfs) 14.00 14.00 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 - 4.00 2.00 - — 2.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 32 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Monday,02/26/2024 Hyd. No. 2 Pre-Dev To AP#2 Hydrograph type = SCS Runoff Peak discharge = 4.343 cfs Storm frequency = 10 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 12,710 cuft Drainage area = 0.860 ac Curve number = 90 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 14.00 min Total precip. = 5.31 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pre-Dev To AP#2 Q (cfs) Hyd. No. 2 -- 10 Year Q (cfs) 5.00 5.00 4.00 I 4.00 3.00 3.00 —1L- 2.00 2.00 1.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 33 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Monday,02/26/2024 Hyd. No. 4 Post-Dev Bypass A Hydrograph type = SCS Runoff Peak discharge = 1.044 cfs Storm frequency = 10 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 3,318 cuft Drainage area = 0.240 ac Curve number = 86.5 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 18.80 min Total precip. = 5.31 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post-Dev Bypass A Q (cfs) Hyd. No. 4 -- 10 Year Q (cfs) 2.00 - 2.00 1.00 - 1.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 4 Time (min) 34 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Monday,02/26/2024 Hyd. No. 5 Post-Dev Bypass B Hydrograph type = SCS Runoff Peak discharge = 1.240 cfs Storm frequency = 10 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 3,483 cuft Drainage area = 0.310 ac Curve number = 80.1 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 14.90 min Total precip. = 5.31 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post-Dev Bypass B Q (cfs) Hyd. No. 5 -- 10 Year Q (cfs) 2.00 - 2.00 1.00 - 1.00 0.00 - - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 5 Time (min) 35 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Monday,02/26/2024 Hyd. No. 6 Post-Dev To Detention Hydrograph type = SCS Runoff Peak discharge = 16.84 cfs Storm frequency = 10 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 38,766 cuft Drainage area = 2.370 ac Curve number = 95.7 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.31 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post-Dev To Detention Q (cfs) Hyd. No. 6 -- 10 Year Q (cfs) 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 6 Time (min) 36 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Monday,02/26/2024 Hyd. No. 7 Thru Detention Hydrograph type = Reservoir Peak discharge = 8.913 cfs Storm frequency = 10 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 38,754 cuft Inflow hyd. No. = 6 - Post-Dev To Detention Max. Elevation = 536.92 ft Reservoir name = Underground Detention + Dry Ilmd Storage = 15,955 cuft Storage Indication method used. Thru Detention Q (cfs) Hyd. No. 7 -- 10 Year Q (cfs) 18.00 - 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 _ _ 0.00 - - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 7 Hyd No. 6 111111111 Total storage used = 15,955 cuft 37 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Monday,02/26/2024 Hyd. No. 8 Total Post-Dev to AP#1 Hydrograph type = Combine Peak discharge = 11.17 cfs Storm frequency = 10 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 45,555 cuft Inflow hyds. = 4, 5, 7 Contrib. drain. area = 0.550 ac Total Post-Dev to AP#1 Q (cfs) Hyd. No. 8 -- 10 Year Q (cfs) 12.00 - 12.00 10.00 - 10.00 8.00 - 8.00 6.00 - 6.00 4.00 — — 4.00 2.00 2.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 8 Hyd No. 4 Hyd No. 5 Hyd No. 7 38 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Monday,02/26/2024 Hyd. No. 9 Post-Dev to AP#2 Hydrograph type = SCS Runoff Peak discharge = 2.860 cfs Storm frequency = 10 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 8,219 cuft Drainage area = 0.600 ac Curve number = 87.1 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 13.70 min Total precip. = 5.31 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post-Dev to AP#2 Q (cfs) Hyd. No. 9 -- 10 Year Q (cfs) 3.00 - 3.00 2.00 2.00 1.00 1.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 9 Time (min) 39 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Monday,02/26/2024 Hyd. No. 11 Offsite Hydrograph type = SCS Runoff Peak discharge = 90.40 cfs Storm frequency = 10 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 328,151 cuft Drainage area = 19.970 ac Curve number = 92.5 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 23.10 min Total precip. = 5.31 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Offs ite Q (cfs) Hyd. No. 11 -- 10 Year Q (cfs) 100.00 100.00 90.00 90.00 80.00 80.00 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 — 10.00 0.00 ��— . 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 11 Time (min) 40 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Monday,02/26/2024 Hyd. No. 12 Downstream Analysis (Pre-Dev) Hydrograph type = Combine Peak discharge = 101.37 cfs Storm frequency = 10 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 363,775 cuft Inflow hyds. = 1, 11 Contrib. drain. area = 22.620 ac Downstream Analysis (Pre-Dev) Q (cfs) Hyd. No. 12-- 10 Year Q (cfs) 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 12 Hyd No. 1 Hyd No. 11 41 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Monday,02/26/2024 Hyd. No. 13 Downstream Analysis (Post-Dev) Hydrograph type = Combine Peak discharge = 100.94 cfs Storm frequency = 10 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 373,705 cuft Inflow hyds. = 8, 11 Contrib. drain. area = 19.970 ac Downstream Analysis (Post-Dev) Q (cfs) Hyd. No. 13-- 10 Year Q (cfs) 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 • 40.00 20.00 20.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 13 Hyd No. 8 Hyd No. 11 42 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 15.54 2 722 44,985 Pre-Dev To AP#1 2 SCS Runoff 5.340 2 722 15,818 Pre-Dev To AP#2 4 SCS Runoff 1.305 2 724 4,188 Post-Dev Bypass A 5 SCS Runoff 1.599 2 722 4,518 Post-Dev Bypass B 6 SCS Runoff 20.29 2 716 47,190 Post-Dev To Detention 7 Reservoir 9.809 2 722 47,178 6 537.13 18,216 Thru Detention 8 Combine 12.68 2 722 55,884 4,5,7 Total Post-Dev to AP#1 9 SCS Runoff 3.561 2 722 10,349 Post-Dev to AP#2 11 SCS Runoff 110.18 2 726 404,406 Offsite 12 Combine 123.84 2 726 449,391 1, 11 Downstream Analysis(Pre-Dev) 13 Combine 122.34 2 726 460,290 8, 11, Downstream Analysis(Post-Dev) 1069 - Stormwater.gpw Return Period: 25 Year Monday, 02/26/2024 43 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Monday,02/26/2024 Hyd. No. 1 Pre-Dev To AP#1 Hydrograph type = SCS Runoff Peak discharge = 15.54 cfs Storm frequency = 25 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 44,985 cuft Drainage area = 2.650 ac Curve number = 86.4 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 16.20 min Total precip. = 6.36 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pre-Dev To AP#1 Q (cfs) Hyd. No. 1 -- 25 Year Q (cfs) 18.00 - 18.00 15.00 15.00 12.00 12.00 • 9.00 9.00 6.00 6.00 3.00 3.00 0.00 - — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 44 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Monday,02/26/2024 Hyd. No. 2 Pre-Dev To AP#2 Hydrograph type = SCS Runoff Peak discharge = 5.340 cfs Storm frequency = 25 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 15,818 cuft Drainage area = 0.860 ac Curve number = 90 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 14.00 min Total precip. = 6.36 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pre-Dev To AP#2 Q (cfs) Hyd. No. 2 -- 25 Year Q (cfs) 6.00 6.00 • 5.00I 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 "—— 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 45 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Monday,02/26/2024 Hyd. No. 4 Post-Dev Bypass A Hydrograph type = SCS Runoff Peak discharge = 1.305 cfs Storm frequency = 25 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 4,188 cuft Drainage area = 0.240 ac Curve number = 86.5 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 18.80 min Total precip. = 6.36 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post-Dev Bypass A Q (cfs) Hyd. No. 4 -- 25 Year Q (cfs) 2.00 - 2.00 1.00 - 1.00 0.00 - - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 4 Time (min) 46 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Monday,02/26/2024 Hyd. No. 5 Post-Dev Bypass B Hydrograph type = SCS Runoff Peak discharge = 1.599 cfs Storm frequency = 25 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 4,518 cuft Drainage area = 0.310 ac Curve number = 80.1 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 14.90 min Total precip. = 6.36 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post-Dev Bypass B Q (cfs) Hyd. No. 5 -- 25 Year Q (cfs) 2.00 - 2.00 1.00 - 1.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 5 Time (min) 47 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Monday,02/26/2024 Hyd. No. 6 Post-Dev To Detention Hydrograph type = SCS Runoff Peak discharge = 20.29 cfs Storm frequency = 25 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 47,190 cuft Drainage area = 2.370 ac Curve number = 95.7 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 6.36 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post-Dev To Detention Q (cfs) Hyd. No. 6 -- 25 Year Q (cfs) 21.00 21.00 18.00 18.00 15.00 15.00 12.00 I 12.00 9.00 9.00 I 6.00 6.00 3.00 3.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 6 Time (min) 48 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Monday,02/26/2024 Hyd. No. 7 Thru Detention Hydrograph type = Reservoir Peak discharge = 9.809 cfs Storm frequency = 25 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 47,178 cuft Inflow hyd. No. = 6 - Post-Dev To Detention Max. Elevation = 537.13 ft Reservoir name = Underground Detention + Dry Ilmd Storage = 18,216 cuft Storage Indication method used. Thru Detention Q (cfs) Hyd. No. 7 -- 25 Year Q (cfs) 21.00 21.00 18.00 18.00 • 15.00 15.00 • 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 7 Hyd No. 6 111111111 Total storage used = 18,216 cuft 49 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Monday,02/26/2024 Hyd. No. 8 Total Post-Dev to AP#1 Hydrograph type = Combine Peak discharge = 12.68 cfs Storm frequency = 25 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 55,884 cuft Inflow hyds. = 4, 5, 7 Contrib. drain. area = 0.550 ac Total Post-Dev to AP#1 Q (cfs) Hyd. No. 8 -- 25 Year Q (cfs) 14.00 14.00 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 — 4.00 2.00 - 2.00 �� 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 8 Hyd No. 4 Hyd No. 5 Hyd No. 7 50 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Monday, 02/26/2024 Hyd. No. 9 Post-Dev to AP#2 Hydrograph type = SCS Runoff Peak discharge = 3.561 cfs Storm frequency = 25 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 10,349 cuft Drainage area = 0.600 ac Curve number = 87.1 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 13.70 min Total precip. = 6.36 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post-Dev to AP#2 Q (cfs) Hyd. No. 9 -- 25 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 - 2.00 1.00 1.00 0.00 — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 9 51 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Monday,02/26/2024 Hyd. No. 11 Offsite Hydrograph type = SCS Runoff Peak discharge = 110.18 cfs Storm frequency = 25 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 404,406 cuft Drainage area = 19.970 ac Curve number = 92.5 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 23.10 min Total precip. = 6.36 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Offsite Q (cfs) Hyd. No. 11 --25 Year Q (cfs) 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 11 Time (min) 52 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Monday,02/26/2024 Hyd. No. 12 Downstream Analysis (Pre-Dev) Hydrograph type = Combine Peak discharge = 123.84 cfs Storm frequency = 25 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 449,391 cuft Inflow hyds. = 1, 11 Contrib. drain. area = 22.620 ac Downstream Analysis (Pre-Dev) Q (cfs) Hyd. No. 12--25 Year Q (cfs) 140.00 140.00 120.00 120.00 100.00 100.00 • 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 '- 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 12 Hyd No. 1 Hyd No. 11 53 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Monday,02/26/2024 Hyd. No. 13 Downstream Analysis (Post-Dev) Hydrograph type = Combine Peak discharge = 122.34 cfs Storm frequency = 25 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 460,290 cuft Inflow hyds. = 8, 11 Contrib. drain. area = 19.970 ac Downstream Analysis (Post-Dev) Q (cfs) Hyd. No. 13--25 Year Q (cfs) 140.00 140.00 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 13 Hyd No. 8 Hyd No. 11 54 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 20.71 2 722 60,919 Pre-Dev To AP#1 2 SCS Runoff 6.998 2 722 21,074 Pre-Dev To AP#2 4 SCS Runoff 1.740 2 724 5,669 Post-Dev Bypass A 5 SCS Runoff 2.207 2 722 6,308 Post-Dev Bypass B 6 SCS Runoff 26.05 2 716 61,334 Post-Dev To Detention 7 Reservoir I 10.92 2 722 61,322 6 537.49 22,057 Thru Detention 8 Combine 14.83 2 722 73,299 4,5,7 Total Post-Dev to AP#1 9 SCS Runoff 4.730 2 722 13,970 Post-Dev to AP#2 11 SCS Runoff 143.10 2 726 532,879 Offsite 12 Combine 161.22 2 726 593,799 1, 11 Downstream Analysis(Pre-Dev) 13 Combine 157.45 2 726 606,179 8, 11, Downstream Analysis(Post-Dev) 1069 - Stormwater.gpw Return Period: 100 Year Monday, 02/26/2024 55 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Monday,02/26/2024 Hyd. No. 1 Pre-Dev To AP#1 Hydrograph type = SCS Runoff Peak discharge = 20.71 cfs Storm frequency = 100 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 60,919 cuft Drainage area = 2.650 ac Curve number = 86.4 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 16.20 min Total precip. = 8.12 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pre-Dev To AP#1 Q (cfs) Hyd. No. 1 -- 100 Year Q (cfs) 21.00 21.00 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 - - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 56 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Monday,02/26/2024 Hyd. No. 2 Pre-Dev To AP#2 Hydrograph type = SCS Runoff Peak discharge = 6.998 cfs Storm frequency = 100 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 21,074 cuft Drainage area = 0.860 ac Curve number = 90 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 14.00 min Total precip. = 8.12 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pre-Dev To AP#2 Q (cfs) Hyd. No. 2 -- 100 Year Q (cfs) 7.00 7.00 6.00 6.00 5.00 5.00 • 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 57 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Monday,02/26/2024 Hyd. No. 4 Post-Dev Bypass A Hydrograph type = SCS Runoff Peak discharge = 1.740 cfs Storm frequency = 100 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 5,669 cuft Drainage area = 0.240 ac Curve number = 86.5 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 18.80 min Total precip. = 8.12 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post-Dev Bypass A Q (cfs) Hyd. No. 4 -- 100 Year Q (cfs) 2.00 2.00 1.00 - 1.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 4 Time (min) 58 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Monday,02/26/2024 Hyd. No. 5 Post-Dev Bypass B Hydrograph type = SCS Runoff Peak discharge = 2.207 cfs Storm frequency = 100 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 6,308 cuft Drainage area = 0.310 ac Curve number = 80.1 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 14.90 min Total precip. = 8.12 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post-Dev Bypass B Q (cfs) Hyd. No. 5-- 100 Year Q (cfs) 3.00 - 3.00 2.00 2.00 1.00 1.00 0.00 - - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 5 Time (min) 59 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Monday,02/26/2024 Hyd. No. 6 Post-Dev To Detention Hydrograph type = SCS Runoff Peak discharge = 26.05 cfs Storm frequency = 100 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 61,334 cuft Drainage area = 2.370 ac Curve number = 95.7 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 8.12 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post-Dev To Detention Q (cfs) Hyd. No. 6-- 100 Year Q (cfs) 28.00 28.00 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 6 Time (min) 60 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Monday,02/26/2024 Hyd. No. 7 Thru Detention Hydrograph type = Reservoir Peak discharge = 10.92 cfs Storm frequency = 100 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 61,322 cuft Inflow hyd. No. = 6 - Post-Dev To Detention Max. Elevation = 537.49 ft Reservoir name = Underground Detention + Dry Ilmd Storage = 22,057 cuft Storage Indication method used. Thru Detention Q (cfs) Hyd. No. 7-- 100 Year Q (cfs) 28.00 28.00 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 - j- 8.00 8.00 4.00 4.00 0.00 �•1 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 7 Hyd No. 6 111111111 Total storage used = 22,057 cuft 61 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Monday,02/26/2024 Hyd. No. 8 Total Post-Dev to AP#1 Hydrograph type = Combine Peak discharge = 14.83 cfs Storm frequency = 100 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 73,299 cuft Inflow hyds. = 4, 5, 7 Contrib. drain. area = 0.550 ac Total Post-Dev to AP#1 Q (cfs) Hyd. No. 8-- 100 Year Q (cfs) 15.00 15.00 12.00 — • 12.00 II 9.00 9.00 • 6.00 6.00 3.00 - 3.00 "Lc 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 8 Hyd No. 4 Hyd No. 5 Hyd No. 7 62 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Monday,02/26/2024 Hyd. No. 9 Post-Dev to AP#2 Hydrograph type = SCS Runoff Peak discharge = 4.730 cfs Storm frequency = 100 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 13,970 cuft Drainage area = 0.600 ac Curve number = 87.1 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 13.70 min Total precip. = 8.12 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post-Dev to AP#2 Q (cfs) Hyd. No. 9-- 100 Year Q (cfs) 5.00 5.00 4.00 4.00 1 3.00 3.00 2.00 2.00 1.00 1.00 ---------"*.j 4*---"'"" - . 0.00 - .— 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 9 Time (min) 63 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Monday,02/26/2024 Hyd. No. 11 Offsite Hydrograph type = SCS Runoff Peak discharge = 143.10 cfs Storm frequency = 100 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 532,879 cuft Drainage area = 19.970 ac Curve number = 92.5 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 23.10 min Total precip. = 8.12 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Offs ite Q (cfs) Hyd. No. 11 -- 100 Year Q (cfs) 160.00 160.00 140.00 140.00 120.00 120.00 100.00 — 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 11 Time (min) 64 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Monday,02/26/2024 Hyd. No. 12 Downstream Analysis (Pre-Dev) Hydrograph type = Combine Peak discharge = 161.22 cfs Storm frequency = 100 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 593,799 cuft Inflow hyds. = 1, 11 Contrib. drain. area = 22.620 ac Downstream Analysis (Pre-Dev) Q (cfs) Hyd. No. 12 -- 100 Year Q (cfs) 180.00 — 180.00 160.00 160.00 140.00 140.00 120.00 120.00 100.00 100.00 80.00 - 80.00 60.00 - 60.00 40.00 40.00 20.00 20.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 12 Hyd No. 1 Hyd No. 11 65 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Monday,02/26/2024 Hyd. No. 13 Downstream Analysis (Post-Dev) Hydrograph type = Combine Peak discharge = 157.45 cfs Storm frequency = 100 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 606,179 cuft Inflow hyds. = 8, 11 Contrib. drain. area = 19.970 ac Downstream Analysis (Post-Dev) Q (cfs) Hyd. No. 13 -- 100 Year Q (cfs) 160.00 160.00 140.00 140.00 120.00 120.00 100.00 — 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 13 Hyd No. 8 Hyd No. 11 DOWNSTREAM ANALYSIS StreamStats Report Region ID: NC Workspace ID: NC20240220155417078000 Clicked Point(Latitude, Longitude): 34.98595,-80.36832 Time: 2024-02-20 10:54:38-0500 c Bolt S; ,o G m 4 r - s*uFSL. I2 E Main St 0.Union St , __ -— �, _._____ _ Chd% Y5! 2 T. Bost St 0 % Si,. it w---VI cc, _ — co 92 King St —F-- _-- - - - c d O 0 U ,, 5� 5\ m �a St ,y\ ��e� G�0s' Griffin VI LL co Paron S`Jca`'4ao O Collapse All Basin Characteristics Parameter Code Parameter Description Value Unit BASINPERIM Perimeter of the drainage basin as defined in SIR 2004-5262 1.25 miles BSLDEM30FT Mean basin slope, based on slope percent grid 2.47 percent CSL10_85fm Change in elevation between points 10 and 85 percent of length along main channel to basin 51.71 feet per divide divided by length between points ft per mi mi DRNAREA Area that drains to a point on a stream 0.0312 square miles ELEV Mean Basin Elevation 551 feet ELEVMAX Maximum basin elevation 565 feet 124H50Y Maximum 24-hour precipitation that occurs on average once in 50 years 7.21 inches LC01 BARE Percentage of area barren land, NLCD 2001 category 31 0 percent LC01CRPHAY Percentage of cultivated crops and hay, classes 81 and 82,from NLCD 2001 0 percent LC01 DEV Percentage of land-use from NLCD 2001 classes 21-24 100 percent LC01 FOREST Percentage of forest from NLCD 2001 classes 41-43 0 percent LC01 HERB Percentage of herbaceous upland from NLCD 2001 class 71 0 percent LC01IMP Percent imperviousness of basin area 2001 NLCD 77.27 percent LC01SHRUB Percent of area covered by shrubland using 2001 NLCD 0 percent LCO1 WATER Percentage of open water,class 11,from NLCD 2001 0 percent LC01 WETLND Percentage of wetlands, classes 90 and 95,from NLCD 2001 0 percent LC06BARE Percent of area covered by barren rock using 2006 NLCD 0 percent LC06DEV Percentage of land-use from NLCD 2006 classes 21-24 100 percent LC06FOREST Percentage of forest from NLCD 2006 classes 41-43 0 percent Parameter Code Parameter Description Value Unit LCO6GRASS Percent of area covered by grassland/herbaceous using 2006 NLCD 0 percent LCO6IMP Percentage of impervious area determined from NLCD 2006 impervious dataset 77.27 percent LCO6PLANT Percent of area in cultivation using 2006 NLCD 0 percent LCO6SHRUB Percent of area covered by shrubland using 2006 NLCD 0 percent LCO6WATER Percent of open water,class 11,from NLCD 2006 0 percent LCO6WETLND Percent of area covered by wetland using 2006 NLCD 0 percent LC11 BARE Percentage of barren from NLCD 2011 class 31 0 percent LCI1CRPHAY Percentage of cultivated crops and hay, classes 81 and 82,from NLCD 2011 0 percent LC11 DEV Percentage of developed (urban) land from NLCD 2011 classes 21-24 100 percent LC11 FOREST Percentage of forest from NLCD 2011 classes 41-43 0 percent LC11GRASS Percent of area covered by grassland/herbaceous using 2011 NLCD 0 percent LC11IMP Average percentage of impervious area determined from NLCD 2011 impervious dataset 77.3 percent LC11SHRUB Percent of area covered by shrubland using 2011 NLCD 0 percent LC11 WATER Percent of open water,class 11,from NLCD 2011 0 percent LC11 WETLND Percentage of wetlands, classes 90 and 95,from NLCD 2011 0 percent LC92FOREST Percentage of forest from NLCD 1992 classes 41-43 0 percent LFPLENGTH Length of longest flow path 0.305 miles LU92BARE Percent of area covered by barren rock using 1992 NLCD 0 percent LU92DEV Percent of area covered by all densities of developed land using 1992 NLCD 54.5 percent LU92PLANT Percent of area in cultivation using 1992 NLCD 45.5 percent LU92WATER Percent of area covered by water using 1992 NLCD 0 percent LU92WETLN Percent of area covered by wetland using 1992 NLCD 0 percent MINBELEV Minimum basin elevation 544 feet OUTLETELEV Elevation of the stream outlet in feet above NAVD88 544 feet PCTREG1 Percentage of drainage area located in Region 1 - Piedmont/ Ridge and Valley 100 percent PCTREG2 Percentage of drainage area located in Region 2- Blue Ridge 0 percent PCTREG3 Percentage of drainage area located in Region 3-Sandhills 0 percent PCTREG4 Percentage of drainage area located in Region 4-Coastal Plains 0 percent PCTREGS Percentage of drainage area located in Region 5- Lower Tifton Uplands 0 percent PRECIP Mean Annual Precipitation 48.2 inches PROTECTED Percent of area of protected Federal and State owned land 0 percent SSURGOA Percentage of area of Hydrologic Soil Type A from SSURGO 0 percent SSURGOB Percentage of area of Hydrologic Soil Type B from SSURGO 48.2 percent SSURGOC Percentage of area of Hydrologic Soil Type C from SSURGO 51.8 percent SSURGOD Percentage of area of Hydrologic Soil Type D from SSURGO 0 percent Peak-Flow Statistics Peak-Flow Statistics Parameters [Region 1 Piedmont rural under 1 sgmi 2014 5030] Parameter Code Parameter Name Value Units Min Limit Max Limit DRNAREA Drainage Area 0.0312 square miles 0.1 1 LCO6IMP Percent Impervious NLCD2006 77.27 percent 0 47.9 Peak-Flow Statistics Parameters [Peak Southeast US NC 2023 5006] Parameter Code Parameter Name Value Units Min Limit Max Limit PCTREG1 Percent Area in Region 1 100 percent 0 100 PCTREG2 Percent Area in Region 2 0 percent 0 100 PCTREG3 Percent Area in Region 3 0 percent 0 100 PCTREG5 Percent Area in Region 5 0 percent 0 100 DRNAREA Drainage Area 0.0312 square miles 0.08 8902 PCTREG4 Percent Area in Region 4 0 percent 0 100 Peak-Flow Statistics Disclaimers [Region 1 Piedmont rural under 1 sqmi 2014 5030] One or more of the parameters is outside the suggested range.Estimates were extrapolated with unknown errors. Peak-Flow Statistics Flow Report [Region 1 Piedmont rural under 1 sqmi 2014 5030] Statistic Value Unit 50-percent AEP flood 149 ft^3/s 20-percent AEP flood 123 ft^3/s 10-percent AEP flood 108 ft^3/s 4-percent AEP flood 90.5 ft^3/s 2-percent AEP flood 78.8 ft^3/s 1-percent AEP flood 71.1 ft^3/s 0.5-percent AEP flood 63 ft^3/s 0.2-percent AEP flood 61.7 ft^3/s Peak-Flow Statistics Disclaimers [Peak Southeast US NC 2023 5006] One or more of the parameters is outside the suggested range.Estimates were extrapolated with unknown errors. Peak-Flow Statistics Flow Report [Peak Southeast US NC 2023 5006] Statistic Value Unit 50-percent AEP flood 15.9 ft^3/s 20-percent AEP flood 29.9 ft^3/s 10-percent AEP flood 41.7 ft^3/s 4-percent AEP flood 58.2 ft^3/s 2-percent AEP flood 73.2 ft^3/s 1-percent AEP flood 88.5 ft^3/s 0.5-percent AEP flood 104 ft^3/s 0.2-percent AEP flood 126 ft^3/s Peak-Flow Statistics Citations Feaster,T.D., Gotvald,A.J.,and Weaver,J.C.,2014, Methods for estimating the magnitude and frequency of floods for urban and small, rural streams in Georgia, South Carolina, and North Carolina, 2011 (ver. 1.1, March 2014): U.S. Geological Survey Scientific Investigations Report 2014-5030, 104 p. (http://pubs.usgs.gov/sir/2014/5030/) Feaster,T.D., Gotvald,A.J., Musser,J.W.,Weaver,J.C, Kolb, K.R.,Veilleux,A.G.,and Wagner, D.M.2023, Magnitude and frequency of floods for rural streams in Georgia,South Carolina,and North Carolina,2017—Results: U.S. Geological Survey Scientific Investigations Report 2023-5006,75 p. (https://pubs.er.usgs.gov/publication/sir20235006) Bankfull Statistics Bankfull Statistics Parameters [Appalachian Highlands D Bieger 2015] Parameter Code Parameter Name Value Units Min Limit Max Limit DRNAREA Drainage Area 0.0312 square miles 0.07722 940.1535 Bankfull Statistics Parameters [Piedmont P Bieger 2015] Parameter Code Parameter Name Value Units Min Limit Max Limit DRNAREA Drainage Area 0.0312 square miles 0.289575 939.99906 Bankfull Statistics Parameters [USA Bieger 2015] Parameter Code Parameter Name Value Units Min Limit Max Limit DRNAREA Drainage Area 0.0312 square miles 0.07722 59927.7393 Bankfull Statistics Disclaimers [Appalachian Highlands D Bieger 2015] One or more of the parameters is outside the suggested range.Estimates were extrapolated with unknown errors. Bankfull Statistics Flow Report [Appalachian Highlands D Bieger 2015] Statistic Value Unit Bieger_D_channel_width 3.6 ft Bieger_D_channel_depth 0.414 ft Bieger_D_channel_cross_sectional_area 1.5 ft^2 Bankfull Statistics Disclaimers [Piedmont P Bieger 2015] One or more of the parameters is outside the suggested range.Estimates were extrapolated with unknown errors. Bankfull Statistics Flow Report [Piedmont P Bieger 2015] Statistic Value Unit Bieger_P_channel_width 3.32 ft Bieger_P_channel_depth 0.391 ft Bieger_P_channel_cross_sectional_area 1.16 ft^2 Bankfull Statistics Disclaimers [USA Bieger 2015] One or more of the parameters is outside the suggested range.Estimates were extrapolated with unknown errors. Bankfull Statistics Flow Report [USA Bieger 2015] Statistic Value Unit Bieger_USA_channel_width 3.65 ft Bieger_USA_channel_depth 0.576 ft Bieger_USA_channel_cross_sectional_area 2.63 ft^2 Bankfull Statistics Flow Report [Area-Averaged] Statistic Value Unit Bieger_D_channel_width 3.6 ft Statistic Value Unit Bieger_D_channel_depth 0.414 ft Bieger_D_channel_cross_sectional_area 1.5 ft^2 Bieger_P_channel_width 3.32 ft Bieger_P_channel_depth 0.391 ft Bieger_P_channel_cross_sectional_area 1.16 ft^2 Bieger_USA_channel_width 3.65 ft Bieger_USA_channel_depth 0.576 ft Bieger_USA_channel_cross_sectional_area 2.63 ft^2 Bankfull Statistics Citations Bieger, Katrin; Rathjens, Hendrik;Allen, Peter M.;and Arnold,Jeffrey G.,2015, Development and Evaluation of Bankfull Hydraulic Geometry Relationships for the Physiographic Regions of the United States, Publications from USDA-ARS/UNL Faculty, 17p. (https://digitalcommons.unl.edu/usdaarsfacpub/1515? utm_source=digitalcommons.unl.edu i 2Fusdaarsfacpub i 2F1515&utm_medium=PDF&utm_campaign=PDFCoverPages) Urban Peak-Flow Statistics Urban Peak-Flow Statistics Parameters [Region 1 Piedmont Urban under 3 sgmi 2014 5030] Parameter Code Parameter Name Value Units Min Limit Max Limit DRNAREA Drainage Area 0.0312 square miles 0.1 3 LCO6IMP Percent Impervious NLCD2006 77.27 percent 0 47.9 Urban Peak-Flow Statistics Disclaimers [Region 1 Piedmont Urban under 3 sgmi 2014 5030] One or more of the parameters is outside the suggested range.Estimates were extrapolated with unknown errors. Urban Peak-Flow Statistics Flow Report [Region 1 Piedmont Urban under 3 sqmi 2014 5030] Statistic Value Unit Urban 50-percent AEP flood 149 ft^3/s Urban 20-Percent AEP flood 123 ft^3/s Urban 10-percent AEP flood 108 ft^3/s Urban 4-percent AEP flood 90.5 ft^3/s Urban 2-percent AEP flood 78.8 ft^3/s Urban 1-percent AEP flood 71.1 ft^3/s Urban 0.5-percent AEP flood 63 ft^3/s Urban 0.2-percent AEP flood 61.7 ft^3/s Urban Peak-Flow Statistics Citations Feaster,T.D., Gotvald,A.J.,and Weaver,J.C.,2014, Methods for estimating the magnitude and frequency of floods for urban and small, rural streams in Georgia, South Carolina, and North Carolina, 2011 (ver. 1.1, March 2014): U.S. Geological Survey Scientific Investigations Report 2014-5030, 104 p. (http://pubs.usgs.gov/sir/2014/5030/) USGS Data Disclaimer:Unless otherwise stated,all data,metadata and related materials are considered to satisfy the quality standards relative to the purpose for which the data were collected.Although these data and associated metadata have been reviewed for accuracy and completeness and approved for release by the U.S.Geological Survey(USGS),no warranty expressed or implied is made regarding the display or utility of the data for other purposes,nor on all computer systems,nor shall the act of distribution constitute any such warranty. USGS Software Disclaimer:This software has been approved for release by the U.S.Geological Survey(USGS).Although the software has been subjected to rigorous review,the USGS reserves the right to update the software as needed pursuant to further analysis and review.No warranty,expressed or implied,is made by the USGS or the U.S.Government as to the functionality of the software and related material nor shall the fact of release constitute any such warranty.Furthermore,the software is released on condition that neither the USGS nor the U.S.Government shall be held liable for any damages resulting from its authorized or unauthorized use. Channel Report Hydraflow Express Extension for Autodesk®Civil 3D®by Autodesk, Inc. Monday, Feb 26 2024 Downstream Channel Analysis (Pre-Dev) - 1-yr Trapezoidal Highlighted Bottom Width (ft) = 4.00 Depth (ft) = 1.82 Side Slopes (z:1) = 1.00, 1.00 Q (cfs) = 51.45 Total Depth (ft) = 4.00 Area (sqft) = 10.59 Invert Elev (ft) = 532.80 Velocity (ft/s) = 4.86 Slope (%) = 0.60 Wetted Perim (ft) = 9.15 N-Value = 0.026 Crit Depth, Yc (ft) = 1.52 Top Width (ft) = 7.64 Calculations EGL (ft) = 2.19 Compute by: Known Q Known Q (cfs) = 51.45 Elev (ft) Section Depth (ft) 537.00 4.20 536.00 3.20 535.00 - 2.20 534.00 - • 1.20 • • 533.00 - • 0.20 532.00 -0.80 • 531.00 -1.80 0 2 4 6 8 10 12 14 16 Reach (ft) Channel Report Hydraflow Express Extension for Autodesk®Civil 3D®by Autodesk, Inc. Monday, Feb 26 2024 Downstream Channel Analysis (Post-Dev) - 1-yr Trapezoidal Highlighted Bottom Width (ft) = 4.00 Depth (ft) = 1.79 Side Slopes (z:1) = 1.00, 1.00 Q (cfs) = 50.11 Total Depth (ft) = 4.00 Area (sqft) = 10.36 Invert Elev (ft) = 532.80 Velocity (ft/s) = 4.83 Slope (%) = 0.60 Wetted Perim (ft) = 9.06 N-Value = 0.026 Crit Depth, Yc (ft) = 1.49 Top Width (ft) = 7.58 Calculations EGL (ft) = 2.15 Compute by: Known Q Known Q (cfs) = 50.11 Elev (ft) Section Depth (ft) 537.00 4.20 536.00 3.20 535.00 - 2.20 534.00 - • 1.20 • • 533.00 - • 0.20 532.00 -0.80 • 531.00 -1.80 0 2 4 6 8 10 12 14 16 Reach (ft) Channel Report Hydraflow Express Extension for Autodesk®Civil 3D®by Autodesk, Inc. Monday, Feb 26 2024 Downstream Channel Analysis (Pre-Dev) - 10-yr Trapezoidal Highlighted Bottom Width (ft) = 4.00 Depth (ft) = 2.62 Side Slopes (z:1) = 1.00, 1.00 Q (cfs) = 101.37 Total Depth (ft) = 4.00 Area (sqft) = 17.34 Invert Elev (ft) = 532.80 Velocity (ft/s) = 5.84 Slope (%) = 0.60 Wetted Perim (ft) = 11.41 N-Value = 0.026 Crit Depth, Yc (ft) = 2.24 Top Width (ft) = 9.24 Calculations EGL (ft) = 3.15 Compute by: Known Q Known Q (cfs) = 101.37 Elev (ft) Section Depth (ft) 537.00 4.20 • • 536.00 • 3.20 • 535.00 - 2.20 • • 534.00 - 1.20 • • 533.00 - 0.20 532.00 -0.80 • 531.00 -1.80 0 2 4 6 8 10 12 14 16 Reach (ft) Channel Report Hydraflow Express Extension for Autodesk®Civil 3D®by Autodesk, Inc. Monday, Feb 26 2024 Downstream Channel Analysis (Post-Dev) - 10-yr Trapezoidal Highlighted Bottom Width (ft) = 4.00 Depth (ft) = 2.62 Side Slopes (z:1) = 1.00, 1.00 Q (cfs) = 100.94 Total Depth (ft) = 4.00 Area (sqft) = 17.34 Invert Elev (ft) = 532.80 Velocity (ft/s) = 5.82 Slope (%) = 0.60 Wetted Perim (ft) = 11.41 N-Value = 0.026 Crit Depth, Yc (ft) = 2.23 Top Width (ft) = 9.24 Calculations EGL (ft) = 3.15 Compute by: Known Q Known Q (cfs) = 100.94 Elev (ft) Section Depth (ft) 537.00 4.20 • • 536.00 • 3.20 • 535.00 - 2.20 • • 534.00 - 1.20 • • 533.00 - 0.20 532.00 -0.80 • 531.00 -1.80 0 2 4 6 8 10 12 14 16 Reach (ft) Channel Report Hydraflow Express Extension for Autodesk®Civil 3D®by Autodesk, Inc. Monday, Feb 26 2024 Downstream Channel Analysis (Pre-Dev) - 25-yr Trapezoidal Highlighted Bottom Width (ft) = 4.00 Depth (ft) = 2.91 Side Slopes (z:1) = 1.00, 1.00 Q (cfs) = 123.84 Total Depth (ft) = 4.00 Area (sqft) = 20.11 Invert Elev (ft) = 532.80 Velocity (ft/s) = 6.16 Slope (%) = 0.60 Wetted Perim (ft) = 12.23 N-Value = 0.026 Crit Depth, Yc (ft) = 2.51 Top Width (ft) = 9.82 Calculations EGL (ft) = 3.50 Compute by: Known Q Known Q (cfs) = 123.84 Elev (ft) Section Depth (ft) 537.00 4.20 • • 536.00 • 3.20 535.00 - 2.20 • • 534.00 - 1.20 • • 533.00 - 0.20 532.00 -0.80 • 531.00 -1.80 0 2 4 6 8 10 12 14 16 Reach (ft) Channel Report Hydraflow Express Extension for Autodesk®Civil 3D®by Autodesk, Inc. Monday, Feb 26 2024 Downstream Channel Analysis (Post-Dev) - 25-yr Trapezoidal Highlighted Bottom Width (ft) = 4.00 Depth (ft) = 2.89 Side Slopes (z:1) = 1.00, 1.00 Q (cfs) = 122.34 Total Depth (ft) = 4.00 Area (sqft) = 19.91 Invert Elev (ft) = 532.80 Velocity (ft/s) = 6.14 Slope (%) = 0.60 Wetted Perim (ft) = 12.17 N-Value = 0.026 Crit Depth, Yc (ft) = 2.49 Top Width (ft) = 9.78 Calculations EGL (ft) = 3.48 Compute by: Known Q Known Q (cfs) = 122.34 Elev (ft) Section Depth (ft) 537.00 4.20 • • 536.00 • 3.20 V 535.00 - 2.20 • • 534.00 - 1.20 • • 533.00 - 0.20 532.00 -0.80 • 531.00 -1.80 0 2 4 6 8 10 12 14 16 Reach (ft) EROSION CONTROL 1 I 2 I 3 I 4 I 5 I 6 I 7 8 I 9 I 10 I 11 I 12 I 13 I 14 I 15 \1p I I11pi EROSION CONTROL PHASE 1 LEGEND 0 N CARO<j, Q XXX MAJOR CONTOUR (EXISTING) $4: ESS/04-'gN9�i Q Q — —XXX— — MINOR CONTOUR (EXISTING) N0. 047666 • SKIMMER SEDIMENT BASIN SF—SILT FENCE D.A. = 2.51 ACRES LIMITS OF DISTURBANCE 'j�''UD I NEB �S` FS STORAGE REQUIRED: 1,800 X 2.SQI�= 4510CF _ O O O DRIVE ENTRANCE BARRICADE -''4 4� ``''''` P STORAGE PROVIDED = 6,837 CF @ 536.50' � Ism P SURFACE AREA REQUIRED: 325 X 8.2 = 2,664 SF \ I ;: ;•;:;:;:;:;;,�,�;�;�,;,�:�:4�:, INLET PROTECTION SIGNATURE DATE 01/17/2024 SURFACE AREA PROVIDED = 3,771 SF @ 536.50' ���• ••"•"�•'""•""" Ci TOP 538.00' BOTTOM 534.00' �//���/��///��♦I TEMPORARY STABILIZED — •���//��/,,,,,a CONSTRUCTION ENTRANCE SIDE SLOPES = 3:1 TEMP SEED ALL SLOPES \ �uuu��u!!��l1 z""g (RE: Al-057o) \ /] " i I a N T tL P / P.� III N De ''\ CONTRACTOR TO INSTALL / %i1°' \ ACREAGE SUMMARY `o.i.$ \\\ TEMPORARY CLEAN WATER L� by . IMPERVIOUS AREA t0.00 ACRES O LIMITS OF ° b\ii TEMPORARY 20' DIVERSION. TO BE IMMEDIATELY I ' LANDSCAPE AREA t0.00 ACRES Z c5 DISTURBANCE I /"T o Q�S EMERGENCY SPILLWAY / STABILIZED VIA IMPERVIOUS ELEV: 536.50 \ �e c F�em^s I LINER, OR SIMILAR METHOD. / TOTAL DISTURBED t3.33 ACRES /F ` \ oe�eso3 ase CONTRACTOR TO �(RE. Fi-0570) M IN 52 Moan zo„•:srR_i INSTALL SILT FENCE PIN 6zJPG 6 I RE: Li-057o I '44 64, I y s OWNERSHIP/CONTRACTOR SUMMARY - I M 6e266264 s _6sa \ ^ �\ y, 1 \ I( ) `�' g F+ LIMITS OF � \\�\�\\ I 1 1 I °\lo:T...1 DISTURBANCEL OWNER/DEVELOPER: \ SEDIMENT SKIMMER / • /� �\ 1 J I — \\ I �/ QUIKTRSTREETIP CORPORATION — ♦ \ \ I / I ` 1 'RF / I> STREET\ W/ 1.5" ORIFICEg,/ ``— \ � // !S — �` / :� r (ITv.)STATE, ZIP CODE FL (oUT): 534.00/ ;i /' � � OUTLET PROTECTION - L \ (RE: H12-0571)i Ciii.r •4\ ♦ \,k, N\ ( ) // TyP - flee_qi'�I �'i .sss� n TBD OPERATOR/GENERAL CONTRACTORL/ \ / II r ♦ RE: HS-0571/ / / I I F_ T." ;, I ,ll \ s KJ Q\ \\\BAFFLES, TYP. OF 5 I aF \ ♦ ...,; \4` // / // I —�� \ \zss\ J ;?%. / �, _ 0woRE: A6-0570 ®G / / /• \ \\\ --___ ,s \ SUPERINTENDENT .�( ) ,1��"��I, � \ \\\ I' la'B6 r --- / ..\ S. '`,. ♦ / m e TBD TI 51 Wtia IF K II ♦�� ����y� \ \ ( �• \ \ CONTRACTOR SHALL INSTALL TEMPORARY ``��_ ,F" \ : SEQUENCE OF CONSTRUCTION (PHASE IB). O J K \��/ / ��'����� OAP' :1111111:1Tize, \ �' I STABILIZED CONSTRUCTION ENTRANCE 41.11 wDIVERSION DITCH #2 �`� \�.• d° .1�'' 0 q�' \\\��� \ �•� I \ (25'X100')� \ \ ',I 1. CLEAR AND DEMOLISH AREAS ONLY NECESSARY TO INSTALL j (RE: F1 C570) I 4/10' ` .w s \ , `� PHASE 1B EROSION CONTROL MEASURES. �� • 00 000 L,,> v (RE L11-057o) I "4,szZg N4 .. ��"���j.///�'� O \ \ (RE: F1-057o .P.PC nnlin •'O i ;_� 2. INSTALL PERIMETER SILT FENCING, STABILIZED CONSTRUCTION •— Q \�` � - i \ 1 0 ENTRANCE, AND CLEAN WATER DIVERSION. CLEAN WATER Z Q " ` ♦`.j/��� @ 0.59 SLOPE (TEMPORARY) „��/ \ \ \ \ Q�� .a• :•� /�•/ FL IN = 534.00 �\\ \ \ \ \ O O O O O O O O O O �1 O DIVERSION TO BE IMMEDIATELY STABILIZED VIA IMPERMEABLE H H Z • O . O . O . O . O'0 � < \ \ \♦ • \ - \ \ \ \ \ O O O O O O O O O O O 0.eil LINER OR SIMILAR MEANS. i In J \� • ' • OUT = 533.25\ I \��\\\ \`\ \ \ -0000000-00000000000011-40 11 — w �,s �•. •�/I� / �3„ CORE INTO STRUCTURE AND \ \ \ \�' �"�' \ °' 04 3. INSTALL SKIMMER BASIN AND ASSOCIATED DIVERSIONS. •� �, \ \ TREE PROTECTION FENCE — \.N,� ♦♦ A nM' �, INSTALL SEDIMENT POND A�\VA \ V (RE: L1-0577) \ 1' I \ C 0 OUTFACE © ELEV: 533.25, TO \ \\ \ _ — / i. / 4. ALL BMPs TO BE INSTALLED AND FULLY FUNCTIONING PRIORi� ♦1. \ \ / /\ I, I \�\\ \ - - - TO LAND DISTURBANCEw \ x \i I' BE PLUGGED WHEN SEDIMENTS \ _ — _ y$ ♦� \����r?I �l ���Ii� BASIN IS REMOVED. �. \\\\V�A �� _ A----- _____ EXISTINGT REMAIN J J` ` N s \ eOd 5. COMMENCE GRADING OPERATION. a H \ Q� ♦�\ ' ` a \\\ \ \ \ + ,si / 6. INSTALL CONCRETE WASHOUT PRIOR TO ANY MASONRY WORK - H usf���♦\ \ �I, �"�+°"n //�II'k\ \� �����\\\\ _ z,.a, �l T \ Lll3 7. TEMPORARY MULCH ALL DISTURBED AREAS WHERE WORK HAS — �A ' 0Q° \ A V J W,� CEASED FOR 14 DAYS OR MORE. a �)�� \\ 14 1 i# \ ..o>"� �\ \��A V \ CONCRETE WASHOUTr \ / A I_ E �\. o. �♦ s \ 1, II �10 , \ ° \ � \ \ \ (RE: F11-057o) I1 / 1 f a N \ \\\ \ �' °he� i \\\ ."�< I STOCKPILE Ir.' / o : LII ®cDRYRrUM�u�,R.CORPORATION zn« USE,REPRODUCTION, ''' \H; t 10.s , — — e \ �a � PUBLICATION, RInR�aFORBmDEN. 68.401 P LIMITS OF ♦ . \ \ _ °'y� \ m n PROTOTYPE P-113(02/Ol/23) Gravel i ���_ =ft DMSION: DISTURBANCE \� \\ sr�\ \ I P%///////r%/////% I 1 I 0 R,ns, I F y VERSION:001 o - % " � 1 I \ / (`I INLET PROTECTION DESIGNED BY:JES/WDE \ '\, \ I/// Roo.v t;.acz sr. P I o -. . �/°a° I° 11: (RE: L6—0570) DRAWN BY:]ES e� \\ // // ''. R otP t z sis s F IF REVIEWED BY:WDE w ... \ _ I % 17 Fr.nf back rin /' moor \� CONTRACTOR TO es °. % — p rn INSTALL SILT FENCE a4° - _ -v�11������ nl a `� (RE: L1-0570) g ! _ _ �R\ may- .�7 GO Z�3 �� ° u9 m^M.l' aUefo uera\ , uqr° ugto � 4�1 a o E . 4, z6 as l o o \� I ,.�" �� o D Q '; a � , s - w r Sc '� wiB �F- - wtr SF �e�r.�,� ,j �i Ili` Q D _ �so,s s o — — — —_— — ---_—_ems= �_ - o� e_.o ' _1' z , _ — o INLET PROTECTION •5� , i ao7 • w — — zre- — e — — _srs (RE: L6-0570) •, m,w-s.,. 1 t=n 'f MARSHVILLE PUkEVARD(U.S.Highway 74) -- / , • 4 a '4' C o ((150 Foot Public Right-of-Way) \ �j AS ° ° Z C o \ o C7 - .er= orc, m�a�e-35'cz:r°B+_ as nsa�r suo se �'*s� �� SHEET TITLE: H -zre ,tl B — — —� —A — — __, _ }�—_ � Z \ ® I © ' EROSION CONTROL PLAN- B "4 a aatw a �%° 1' ° \\\ 1 PHASE 1 B MPH m,.-sRerss,I a ;�` uanm a ." a"1 *n sR D° 9^s_� ,,\ 1'; — - i=1.az _ e= wee I SHEET NUMBER: NAM,ea o A mg 30 30 1530 60 C140B A 1 I 2 I 3 I 4 I 5 I 6 I 7 I 8 I 9 I 10 I 11 I 12 I 13 14 15 1069 - Erosion Control Table of Contents Prepared by Freeland & Kauffman, Inc Printed 2/21/2024 HydroCAD® 10.20-4a s/n 04485 ©2023 HydroCAD Software Solutions LLC TABLE OF CONTENTS Project Reports 1 Routing Diagram 10-Year Event 2 Subcat 1 S: To Basin 4 Pond 2P: Skimmer Sediment Basin Ph. 1 B < 1s To asin 2P Skimmer Sediment Basin Ph . 1 B SUbCat Reach 'On. MI Routing Diagram for 1069-Erosion Control Prepared by Freeland&Kauffman, Inc, Printed 2/21/2024 HydroCAD®10.20-4a s/n 04485 ©2023 HydroCAD Software Solutions LLC 1069 - Erosion Control Type 1124-hr 10-Year Rainfall=5.31" Prepared by Freeland & Kauffman, Inc Printed 2/21/2024 HydroCAD® 10.20-4a s/n 04485 ©2023 HydroCAD Software Solutions LLC Page 2 Summary for Subcatchment 1S: To Basin Runoff = 17.12 cfs @ 11.96 hrs, Volume= 0.893 af, Depth> 4.27" Routed to Pond 2P : Skimmer Sediment Basin Ph. 1 B Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-150.00 hrs, dt= 0.05 hrs Type II 24-hr 10-Year Rainfall=5.31" Area (ac) CN Description 2.510 91 Fallow, bare soil, HSG C 2.510 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Subcatchment 1S: To Basin Hydrograph 1 i i i i i i i i i ;..........:........._........_;........._:...........:._......._i...._. ■Runoff 18 17.12 cfs -_...........i..............................:........._i........._i.................................._........._........._........._................................i..........;. . i ; . . ........._...........-..................._.........._........._...... TT .. ...... I Ii i : i i . i ; 16=' 15 ...... Year... 31"........ Runoff Ares-2 510 aC 12 ....... � f VO�u11t 11_ 10= '' / :.................................._........._........._........ Runoff Depth>4. .«.......... LL9_ ; .... ...... .. ...... ; T-c=6.0..m.it 1-..... 5 + 4 . 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 Time (hours) 1069 - Erosion Control Type 1124-hr 10-Year Rainfall=5.31" Prepared by Freeland & Kauffman, Inc Printed 2/21/2024 HydroCAD® 10.20-4a s/n 04485 ©2023 HydroCAD Software Solutions LLC Page 3 Hydrograph for Subcatchment 1 S: To Basin Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 5.00 0.33 0.02 0.05 135.00 5.31 4.28 0.00 7.50 0.58 0.11 0.13 137.50 5.31 4.28 0.00 10.00 0.96 0.33 0.35 140.00 5.31 4.28 0.00 12.50 3.90 2.92 1.39 142.50 5.31 4.28 0.00 15.00 4.53 3.53 0.40 145.00 5.31 4.28 0.00 17.50 4.84 3.83 0.25 147.50 5.31 4.28 0.00 20.00 5.06 4.04 0.17 150.00 5.31 4.28 0.00 22.50 5.22 4.20 0.15 25.00 5.31 4.28 0.00 27.50 5.31 4.28 0.00 30.00 5.31 4.28 0.00 32.50 5.31 4.28 0.00 35.00 5.31 4.28 0.00 37.50 5.31 4.28 0.00 40.00 5.31 4.28 0.00 42.50 5.31 4.28 0.00 45.00 5.31 4.28 0.00 47.50 5.31 4.28 0.00 50.00 5.31 4.28 0.00 52.50 5.31 4.28 0.00 55.00 5.31 4.28 0.00 57.50 5.31 4.28 0.00 60.00 5.31 4.28 0.00 62.50 5.31 4.28 0.00 65.00 5.31 4.28 0.00 67.50 5.31 4.28 0.00 70.00 5.31 4.28 0.00 72.50 5.31 4.28 0.00 75.00 5.31 4.28 0.00 77.50 5.31 4.28 0.00 80.00 5.31 4.28 0.00 82.50 5.31 4.28 0.00 85.00 5.31 4.28 0.00 87.50 5.31 4.28 0.00 90.00 5.31 4.28 0.00 92.50 5.31 4.28 0.00 95.00 5.31 4.28 0.00 97.50 5.31 4.28 0.00 100.00 5.31 4.28 0.00 102.50 5.31 4.28 0.00 105.00 5.31 4.28 0.00 107.50 5.31 4.28 0.00 110.00 5.31 4.28 0.00 112.50 5.31 4.28 0.00 115.00 5.31 4.28 0.00 117.50 5.31 4.28 0.00 120.00 5.31 4.28 0.00 122.50 5.31 4.28 0.00 125.00 5.31 4.28 0.00 127.50 5.31 4.28 0.00 130.00 5.31 4.28 0.00 132.50 5.31 4.28 0.00 1069 - Erosion Control Type 1124-hr 10-Year Rainfall=5.31" Prepared by Freeland & Kauffman, Inc Printed 2/21/2024 HydroCAD® 10.20-4a s/n 04485 ©2023 HydroCAD Software Solutions LLC Page 4 Summary for Pond 2P: Skimmer Sediment Basin Ph. 1 B Inflow Area = 2.510 ac, 0.00% Impervious, Inflow Depth > 4.27" for 10-Year event Inflow = 17.12 cfs @ 11.96 hrs, Volume= 0.893 af Outflow = 16.74 cfs @ 11.99 hrs, Volume= 0.893 af, Atten= 2%, Lag= 1.3 min Primary = 0.02 cfs @ 5.45 hrs, Volume= 0.189 af Secondary= 16.72 cfs @ 11.99 hrs, Volume= 0.704 af Routing by Stor-Ind method, Time Span= 5.00-150.00 hrs, dt= 0.05 hrs Peak Elev= 536.97' @ 11.99 hrs Surf.Area= 4,180 sf Storage= 8,700 cf Plug-Flow detention time= 653.2 min calculated for 0.893 af(100% of inflow) Center-of-Mass det. time= 654.7 min ( 1,438.1 - 783.3 ) Volume Invert Avail.Storage Storage Description #1 534.00' 13,505 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 534.00 1,757 0 0 535.00 2,516 2,137 2,137 536.00 3,333 2,925 5,061 537.00 4,208 3,771 8,832 538.00 5,138 4,673 13,505 Device Routing Invert Outlet Devices #1 Primary 534.00' 0.020 cfs Constant Flow/Skimmer #2 Secondary 536.50' 20.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=0.02 cfs @ 5.45 hrs HW=534.04' (Free Discharge) 4-1=Constant Flow/Skimmer (Constant Controls 0.02 cfs) Secondary OutFlow Max=16.20 cfs @ 11.99 hrs HW=536.96' (Free Discharge) L2=Broad-Crested Rectangular Weir (Weir Controls 16.20 cfs @ 1.76 fps) 1069 - Erosion Control Type 1124-hr 10-Year Rainfall=5.31" Prepared by Freeland & Kauffman, Inc Printed 2/21/2024 HydroCAD® 10.20-4a s/n 04485 ©2023 HydroCAD Software Solutions LLC Page 5 Pond 2P: Skimmer Sediment Basin Ph. 1B Hydrograph M Inflow ........................................j..-..-.........-..-.i........-..-..- ..-..-...... -........... ........... ............ ........... ............ ........... ............ ................ •Outflow 16.74 cfs ......... ......... ....,.... ......... ......... : l r =-..- .-..r n ■Prima 19_' � ......-..-.._-.. -..-..- ...I� i© ...wf Aria........�:JV...- �+..-..-... ■Secondary 18 Peak elev=5$6.97' _ 116 72 cfs l� ; ': # 17 i 16= ©I"afe�v7VV. ........ 15= 14 ' 13 ' / w 11=' -- 10 - --i--- ---'- u- 8- 7= ? ..-.. 6= 5= • , , , . 2 vim//////�������������������������������������������������������������� 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 Time (hours) Pond 2P: Skimmer Sediment Basin Ph. 1B Stage-Discharge '''''' Prial mary 538 '' ���''''' v Secondary , 537 �/ ������� , ,OM Broad-Crested Rectangular Weir r w ,1 536 1,1 535 Constant Flow/Skimmer 534 ; . . 0 10 20 30 40 50 60 70 80 90 Discharge (cfs) 1069 - Erosion Control Type 1124-hr 10-Year Rainfall=5.31" Prepared by Freeland & Kauffman, Inc Printed 2/21/2024 HydroCAD® 10.20-4a s/n 04485 ©2023 HydroCAD Software Solutions LLC Page 6 Pond 2P: Skimmer Sediment Basin Ph. 1 B Stage-Area-Storage Surface/Horizontal/Wetted Area(sq-ft) 0 500 1,000 1,500 2,000 2,500 3,000 3,500 4,000 4,500 5,000 0 Surface] I . I . . . I. . . . i . i . . . i, . . . i . I . . . I ,. . . I ❑Storage / " . • • 538 • �� r i 537—' ��������� is w 0 536 • > d w 535—' • - . .. j Custom Stage . 534 , . . , ( ( I' 0 2,000 4,000 6,000 8,000 10,000 12,000 Storage(cubic-feet) 1069 - Erosion Control Type 1124-hr 10-Year Rainfall=5.31" Prepared by Freeland & Kauffman, Inc Printed 2/21/2024 HydroCAD® 10.20-4a s/n 04485 ©2023 HydroCAD Software Solutions LLC Page 7 Hydrograph for Pond 2P: Skimmer Sediment Basin Ph. 1 B Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic-feet) (feet) (cfs) (cfs) (cfs) 5.00 0.05 4 534.00 0.00 0.00 0.00 10.00 0.35 2,434 535.12 0.02 0.02 0.00 15.00 0.40 6,975 536.54 0.40 0.02 0.38 20.00 0.17 6,916 536.52 0.18 0.02 0.16 25.00 0.00 6,793 536.49 0.02 0.02 0.00 30.00 0.00 6,433 536.39 0.02 0.02 0.00 35.00 0.00 6,073 536.29 0.02 0.02 0.00 40.00 0.00 5,713 536.19 0.02 0.02 0.00 45.00 0.00 5,353 536.09 0.02 0.02 0.00 50.00 0.00 4,993 535.98 0.02 0.02 0.00 55.00 0.00 4,633 535.87 0.02 0.02 0.00 60.00 0.00 4,273 535.76 0.02 0.02 0.00 65.00 0.00 3,913 535.64 0.02 0.02 0.00 70.00 0.00 3,553 535.52 0.02 0.02 0.00 75.00 0.00 3,193 535.39 0.02 0.02 0.00 80.00 0.00 2,833 535.27 0.02 0.02 0.00 85.00 0.00 2,473 535.13 0.02 0.02 0.00 90.00 0.00 2,113 534.99 0.02 0.02 0.00 95.00 0.00 1,753 534.84 0.02 0.02 0.00 100.00 0.00 1,393 534.69 0.02 0.02 0.00 105.00 0.00 1,033 534.53 0.02 0.02 0.00 110.00 0.00 673 534.36 0.02 0.02 0.00 115.00 0.00 313 534.17 0.02 0.02 0.00 120.00 0.00 14 534.01 0.00 0.00 0.00 125.00 0.00 0 534.00 0.00 0.00 0.00 130.00 0.00 0 534.00 0.00 0.00 0.00 135.00 0.00 0 534.00 0.00 0.00 0.00 140.00 0.00 0 534.00 0.00 0.00 0.00 145.00 0.00 0 534.00 0.00 0.00 0.00 150.00 0.00 0 534.00 0.00 0.00 0.00 1069 - Erosion Control Type 1124-hr 10-Year Rainfall=5.31" Prepared by Freeland & Kauffman, Inc Printed 2/21/2024 HydroCAD® 10.20-4a s/n 04485 ©2023 HydroCAD Software Solutions LLC Page 8 Stage-Discharge for Pond 2P: Skimmer Sediment Basin Ph. 1 B Elevation Discharge Primary Secondary Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) I (feet) (cfs) (cfs) (cfs) 534.00 0.00 0.00 0.00 536.60 1.59 0.02 1.57 534.05 0.02 0.02 0.00 536.65 2.91 0.02 2.89 534.10 0.02 0.02 0.00 536.70 4.47 0.02 4.45 534.15 0.02 0.02 0.00 536.75 6.29 0.02 6.27 534.20 0.02 0.02 0.00 536.80 8.32 0.02 8.30 534.25 0.02 0.02 0.00 536.85 10.55 0.02 10.53 534.30 0.02 0.02 0.00 536.90 12.97 0.02 12.95 534.35 0.02 0.02 0.00 536.95 15.69 0.02 15.67 534.40 0.02 0.02 0.00 537.00 18.62 0.02 18.60 534.45 0.02 0.02 0.00 537.05 21.76 0.02 21.74 534.50 0.02 0.02 0.00 537.10 25.12 0.02 25.10 534.55 0.02 0.02 0.00 537.15 28.29 0.02 28.27 534.60 0.02 0.02 0.00 537.20 31.59 0.02 31.57 534.65 0.02 0.02 0.00 537.25 35.00 0.02 34.98 534.70 0.02 0.02 0.00 537.30 38.52 0.02 38.50 534.75 0.02 0.02 0.00 537.35 42.14 0.02 42.12 534.80 0.02 0.02 0.00 537.40 45.87 0.02 45.85 534.85 0.02 0.02 0.00 537.45 49.70 0.02 49.68 534.90 0.02 0.02 0.00 537.50 53.62 0.02 53.60 534.95 0.02 0.02 0.00 537.55 57.74 0.02 57.72 535.00 0.02 0.02 0.00 537.60 61.97 0.02 61.95 535.05 0.02 0.02 0.00 537.65 66.31 0.02 66.29 535.10 0.02 0.02 0.00 537.70 70.74 0.02 70.72 535.15 0.02 0.02 0.00 537.75 75.07 0.02 75.05 535.20 0.02 0.02 0.00 537.80 79.47 0.02 79.45 535.25 0.02 0.02 0.00 537.85 83.94 0.02 83.92 535.30 0.02 0.02 0.00 537.90 88.48 0.02 88.46 535.35 0.02 0.02 0.00 ' 537.95 93.00 0.02 92.98 535.40 0.02 0.02 0.00 538.00 97.57 0.02 97.55 535.45 0.02 0.02 0.00 535.50 0.02 0.02 0.00 535.55 0.02 0.02 0.00 535.60 0.02 0.02 0.00 535.65 0.02 0.02 0.00 535.70 0.02 0.02 0.00 535.75 0.02 0.02 0.00 535.80 0.02 0.02 0.00 535.85 0.02 0.02 0.00 535.90 0.02 0.02 0.00 535.95 0.02 0.02 0.00 536.00 0.02 0.02 0.00 536.05 0.02 0.02 0.00 536.10 0.02 0.02 0.00 536.15 0.02 0.02 0.00 536.20 0.02 0.02 0.00 536.25 0.02 0.02 0.00 536.30 0.02 0.02 0.00 536.35 0.02 0.02 0.00 536.40 0.02 0.02 0.00 536.45 0.02 0.02 0.00 536.50 0.02 0.02 0.00 536.55 0.58 0.02 0.56 1069 - Erosion Control Type 1124-hr 10-Year Rainfall=5.31" Prepared by Freeland & Kauffman, Inc Printed 2/21/2024 HydroCAD® 10.20-4a s/n 04485 ©2023 HydroCAD Software Solutions LLC Page 9 Stage-Area-Storage for Pond 2P: Skimmer Sediment Basin Ph. 1 B Elevation Surface Storage Elevation Surface Storage (feet) (sq-ft) (cubic-feet) (feet) (sq-ft) (cubic-feet) 534.00 1,757 0 536.60 3,858 7,218 534.05 1,795 89 536.65 3,902 7,412 534.10 1,833 179 536.70 3,946 7,608 534.15 1,871 272 536.75 3,989 7,807 534.20 1,909 367 536.80 4,033 8,007 534.25 1,947 463 536.85 4,077 8,210 534.30 1,985 561 536.90 4,120 8,415 534.35 2,023 661 536.95 4,164 8,622 534.40 2,061 764 537.00 4,208 8,832 534.45 2,099 867 537.05 4,254 9,043 534.50 2,137 973 537.10 4,301 9,257 534.55 2,174 1,081 , 537.15 4,347 9,473 534.60 2,212 1,191 537.20 4,394 9,692 534.65 2,250 1,302 537.25 4,441 9,913 534.70 2,288 1,416 537.30 4,487 10,136 534.75 2,326 1,531 537.35 4,534 10,361 534.80 2,364 1,648 537.40 4,580 10,589 534.85 2,402 1,768 537.45 4,627 10,819 534.90 2,440 1,889 537.50 4,673 11,052 534.95 2,478 2,012 537.55 4,719 11,287 535.00 2,516 2,137 537.60 4,766 11,524 535.05 2,557 2,263 537.65 4,812 11,763 535.10 2,598 2,392 537.70 4,859 12,005 535.15 2,639 2,523 537.75 4,906 12,249 535.20 2,679 2,656 537.80 4,952 12,495 535.25 2,720 2,791 537.85 4,999 12,744 535.30 2,761 2,928 537.90 5,045 12,995 535.35 2,802 3,067 537.95 5,092 13,249 535.40 2,843 3,208 538.00 5,138 13,505 535.45 2,884 3,351 535.50 2,925 3,497 535.55 2,965 3,644 535.60 3,006 3,793 535.65 3,047 3,944 535.70 3,088 4,098 535.75 3,129 4,253 535.80 3,170 4,411 535.85 3,210 4,570 535.90 3,251 4,732 535.95 3,292 4,895 536.00 3,333 5,061 536.05 3,377 5,229 536.10 3,421 5,399 536.15 3,464 5,571 536.20 3,508 5,745 536.25 3,552 5,922 536.30 3,595 6,100 536.35 3,639 6,281 536.40 3,683 6,464 536.45 3,727 6,649 536.50 3,771 6,837 536.55 3,814 7,026 Channel Report Hydraflow Express Extension for Autodesk®Civil 3D®by Autodesk, Inc. Wednesday,Jan 17 2024 Diversion #1 Trapezoidal Highlighted Bottom Width (ft) = 2.00 Depth (ft) = 0.51 Side Slopes (z:1) = 2.00, 2.00 Q (cfs) = 6.050 Total Depth (ft) = 1.50 Area (sqft) = 1.54 Invert Elev (ft) = 1.00 Velocity (ft/s) = 3.93 Slope (%) = 3.50 Wetted Perim (ft) = 4.28 N-Value = 0.035 Crit Depth, Yc (ft) = 0.55 Top Width (ft) = 4.04 Calculations EGL (ft) = 0.75 Compute by: Known Q Known Q (cfs) = 6.05 Elev (ft) Section Depth (ft) 3.00 2.00 2.50 1.50 2.00 1.00 v 1.50 _ 0.50 1.00 0.00 0.50 -0.50 0 1 2 3 4 5 6 7 8 9 10 Reach (ft) Channel Report Hydraflow Express Extension for Autodesk®Civil 3D®by Autodesk, Inc. Wednesday,Jan 17 2024 Diversion #2 Trapezoidal Highlighted Bottom Width (ft) = 2.00 Depth (ft) = 0.26 Side Slopes (z:1) = 2.00, 2.00 Q (cfs) = 0.920 Total Depth (ft) = 1.50 Area (sqft) = 0.66 Invert Elev (ft) = 1.00 Velocity (ft/s) = 1.40 Slope (%) = 1.00 Wetted Perim (ft) = 3.16 N-Value = 0.035 Crit Depth, Yc (ft) = 0.18 Top Width (ft) = 3.04 Calculations EGL (ft) = 0.29 Compute by: Known Q Known Q (cfs) = 0.92 Elev (ft) Section Depth (ft) 3.00 2.00 2.50 1.50 2.00 1.00 1.50 0.50 v 1.00 0.00 0.50 -0.50 0 1 2 3 4 5 6 7 8 9 10 Reach (ft) STORM DRAIN 1 2 I 3 I 4 5 6 I 7 I 8 I 9 I 10 I 11 I 12 I 13 I 14 I 15 puuupi INLET AREA DRAINAGE(PIPE SIZING ONLY) INLET AREA LEGEND `Jo�,N CARO<i IMPERVIOUS AREA OPEN AREA TOTAL AREA 0/100-YR. ;? OF ESS l p4q Q AREA ID DRAINS TO: WEIGHTED C i1100-YR. Q- 9 Q (AC.) (AC.) (AC.) (CFS) Q < #1 INLET#8 0.46 0.01 0.48 0.93 9.18 4.06 gh A = BASIN DESIGNATION _ N0. 047666 B = BASIN AREA (AC) #2 INLET#14 0.40 0.09 0.49 0.82 9.18 3.69 C = WEIGHTED RUNOFF COEFF. P Q` #3 INLET#15 0.34 0.00 0.34 0.95 9.18 2.92 uNOO w ''i<i6411 DUPI�` `` #4 INLET#11 0.31 0.01 0.32 0.94 9.18 2.74 z.3J m m BASIN BOUNDARY //11111111i P °J P \ #5 INLET#9 0.43 0.00 0.43 0.94 9.18 3.75 i SIGNATURE DATE:01/17/2024 BUILDING UGD 0.17 0.00 0.17 0.95 9.18 1.46 z POND FES#12 0.00 0.19 0.19 0.21 9.18 0.37 z e S e N o M� 213P N 0 11 I':, M oonod Wend \� \ \ PIN 015110NPA \ °B 8504,s A s` \ I �� 1.......: I / ;/'I M P/N.02311005 \ �� I \ I 6���'((� PV' // I Zone:5PR-3 n' W\ 1 \ V ( \ A \ \ \ , , 00<rimio. Tic5p •/.. \ Ir' 1''' 5.1S5N ',2 _.- I [ 1 LO ce T. �s \\ \ / / ?40.:11, POND ® \\\� `/f e 1 o G1Coo� Nillittil%‘N \ t /i �--I J a \ "s-„\\ I 1 N .cE°" F �s I ■I \ V � i :Ao--�®vi1 ��Qi �I\ w K ti 0.19 0.21 . ,„ 150.4, ° �� /1 , _� _ _ 44i v �00 v �I _� v °_ R I �REENE SCREEce l u Diu 2 Inv %SSW ��'� / i ■\ V \ III III Mli \fim I- Jify �\ �� L�a ® �. ■ \� 0.34 0.95 �� II®0.49 0.82�I�MI 1- 3 , _ w J 9 ® � ss V �� • III_ iMII=11� A �; . \m ,� .� •� .ei or Q� CY ` + ' ! L. .L� a1M 1M �-I--I��- he ice. ' �1�� H H \ 06�` oqo al \ ■ _\\ 1N�711MMPyl _ I�II�� _ \ , 6,,,,1, V itiN II ,.:� TT r j��' ri_:,,, , p e1 P: *. .N 4\ G 1 �oµoo 04 a � BUILDING o� �� GEUGT'''c -b''' N 1 ,'IM 2---- - .\\\\\ \ \ Ili I( �IUGT �®J►' G ■''',:\ �1� r�1 ■ rl 0.17 0.95 \ li • ®©. \ I i 11 ®COPYRIGHT°� R CORPORATION, - 1 o NO O V'� y4"0. q. I V OLEO o OR STN.CTLLvFORBIDDEN h` / IN MT,6 '13 f ! \ "�, \ - PROTOTYPE:P-113(02/01/23) #5 I VERSION:001 r o \ I� _ .C M. �° ` = ® I\\ _) , \ ,, DESIGNED BY:JES/WDE DRAWN BY:TES `\ I \ • ,IREVIEWED BY:WDE � ��� = - 0.43 0.94 � I bF_ 6 I"� b� .. _ I �" 2l'Fro.f Setback ` / 1. IN P OHE - 046' - �t9 am ■ 1 '�_ a - �/i1' ' ' 4z 3 N • -� �■ - �QI III N v. n• `J CO III' ��Y i Y 1� 5°I 1 O .0 I -, 1 9 ace ai t 'Si IMARSHVILLE�UL�EVARD(U.S.Highway 74) �� ♦%\ \ _„....„,,,I...- ___ -)4 sm, ,- ;v-i,•.;..,:, N, ,,-A,"c,,,,s,,,m.-,•=n11~41100, 1, C o (150 Foot Public Right-of-Way) \ =9 ''k♦ a z C a �sia _ \ Ii�l ic - �,a ar- °ve ee / SHEET TITLE: Asphalted Over til B _ i_ S�A -� - - - - -� Z ® © INLET AREA DRAINAGE MAP B i ou°Ii � a ''. , .: TrafficSign0vro ro ge � MPH,-' �sq g ,,. - - r � s,.a s' I �� s oa .. o - in'v= .°'z m SHEET NUMBER: i I FD A ® 30 15 0 30 60 C 12 3 A 1 I 2 I 3 I 4 I 5 I 6 I 7 I 8 I 9 I 10 I 11 I 12 I 13 I 14 15 Hydraflow Storm Sewers Extension for Autodesk® Civil 3D® Plan D2 A 10 D3 4 5 A3 11 9 D4 4 12 Outfall A2 D5 3 13 D6 Outfall B3utfall 6 C3 1 2 8 7 B2 B1 Project File: 1069-Storm Sewers.stm Number of lines: 13 Date:2/26/2024 Storm Sewers v2023.00 Storm Sewer Tabulation Pagel Station Len Drng Area Rnoff Area x C Tc Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd/Rim Elev Line ID coeff (I) flow full Line To Incr Total Incr Total Inlet Syst Size Slope Dn Up Dn Up Dn Up Line (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (ft/s) (in) (%) (ft) (ft) (ft) (ft) (ft) (ft) 1 End 32.554 0.49 0.83 0.82 0.40 0.72 5.0 5.8 7.5 5.47 31.27 4.88 18 7.56 536.00 538.46 536.92 539.36 538.21 544.20 C.1 2 1 64.326 0.34 0.34 0.95 0.32 0.32 5.0 5.0 7.8 2.52 18.44 3.46 18 2.63 538.66 540.35 539.36 540.95 544.20 544.00 C.2 3 End 21.542 0.00 20.21 0.00 0.00 15.97 0.0 41.8 3.1 58.92 73.02 10.46 36 1.02 532.80 533.02 534.84 535.50 536.09 545.25 A.1 4 3 171.273 0.00 20.21 0.00 0.00 15.97 0.0 41.4 3.2 50.32 72.19 8.68 36 1.00 533.22 534.93 535.50 537.24 545.25 545.80 A.2 5 4 195.971 20.21 20.21 0.79 15.97 15.97 41.1 41.1 3.2 50.56 50.18 11.07 30 1.28 535.13 537.63 537.24 539.94 545.80 545.35 A.3 6 3 156.745 0.00 0.00 0.00 0.00 0.00 0.0 0.2 0.0 8.91 5.06 5.04 18 0.20 533.34 533.65 535.50 536.46 545.25 547.00 B.1 7 6 10.780 0.00 0.00 0.00 0.00 0.00 0.0 0.1 0.0 8.91 7.75 5.04 18 0.46 534.15 534.20 536.87 536.94 547.00 547.00 B.2 8 7 44.000 0.00 0.00 0.00 0.00 0.00 0.0 0.0 0.0 8.91 8.58 5.04 18 0.57 534.25 534.50 537.22 537.49 547.00 545.50 B.3 9 End 126.971 0.48 1.42 0.93 0.45 1.19 5.0 11.4 6.1 7.25 7.84 2.31 24 0.10 534.50 534.63 536.92 537.03 537.25 544.80 D.1 10 9 280.719 0.43 0.94 0.94 0.40 0.74 0.0 8.7 6.7 4.98 7.74 1.59 24 0.10 534.74 535.02 537.16 537.27 544.80 543.75 D.2 11 10 77.623 0.00 0.51 0.00 0.00 0.34 0.0 7.8 6.9 2.36 4.08 1.34 18 0.13 535.10 535.20 537.32 537.35 543.75 540.90 D.3 12 11 102.872 0.32 0.51 0.94 0.30 0.34 5.0 6.7 7.3 2.47 3.55 1.40 18 0.10 535.30 535.40 537.38 537.42 540.90 540.00 D.4 13 12 17.768 0.19 0.19 0.21 0.04 0.04 5.0 5.0 7.8 0.31 5.40 0.18 18 0.22 535.46 535.50 537.44 537.44 540.00 538.75 D.5 Project File: 1069-Storm Sewers.stm Number of lines: 13 Run Date: 2/26/2024 NOTES:Intensity=80.47/(Inlet time+12.70)A 0.81; Return period=Yrs. 10 ; c=cir e=ellip b=box Storm Sewers v2023 00 Storm Sewer Tabulation Pagel Station Len Drng Area Rnoff Area x C Tc Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd/Rim Elev Line ID coeff (I) flow full Line To Incr Total Incr Total Inlet Syst Size Slope Dn Up Dn Up Dn Up Line (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (ft/s) (in) (%) (ft) (ft) (ft) (ft) (ft) (ft) 1 End 32.554 0.49 0.83 0.82 0.40 0.72 5.0 5.7 8.4 6.05 31.27 4.69 18 7.56 536.00 538.46 537.13 539.41 538.21 544.20 C.1 2 1 64.326 0.34 0.34 0.95 0.32 0.32 5.0 5.0 8.6 2.78 18.44 3.54 18 2.63 538.66 540.35 539.41 540.98 544.20 544.00 C.2 3 End 21.542 0.00 20.21 0.00 0.00 15.97 0.0 41.7 3.6 66.77 73.02 10.97 36 1.02 532.80 533.02 535.06 535.63 536.09 545.25 A.1 4 3 171.273 0.00 20.21 0.00 0.00 15.97 0.0 41.4 3.6 57.24 72.19 9.34 36 1.00 533.22 534.93 535.63 537.38 545.25 545.80 A.2 5 4 195.971 20.21 20.21 0.79 15.97 15.97 41.1 41.1 3.6 57.47 50.18 11.71 30 1.28 535.13 537.63 537.63 540.91 545.80 545.35 A.3 6 3 156.745 0.00 0.00 0.00 0.00 0.00 0.0 0.2 0.0 9.81 5.06 5.55 18 0.20 533.34 533.65 535.63 536.80 545.25 547.00 B.1 7 6 10.780 0.00 0.00 0.00 0.00 0.00 0.0 0.1 0.0 9.81 7.75 5.55 18 0.46 534.15 534.20 537.29 537.38 547.00 547.00 B.2 8 7 44.000 0.00 0.00 0.00 0.00 0.00 0.0 0.0 0.0 9.81 8.58 5.55 18 0.57 534.25 534.50 537.72 538.05 547.00 545.50 B.3 9 End 126.971 0.48 1.42 0.93 0.45 1.19 5.0 10.8 6.9 8.18 7.84 2.60 24 0.10 534.50 534.63 537.13 537.27 537.25 544.80 D.1 10 9 280.719 0.43 0.94 0.94 0.40 0.74 0.0 8.4 7.5 5.58 7.74 1.77 24 0.10 534.74 535.02 537.43 537.58 544.80 543.75 D.2 11 10 77.623 0.00 0.51 0.00 0.00 0.34 0.0 7.6 7.7 2.63 4.08 1.49 18 0.13 535.10 535.20 537.64 537.68 543.75 540.90 D.3 12 11 102.872 0.32 0.51 0.94 0.30 0.34 5.0 6.5 8.1 2.74 3.55 1.55 18 0.10 535.30 535.40 537.71 537.77 540.90 540.00 D.4 13 12 17.768 0.19 0.19 0.21 0.04 0.04 5.0 5.0 8.6 0.34 5.40 0.19 18 0.22 535.46 535.50 537.78 537.78 540.00 538.75 D.5 Project File: 1069-Storm Sewers.stm Number of lines: 13 Run Date: 2/26/2024 NOTES:Intensity=69.23/(Inlet time+11.30)A 0.75; Return period=Yrs.25 ; c=or e=ellip b=box Storm Sewers v2023 00 Storm Sewer Tabulation Pagel Station Len Drng Area Rnoff Area x C Tc Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd/Rim Elev Line ID coeff (I) flow full Line To Incr Total Incr Total Inlet Syst Size Slope Dn Up Dn Up Dn Up Line (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (ft/s) (in) (%) (ft) (ft) (ft) (ft) (ft) (ft) 1 End 32.554 0.49 0.83 0.82 0.40 0.72 5.0 5.6 8.9 6.49 31.27 4.48 18 7.56 536.00 538.46 537.49 539.44 538.21 544.20 C.1 2 1 64.326 0.34 0.34 0.95 0.32 0.32 5.0 5.0 9.2 2.96 18.44 3.59 18 2.63 538.66 540.35 539.44 541.00 544.20 544.00 C.2 3 End 21.542 0.00 20.21 0.00 0.00 15.97 0.0 41.6 4.2 77.92 73.02 11.54 36 1.02 532.80 533.02 535.51 535.77 536.09 545.25 A.1 4 3 171.273 0.00 20.21 0.00 0.00 15.97 0.0 41.3 4.2 67.27 72.19 10.39 36 1.00 533.22 534.93 535.77 537.55 545.25 545.80 A.2 5 4 195.971 20.21 20.21 0.79 15.97 15.97 41.1 41.1 4.2 67.48 50.18 13.75 30 1.28 535.13 537.63 537.63 542.15 545.80 545.35 A.3 6 3 156.745 0.00 0.00 0.00 0.00 0.00 0.0 0.1 0.0 10.92 5.06 6.18 18 0.20 533.34 533.65 535.77 537.21 545.25 547.00 B.1 7 6 10.780 0.00 0.00 0.00 0.00 0.00 0.0 0.1 0.0 10.92 7.75 6.18 18 0.46 534.15 534.20 537.83 537.93 547.00 547.00 B.2 8 7 44.000 0.00 0.00 0.00 0.00 0.00 0.0 0.0 0.0 10.92 8.58 6.18 18 0.57 534.25 534.50 538.36 538.76 547.00 545.50 B.3 9 End 126.971 0.48 1.42 0.93 0.45 1.19 5.0 10.4 7.6 9.09 7.84 2.89 24 0.10 534.50 534.63 537.49 537.66 537.25 544.80 D.1 10 9 280.719 0.43 0.94 0.94 0.40 0.74 0.0 8.2 8.2 6.10 7.74 1.94 24 0.10 534.74 535.02 537.86 538.03 544.80 543.75 D.2 11 10 77.623 0.00 0.51 0.00 0.00 0.34 0.0 7.4 8.4 2.86 4.08 1.62 18 0.13 535.10 535.20 538.11 538.16 543.75 540.90 D.3 12 11 102.872 0.32 0.51 0.94 0.30 0.34 5.0 6.4 8.7 2.96 3.55 1.68 18 0.10 535.30 535.40 538.19 538.26 540.90 540.00 D.4 13 12 17.768 0.19 0.19 0.21 0.04 0.04 5.0 5.0 9.2 0.37 5.40 0.21 18 0.22 535.46 535.50 538.28 538.28 540.00 538.75 D.5 Project File: 1069-Storm Sewers.stm Number of lines: 13 Run Date: 2/26/2024 NOTES:Intensity=71.71 /(Inlet time+13.20)A 0.71; Return period=Yrs. 100 ; c=cir e=ellip b=box Storm Sewers v2023 00 WATER QUALITY % \iiilikuoro • %O I & E GINEERED SOLUTI it ,... ..,... • . ,t \ ,„ ,. . --...., . , . ...,, , . , ‘ 0 ' . , . ) •2• . • .. ,, .,• , .. f . , f i, \ '.• . if . . l\ \ I• , , 1 0 , . Jellyfish ® Filter . e • . Stormwater Treatment . . i . . ;...._•....... .. .... _ ...-..-- - . ..„ .........ii....: _ _,..:_.:..;:„.... ...„....,_, ., . , . _ ,,: ,c__:.1,,•44,.... .....,..,,..„..._., _ .• .i-,.._,-wv.....voirp", . ,iit. . ..„..:4. ..,...,....-.. ‘„ _. ,_,,,A,„---,;‘,—.„,,,z _ , _ , ..-..-§,.:, A-,....-c-''.• - : r ' -A._ '.. lirk.,, -- • 2V.r-,1-_:..-.--S--- -.-:s-..:•77--_ - 1 • . ,',-- - . -- "X' . -- -,•Z .._.:.F.. 7, —----..,,-..,.-,z-1,-...-,--_--_-:.-..-..--. -'''''..,,_.-i,R•ii. •;..-0-.-.5 .- s't '•••• -4,. . — . - . __ , „ s •,.. C" • •-- ' ...:;' ' ... ... .1( , . . , .- • ,4 --•• -.• . —... . . ._ .. i •.4. • , -.0` ' . ',.''.-'i•t,.'t:.,...,----,,-•..:-:. . -. 4 --.1 --k•-CC;;:,wX444..-,_11„, , i • .. - • •••-' st,'•:::44- ,. ,... ., .. - 1 , The experts you need to solve stormwater hallengesyour � 11. , - , 4$ti. % !4 '1 d. , .)0 . 4 it / � �VII `d ' • ''� / :' Your Contech Team Contech is the leader in stormwater solutions, STORMWATER helping engineers,contractors and owners with CONSULTANT infrastructure and land development projects t ` . It's my job to recommend the best solution to meet throughout North America. permitting requirements. With our responsive team of stormwater experts, I STORMWATER local regulatory expertise and flexible solutions, 'at/IN DESIGN ENGINEER Contech is the trusted partner you can count on for i.„.,, lworkwith consultants to design I the best approved solution to stormwater management solutions. meet your project's needs. REGULATORY MANAGER a, -, I understand the local stormwater regulations and what solutions Is will be approved. i SALES ENGINEER 1 make sure our solutions • meet the needs of the contractor GP el during construction. Contech is your partner in stormwater management solutions 1m1111111 ' 11 m • •I. -- - 1l q i 1! .V J. 0 _, Nii Y.' i. r I ... . ,•..) Pc •- , i ' f t• ,''Y , � . • d �� Ifff •; }� ;117+y;„4 t (' + ia t WI 9q p (' -7 fet .I•il•I • } ar �' M • ! ' 1 +1 i1• a 4! a�� . { � ' I-- Y , • 1 1111 y • c 4 if O' ma � ~.• _ y^{- Setting new standards in Stormwater in efieldaellyfish Flaboer atory,as been ested in the field and laboratory,and has received ap teses sTreatment — Jellyfish° Filter stormwater regulatory omnumerous The Jellyfish Filter is a stormwater quality treatment technology featuring high flow pretreatment and membrane Jellyfish®Filter filtration in a compact stand-alone system.Jellyfish removes floatables,trash,oil,debris,TSS,fine silt-sized particles, and a high percentage of particulate-bound pollutants; including phosphorus, nitrogen, metals and hydrocarbons.The high surface area membrane cartridges,combined with up-flow hydraulics,frequent, passive backwashing,and rinseable/ reusable cartridges ensure long-lasting performance. C=:: NTECH@ ENGINEERED SOLUTIONS How the Jellyfish° Filter Treats Stormwater Tested in the field and laboratory... ■ Stormwater enters the Jellyfish through the inlet pipe and traps floating pollutants behind the maintenance access wall and below the cartridge deck. ■ Water is conveyed below the cartridge deck where a 411. separation skirt around the cartridges isolates oil,trash and debris outside the filtration zone. ■ Water is directed to the filtration zone and up through the top of the cartridge where it exits via the outlet pipe. ■ The membrane filters provide a very large surface area to effectively remove fine sand and silt-sized particles, and a high percentage of particulate-bound pollutants such as nitrogen,phosphorus,metals,and hydrocarbons while ensuring long-lasting treatment. ■ As influent flow subsides,the water in the backwash pool flows back into the lower chamber.This passive backwash extends cartridge life. ■ The draindown cartridge(s)located outside the backwash pool enables water levels to balance. Jellyfish'Filter Standard Configuration Learn More: www.ContechES.com/jellyfish 1 Pretreat bioretention or 111113°).1.7. infiltration with Jellyfish to extend service life. Setting new standards in Stormwater Treatment O U STEPS 41) O VI MAY • MAY VARY FLOW � O 00H OO Jellyfish® Filter Performance O O O F< Testing Results 1 cw rIt, . s • APPLICATION TIPS - - • The Peak Diversion Jellyfish provides treatment and high- • .4.1.0000/ flow bypass in one structure, ' eliminating the need for a / separate bypass structure. C \ J. • LID and GI are complemented J by filtration solutions,as they ill� help keep sites free from fine sediments that can impede performance,remove 10 unsightly trash,and provide a . - -_, ___, /0 410 , : ... single point of maintenance. • Selecting a filter with a long maintenance cycle and low maintenance cost will result in healthy waterways and •happy property owners. z. ; i The pleated tentacles of the Jellyfish®Filter provide a large surface area for pollutant removal. POLLUTANT OF CONCERN %REMOVAL . . .`r`- Total Trash 99% 1 i 114' ' Total Suspended Solids(TSS) 89% - Total Phosphorus(TP) 59% Total Nitrogen(TN) 51% Sources: Total Copper(TCu) > 50% TARP II Field Study-2012 JF 4-2-1 Configuration MRDCFIoatables Testing-2008JF6-6-1 Configuration Total Zinc(TZn) > 50% =:1►C NTECH ENGINEERED SOLUTIONS Jellyfish° Filter Features and Benefits FEATURE BENEFITS High surface area membrane filtration Low flux rate promotes cake filtration and slows membrane occlusion High design treatment flow rate per cartridge(up to 80 Compact system with a small footprint,lower construction cost gpm(5 Us)) Low driving head(typically 18 inches or less(457 mm)) Design flexibility,lower construction cost Lightweight cartridges with passive backwash Easy maintenance and low life-cycle cost The Jellyfish Filter can be �,� configured in a manhole, catch basin, or vault. Select Jellyfish° Filter Certifications and Verifications The Jellyfish Filter has been reviewed by numerous state and federal programs,including: • Washington State Department of Ecology(TAPE)GULD—BASIC, � • , Phosphorus I • Virginia Department of Environmental Quality(VA DEQ) • Texas Commission of Environmental Quality(TCEQ) • Aft. • • Canada ISO 14034 Environmental Management—Environmental • ✓ • Technology Verification(ETV) • • Philadelphia Water District(PWD) • • Maryland Department of the Environment(MD DOE) Field tested and performance verified O U STEPS 41)/7' O (LOCATION MAY VARY• �� O OOH FLOW v OO . Jellyfish® Filter Configurations O O O F< 1 cw Multiple system configurations to optimize your site.... The Jellyfish Filter can be manufactured in a variety of configurations:manhole,catch basin�40 MIN vault,fiberglass tank,or custom configurations. Typically, 18 inches(457 mm)of driving head is designed into the system.For low drop sites,the designed driving head can be less. MID 411. lit-_-....,,,- ..- .... Manhole Vault - 3. I lick . , 1 ,,...- Oa Curb Inlet I II It Op ' Grated Inlet Ill Ill Jellyfish° Filter Maintenance � , .� • Jellyfish Filter cartridges are light weight and reusable `` • Maintenance of the filter cartridges is performed by removing, . rinsing and reusing the cartridge tentacles. I , 'if. I • Vacuum extraction of captured pollutants in the sump is 1hl ,- recommended at the same time. i • Full cartridge replacement intervals differ by site due to varying r M A. pollutant loading and type,and maintenance frequency. " Replacement is anticipated every 2-5 years. • Contech®has created a network of Certified Maintenance Providers to provide maintenance on stormwater BMP's. The Jellyfish®Filter tentacle is light and easy to clean. C=:: NTECH ENGINEERED SOLUTIONS A partner you can rel o 1.._.:77 _ _ •,..,..,,.,,. .a. IF' ._ t ..• �,04 \� c� n _ .� A ear 4 , t!k i ..r!'A .�_ t t, mi til , ,..f _ } '14ftb'--4\l'''''' 1 • r ti c . a- ,'o �*k>s v s pi " -:-. 6'" v'�\ �t< }i i - - '`11.erm -__If iv,--re .L x. { -�t j b �. '- - 17E -4: �o ;+irrind r:\ ' `# >.r� _ } '.x w-$a44.* I. •A �'- a v r��ro - .`_- _ .may .i7. rFs 7_, '",'� ;� -_• i`M�..y,X+h-�f 7h a� ', 'x\ °Ps`..<4',S_,�q,..r, tow,, L , t s -, -,..-r - _ —T; _ z o y. :^'L ^•' ... M'r , • '.: •w"rr ._ 4� *' T7r'r. r.3"-_ -"- _ f_ °'£- 3 _- t i.-- V/', _ •'' ' . - STORMWATER , PIPE STRUCTURES SOLUTIONS SOLUTIONS IT9111 SOLUTIONS Few companies offer the wide range of high- THE CONTECH WAY Contech®Engineered Solutions provides innovative,cost-effective quality stormwater resources you can find with site solutions to engineers,contractors,and developers on projects us—state-of-the-art products,decades of across North America.Our portfolio includes bridges,drainage, expertise,and all the maintenance support you erosion control,retaining wall,sanitary sewer and stormwater management products. need to operate your system cost-effectively. TAKE THE NEXT STEP For more information:www.ContechES.com NOTHING IN THIS CATALOG SHOULD BE CONSTRUED AS A WARRANTY.APPLICATIONS C I�/i N T E C H SUGGESTED HEREIN ARE DESCRIBED ONLY TO HELP READERS MAKE THEIR OWN EVALUATIONS AND DECISIONS,AND ARE NEITHER GUARANTEES NOR WARRANTIES OF SUITABILITY FOR ANY ENGINEERED SOLUTIONS APPLICATION.CONTECH MAKES NO WARRANTY WHATSOEVER,EXPRESS OR IMPLIED,RELATED TO THE APPLICATIONS,MATERIALS,COATINGS,OR PRODUCTS DISCUSSED HEREIN.ALL IMPLIED WARRANTIES OF MERCHANTABILITY AND ALL IMPLIED WARRANTIES OF FITNESS FOR ANY II MOO PARTICULAR PURPOSE ARE DISCLAIMED BY CONTECH.SEE CONTECH'S CONDITIONS OF SALE Get social with us: (AVAILABLE AT W W W.CONTECHES.COM/COS)FOR MORE INFORMATION. 800-338-1122 I www.Contech ES.com ®2021 Contech Engineered Solutions LLC,a QUIKRETE Company All Rights Reserved.Printed in the USA.