HomeMy WebLinkAbout20072030 Ver 1_More Info Letter_20071221O~~F W A TF,9pG Michael F. Easley, Governor
~ William G. Ross Jr., Secretary
~ r North Carolina Department of Environment and Natural Resources
~ ~
~ .~- Coleen H. Sullins, Director
Division of Water Quality
December 21, 2007
DWQ Project~# 2007-2030
Mecklenburg County
CERTIFIED MAIL: RETURN RECEIPT REQUESTED
Charlotte Mecklenburg Utilities
Attn: Mr. Brian Pate
5100 Brookshire Blvd
Charlotte, NC 28216
Subject Property: Griffith Street Pump Station Modifications, Davidson, NC
Lake Norman [030832, 11-(75), WSIV, B, Ca]
REQUEST FOR MORE INFORMATION
Dear Mr. Pate:
On December 4, 2007, the Division of Water Quality (DWQ) received your application dated November
16, 2007 to impact 509 square feet (ft2) of Zone 1 of the protected riparian buffers to construct the
proposed emergency detention structure and associated utility lines at the subject property. The DWQ has
determined that your application was incomplete and/or provided inaccurate information as discussed
below. The DWQ will require additional information in order to process your application to impact
protected wetland, streams and/or buffers on the subject property. Therefore, unless we receive the
additional information requested below, we will have to move toward denial of your application as
required by 15A NCAC 2H .0506 and 2B .0243(8) and will place this project on hold as incomplete until
we receive this additional information. Please provide the following information so that we may continue
to review your project.
Additional Information Requested:
1. Impact Justification (Avoidance and Minimization)
This Office believes that impacts to Zone 1 of the protected riparian buffer can be avoided or
minimized for the emergency detention structure. Please reconfigure your plans to reflect this
change.
2. Buffer Impacts
Please quantify the square footage of impacts for the emergency detention structure in Zone 2 of the
protected riparian buffer.
3. Variance
The proposed emergency detention structure will require a variance from the Catawba Buffer Rules
(15A NCAC 2B.0243). You are required to fill out and submit three copies of a Variance
application to DWQ.
401 OversighUExpress Permitting Unit
1650 Mail Service Center, Raleigh, North Carolina 27699-1650
2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604
Phone: 919-733-1786 /FAX 919-733-6893 /Internet: http://h2o.enr.state.nc.us/ncwetlands
No e hCarolina
~atura!!y
An Equal Opportunity/Affirmative Action Employer - 50% Recycled/] 0% Post Consumer Paper
Charlotte Mecklenburg Utilities
Page 2 of 2
December 21, 2007
4. Geotechnical Report
You must submit a signed and sealed (by a Professional Engineer or Professional Geologist)
geotechnical investigation of subsurface soils, demonstrating whether or not you encounter bedrock
at the lowest depth of the proposed emergency detention structure.
Please respond within three weeks of the date of this letter by sending this information to me in writing
and Alan Johnson of the DWQ Mooresville Regional Office. If we do not hear from you within three
weeks, we will assume that you no longer want to pursue this project and we will consider the project as
withdrawn.
This letter only addresses the application review and does not authorize any impacts to wetlands, waters
or protected buffers. Please be aware that any impacts requested within your application are not
authorized (at this time) by the DWQ. Please call Amy Chapman or Cyndi Karoly at 919-733-1786 if
you have any questions regarding or would like to set up a meeting to discuss this ma}t~.
CBK/asc
Enclosures: Variance Application
Sincer ly,
Cyndi Karoly, Supervisor
401 OversightlExpress Review Permits Unit
cc: Alan Johnson, DWQ Mooresville Regional Office
USACE Mooresville Regulatory Field Office
File Copy
Central Files
Filename: 072030Gri ffith StPumpStationModifications(Mecklenburg)CB R_On_Hold