HomeMy WebLinkAboutNC0083933_Authorization to Construct_19990531r
Permit No. NCO083933
Heater Utilities, Inc.
Salem Quarters WWTP
ENGINEER'S CERTIFICATION
FOR
CONSTRUCTION OF WASTEWATER TREATMENT FACILITIES
I� 0 H ti ISM i0i , am a duly registered Professional Engineer
(please print)
in the State of North Carolina and have been authorized to observe (circle one: periodical)
weekly, full time) the construction of the subject project for the Permittee:
Project No.: 83933ACB
Project: Addition of Ultraviolet Disinfection System
Salem Quarters Wastewater Treatment Plant
Location: Belews Creek Road, North Carolina
Walkertown, Forsyth County
The project consists of. -
construction of one complete open channel gravity flow ultraviolet (UV) disinfection
system with all control equipment, accessories, and associated equipment, piping, and
structures as described in the plans and specifications.
f L R «o I cA %-L-Y
I hereby certify that I did B1&iy observe this project with due care and diligence and that the
construction was completed in substantial conformance with the Authorization to Construct and
with the approved plans and specifications.
Signature
. i
Date S-/J 11 91i
Registration No. U t 3 a
Upon completion of construction and prior to operation of the modified facility, the 'Permittee shall
provide the a Division with a certification from a professional engineer certifying that the permitted facility
has-been; installed in 'accordance with the NPDES Permit, this Authorization to Construct, and the
approved plans and specifications.
Mail the Certification to the NPDES Unit, NCDENZ P. O. Box 29535, Raleigh, NC 27626-0535.
State of North Carolina
Department of Environment
and Natural Resources
Division of Water Quality
James B. Hunt, Jr., Governor
Wayne McDevitt, Secretary
A. Preston Howard, Jr., P.E., Director
December 11, 1998
Mr. Jerry H. Tweed
Heater Utilities, Inc.
P.O. Drawer 4889
Cary, North Carolina 27519
ern
NCDENR
Subject: Authorization to Construct
Application No. 83933ACB
Permit No. NCO083933
Salem Quarters WWTP
Forsyth County
Dear Mr. Tweed:
The Division of Water Quality's NPDES Unit has reviewed Heater Utilities' request for an Authorization
to Construct and finds the proposed improvements and design for the Salem Quarters W WTP to be
satisfactory. The Division hereby grants authorization for the following:
• construction of one complete open channel gravity flow ultraviolet (UV) disinfection system with
ail control equipment, accessories, and associated equipment, piping, and structures as described in
the plans and specifications.
Upon completion of these improvements, the permitted capacity of the facility remains at 0.060 MGD.
This approval of the single -bank UV system is based upon assurances that Heater Utilities will maintain
adequate spare parts for the system and maintain the existing tablet chlorination and dechlorination units
as a backup disinfection system. The Division reserves the option to require a second UV unit if these
conditions are not met or if the new system does not provide reliable disinfection.
This Authorization to Construct is issued in accordance with Part III, Paragraph A of NPDES Permit No.
NCO083933 issued June 2, 1997, and shall be subject to revocation unless the wastewater treatment
facilities are constructed in accordance with the conditions and limitations specified in Permit No.
NCO083933.
Additional Conditions
The sludge generated from this treatment facility must be disposed of in accordance with G.S. 143-215.1
and in a manner approved by the North Carolina Division of Water Quality.
In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions,
the Permittee shall take immediate corrective action, including those as may be required by this Division,
such as the construction of additional or replacement wastewater treatment or disposal facilities.
The Permittee shall notify the Winston-Salem Regional Office, telephone number 910-7714600, at
least forty-eight (48) hours in advance of operation of the installed facilities, so that an in -place
inspection can be made. Such notification to the regional supervisor shall be made during the normal
office hours of 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays.
P.O. Box 29535, Raleigh, North Carolina 27t 26-0535 Telephone (919) 733-5083 _ FAX (919) 733-0719
An Equal Opportunity Affirmative Action'Employer Internet: hftp://h2o.enr.state.nc.us/
Permit No. NCO083933
Authorization to Construct
Salem Quarters WWTP
Page 2
Upon completion of construction and prior to operation of the modified facility, the Permittee shall
provide the Division with a certification from a professional engineer certifying that the permitted facility
has been installed in accordance with the NPDES Permit, this Authorization to Construct, and the
approved plans and specifications. Mail the Certification to the NPDES Unit, P.O. Box 29535, Raleigh,
NC 27626-0535.
The Permittee shall employ a certified wastewater treatment plant operator to be in responsible charge
(ORC) of the wastewater treatment facilities. The operator must hold a certificate of the type and grade at
least equivalent to or greater than the classification assigned to the wastewater treatment facilities by the
Certification Commission. The Permittee must also employ a certified back-up operator of the
appropriate type and grade to comply with the conditions of Title I SA, Chapter 8A, .0202. The ORC of
the facility must visit each Class I facility at least weekly and each Class II, III, and IV facility at least
daily, excluding weekends and holidays; and must properly manage and document daily operation and
maintenance of the facility and comply with all other conditions of Title 15A, Chapter 8A, .0202.
The Operational Agreement between the Permittee and the Environmental Management Commission is
incorporated herein by reference and is a condition of this Permit. Noncompliance with the terms of the
Operational Agreement shall subject the Permittee to all sanctions provided by G. S. 143-215.6 for
violation of or failure to act in accordance with the terms and conditions of this Permit.
Failure to abide by the requirements contained in this Authorization to Construct may subject the
Permittee to an enforcement action by the Division of Water Quality in accordance with North Carolina
General Statute 143-215.6A to 143-215.6C.
The issuance of this Authorization to Construct does not preclude the Permittee from complying with any
and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies
(local, state, and federal) which have jurisdiction.
The Permittee shall maintain a copy of the approved plans and specifications on file for the life of the
facility. One (1) copy of the approved plans and specifications is enclosed for your records.
If you have any questions about this Authorization to Construct, please contact Mike Templeton, at
(919) 733-5083, extension 541.
Sincerely
U,�
A. Preston Howard, Jr., P.E.
Enclosures: Project Plans and Specifications
Engineer's Certification Form
cc: Mr. John F. Phillips, P.E., Diehl & Phillips (w/ certification form)
Winston-Salem Regional Office, Water Quality
Technical Assistance and Certification Unit
Central Files
NPDES Unit Files
t