HomeMy WebLinkAbout820546_sludge plan of action_20240412PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 82 546 County: Sampson Facility Name: Carl Riley Nursery Certified Operator Name: Carl Riley Operator # 18431 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Structure 1 Structure 2 Structure 3Structure 4 Structure 5 Structure 6 Lagoon Name/Identifier (ID): L-1 Spillway (Yes or No): No Level (inches): 14 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to pumped and hauled is reflected in section III tables. 'Included within this plan is a list of the proposed sites with related facility number(s), number acres and receiving crop information. Contact and secure approval from the Division of Water Resources prior to transfer of waste to a site not covered in the facility's certified animal waste management plan. Operation will be partially or fully depopulated. - attach a complete schedule with corresponding animal units and dates for depopulation - if animals are to be moved to another permitted facility,' provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Carl Riley Phone:' Facility Owner/Manager (print) Date: Facility Owner/Manager (signature) PoA Cover Page 2121100 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY (30) DAY DRAW DOWN', PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Lagoon #1 2. Current liquid volume in 25 yr./24 hr. storm storage &',structural freeboard a. current liquid level according to marker 14 inches b. designed 25 yr.124 hr. storm & structural freeboard 19 inches c. line b - line a (inches in red zone) = 5 inches d. top of dike surface area according to design 46221 ftz (area at below structural freeboard elevation) e. line c x line d x 7.48 allons = 145,208 gallons 12 ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 46155 ft3 h. actual waste produced = current herd # x line g = 0 ft3 certified herd # i. volume of wash water according to structural design 0 ft3 j. excess rainfall over evaporation according to design k. (lines h + i +i) x 7.48 x 30 days = line f 4. Total PAN to be land applied during draw down period' 71� I. current waste analysis dated $�� ,lob m. (lines e + k) x line I = 1000 28656 ft3 36439 gallons 3 Ib/1000 gal. 5 4-J lb PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY PoA (30 Day) 2/21/00 1 1. structure ID: line m = lb PAN 2. structure ID: line m = lb PAN 3. structure ID: line m = lb PAN 4. structure ID: line m = lb PAN 5. structure ID: line m = lb PAN 6. structure ID: line m = lb PAN n. lines 1 +2+3+4+5+6 = S%F�- lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAYDRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CAN NOT RF APPI IFS nI IPIMrr TWIG zn nev Dr-Dlnn o. tract # p. field # q. crop r. acres s. remaining IRR-2 PAN balance (lb/acre) t. TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u. application window' A{ - S An - estate current crop enaing appocation aate or next crop application beginning date for available receiving crops during 30 day drawn down period v. Total PAN available for all fields (sum of column t) = 2. 09? Ib. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) _ _ lb. PAN PoA (30 Day) 2/21/00 2 x. Crop's remaining PAN balance (line v from section III) lb. PAN y. Overall PAN balance (w - x) _ �S3'f lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: S Its o4, N-�fin S1%kIo..-S u'sr� -'o CAICt"\t-AF kb LF 4FFp rj C UVXti r- A SAry .� -.z � ►z a��� . S1 bra ri, '-K fTzfil 4 31 W fi PoA (30 Day) 2121100 3