HomeMy WebLinkAboutNCC242219_Site Plan or Location Map_20240723 9m aD� �`�� \\\� \ / v / \ GROUND STABILIZATION SODDING
rum P J�J \ / / / / EXCEPTIONS _
syyoE oN �P T+O`"5 OO GO � \ i�, // ( / �� / \ SITE AREA STABILIZATION w
Rs as `�' ,�` \ /�`_/ . y
/
/-\ /% \ gVATZL
PERMETER DIKES,SIGN EA MENT S ♦ MASONS TROWEL IS 0110.101,
I \ _ / / � / SW&ESLOPESHES M sNosANornlMMwa Paces
/
ro N GOQ ow�NP"2°5 / �r,Y S • , �/ HIGH QUALITY 7 DAYS NONE M N
7� / ------
/ WATER ZONES
e asA5A i Steer-�/t\� \. sT.�- 1 I _ / I ( ( -\ / (HOW) a
�,x CnY
�a / ICN� / _ / SLOPES STEEPER 7 DAYS IF SLOPES ARE mom MATCHED R�
2` GePp p0 S�o�r0 / /j EAS'- ENT \ \ \ / / OPEN
I I / 7-----77--
-% �/// � THAN 3:1 LENGTTH ANDS ARE
\
�\ \ /- THAN 2:1, 14
?P °�� a , R ZO // // 6a� NOT STEEPER
s` 2
Esc a Ica se' // '\ \ \ / / \/ �- / / / __/ / I I DAYS ARE
e" '£N SITE �\ \ ALLOWED
m ]]\
i> otCP St?� Qo \` \ `�\\ // •
/ �� / � // / ��� \ I SLOPES
FLATTER OR 14 DAYS SLOPES DAYS
GREATER
'1 wn.caron oearn era . o
a / -� \\ 1 1
•
�� o \ \ ` \\ \ / 3( O�O / 7 ^ \ // / / _� \ \ THAN 50 IN wlrn.nesoa ncr aloe As meson is HWEEKS SET laH za. emowee
\ / \� \ / / \ \ LENGTH xorp.wnmawau
�C P� \ \\\\ \\\ ROADSIDE / / \ N...______. / / / �� \ ALL OTHER AREAS 14 DAYS NONE(EXCEPT '
\ Z` \ \ '� ` G / / �/ / \ WITH SLOPES m APPEARANCE OF GOOD SOD
\ �� ' �/ / /^\ //// '�\ \ FLATTER THAN 4:1 FOR PERIMETERS)
\ \ DITCH / i
/ / / \ AND HQW ZONES
y���°���o Gk,o ` \ ` \ \\�\�\\\\ dP /// N �/ /� �/ \ \ _ - // -a.r mmrn na�
�P \ N.
\ \ `D�� \ / I aa� / ,�� �j / / / \ \� rum m naxaa rear
0012' 1 \ , \ \ \\ •
\ ROADSIDE `ems - \�� / // /\ \ rz.ae
, NGNwv,, VICINITY MAP \ �\ \; D DITCH - / \ /
zPoro �`t \ \�• / ' i CONSTRUCTION SCHEDULE
(NOT TO SCALE) • ' '� •
\ \ \\ O\ \ \ 5 \ .'.'.' / / /�/ \ / I. Ob dirt all necessaryp mite and plan approvals.Erosion ands Sediment Control
v1 \ -------- ------- / \ \ / (E&SC)permit and a Certificate of Coverage(COG)must be obtained before my land disturbing activities occur.
\\ \, \ \ �- �_ A copy of the E&SC peanut,the COC and a hard copy of the plan must be kept on site,preferably in a permits
\ \ \ \ .,-1 .'/ / \ box,and accessible during
. \\„$ \ \ \ \ IAND.. me inspection.
General Erosion Control Notes , �& \ \ \ \ - 2. Install•avel construction mfirst,then nut rmeea,reinforcedaatr fence outlets and wattles.
.....................
/ \ \ \ \ N \\\ \ ----- - ........... - ., ` �\ .✓ / - _3. Finish clearing and grubbing any necessary areas on the lots as they me started.
1.Only the areas shown shall be disturbed. •• oADSI \ \ \ o ----- --------- \\ \ / / 4. Begin lot grading and excavation activities
2.All disturbed areas shall be grassed and mulched as soon as '� \ DI H \\ \ \ \ \ - "5. Begin or continue with house construction activities.
\ae\ \ \ / \ ..L'1.. ' ��� 0'.'� \\ \ / -6. Finish all rough grading and house construction.All areas not disturbed for T days needs to have temporary or
possible and maintained until permanent cover is established. '� \\ _
Osy \ \ \\ \ \\ \ \\ \ \ ` _Prig \ \\ // permanent gmundcwer msmlled.
\ �Cp` \ \ \ \ \ ll'f� \ / / • ]. retgl l drivgwraTi walks and patios.
D V \ R� ,, \ 8. Begin fine grading of lot areas
/ ./.
\ \\ 15 \N. \ \ -9. Final mulching d stabilizing f lot.In most cases this will involve the installation of sod on the lot.
\ / grossing,mu g an g o
Pursuant to G.S.113A3,provisions for permanent round cover a- / The sinfence wdl remain in plane until the ant is sodded or grassingis stabilized and cokes hula.
()P P g \ \ \'''
/ \ \\ N. 'g. \ \ ! \ �"\�. \ \ -10. The contractor shall conduct self-inspections of the erosion and sedimentation control measures and complete the
sufficient to restrain erosion must be accomplished for all \ �l6 \ / \ 16 \ ya /� g self-inspection on
\ \ following combined self-ins f found the DEMLR website
disturbed areas within 14 working days or 90 calendar days \ \ \\\ -to, \ \ r ��. � _• _ https://www.tleg.nr.gov/abont/dimslons/mer hand-lentl-resonrces/smrmwaledstormwater-
sss gy-mines program
(whichever is shorter)following completion of construction. / \ �� 'y R:,µ ' t e iea-conanurtion-program.Tweroe months ofmmplete mspemirn ile shall be kept on sire lthe ghable
\'2, \ \ OW
7
` \ \\ 7 -�€M \ \ ` \ 1 ,fie _/ far inspection at all times.It is recommrnded a copy be kept iv a permits box.Ref.G.S.113A-54.1 through G.S.
P t \ \ / � g0 �/ \ \ \ A-57 Sectio s 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCO 010000 NPDES
A 1- \ ? �r N \ \ \\ ��� f r Co w m tide Activities
r ` / 6` /y\ fie.\-.\\ \ \\\ II. Self-inspections for erosion and sedimentation control measures me to be performed at least once every seven
DATE: nu Funco Filter Fabric PAGE: '� \\ ��� �\\ 19 �_�\ \M !' �. \ calendar days and within 24 hours of every ram event of greater than linen Any needed repairs shall be
v' \ \ _\ 2p \\` \ �I ! \ made immeamtely m maintain measures as designed.All Esc measures shall be mum aspecified m
S"°I a Strength..
core fen Wire Fence Poste or 6ackfll trench /`• / 57\� \ \ //� \ \ the construction details on this plan Amin gauge small be installed at the project site for monitoring
Poct�G s max.Emus Wire I I / '2 \/// \ ,pN. \ \ \ -- 12. Inspection and final acceptance lepers When the project is complete,the permmees shall DEMLR to
thoroughly O Fgct ' / -� \.\ \ \ / / L 1 closeout the E&SC Plan After DEMLR mPorms thepermittae oftha pro/act close out,via inspection report,
1 Steel Post / \ // \ thepermmee shall visit"deq vo gwMCG01"to submit es electronic Notrce oftess,setiov(e NOT)A$120
J /// 6• 5• ��\ \ .eBs22 / z6I \\ a \\ \ 1 annualgrneral permit fee will6e charged wtil the•NOT hes been filled out18-24.
1II onpp. I -
23 ' \Plw re at es � -� I / / \ \ I `MAI R ADSIDE A'SELF-INSPEC ON REPORT FOR LAND DISTURBING AC TY AS REQUIRED BY
G \ KI S TCHa 1 °IfXV \ NCGS 113A-54.1'IS AVAILABLE FOR USE.IT CAN BE COMPLETED BY HAND OR
1 X%^ A �,elo aMeo-erwn 4 j ' ' �s \\ '° 25 r/ 1 \ \` `�ylI .. COMPLETEDD ANEXCELSPRADSHEET.
A / \\ I I .. VIAR ERNAPVEIS TOMAKE NOTATIONS ON THE COPY OF THE APPROVED
down a4-rorwem - 1\ ` \\ // 1 \\ \\\ z I EROSION AND[t� •/ \ -\-.-.-.-.-. SEDIMENTATION CONTROL PLAN THAT IS KEPT ON THE PROJECT SITE.RULE i5A
1 % `Filter Fabric / \ \ \ \, 5� • \\ / \ I I NCAC04B.0131 STATESTHAT'...DOCUMENTATIONSHALLBEACCOMPLISHEDBYO MWAT 55Q \\ / MPALINGANDDATINGEACH MEASURE ORPRACTICE SHOWN ON A COPY OF THE
1.Construct the trength or emu strength sy- tic Mart... CROSS SECTION VIEWI \I r
� 5, a / APPROVED EROSION AND SEDIMENTATION CONTROL PLAN OR BY COMPLETING,
2.EnSure that bam.rmvendama MA nd Nigherfences \ \ \ , I / `fir\ I' AT NT 1JTly/n, / DATING ANDSIGNINGAN INSPECTIONREPORTTHATLISTSEACHMEASUREmay impound men°of water suMent to cause failureeof ae structures9.Construct •the gmu \ \ \ '/ / S \\ f"ta.faba�ric acontinuous mhon a a henpothof the fM14benierto amadjedvt tl,ehen a'Ms are
art. \ \ ^ENT - - I PRACTICE OR DEVICE SHOWN ON THE APPROVED EROSION AND SEDIMENTATION
necessary securely ex
I f f I •1 CONTROL PLAN.'
4.Support standard strengtt!liter bnebywireMeshfastunasecurely10.8UpalaoesdeofMeoosts.Extena "epee \ J J I I t s°r��cE \ i / /// (//
the wire mesh support to the bottom of the...Fasten the*reinforced.,then fabric on euPsloPe al pect sediment fences atleamanoea week and uired repairs,a.each 1 O I -5 A6ry° / / /// f // I -- :::---
s.w e of Metall.post.Nare or Dares Zip
pp'n'arsh'e`n'a,omem°ierae�aren seapnn.anowa be enren Strength. inch or Make e.tear decompose, \ �/ I I fo �- _ \ 3g 49 / / / / .-.f-.-
r��sa;ene opo:iavaoba does not req.a wire mesh support...Securelr .Remove sediment depos e necess°n to provide adequat I T M Ar: Ens 8 / / .�' ThStall...
7.Excavatefasten. trench
r posts.mately 4 �esw�anaaman�hou hav deep eam„m m the ebenfpound the tenssts ile retoawaunaem e fence during
re e I I EM 7 Q, 1�/ i
for We next rain anda pressure \ v I I / / / ///ik ,
upslope from the barrier. 4.Remove all fencing materials and unstable sediment deposes ,� \ I /� / /// ..L � ... P .,i,
over the niter fabno and compact.Thorough comp.-eon WWII la drainagerea has be properly bil.d. me don b rre I I I `\ i / �44� '/ // l .'I'.'.'.'.' a av e•
8.Place 12 inches of m.critical too siltfe�ce pebdc nwmanp pined s. \ I \��notaaaehfilterabratoem \ \ i ► I � , /\\ �� - - - 7 /;
// .,
..NC-En ental stirs / lift
/ rill
a , Tm SILT FENCE \ \ 1 \ \ \ ` \ �/ /�// /�. \ \�\� _ �� \ �X /� � mwA _/ //�� l� ./...) - ro:- "u. .,,
DATE: PAGE \ \ \ \ \ \ / / / \ \ j ......... \ / / / T RKS ///I ' ////// .. ..
SW Sock/watts S oak/w ' \ / / //// E N /1 I // .'.'f.'..'.'.'..'..... ....,a.,
FLOW----,... - P .ID
r bes'uemt.dfor \ / // \\ / \\ // /// \ \ .,.,...
'y41.
0 II II II
....2 m.'I tr n.'II ..I1-11r. 3 Stsx d eathsudbenstad compost \ \ \ \ %� , \\\ \ '; / / .. // /4i//
.......w....aM W rmrwWan2 2 togs eo ant /smkea stakes tabs - () pareMw- \ \ \ \ \ 3T0 / \//� �/� , �1 \ \_ ,/1I'I , / M T ..... ...".�..'. .......
SECTION beyond the
SECTION we(s)locatedSat areas should Pe boated at the edge fbelow ine l- �� \ ( 1 .::::::.. ________.,/,
.. . � .
. .....,„,/;) i 1 )f ___
IL
land disturbance The ends of Me silt
tr3X.' Prevent runoff from going around We end of the I 111,
M�eawma,
,I) kV in.x 2 inch cross section Would
Eldven
veMcally plumb,through the
We net
Tree n maximum i.rval of 4 feet or a rosin sowwameiap socksveNe.Stakes should be dina4inrn t a
/� V� V A\ \�\ � / /4///
�� ��� \ / �r___ _,,,,A ���\ ' �N �4�.- III,I II 1 ;;] 8�'-1P'
DNreeNcxe'tisTuunanWood Mulch or amg at ground a"Min. trench. poss when blocks shell he used beh.ible
�' / // �� A�- A\ q 11 VA ��... ��.... ,...x-...,..a...,.d.,�,......,...,
ISOMETRIC VIEW ENwa hold It place d a nnn.Terema \ \\\ \ \ / / �\ /\ \ \\ / //�// \\ \\\\\\ \ \ 1 I 7-�
,.MAINTENANCE: weeinch or greater rairffall. kly and \
forUMulch or Compost
ntrend,edSocksPOST „° z. Natrlw.a p �g r - ��i��� / v �1\ �\\ ��\ \ \ �;/iiir;a/%'" \ \ ����\�\ \\
Hm.Mr ;� ALFwnm�eronm v
to To be•gn o sw gym) SOCK
hen)(,e %)(ze nth) ni" \
VIII Sock/'dtenpum(s31q• D9aFni) (RReFm) a //,J \
Sheet Flewv ni m J. / \ \ \\ �`_ �� / \ / // \\\ \R2 \ y////' //// CONSTRUCTiON36 \\\ \\ \ \\
Work Are 1 Wattle (.wan) rwot) (Boo t) d�eeaasurevnth / / \ / ` I
° xhraravp.FI°. ,t. ,s. v. so. s \ / \ \ \\ � �� / - ......------/
�� -�/ / \ /ry \ 4� LIMITS \ \ �`1\ \\ \I
art a art a m;tt g AA) different
Led :,n � _ -� j � �- ��/ \ 0 it i ,/ l \11 l
SILT SOCK/WATTLE FOR PERIMETER ANDIlnd malted Ilbe °rea
Reinstall or
a�a Sir \
/m/m) /m/ni) /m/m) /m/ni) ,/m/ni) me„°rahaabee"Padua"e"tly,rehll6,d / �_
INLET PROTECTION / �_ _ ��/��/ / / �\ \ /4 I 1\y�\ \\ �/ . // I
\\ /
/ /\ ` _/ ! /1 1 / 1 I p I I I I I I I I I ( PAGE 1 of 2
P--, r / I / / �\ \ \` \ /OV \ \ / ,Bo
I I `� TOTAL DISTURBED ACREAGE: 0.43 ACRES
�� �� \ �/ J :- \ \ y I I EROSION CONTROL PLAN FOR
R R ll - - - - % , R ` /
R rvous 4 ll •ll rvous Hous= rvous B'rvous Hous HOUSE / / �\ \` / /��� /)c'1 I 1/ \\ a / ` \\\\/y' .P / /I// )/// J /III LOT 37
Eo r� TTn� R -,,. . Tr /' Nvws /ice - �/ 1� \ 1������/ ; ' � ��' ��/ �( // /7/ WATSON RIDGE
i 1 1 / - \\�\� I PHASE 3
Notes:
LEGEND 1.If needed,Tree PrMectlon fencing should be installetl along the buffer zone,wetland / /- �/ O �� I I
boundary and/Or around protected trees,providing a radius of at least 1.25 feet for each I// J// I / 11J11
FLOW itch of trunk diameter. /
ONCE TON 2.Install Silt Fence on the low elevaeon sides of each lot Inslall5ill Fence outlets shown on \ �- - / I I I // / 7j' `�••Teir... ..N
\\ \ \ FOR
��� schematicldiagramund Feld adjusted,tl necessary,for placement at low points.If lots are 1 ,.../
., ,"♦
SILaLE/0Dr,SOCKS
Fenticeg5ousand have dHemntland owners orbuilde ,eachlotshoulahavelndlviduaINS _ > ) ► �- �. = �� \\�� DREAM FINDERS HOMES, LLC
SILT FENCE OUTLET ® S.Install required Silt Fence within 10 feat of properly line to ensure there is no conflict with /I II` dyl\
CONSTRUCTION ENTRANCEseptic system.It Is the responsibility of the builder to ensure the installation of sediment �- �\ \ / // I I I,/ // �(/.' \\ \\\ \\\\
control measures does not impact the septic system and repair area(s). \ _\.
// / �I \ JOHNSONVILLE TOWNSHIP HARNETT COUNTY, N.C.
4.W leastone Construction Entrance/Exit tobeinstalled per lot. \ \ / / �/ / //ST R WATER `\\\\\ \\ SCALE 1"=100' JUNE 2024
5.Waste bins and other areas dedicated for managing building material waste shall be at \\��
least SD foot away from alone drain inlets Or drainage ditches unless it can be shown that \\� //(/.-'.
// 1 I I TR A ENT \\� � GRAPHIC SCALE
no other alternative exists.If this separation cannot be acM1ievetl,tM1ese areas must be 1 �/
wets downstream
behind of Fence. j I EN // / \ \\ 100 o so 100 zoo moo
s.Inlsediment
entfromte.nstrumancesanome reentectea;streets unhand be swept when // / �, SPS E , \ ENGINEERS seaimenl from me conatrnetlon activity Is present. / \ \ •
Z.Details far alit Fence,Silt Fence Erosion
a Construction Entrances end other measures are
/ / / `\ l \ / / \` PLANNERS ( IN FEET)
provided f on Silt
Fence,
sheets.a Outlets,
and sedimentConstruction
control a es a are not drawnmeae re \
L----_--_ scale. TYPICAL LOT LAYOUT WITH ROADSIDE DITCHES /\ 1 SURVEYORS 1 inch= 100 ft.
NOTE-DIVERSION DITCHES AND WATTLES WILL NOT BE UTILIZED IN ROADSIDE DITCHES / / / \ \ \ // � MOORMAN,KIZER&REITZEL,INC. 115 BROADFOOT AVE. FAYETTEVILLE,N.C.
/ / \ l_t \ `\ / MOORMAN, KIZER & REITZEL, INC. PHONE(910)484-5191 FAX(910)484-0388 LICENSEq F-0106
LAST SAVED:6/18/2024 1124 AM LOST PLOTTED 6/18/2024 1125 AM PLOTTED Dr:Dennis Gilbert FILENAME:G:\CURRENT JOSS\H&H CONSTRUCTORS\23-1367-01 WATSON RIDGE-EC\PLANS\WATSONRIDGEEC-LOT3].OWG