Loading...
HomeMy WebLinkAboutAdd Info Received 20240628 - Warne, NC Geotech Report Responsive ■ Resourceful ■ Reliable EXHIBIT F 2 of 1 Report Cover Page Proposed Dollar General Warne, NC Geotechnical Engineering Report February 5, 2024 | Terracon Project No. E2235144 Prepared for: The Broadway Group, LLC 216 West Side Square Huntsville, Alabama 35804 Responsive ■ Resourceful ■ Reliable EXHIBIT F 1 of 1 Report Cover Letter to Sign February 5, 2024 The Broadway Group, LLC 216 West Side Square Huntsville, Alabama 35804 Attn: Ms. Tara Bennett, Development Manager P: (256) 533-7287 E: tara.bennett@broadwaygroup.net Re: Geotechnical Engineering Report Proposed Dollar General Warne, NC 5050 Old Hwy 64 West Warne, NC 28909 Terracon Project No. E2235144 Dear Ms. Bennett: We have completed the scope of Geotechnical Engineering services for the above referenced project in general accordance with Terracon Proposal No. PE2235144 dated December 21, 2023. This report presents the findings of the subsurface exploration and provides geotechnical recommendations concerning earthwork and the design and construction of foundations, floor slabs, and pavements for the proposed project. We appreciate the opportunity to be of service to you on this project. If you have any questions concerning this report or if we may be of further service, please contact us. Sincerely, Terracon Austin Simpson, E.I. Jim Kellogg, P.E., G.E., PhD Staff Engineer Geotechnical Services Manager Geotechnical Engineering Report Proposed Dollar General Warne, NC | Warne, NC 28909 February 5, 2024 | Terracon Project No. E2235144 Facilities | Environmental | Geotechnical | Materials i Table of Contents Introduction .................................................................................................... 1 Project Description .......................................................................................... 1 Site Conditions ................................................................................................ 2 Geotechnical Characterization ......................................................................... 3 Auger Refusal........................................................................................... 4 Seismic Site Class ..................................................................................... 4 Infiltration ...................................................................................................... 4 Geotechnical Overview .................................................................................... 5 Earthwork ....................................................................................................... 6 Site Preparation........................................................................................ 6 Subgrade Preparation ................................................................................ 6 Excavation ............................................................................................... 7 Soil Stabilization ....................................................................................... 8 Fill Material Types ..................................................................................... 8 Fill Placement and Compaction Requirements ................................................ 9 Utility Trench Backfill ............................................................................... 10 Grading and Drainage ............................................................................... 11 Earthwork Construction Considerations ....................................................... 11 Construction Observation and Testing ......................................................... 12 Shallow Foundations ..................................................................................... 12 Design Parameters – Compressive Loads ..................................................... 13 Design Parameters – Overturning and Uplift Loads ........................................ 13 Foundation Construction Considerations ...................................................... 14 Floor Slabs .................................................................................................... 15 Floor Slab Design Parameters .................................................................... 15 Floor Slab Construction Considerations ........................................................ 16 Pavements .................................................................................................... 17 General Pavement Comments .................................................................... 17 Pavement Design Parameters .................................................................... 17 Pavement Section Thicknesses ................................................................... 17 Pavement Drainage .................................................................................. 19 Pavement Maintenance ............................................................................. 19 General Comments ........................................................................................ 20 Figures GeoModel Attachments Exploration and Testing Procedures Geotechnical Engineering Report Proposed Dollar General Warne, NC | Warne, NC 28909 February 5, 2024 | Terracon Project No. E2235144 Facilities | Environmental | Geotechnical | Materials ii Site Location and Exploration Plans Exploration and Laboratory Results Supporting Information Note: This report was originally delivered in a web-based format. Blue Bold text in the report indicates a referenced section heading. The PDF version also includes hyperlinks which direct the reader to that section and clicking on the logo will bring you back to this page. For more interactive features, please view your project online at client.terracon.com. Refer to each individual Attachment for a listing of contents. Geotechnical Engineering Report Proposed Dollar General Warne, NC | Warne, NC 28909 February 5, 2024 | Terracon Project No. E2235144 Facilities | Environmental | Geotechnical | Materials 1 Introduction This report presents the results of our subsurface exploration and Geotechnical Engineering services performed for the proposed Dollar General to be located at 5050 Old Hwy 64 West in Warne, NC 28909. The purpose of these services was to provide information and geotechnical engineering recommendations relative to: ■ Subsurface soil conditions ■ Groundwater conditions ■ Seismic site classification per IBC ■ Site preparation and earthwork ■ Foundation design and construction ■ Floor slab design and construction ■ Lateral earth pressure ■ Pavement design and construction The geotechnical engineering Scope of Services for this project included the advancement of test borings, laboratory testing, engineering analysis, and preparation of this report. Drawings showing the site and boring locations are shown on the Site Location and Exploration Plan, respectively. The results of the laboratory testing performed on soil samples obtained from the site during our field exploration are included on the boring logs and as separate graphs in the Exploration Results section. Project Description Our initial understanding of the project was provided in our proposal and was discussed during project planning. A period of collaboration has transpired since the project was initiated, and our final understanding of the project conditions is as follows: Item Description Information Provided Our understanding of the project is based upon email correspondence dated December 14, 2023. Project Description The proposed project consists of development of the site for a Dollar General retail store with associated driving and automobile parking areas. Proposed Structure The proposed structure consists of an approximate 12,640 square foot Dollar General retail store. Geotechnical Engineering Report Proposed Dollar General Warne, NC | Warne, NC 28909 February 5, 2024 | Terracon Project No. E2235144 Facilities | Environmental | Geotechnical | Materials 2 Item Description Building Construction The structure is anticipated to be of steel frame construction supported on a reinforced concrete shallow foundation system incorporating a concrete slab-on-grade floors. Finished Floor Elevation Based on a conceptual site plan provided, the planned FFE = 1717.72 Maximum Loads (assumed) ■ Columns: 50 kips ■ Walls: 2-3 kips per linear foot (klf) ■ Slabs: 100 ponds per square foot (psf) Below-Grade Structures A storm water detention area is proposed along the southern portion of the site and a septic system is proposed on the northern portion of the property. Free-Standing Retaining Walls No free-standing retaining walls are anticipated as part of the proposed development. Pavements We assume both rigid (concrete) and flexible (asphalt) pavement sections will be considered. Anticipated traffic loading is as follows: Light Duty: ■ Autos/light trucks: 200 vehicles per day ■ Delivery and trash collection vehicles: 10 per week Heavy Duty ■ Autos/light trucks: 400 vehicles per day ■ Delivery and trash collection vehicles: 20 per week Building Code 2018 IBC Terracon should be notified if any of the above information is inconsistent with the planned construction as modifications to our recommendations may be necessary. Site Conditions The following description of site conditions is derived from our site visit in association with the field exploration and our review of publicly available geologic and topographic maps. Geotechnical Engineering Report Proposed Dollar General Warne, NC | Warne, NC 28909 February 5, 2024 | Terracon Project No. E2235144 Facilities | Environmental | Geotechnical | Materials 3 Item Description Parcel Information The site is located at 5050 Old Hwy 64 West, Warne, NC 28909. The subject site is approximately 2.35 acres. See Site Location Existing Improvements Undeveloped. There are no structures located at the subject stie. Current Ground Cover Grass, native vegetation, and exposed soil. Existing Topography Based on a review of the provided grading plan, elevations at the subject site range from 1710 to 1745 feet, AMSL. Geotechnical Characterization We have developed a general characterization of the subsurface conditions based upon our review of the subsurface exploration, laboratory data, geologic setting and our understanding of the project. This characterization, termed GeoModel, forms the basis of our geotechnical calculations and evaluation of the site. Conditions observed at each exploration point are indicated on the individual logs. The individual logs can be found in the Exploration Results and the GeoModel can be found in the Figures attachment of this report. As part of our analyses, we identified the following model layers within the subsurface profile. For a more detailed view of the model layer depths at each boring location, refer to the GeoModel. Model Layer Layer Name General Description 1 Surface Topsoil 2 Soft Native Soils Native soils consisting of silty sand, clayey sand, and silty clayey sand; very loose to loose 3 Stiff Native Soils Native soils consisting of silty sand, clayey sand, and silty clayey sand; medium dense to very dense The borings were advanced using a drilling technique that allow short term groundwater observations to be made while drilling. Groundwater seepage was encountered at depths ranging between 6 and 13 feet below existing ground surface in borings B-1, B-3, and P- 1. Groundwater seepage was not encountered in the other 7 borings performed on the subject site. Groundwater conditions may be different at the time of construction. Groundwater conditions may change because of seasonal variations in rainfall, runoff, and Geotechnical Engineering Report Proposed Dollar General Warne, NC | Warne, NC 28909 February 5, 2024 | Terracon Project No. E2235144 Facilities | Environmental | Geotechnical | Materials 4 other conditions not apparent at the time of drilling. Long-term groundwater monitoring was outside the scope of services for this project. Auger Refusal Auger refusal is defined as the depth below the ground surface at which a test boring can no longer be advanced with the soil drilling technique being used. Rock coring procedures are generally required to determine the character and continuity of the auger refusal material and these factors must be considered when evaluating the depth to auger refusal in those test borings that are not cored. Auger refusal was encountered in borings B-1, B-2, B-4, and B-5 at depths ranging between 10 and 14.9 feet below existing site grades. Seismic Site Class The seismic design requirements for buildings and other structures are based on Seismic Design Category. Site Classification is required to determine the Seismic Design Category for a structure. The Site Classification is based on the upper 100 feet of the site profile defined by a weighted average value of either shear wave velocity, standard penetration resistance, or undrained shear strength in accordance with Section 20.4 of ASCE 7 and the International Building Code (IBC). Based on the soil properties observed at the site and as described on the exploration logs and results, our professional opinion is for that a Seismic Site Classification of D be considered for the project. Subsurface explorations at this site were extended to a maximum depth of 20 feet. The site properties below the boring depth to 100 feet were estimated based on our experience and knowledge of geologic conditions of the general area. Additional deeper borings or geophysical testing may be performed to confirm the conditions below the current boring depth. Infiltration Four soil infiltration testing locations designated IT-1 through IT-4 were performed as cased hole infiltration tests. At the soil infiltration test locations, a drill rig was used to set a 4-inch diameter casing. The outer casing was isolated from the soil with a bentonite seal. Each 4-inch diameter test hole was filled with water and allowed to pre-soak overnight, after which water was introduced to a depth of approximately 6 inches in the bottom of each test hole, and an initial reading was taken. Water level readings were taken every 30 minutes for a period of at least four hours, or until the rate of infiltration stabilized. Water was introduced to restore the original level for each time interval. Geotechnical Engineering Report Proposed Dollar General Warne, NC | Warne, NC 28909 February 5, 2024 | Terracon Project No. E2235144 Facilities | Environmental | Geotechnical | Materials 5 The following table provides the measured soil infiltration rates in inches per hour for each test location as a mildly fluctuating infiltration rate was achieved. Soil Infiltration Test Summary Test Location Depth Below Ground Surface (ft.) Average Infiltration Rate (inch/hr.) IT-1 5 1.5 IT-2 5 10.5 IT-3 5 3 IT-4 5 0 Geotechnical Overview The scope of services for this project consisted of the advancement of 9 soil test borings. Five of the borings were performed within the proposed building footprint, B-1 to B-5, and 4 borings were performed within the proposed pavement areas, P-1 to P-4. The borings typically encountered soft silty sands and clayey sands in the upper 8 feet underlain by stiffer native material. Due to the increased risk of excessive settlement for the proposed structure, the following subgrade improvements must be made. Within the entire building footprint, the subgrade must be undercut a minimum of 3 feet below finished grade or foundation bearing elevation, whichever is deeper, and backfilled in 8-to-12-inch lifts with compacted engineered fill. The overexcavation should extend to at least 10 feet beyond the limits of the proposed building, including any appurtenances. Following overexcavation but prior to backfilling, the exposed subgrade soils within the overexcavation should be proofrolled with an adequately loaded vehicle such as a fully- loaded tandem-axle dump truck to delineate any soft or unsuitable areas. Then the exposed soils within the overexcavation should be scarified to a minimum depth of 12 inches and then compacted to a minimum of 98% of the materials maximum dry density as determined by the standard Proctor test. The groundwater table could affect overexcavation efforts. The grading contractor should be prepared to deal with saturated soil conditions that may arise. A temporary dewatering system consisting of sumps with pumps may be necessary to achieve the recommended depth of overexcavation depending on groundwater conditions at the time of construction. The existing on-site soils appear suitable for pavement support providing they pass a proofroll. Following proof-roll, the upper 12 inches of pavement subgrade should be Geotechnical Engineering Report Proposed Dollar General Warne, NC | Warne, NC 28909 February 5, 2024 | Terracon Project No. E2235144 Facilities | Environmental | Geotechnical | Materials 6 scarified and compacted to a minimum of 98% of the materials maximum dry density as determined by the standard Proctor test. The recommendations contained in this report are based upon the results of field and laboratory testing (presented in the Exploration Results), engineering analyses, and our current understanding of the proposed project. The General Comments section provides an understanding of the report limitations. Earthwork Earthwork is anticipated to include clearing and grubbing, excavations, and engineered fill placement. The following sections provide recommendations for use in the preparation of specifications for the work. Recommendations include critical quality criteria, as necessary, to render the site in the state considered in our geotechnical engineering evaluation for foundations, floor slabs, and pavements. Site Preparation Prior to placing fill, existing vegetation, topsoil, and root mats should be removed. Complete stripping of the topsoil should be performed in the proposed building and parking/driveway areas. Where fill is placed on existing slopes steeper than 5H:1V, benches should be cut into the existing slopes prior to fill placement. The benches should have a minimum vertical face height of 1 foot and a maximum vertical face height of 3 feet and should be cut wide enough to accommodate the compaction equipment. This benching will help provide a positive bond between the fill and natural soils and reduce the possibility of failure along the fill/natural soil interface. Although no evidence of fill or underground facilities (such as septic tanks, cesspools, basements, and utilities) was observed during the exploration and site reconnaissance, such features could be encountered during construction. If unexpected fills or underground facilities are encountered, such features should be removed, and the excavation thoroughly cleaned prior to backfill placement and/or construction. Subgrade Preparation We recommend that the soils within the footprint of the proposed structures be removed to a minimum depth of 3 feet below the bottom of footings, or 3 feet below existing grades, whichever is deeper. Structural fill placed beneath the entire footprint of the foundations should extend horizontally a minimum distance of 10 feet beyond the Geotechnical Engineering Report Proposed Dollar General Warne, NC | Warne, NC 28909 February 5, 2024 | Terracon Project No. E2235144 Facilities | Environmental | Geotechnical | Materials 7 outside limits of the structure. On-site soils are considered suitable to be used as structural fill materials. The subgrade should be proofrolled with an adequately loaded vehicle such as a fully- loaded tandem-axle dump truck. The proofrolling should be performed under the observation of the Geotechnical Engineer or representative. Areas excessively deflecting under the proofroll should be delineated and subsequently addressed by the Geotechnical Engineer. Excessively wet or dry material should either be removed or moisture conditioned and recompacted. Following proofroll to identify any unsuitable areas, the upper 12 inches of pavement subgrade should be scarified and compacted to 98% of the materials maximum dry density as determined by the standard Proctor test. All exposed areas which will receive fill, once properly cleared and benched where necessary, should be scarified to a minimum depth of 12 inches, moisture conditioned as necessary, and compacted per the compaction requirements in this report. Compacted structural fill soils should then be placed to the proposed design grade and the moisture content and compaction of subgrade soils should be maintained until foundation or pavement construction. Based upon the subsurface conditions determined from the geotechnical exploration, subgrade soils exposed during construction are anticipated to be relatively workable; however, the workability of the subgrade may be affected by precipitation, repetitive construction traffic or other factors. If unworkable conditions develop, workability may be improved by scarifying and drying. Excavation We anticipate that excavations for the proposed construction can be accomplished with conventional earthmoving equipment. The bottom of excavations should be thoroughly cleaned of loose soils and disturbed materials prior to backfill placement and/or construction. The groundwater table could affect overexcavation efforts. The grading contractor should be prepared to deal with saturated soil conditions that may arise. A temporary dewatering system consisting of sumps with pumps may be necessary to achieve the recommended depth of overexcavation depending on groundwater conditions at the time of construction. Geotechnical Engineering Report Proposed Dollar General Warne, NC | Warne, NC 28909 February 5, 2024 | Terracon Project No. E2235144 Facilities | Environmental | Geotechnical | Materials 8 Soil Stabilization Soft or otherwise unsuitable material delineated by proofrolling can be stabilized using a layered system of geotextile material such as Propex 315ST or equivalent and open graded rock. Typically, soft or unstable soil conditions can be addressed by excavation of the exposed subgrade to an estimated depth of 2 to 3 feet below planned subgrade elevation, or bottom of recommended remedial grading. In areas identified with unsuitable subgrade conditions, it is anticipated that 6 inches of open graded rock should be placed on the exposed subgrade, followed by Propex 315ST or equivalent, and a second layer of open graded rock placed above the geotextile. The final layer of rock should be a minimum of 3 inches, however additional rock may be required in order to provide a stable subgrade. Additional rock stabilization and reinforcing material may be warranted depending on the conditions encountered. Fill Material Types Fill required to achieve design grade should be classified as structural fill and general fill. Structural fill is material used below, or within 10 feet of structures, pavements or constructed slopes. General fill is material used to achieve grade outside of these areas. Reuse of On-Site Soil: Excavated on-site soil may be selectively reused as fill. It should be noted that high silt content soils encountered in some areas of this site can become relatively unworkable during high precipitation events. The water content of these high silt content soils should be closely monitored during grading activities. Material property requirements for on-site soil for use as general fill and structural fill are noted in the table below: Property Structural Fill General Fill Composition Free of deleterious material Free of deleterious material Maximum particle size 3 inches 6 inches Fines content At least 25% passing the No. 200 sieve Not limited Plasticity Liquid Limit less than 50 Plasticity index less than 33 Not limited GeoModel Layer Expected to be Suitable1 2,3 2,3 Geotechnical Engineering Report Proposed Dollar General Warne, NC | Warne, NC 28909 February 5, 2024 | Terracon Project No. E2235144 Facilities | Environmental | Geotechnical | Materials 9 Imported Fill Materials: Imported fill materials should meet the following material property requirements. Regardless of its source, compacted fill should consist of approved materials that are free of organic matter and debris. Frozen material should not be used, and fill should not be placed on a frozen subgrade. Soil Type 1 USCS Classification Acceptable Parameters (for Structural Fill) Low Plasticity Cohesive CL, SC, GC Liquid Limit less than 50 Plasticity index less than 33 Less than 50% retained on No. 200 sieve Granular GW, GP, GM, SW, SP, SM Less than 50% passing No. 200 sieve 1. Structural and general fill should consist of approved materials free of organic matter and debris. Frozen material should not be used, and fill should not be placed on a frozen subgrade. A sample of each material type should be submitted to the Geotechnical Engineer for evaluation prior to use on this site. Additional geotechnical consultation should be provided prior to use of uniformly graded gravel on the site. Fill Placement and Compaction Requirements Structural and general fill should meet the following compaction requirements. Item Structural Fill General Fill Maximum Lift Thickness 8 inches or less in loose thickness when heavy, self-propelled compaction equipment is used 4 inches in loose thickness when hand- guided equipment (i.e. jumping jack or plate compactor) is used. Same as structural fill Minimum Compaction Requirements 1,2,3 98% of the maximum dry density below foundations paved areas. 92% of the maximum dry density Water Content Range 1 Cohesive: Optimum moisture content to +3% of optimum moisture content Granular: Optimum moisture content to +3% of optimum moisture content As required to achieve min. compaction requirements Geotechnical Engineering Report Proposed Dollar General Warne, NC | Warne, NC 28909 February 5, 2024 | Terracon Project No. E2235144 Facilities | Environmental | Geotechnical | Materials 10 Item Structural Fill General Fill 1. Maximum density and optimum water content as determined by the standard Proctor test (ASTM D 698). 2. If the granular material is a coarse sand or gravel, or of a uniform size, or has a low fines content, compaction comparison to relative density may be more appropriate. In this case, granular materials should be compacted to at least 70% relative density (ASTM D 4253 and D 4254). Materials not amenable to density testing should be placed and compacted to a stable condition observed by the Geotechnical Engineer or representative. Utility Trench Backfill Any soft or unsuitable materials encountered at the bottom of utility trench excavations should be removed and replaced with structural fill or bedding material in accordance with public works specifications for the utility be supported. This recommendation is particularly applicable to utility work requiring grade control and/or in areas where subsequent grade raising could cause settlement in the subgrade supporting the utility. Trench excavation should not be conducted below a downward 1:1 projection from existing foundations without engineering review of shoring requirements and geotechnical observation during construction. On-site materials are considered suitable for backfill of utility and pipe trenches from 1 foot above the top of the pipe to the final ground surface, provided the material is free of organic matter and deleterious substances. Trench backfill should be mechanically placed and compacted as discussed earlier in this report. Compaction of initial lifts should be accomplished with hand-operated tampers or other lightweight compactors. Where trenches are placed beneath slabs or footings, the backfill should satisfy the gradation and expansion index requirements of engineered fill discussed in this report. Flooding or jetting for placement and compaction of backfill is not recommended. Utility trenches are a common source of water infiltration and migration. Utility trenches penetrating beneath the building should be effectively sealed to restrict water intrusion and flow through the trenches, which could migrate below the building. The trench should provide an effective trench plug that extends at least 5 feet from the face of the building exterior. The plug material should consist of cementitious flowable fill or low permeability clay. The trench plug material should be placed to surround the utility line. If used, the clay trench plug material should be placed and compacted to comply with the water content and compaction recommendations for structural fill stated previously in this report. Geotechnical Engineering Report Proposed Dollar General Warne, NC | Warne, NC 28909 February 5, 2024 | Terracon Project No. E2235144 Facilities | Environmental | Geotechnical | Materials 11 Grading and Drainage All grades must provide effective drainage away from the building during and after construction and should be maintained throughout the life of the structure. Water retained next to the building can result in soil movements greater than those discussed in this report. Greater movements can result in unacceptable differential floor slab and/or foundation movements, cracked slabs and walls, and roof leaks. The roof should have gutters/drains with downspouts that discharge onto splash blocks at a distance of at least 10 feet from the building. Exposed ground should be sloped and maintained at a minimum 5% away from the building for at least 10 feet beyond the perimeter of the building. Locally, flatter grades may be necessary to transition ADA access requirements for flatwork. After building construction and landscaping have been completed, final grades should be verified to document effective drainage has been achieved. Grades around the structure should also be periodically inspected and adjusted, as necessary, as part of the structure’s maintenance program. Where paving or flatwork abuts the structure, a maintenance program should be established to effectively seal and maintain joints and prevent surface water infiltration. Earthwork Construction Considerations Shallow excavations for the proposed structure are anticipated to be accomplished with conventional construction equipment. Upon completion of filling and grading, care should be taken to maintain the subgrade water content prior to construction of grade-supported improvements such as floor slabs and pavements. Construction traffic over the completed subgrades should be avoided. The site should also be graded to prevent ponding of surface water on the prepared subgrades or in excavations. Water collecting over or adjacent to construction areas should be removed. If the subgrade freezes, desiccates, saturates, or is disturbed, the affected material should be removed, or the materials should be scarified, moisture conditioned, and recompacted prior to floor slab construction. As a minimum, excavations should be performed in accordance with OSHA 29 CFR, Part 1926, Subpart P, “Excavations” and its appendices, and in accordance with any applicable local and/or state regulations. Construction site safety is the sole responsibility of the contractor who controls the means, methods, and sequencing of construction operations. Under no circumstances shall the information provided herein be interpreted to mean Terracon is assuming responsibility for construction site safety or the contractor's activities; such responsibility shall neither be implied nor inferred. Excavations or other activities resulting in ground disturbance have the potential to affect adjoining properties and structures. Our scope of services does not include review of Geotechnical Engineering Report Proposed Dollar General Warne, NC | Warne, NC 28909 February 5, 2024 | Terracon Project No. E2235144 Facilities | Environmental | Geotechnical | Materials 12 available final grading information or consider potential temporary grading performed by the contractor for potential effects such as ground movement beyond the project limits. A preconstruction/ precondition survey should be conducted to document nearby property/infrastructure prior to any site development activity. Excavation or ground disturbance activities adjacent or near property lines should be monitored or instrumented for potential ground movements that could negatively affect adjoining property and/or structures. Construction Observation and Testing The earthwork efforts should be observed by the Geotechnical Engineer (or others under their direction). Observation should include documentation of adequate removal of surficial materials (vegetation, topsoil, and pavements), evaluation and remediation of existing fill materials, as well as proofrolling and mitigation of unsuitable areas delineated by the proofroll. Each lift of compacted fill should be tested, evaluated, and reworked, as necessary, as recommended by the Geotechnical Engineer prior to placement of additional lifts. Each lift of fill should be tested for density and water content at a frequency of at least one test for every 2,000 square feet of compacted fill in the building areas and 5,000 square feet in pavement areas. Where not specified by local ordinance, one density and water content test should be performed for every 100 linear feet of compacted utility trench backfill and a minimum of one test performed for every 12 vertical inches of compacted backfill. In areas of foundation excavations, the bearing subgrade should be evaluated by the Geotechnical Engineer. If unanticipated conditions are observed, the Geotechnical Engineer should prescribe mitigation options. In addition to the documentation of the essential parameters necessary for construction, the continuation of the Geotechnical Engineer into the construction phase of the project provides the continuity to maintain the Geotechnical Engineer’s evaluation of subsurface conditions, including assessing variations and associated design changes. Shallow Foundations If the site has been prepared in accordance with the requirements noted in Earthwork, the following design parameters are applicable for shallow foundations. Geotechnical Engineering Report Proposed Dollar General Warne, NC | Warne, NC 28909 February 5, 2024 | Terracon Project No. E2235144 Facilities | Environmental | Geotechnical | Materials 13 Design Parameters – Compressive Loads Item Description Maximum Net Allowable Bearing Pressure 1, 2 2,000 psf - foundations bearing upon at least 3 feet of compacted structural fill Required Bearing Stratum 3 At least 3 feet of compacted structural fill Minimum Foundation Dimensions Per IBC 1809.7 Ultimate Passive Resistance4 (equivalent fluid pressures) 250 pcf Sliding Resistance 5 0.30 allowable coefficient of friction Minimum Embedment below Finished Grade 6 24 inches Estimated Total Settlement from Structural Loads 2 Less than about 1 inch Estimated Differential Settlement 2, 7 About ½ of total settlement 1. The maximum net allowable bearing pressure is the pressure in excess of the minimum surrounding overburden pressure at the footing base elevation. Values assume that exterior grades are no steeper than 20% within 10 feet of structure. 2. Values provided are for maximum loads noted in Project Description. Additional geotechnical consultation will be necessary if higher loads are anticipated. 3. Unsuitable or soft soils should be overexcavated and replaced per the recommendations presented in Earthwork. 4. Use of passive earth pressures require the sides of the excavation for the spread footing foundation to be nearly vertical and the concrete placed neat against these vertical faces or that the footing forms be removed and compacted structural fill be placed against the vertical footing face. Assumes no hydrostatic pressure. 5. Can be used to compute sliding resistance where foundations are placed on suitable soil/materials. Frictional resistance for granular materials is dependent on the bearing pressure which may vary due to load combinations. For fine-grained materials, lateral resistance using cohesion should not exceed ½ the dead load. 6. Embedment necessary to minimize the effects of frost and/or seasonal water content variations. For sloping ground, maintain depth below the lowest adjacent exterior grade within 5 horizontal feet of the structure. 7. Differential settlements are noted for equivalent-loaded found ations and bearing elevation as measured over a span of 50 feet. Design Parameters – Overturning and Uplift Loads Shallow foundations subjected to overturning loads should be proportioned such that the resultant eccentricity is maintained in the center-third of the foundation (e.g., e < b/6, where b is the foundation width). This requirement is intended to keep the entire Geotechnical Engineering Report Proposed Dollar General Warne, NC | Warne, NC 28909 February 5, 2024 | Terracon Project No. E2235144 Facilities | Environmental | Geotechnical | Materials 14 foundation area in compression during the extreme lateral/overturning load event. Foundation oversizing may be required to satisfy this condition. Uplift resistance of spread footings can be developed from the effective weight of the footing and the overlying soils with consideration to the IBC basic load combinations. Foundation Construction Considerations As noted in Earthwork, the footing excavations should be evaluated under the observation of the Geotechnical Engineer. The base of all foundation excavations should be free of water and loose soil, prior to placing concrete. Concrete should be placed soon after excavating to reduce bearing soil disturbance. Care should be taken to prevent wetting or drying of the bearing materials during construction. Excessively wet or dry material or any loose/disturbed material in the bottom of the footing excavations should be removed/reconditioned before foundation concrete is placed. If unsuitable bearing soils are observed at the base of the planned footing excavation, the excavation should be extended deeper to suitable soils, and the footings could bear directly on these soils at the lower level or on lean concrete backfill placed in the excavations. The lean concrete replacement zone is illustrated on the sketch below. Item Description Soil Moist Unit Weight 110 pcf Soil Effective Unit Weight1 50 pcf Soil weight included in uplift resistance Soil included within the prism extending up from the top perimeter of the footing at an angle of 20 degrees from vertical to ground surface 1. Effective (or buoyant) unit weight should be used for soil above the foundation level and below a water level. The high groundwater level should be used in uplift design as applicable. Geotechnical Engineering Report Proposed Dollar General Warne, NC | Warne, NC 28909 February 5, 2024 | Terracon Project No. E2235144 Facilities | Environmental | Geotechnical | Materials 15 Overexcavation for structural fill placement below footings should be conducted as shown below. The overexcavation should be backfilled up to the footing base elevation, with engineered fill placed, as recommended in the Earthwork section. Floor Slabs Design parameters for floor slabs assume the requirements for Earthwork have been followed. Specific attention should be given to positive drainage away from the structure and positive drainage of the aggregate base beneath the floor slab. Floor Slab Design Parameters Item Description Floor Slab Support1 3 feet of compacted structural fill Geotechnical Engineering Report Proposed Dollar General Warne, NC | Warne, NC 28909 February 5, 2024 | Terracon Project No. E2235144 Facilities | Environmental | Geotechnical | Materials 16 Item Description Minimum 6 inches of free-draining (less than 5% passing the U.S. No. 200 sieve) crushed aggregate compacted to at least 98% of ASTM D 698 1, 2 Estimated Modulus of Subgrade Reaction 2 100 pounds per square inch per inch (psi/in) for point loads 1. Modulus of subgrade reaction is an estimated value based upon our experience with the subgrade condition, the requirements noted in Earthwork, and the floor slab support as noted in this table. It is provided for point loads. For large area loads the modulus of subgrade reaction would be lower. 2. Free-draining granular material should have less than 5% fines (material passing the No. 200 sieve). Other design considerations such as cold temperatures and condensation development could warrant more extensive design provisions. The use of a vapor retarder should be considered beneath concrete slabs on grade covered with wood, tile, carpet, or other moisture sensitive or impervious coverings, when the project includes humidity-controlled areas, or when the slab will support equipment sensitive to moisture. When conditions warrant the use of a vapor retarder, the slab designer should refer to ACI 302 and/or ACI 360 for procedures and cautions regarding the use and placement of a vapor retarder. Saw-cut contraction joints should be placed in the slab to help control the location and extent of cracking. For additional recommendations, refer to the ACI Design Manual. Joints or cracks should be sealed with a waterproof, non-extruding compressible compound specifically recommended for heavy duty concrete pavement and wet environments. Where floor slabs are tied to perimeter walls or turn-down slabs to meet structural or other construction objectives, our experience indicates differential movement between the walls and slabs will likely be observed in adjacent slab expansion joints or floor slab cracks beyond the length of the structural dowels. The Structural Engineer should account for potential differential settlement through use of sufficient control joints, appropriate reinforcing or other means. Floor Slab Construction Considerations Finished subgrade, within and for at least 10 feet beyond the floor slab, should be protected from traffic, rutting, or other disturbance and maintained in a relatively moist condition until floor slabs are constructed. If the subgrade should become damaged or desiccated prior to construction of floor slabs, the affected material should be removed, and structural fill should be added to replace the resulting excavation. Final conditioning Geotechnical Engineering Report Proposed Dollar General Warne, NC | Warne, NC 28909 February 5, 2024 | Terracon Project No. E2235144 Facilities | Environmental | Geotechnical | Materials 17 of the finished subgrade should be performed immediately prior to placement of the floor slab support course. The Geotechnical Engineer should observe the condition of the floor slab subgrades immediately prior to placement of the floor slab support course, reinforcing steel, and concrete. Attention should be paid to high traffic areas that were rutted and disturbed earlier, and to areas where backfilled trenches are located. Pavements General Pavement Comments Pavement designs are provided for the traffic conditions and pavement life conditions as noted in Project Description and in the following sections of this report. A critical aspect of pavement performance is site preparation. Pavement designs noted in this section must be applied to the site which has been prepared as recommended in the Earthwork section. Support characteristics of subgrade for pavement design do not account for shrink/swell movements of an expansive clay subgrade, such as soils observed on this project. Thus, the pavement may be adequate from a structural standpoint, yet still experience cracking and deformation due to shrink/swell related movement of the subgrade. Pavement Design Parameters A California Bearing Ratio (CBR) of 3 was used for the subgrade for the asphaltic concrete (AC) pavement designs. A modulus of subgrade reaction of 120 pci was used for the portland cement concrete (PCC) pavement designs. The value was empirically derived based upon our experience with the clayey subgrade soils and our expectation of the quality of the subgrade as prescribed by the Site Preparation conditions as outlined in Earthwork. A modulus of rupture of 550 psi was used in design for the concrete (based on correlations with a minimum 28-day compressive strength of 4,000 psi). Pavement Section Thicknesses The following table provides our opinion of minimum thickness for AC sections: Geotechnical Engineering Report Proposed Dollar General Warne, NC | Warne, NC 28909 February 5, 2024 | Terracon Project No. E2235144 Facilities | Environmental | Geotechnical | Materials 18 Asphaltic Concrete Design Layer Thickness (inches) Light Duty 1 Heavy Duty 1 AC 2, 3 34 4 Aggregate Base 6 6 1. See Project Description for more specifics regarding traffic assumptions. 2. All materials should meet the current North Carolina Department of Transportation (NCDOT) Standard Specifications for Highway and Bridge Construction 3. A minimum 1.5-inch surface course should be used on ACC pavements. The following table provides our estimated minimum thickness of PCC pavements. Portland Cement Concrete Design Layer Thickness (inches) Light Duty 1 Heavy Duty 1 PCC 2 4 5 Aggregate Base 6 6 1. See Project Description for more specifics regarding traffic classifications. 2. All materials should meet the current North Carolina Department of Transportation (NCDOT) Standard Specifications for Highway and Bridge Construction. Areas for parking of heavy vehicles, concentrated turn areas, and start/stop maneuvers could require thicker pavement sections. Edge restraints (i.e. concrete curbs or aggregate shoulders) should be planned along curves and areas of maneuvering vehicles. Although not required for structural support, a minimum 4-inch thick base course layer is recommended to help reduce potential for slab curl, shrinkage cracking, and subgrade pumping through joints. Proper joint spacing will also be required to prevent excessive slab curling and shrinkage cracking. Joints should be sealed to prevent entry of foreign material and doweled where necessary for load transfer. PCC pavement details for joint spacing, joint reinforcement, and joint sealing should be prepared in accordance with ACI 330 and ACI 325. Where practical, we recommend early-entry cutting of crack-control joints in PCC pavements. Cutting of the concrete in its “green” state typically reduces the potential for micro-cracking of the pavements prior to the crack control joints being formed, compared to cutting the joints after the concrete has fully set. Micro-cracking of pavements may Geotechnical Engineering Report Proposed Dollar General Warne, NC | Warne, NC 28909 February 5, 2024 | Terracon Project No. E2235144 Facilities | Environmental | Geotechnical | Materials 19 lead to crack formation in locations other than the sawed joints, and/or reduction of fatigue life of the pavement. Openings in pavements, such as decorative landscaped areas, are sources for water infiltration into surrounding pavement systems. Water can collect in the islands and migrate into the surrounding subgrade soils thereby degrading support of the pavement. Islands with raised concrete curbs, irrigated foliage, and low permeability near-surface soils are particular areas of concern. The civil design for the pavements with these conditions should include features to restrict or collect and discharge excess water from the islands. Examples of features are edge drains connected to the stormwater collection system, longitudinal subdrains, or other suitable outlets and impermeable barriers preventing lateral migration of water such as a cutoff wall installed to a depth below the pavement structure. Pavement Drainage Pavements should be sloped to provide rapid drainage of surface water. Water allowed to pond on or adjacent to the pavements could saturate the subgrade and contribute to premature pavement deterioration. In addition, the pavement subgrade should be graded to provide positive drainage within the granular base section. Appropriate sub-drainage or connection to a suitable daylight outlet should be provided to remove water from the granular subbase. Based on the possibility of shallow and/or perched groundwater, we recommend installing a pavement subdrain system to control groundwater, improve stability, and improve long- term pavement performance. We recommend at least 6 inches of free-draining granular material be placed beneath the pavements. The use of a free draining granular base will also reduce the potential for frost action. We recommend pavement subgrades be crowned at least 2% to promote the flow of water towards the subdrains, and to reduce the potential for ponding of water on the subgrade. Pavement Maintenance The pavement sections represent minimum recommended thicknesses and, as such, periodic upkeep should be anticipated. Preventive maintenance should be planned and provided for through an on-going pavement management program. Maintenance activities are intended to slow the rate of pavement deterioration and to preserve the pavement investment. Pavement care consists of both localized (e.g., crack and joint sealing and patching) and global maintenance (e.g., surface sealing). Additional engineering consultation is recommended to determine the type and extent of a cost-effective Geotechnical Engineering Report Proposed Dollar General Warne, NC | Warne, NC 28909 February 5, 2024 | Terracon Project No. E2235144 Facilities | Environmental | Geotechnical | Materials 20 program. Even with periodic maintenance, some movements and related cracking may still occur, and repairs may be required. Pavement performance is affected by its surroundings. In addition to providing preventive maintenance, the civil engineer should consider the following recommendations in the design and layout of pavements: ■ Final grade adjacent to paved areas should slope down from the edges at a minimum 2%. ■ Subgrade and pavement surfaces should have a minimum 2% slope to promote proper surface drainage. ■ Install pavement drainage systems surrounding areas anticipated for frequent wetting. ■ Install joint sealant and seal cracks immediately. ■ Seal all landscaped areas in or adjacent to pavements to reduce moisture migration to subgrade soils. ■ Place compacted, low permeability backfill against the exterior side of curb and gutter. ■ Place curb, gutter and/or sidewalk directly on clay subgrade soils rather than on unbound granular base course materials. General Comments Our analysis and opinions are based upon our understanding of the project, the geotechnical conditions in the area, and the data obtained from our site exploration. Variations will occur between exploration point locations or due to the modifying effects of construction or weather. The nature and extent of such variations may not become evident until during or after construction. Terracon should be retained as the Geotechnical Engineer, where noted in this report, to provide observation and testing services during pertinent construction phases. If variations appear, we can provide further evaluation and supplemental recommendations. If variations are noted in the absence of our observation and testing services on-site, we should be immediately notified so that we can provide evaluation and supplemental recommendations. Our Scope of Services does not include either specifically or by implication any environmental or biological (e.g., mold, fungi, bacteria) assessment of the site or identification or prevention of pollutants, hazardous materials or conditions. If the owner is concerned about the potential for such contamination or pollution, other studies should be undertaken. Our services and any correspondence are intended for the sole benefit and exclusive use of our client for specific application to the project discussed and are accomplished in Geotechnical Engineering Report Proposed Dollar General Warne, NC | Warne, NC 28909 February 5, 2024 | Terracon Project No. E2235144 Facilities | Environmental | Geotechnical | Materials 21 accordance with generally accepted geotechnical engineering practices with no third-party beneficiaries intended. Any third-party access to services or correspondence is solely for information purposes to support the services provided by Terracon to our client. Reliance upon the services and any work product is limited to our client and is not intended for third parties. Any use or reliance of the provided information by third parties is done solely at their own risk. No warranties, either express or implied, are intended or made. Site characteristics as provided are for design purposes and not to estimate excavation cost. Any use of our report in that regard is done at the sole risk of the excavating cost estimator as there may be variations on the site that are not apparent in the data that could significantly effect excavation cost. Any parties charged with estimating excavation costs should seek their own site characterization for specific purposes to obtain the specific level of detail necessary for costing. Site safety and cost estimating including excavation support and dewatering requirements/design are the responsibility of others. Construction and site development have the potential to affect adjacent properties. Such impacts can include damages due to vibration, modification of groundwater/surface water flow during construction, foundation movement due to undermining or subsidence from excavation, as well as noise or air quality concerns. Evaluation of these items on nearby properties are commonly associated with contractor means and methods and are not addressed in this report. The owner and contractor should consider a preconstruction/precondition survey of surrounding development. If changes in the nature, design, or location of the project are planned, our conclusions and recommendations shall not be considered valid unless we review the changes and either verify or modify our conclusions in writing. Geotechnical Engineering Report Proposed Dollar General Warne, NC | Warne, NC 28909 February 5, 2024 | Terracon Project No. E2235144 Facilities | Environmental | Geotechnical | Materials Figures Contents: GeoModel 1,700 1,705 1,710 1,715 1,720 1,725 1,730 1,735 EL E V A T I O N ( M S L ) ( f e e t ) Layering shown on this figure has been developed by the geotechnical engineer for purposes of modeling the subsurface conditions as required for the subsequent geotechnical engineering for this project. Numbers adjacent to soil column indicate depth below ground surface. NOTES: B-1 B-2 B-3 B-4 B-5 P-1 P-2 P-3 P-4 Legend This is not a cross section. This is intended to display the Geotechnical Model only. See individual logs for more detailed conditions. GeoModel 5050 Old Hwy 64 West | Warne, NC Terracon Project No. E2235144 Proposed Dollar General - Warne, NC - GEO 51 Lost Mound Dr, Ste 135 Chattanooga, TN First Water Observation Groundwater levels are temporal. The levels shown are representative of the date and time of our exploration. Significant changes are possible over time. Water levels shown are as measured during and/or after drilling. In some cases, boring advancement methods mask the presence/absence of groundwater. See individual logs for details. Topsoil Silty Clayey Sand Silty Sand Clayey Sand Model Layer Layer Name General Description 1 Topsoil 3 Native soils consisting of silty sand, clayey sand, and silty clayey sand; medium dense to very dense in density 2 Native soils consisting of silty sand, clayey sand, and silty clayey sand; very loose to loose in density Surface Stiff Native Soils Soft Native Soils 1 2 3 6 0.33 8 10 1 2 3 0.33 8 11 1 2 13 0.33 20 1 2 3 2 3 0.33 5.5 8 13 14.9 1 2 0.33 13.1 1 2 3 6 0.33 5.5 10 1 2 0.33 10 1 2 3 2 0.33 5.5 8 10 1 2 0.33 10 Geotechnical Engineering Report Proposed Dollar General Warne, NC | Warne, NC 28909 February 5, 2024 | Terracon Project No. E2235144 Facilities | Environmental | Geotechnical | Materials Attachments Geotechnical Engineering Report Proposed Dollar General Warne, NC | Warne, NC 28909 February 5, 2024 | Terracon Project No. E2235144 Facilities | Environmental | Geotechnical | Materials Exploration and Testing Procedures Field Exploration Number of Borings Approximate Boring Depth (feet) Location 5 10 to 20 Proposed building footprint 4 10 Proposed pavement areas Boring Layout and Elevations: Terracon personnel provided the boring layout using handheld GPS equipment (estimated horizontal accuracy of about ±10 feet) and referencing existing site features. Approximate ground surface elevations were obtained by interpolation from the provided grading plan. If elevations and a more precise boring layout are desired, we recommend borings be surveyed. Subsurface Exploration Procedures: We advanced the borings with a track-mounted rotary drill rig using continuous flight hollow stem augers. Four samples were obtained in the upper 10 feet of each boring and at intervals of 5 feet thereafter. In the split-barrel sampling procedure, a standard 2-inch outer diameter split-barrel sampling spoon was driven into the ground by a 140-pound automatic hammer falling a distance of 30 inches. The number of blows required to advance the sampling spoon the last 12 inches of a normal 18-inch penetration is recorded as the Standard Penetration Test (SPT) resistance value. The SPT resistance values, also referred to as N-values, are indicated on the boring logs at the test depths. We observed and recorded groundwater levels during drilling and sampling. For safety purposes, all borings were backfilled with auger cuttings after their completion. Pavements were patched with cold-mix asphalt and/or pre-mixed concrete, as appropriate. The sampling depths, penetration distances, and other sampling information was recorded on the field boring logs. The samples were placed in appropriate containers and taken to our soil laboratory for testing and classification by a Geotechnical Engineer. Our exploration team prepared field boring logs as part of the drilling operations. These field logs included visual classifications of the materials observed during drilling and our interpretation of the subsurface conditions between samples. Final boring logs were prepared from the field logs. The final boring logs represent the Geotechnical Engineer's interpretation of the field logs and include modifications based on observations and tests of the samples in our laboratory. Laboratory Testing The project engineer reviewed the field data and assigned laboratory tests. The laboratory testing program included the following types of tests: Geotechnical Engineering Report Proposed Dollar General Warne, NC | Warne, NC 28909 February 5, 2024 | Terracon Project No. E2235144 Facilities | Environmental | Geotechnical | Materials ■ Moisture Content ■ Atterberg Limits ■ Grain Size Analysis The laboratory testing program often included examination of soil samples by an engineer. Based on the results of our field and laboratory programs, we described and classified the soil samples in accordance with the Unified Soil Classification System. Geotechnical Engineering Report Proposed Dollar General Warne, NC | Warne, NC 28909 February 5, 2024 | Terracon Project No. E2235144 Facilities | Environmental | Geotechnical | Materials Site Location and Exploration Plans Contents: Site Location Plan Exploration Plan Note: All attachments are one page unless noted above. Geotechnical Engineering Report Proposed Dollar General Warne, NC | Warne, NC 28909 February 5, 2024 | Terracon Project No. E2235144 Facilities | Environmental | Geotechnical | Materials Note to Preparer: This is a large table with outside borders. Just click inside the table above this text box, then paste your GIS Toolbox image. When paragraph markers are turned on you may notice a line of hidden text above and outside the table – please leave that alone. Limit editing to inside the table. Site Location DIAGRAM IS FOR GENERAL LOCATION ONLY, AND IS NOT INTENDED FOR CONSTRUCTION PURPOSES MAP PROVIDED BY MICROSOFT BING MAPS Geotechnical Engineering Report Proposed Dollar General Warne, NC | Warne, NC 28909 February 5, 2024 | Terracon Project No. E2235144 Facilities | Environmental | Geotechnical | Materials Note to Preparer: This is a large table with outside borders. Just click inside the table above this text box, then paste your GIS Toolbox image. When paragraph markers are turned on you may notice a line of hidden text above and outside the table – please leave that alone. Limit editing to inside the table. Exploration Plan DIAGRAM IS FOR GENERAL LOCATION ONLY, AND IS NOT INTENDED FOR CONSTRUCTION PURPOSES MAP PROVIDED BY MICROSOFT BING MAPS Geotechnical Engineering Report Proposed Dollar General Warne, NC | Warne, NC 28909 February 5, 2024 | Terracon Project No. E2235144 Facilities | Environmental | Geotechnical | Materials Exploration and Laboratory Results Contents: Boring Logs (B-1 through P-9) Atterberg Limits Grain Size Distribution Note: All attachments are one page unless noted above. 1714.67 1707 1705 TOPSOIL, approximately 4 inches SILTY CLAYEY SAND (SC-SM), very loose to loose SILTY CLAYEY SAND (SC-SM), very dense Auger Refusal at 10 Feet Boring Log No. B-1 Wa t e r L e v e l Ob s e r v a t i o n s De p t h ( F t . ) 5 10 Facilities | Environmental | Geotechnical | Materials Gr a p h i c L o g Mo d e l L a y e r 1724.8 24.8 27.4 18.1 27-21-6 0.3 8.0 10.0 1-2-2 N=4 1-1-1 N=2 2-2-1 N=3 15-50/1" Abandonment Method Boring backfilled with auger cuttings upon completion. Advancement Method Hollow Stem Augers Hammer Type Automatic Driller R. Foster Logged by A. Simpson Boring Started 01-11-2024 Boring Completed 01-11-2024 Drill Rig GP890 Proposed Dollar General - Warne, NC - GEO 5050 Old Hwy 64 West | Warne, NC Terracon Project No. E2235144 See Exploration and Testing Procedures for a description of field and laboratory procedures used and additional data (If any). See Supporting Information for explanation of symbols and abbreviations. Water Level Observations While drilling Chattanooga, TN 51 Lost Mound Dr, Ste 135 Notes Sa m p l e T y p e Wa t e r Co n t e n t ( % ) Dr y U n i t We i g h t ( p c f ) St r a i n ( % ) Co m p r e s s i v e St r e n g t h (t s f ) Te s t T y p e Elevation: 1715 (Ft.) +/- Atterberg Limits LL-PL-PI See Exploration PlanLocation: Latitude: 34.9961° Longitude: -83.8990° Depth (Ft.) Strength Test Fi e l d T e s t Re s u l t s 1 2 3 1714.67 1707 1704 TOPSOIL, approximately 4 inches SILTY CLAYEY SAND (SC-SM), very loose to loose SILTY CLAYEY SAND (SC-SM), very dense Auger Refusal at 11 Feet Boring Log No. B-2 Wa t e r L e v e l Ob s e r v a t i o n s De p t h ( F t . ) 5 10 Facilities | Environmental | Geotechnical | Materials Gr a p h i c L o g Mo d e l L a y e r 17.0 21.0 29.3 7.7 23-18-5 0.3 8.0 11.0 1-2-3 N=5 1-2-2 N=4 3-4-4 N=8 50/5" Abandonment Method Boring backfilled with auger cuttings upon completion. Advancement Method Hollow Stem Augers Hammer Type Automatic Driller R. Foster Logged by A. Simpson Boring Started 01-11-2024 Boring Completed 01-11-2024 Drill Rig GP890 Proposed Dollar General - Warne, NC - GEO 5050 Old Hwy 64 West | Warne, NC Terracon Project No. E2235144 See Exploration and Testing Procedures for a description of field and laboratory procedures used and additional data (If any). See Supporting Information for explanation of symbols and abbreviations. Water Level Observations No groundwater was encountered while drilling Chattanooga, TN 51 Lost Mound Dr, Ste 135 Notes Sa m p l e T y p e Wa t e r Co n t e n t ( % ) Dr y U n i t We i g h t ( p c f ) St r a i n ( % ) Co m p r e s s i v e St r e n g t h (t s f ) Te s t T y p e Elevation: 1715 (Ft.) +/- Atterberg Limits LL-PL-PI See Exploration PlanLocation: Latitude: 34.9961° Longitude: -83.8989° Depth (Ft.) Strength Test Fi e l d T e s t Re s u l t s 1 2 3 TOPSOIL, approximately 4 inches SILTY SAND (SM), very loose to loose Boring Terminated at 20 Feet 1724.67 1705 Boring Log No. B-3 Wa t e r L e v e l Ob s e r v a t i o n s De p t h ( F t . ) 5 10 15 20 Mo d e l L a y e r Facilities | Environmental | Geotechnical | Materials Gr a p h i c L o g 28.0 19.9 27.2 17.2 24.8 31.4 0.3 20.0 0-0-1 N=1 1-2-3 N=5 2-3-3 N=6 4-3-2 N=5 2-5-2 N=7 2-4-5 N=9 29-25-4 Abandonment Method Boring backfilled with auger cuttings upon completion. Advancement Method Hollow Stem Augers Hammer Type Automatic Driller R. Foster Logged by A. Simpson Boring Started 01-11-2024 Boring Completed 01-11-2024 Drill Rig GP890 Proposed Dollar General - Warne, NC - GEO 5050 Old Hwy 64 West | Warne, NC Terracon Project No. E2235144 See Exploration and Testing Procedures for a description of field and laboratory procedures used and additional data (If any). See Supporting Information for explanation of symbols and abbreviations. Water Level Observations While drilling Chattanooga, TN 51 Lost Mound Dr, Ste 135 Notes Sa m p l e T y p e Wa t e r Co n t e n t ( % ) Dr y U n i t We i g h t ( p c f ) St r a i n ( % ) Co m p r e s s i v e St r e n g t h (t s f ) Te s t T y p e Depth (Ft.) Strength Test Fi e l d T e s t Re s u l t s Elevation: 1725 (Ft.) +/- Atterberg Limits LL-PL-PI See Exploration PlanLocation: Latitude: 34.9964° Longitude: -83.8988° 1 2 1724.67 1719.5 1717 1712 1710.1 TOPSOIL, approximately 4 inches SILTY SAND (SM), very loose to loose SILTY SAND (SM), medium dense SILTY SAND (SM), very loose SILTY SAND (SM), very dense Auger Refusal at 14.9 Feet Boring Log No. B-4 Wa t e r L e v e l Ob s e r v a t i o n s De p t h ( F t . ) 5 10 Facilities | Environmental | Geotechnical | Materials Gr a p h i c L o g Mo d e l L a y e r 27.6 18.4 17.0 16.6 12.5 0.3 5.5 8.0 13.0 14.9 0-0-1 N=1 1-3-5 N=8 6-6-5 N=11 2-1-1 N=2 50/4" Abandonment Method Boring backfilled with auger cuttings upon completion. Advancement Method Hollow Stem Augers Hammer Type Automatic Driller R. Foster Logged by A. Simpson Boring Started 01-11-2024 Boring Completed 01-11-2024 Drill Rig GP890 Proposed Dollar General - Warne, NC - GEO 5050 Old Hwy 64 West | Warne, NC Terracon Project No. E2235144 See Exploration and Testing Procedures for a description of field and laboratory procedures used and additional data (If any). See Supporting Information for explanation of symbols and abbreviations. Water Level Observations No groundwater was encountered while drilling Chattanooga, TN 51 Lost Mound Dr, Ste 135 Notes Sa m p l e T y p e Wa t e r Co n t e n t ( % ) Dr y U n i t We i g h t ( p c f ) St r a i n ( % ) Co m p r e s s i v e St r e n g t h (t s f ) Te s t T y p e Elevation: 1725 (Ft.) +/- Atterberg Limits LL-PL-PI See Exploration PlanLocation: Latitude: 34.9963° Longitude: -83.8987° Depth (Ft.) Strength Test Fi e l d T e s t Re s u l t s 1 2 3 2 3 1718.67 1705.9 TOPSOIL, approximately 4 inches CLAYEY SAND (SC), very loose to loose Auger Refusal at 13.1 Feet Boring Log No. B-5 Wa t e r L e v e l Ob s e r v a t i o n s De p t h ( F t . ) 5 10 Facilities | Environmental | Geotechnical | Materials Gr a p h i c L o g Mo d e l L a y e r 22.1 20.8 21.7 21.7 30-18-12 0.3 13.1 0-0-0 N=0 1-1-2 N=3 2-3-3 N=6 3-2-6 N=8 Abandonment Method Boring backfilled with auger cuttings upon completion. Advancement Method Hollow Stem Augers Hammer Type Automatic Driller R. Foster Logged by A. Simpson Boring Started 01-11-2024 Boring Completed 01-11-2024 Drill Rig GP890 Proposed Dollar General - Warne, NC - GEO 5050 Old Hwy 64 West | Warne, NC Terracon Project No. E2235144 See Exploration and Testing Procedures for a description of field and laboratory procedures used and additional data (If any). See Supporting Information for explanation of symbols and abbreviations. Water Level Observations No groundwater was encountered while drilling Chattanooga, TN 51 Lost Mound Dr, Ste 135 Notes Sa m p l e T y p e Wa t e r Co n t e n t ( % ) Dr y U n i t We i g h t ( p c f ) St r a i n ( % ) Co m p r e s s i v e St r e n g t h (t s f ) Te s t T y p e Elevation: 1719 (Ft.) +/- Atterberg Limits LL-PL-PI See Exploration PlanLocation: Latitude: 34.9962° Longitude: -83.8989° Depth (Ft.) Strength Test Fi e l d T e s t Re s u l t s 1 2 1710.67 1705.5 1701 TOPSOIL, approximately 4 inches SILTY CLAYEY SAND (SC-SM), very loose SILTY CLAYEY SAND (SC-SM), medium dense Boring Terminated at 10 Feet Boring Log No. P-1 Wa t e r L e v e l Ob s e r v a t i o n s De p t h ( F t . ) 5 10 Facilities | Environmental | Geotechnical | Materials Gr a p h i c L o g Mo d e l L a y e r 24.6 25.7 30.0 22.7 0.3 5.5 10.0 0-1-1 N=2 3-2-1 N=3 6-7-5 N=12 3-6-4 N=10 Abandonment Method Boring backfilled with auger cuttings upon completion. Advancement Method Hollow Stem Augers Hammer Type Automatic Driller R. Foster Logged by A. Simpson Boring Started 01-11-2024 Boring Completed 01-11-2024 Drill Rig GP890 Proposed Dollar General - Warne, NC - GEO 5050 Old Hwy 64 West | Warne, NC Terracon Project No. E2235144 See Exploration and Testing Procedures for a description of field and laboratory procedures used and additional data (If any). See Supporting Information for explanation of symbols and abbreviations. Water Level Observations While drilling Chattanooga, TN 51 Lost Mound Dr, Ste 135 Notes Sa m p l e T y p e Wa t e r Co n t e n t ( % ) Dr y U n i t We i g h t ( p c f ) St r a i n ( % ) Co m p r e s s i v e St r e n g t h (t s f ) Te s t T y p e Elevation: 1711 (Ft.) +/- Atterberg Limits LL-PL-PI See Exploration PlanLocation: Latitude: 34.9960° Longitude: -83.8990° Depth (Ft.) Strength Test Fi e l d T e s t Re s u l t s 1 2 3 1710.67 1701 TOPSOIL, approximately 4 inches SILTY CLAYEY SAND (SC-SM), very loose to loose Boring Terminated at 10 Feet Boring Log No. P-2 Wa t e r L e v e l Ob s e r v a t i o n s De p t h ( F t . ) 5 10 Facilities | Environmental | Geotechnical | Materials Gr a p h i c L o g Mo d e l L a y e r 14.4 19.1 22.9 31.6 0.3 10.0 2-3-2 N=5 1-2-3 N=5 3-3-3 N=6 0-2-2 N=4 Abandonment Method Boring backfilled with auger cuttings upon completion. Advancement Method Hollow Stem Augers Hammer Type Automatic Driller R. Foster Logged by A. Simpson Boring Started 01-11-2024 Boring Completed 01-11-2024 Drill Rig GP890 Proposed Dollar General - Warne, NC - GEO 5050 Old Hwy 64 West | Warne, NC Terracon Project No. E2235144 See Exploration and Testing Procedures for a description of field and laboratory procedures used and additional data (If any). See Supporting Information for explanation of symbols and abbreviations. Water Level Observations No groundwater was encountered while drilling Chattanooga, TN 51 Lost Mound Dr, Ste 135 Notes Sa m p l e T y p e Wa t e r Co n t e n t ( % ) Dr y U n i t We i g h t ( p c f ) St r a i n ( % ) Co m p r e s s i v e St r e n g t h (t s f ) Te s t T y p e Elevation: 1711 (Ft.) +/- Atterberg Limits Latitude: 34.9960° Longitude: -83.8987° Depth (Ft.) Strength Test Fi e l d T e s t Re s u l t s LL-PL-PI See Exploration PlanLocation: 1 2 1732.67 1727.5 1725 1723 TOPSOIL, approximately 4 inches SILTY CLAYEY SAND (SC-SM), very loose to loose SILTY CLAYEY SAND (SC-SM), medium dense SILTY CLAYEY SAND (SC-SM), loose Boring Terminated at 10 Feet Boring Log No. P-3 Wa t e r L e v e l Ob s e r v a t i o n s De p t h ( F t . ) 5 10 Facilities | Environmental | Geotechnical | Materials Gr a p h i c L o g Mo d e l L a y e r 31.6 35.5 12.4 42.7 0.3 5.5 8.0 10.0 2-1-1 N=2 0-0-9 N=9 8-4-10 N=14 1-2-2 N=4 Abandonment Method Boring backfilled with auger cuttings upon completion. Advancement Method Hollow Stem Augers Hammer Type Automatic Driller R. Foster Logged by A. Simpson Boring Started 01-11-2024 Boring Completed 01-11-2024 Drill Rig GP890 Proposed Dollar General - Warne, NC - GEO 5050 Old Hwy 64 West | Warne, NC Terracon Project No. E2235144 See Exploration and Testing Procedures for a description of field and laboratory procedures used and additional data (If any). See Supporting Information for explanation of symbols and abbreviations. Water Level Observations No groundwater was encountered while drilling Chattanooga, TN 51 Lost Mound Dr, Ste 135 Notes Sa m p l e T y p e Wa t e r Co n t e n t ( % ) Dr y U n i t We i g h t ( p c f ) St r a i n ( % ) Co m p r e s s i v e St r e n g t h (t s f ) Te s t T y p e Elevation: 1733 (Ft.) +/- Atterberg Limits LL-PL-PI See Exploration PlanLocation: Latitude: 34.9965° Longitude: -83.8989° Depth (Ft.) Strength Test Fi e l d T e s t Re s u l t s 1 2 3 2 1732.67 1723 TOPSOIL, approximately 4 inches SILTY CLAYEY SAND (SC-SM), very loose to loose Boring Terminated at 10 Feet Boring Log No. P-4 Wa t e r L e v e l Ob s e r v a t i o n s De p t h ( F t . ) 5 10 Facilities | Environmental | Geotechnical | Materials Gr a p h i c L o g Mo d e l L a y e r 17.0 27.4 29.4 0.3 10.0 0-0-1 N=1 4-5-3 N=8 5-3-3 N=6 1-1-1 N=2 Abandonment Method Boring backfilled with auger cuttings upon completion. Advancement Method Hollow Stem Augers Hammer Type Automatic Driller R. Foster Logged by A. Simpson Boring Started 01-11-2024 Boring Completed 01-11-2024 Drill Rig GP890 Proposed Dollar General - Warne, NC - GEO 5050 Old Hwy 64 West | Warne, NC Terracon Project No. E2235144 See Exploration and Testing Procedures for a description of field and laboratory procedures used and additional data (If any). See Supporting Information for explanation of symbols and abbreviations. Water Level Observations No groundwater was encountered while drilling Chattanooga, TN 51 Lost Mound Dr, Ste 135 Notes Sa m p l e T y p e Wa t e r Co n t e n t ( % ) Dr y U n i t We i g h t ( p c f ) St r a i n ( % ) Co m p r e s s i v e St r e n g t h (t s f ) Te s t T y p e Elevation: 1733 (Ft.) +/- Atterberg Limits LL-PL-PI See Exploration PlanLocation: Latitude: 34.9964° Longitude: -83.8985° Depth (Ft.) Strength Test Fi e l d T e s t Re s u l t s 1 2 0 10 20 30 40 50 60 0 10 20 30 40 50 60 70 80 90 100 110 "A" L i n e ASTM D4318 CH o r O H CL o r O L ML or OL MH or OH 6 5 4 12 41.3 33.5 28.1 36.7 SC-SM SC-SM SM SC 21 18 25 18 6 5 4 12 41.3 33.5 28.1 36.7 SC-SM SC-SM SM SC 21 18 25 18 27 23 29 30 SILTY, CLAYEY SAND SILTY, CLAYEY SAND SILTY SAND CLAYEY SAND Atterberg Limit Results "U" L i n e Liquid Limit LL PL PI Fines USCS DescriptionFines Pl a s t i c i t y I n d e x CL - ML 16 4 7 Facilities | Environmental | Geotechnical | Materials 1 - 2.5 6 - 7.5 3.5 - 5 3.5 - 5 B-1 B-2 B-3 B-5 Boring ID Depth (Ft) 51 Lost Mound Dr, Ste 135 Chattanooga, TNTerracon Project No. E2235144 5050 Old Hwy 64 West | Warne, NC Proposed Dollar General - Warne, NC - GEO 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 0.0010.010.1110100 16 2044 100 U.S. Sieve Numbers 632 10 14 506 2001.5 83/4 1/23/8 30 403 601 140 HydrometerU.S. Sieve Opening in Inches Grain Size Distribution ASTM D422 / ASTM C136 SandGravel Grain Size (mm) coarse fine coarse finemedium Silt or ClayCobbles Pe r c e n t C o a r s e r b y W e i g h t Pe r c e n t F i n e r b y W e i g h t 100 90 80 70 60 50 40 30 20 10 0 Facilities | Environmental | Geotechnical | Materials LL PL PI Cc CuDescription SILTY, CLAYEY SAND SILTY, CLAYEY SAND SILTY SAND CLAYEY SAND 41.3 33.5 28.1 36.7 27 23 29 30 6 5 4 12 21 18 25 18 %CobblesD60 0.165 0.206 0.399 0.239 D100 %Clay%Sand%Gravel 0.0 4.7 15.0 10.6 58.7 61.8 56.9 52.6 0.0 0.0 0.0 0.0 D10D30 0.091 9.5 12.5 37.5 19 %Fines %Silt Boring ID 1 - 2.5 6 - 7.5 3.5 - 5 3.5 - 5 B-1 B-2 B-3 B-5 1 - 2.5 6 - 7.5 3.5 - 5 3.5 - 5 Depth (Ft)Boring ID B-1 B-2 B-3 B-5 Depth (Ft) 51 Lost Mound Dr, Ste 135 Chattanooga, TNTerracon Project No. E2235144 5050 Old Hwy 64 West | Warne, NC Proposed Dollar General - Warne, NC - GEO USCS SC-SM SC-SM SM SC Geotechnical Engineering Report Proposed Dollar General Warne, NC | Warne, NC 28909 February 5, 2024 | Terracon Project No. E2235144 Facilities | Environmental | Geotechnical | Materials Supporting Information Contents: General Notes Unified Soil Classification System Note: All attachments are one page unless noted above. Standard Penetration Test Facilities | Environmental | Geotechnical | Materials > 4.00 2.00 to 4.00 1.00 to 2.00 0.50 to 1.00 0.25 to 0.50 less than 0.25 Unconfined Compressive Strength Qu (tsf) Proposed Dollar General - Warne, NC - GEO 5050 Old Hwy 64 West | Warne, NC Terracon Project No. E2235144 51 Lost Mound Dr, Ste 135 Chattanooga, TN N (HP) (T) (DCP) UC (PID) (OVA) Standard Penetration Test Resistance (Blows/Ft.) Hand Penetrometer Torvane Dynamic Cone Penetrometer Unconfined Compressive Strength Photo-Ionization Detector Organic Vapor Analyzer Water Level After a Specified Period of Time Water Level After a Specified Period of Time Cave In Encountered Water Level Field Tests Water Initially Encountered Sampling Water levels indicated on the soil boring logs are the levels measured in the borehole at the times indicated. Groundwater level variations will occur over time. In low permeability soils, accurate determination of groundwater levels is not possible with short term water level observations. General Notes Location And Elevation Notes Exploration point locations as shown on the Exploration Plan and as noted on the soil boring logs in the form of Latitude and Longitude are approximate. See Exploration and Testing Procedures in the report for the methods used to locate the exploration points for this project. Surface elevation data annotated with +/- indicates that no actual topographical survey was conducted to confirm the surface elevation. Instead, the surface elevation was approximately determined from topographic maps of the area. Soil classification as noted on the soil boring logs is based Unified Soil Classification System. Where sufficient laboratory data exist to classify the soils consistent with ASTM D2487 "Classification of Soils for Engineering Purposes" this procedure is used. ASTM D2488 "Description and Identification of Soils (Visual-Manual Procedure)" is also used to classify the soils, particularly where insufficient laboratory data exist to classify the soils in accordance with ASTM D2487. In addition to USCS classification, coarse grained soils are classified on the basis of their in-place relative density, and fine-grained soils are classified on the basis of their consistency. See "Strength Terms" table below for details. The ASTM standards noted above are for reference to methodology in general. In some cases, variations to methods are applied as a result of local practice or professional judgment. Exploration/field results and/or laboratory test data contained within this document are intended for application to the project as described in this document. Use of such exploration/field results and/or laboratory test data should not be used independently of this document. Relevance of Exploration and Laboratory Test Results Descriptive Soil Classification > 30 15 - 30 8 - 15 4 - 8 2 - 4 Hard > 50 Very Stiff Stiff Medium Stiff Soft Very Soft 30 - 50 10 - 29 4 - 9 0 - 3Very Loose Loose Medium Dense Dense Very Dense Relative Density of Coarse-Grained Soils (More than 50% retained on No. 200 sieve.) Density determined by Standard Penetration Resistance Consistency of Fine-Grained Soils (50% or more passing the No. 200 sieve.) Consistency determined by laboratory shear strength testing, field visual-manual procedures or standard penetration resistance 0 - 1 Relative Density ConsistencyStandard Penetration or N-Value (Blows/Ft.) Standard Penetration or N-Value (Blows/Ft.) Strength Terms Geotechnical Engineering Report Proposed Dollar General Warne, NC | Warne, NC 28909 February 5, 2024 | Terracon Project No. E2235144 Facilities | Environmental | Geotechnical | Materials Unified Soil Classification System Criteria for Assigning Group Symbols and Group Names Using Laboratory Tests A Soil Classification Group Symbol Group Name B Coarse-Grained Soils: More than 50% retained on No. 200 sieve Gravels: More than 50% of coarse fraction retained on No. 4 sieve Clean Gravels: Less than 5% fines C Cu≥4 and 1≤Cc≤3 E GW Well-graded gravel F Cu<4 and/or [Cc<1 or Cc>3.0] E GP Poorly graded gravel F Gravels with Fines: More than 12% fines C Fines classify as ML or MH GM Silty gravel F, G, H Fines classify as CL or CH GC Clayey gravel F, G, H Sands: 50% or more of coarse fraction passes No. 4 sieve Clean Sands: Less than 5% fines D Cu≥6 and 1≤Cc≤3 E SW Well-graded sand I Cu<6 and/or [Cc<1 or Cc>3.0] E SP Poorly graded sand I Sands with Fines: More than 12% fines D Fines classify as ML or MH SM Silty sand G, H, I Fines classify as CL or CH SC Clayey sand G, H, I Fine-Grained Soils: 50% or more passes the No. 200 sieve Silts and Clays: Liquid limit less than 50 Inorganic: PI > 7 and plots above “A” line J CL Lean clay K, L, M PI < 4 or plots below “A” line J ML Silt K, L, M Organic: 𝐿𝐿 𝑜𝑣𝑒𝑛 𝑑𝑟𝑖𝑒𝑑 𝐿𝐿 𝑛𝑜𝑡 𝑑𝑟𝑖𝑒𝑑<0.75 OL Organic clay K, L, M, N Organic silt K, L, M, O Silts and Clays: Liquid limit 50 or more Inorganic: PI plots on or above “A” line CH Fat clay K, L, M PI plots below “A” line MH Elastic silt K, L, M Organic: 𝐿𝐿 𝑜𝑣𝑒𝑛 𝑑𝑟𝑖𝑒𝑑 𝐿𝐿 𝑛𝑜𝑡 𝑑𝑟𝑖𝑒𝑑<0.75 OH Organic clay K, L, M, P Organic silt K, L, M, Q Highly organic soils: Primarily organic matter, dark in color, and organic odor PT Peat A Based on the material passing the 3-inch (75-mm) sieve. B If field sample contained cobbles or boulders, or both, add “with cobbles or boulders, or both” to group name. C Gravels with 5 to 12% fines require dual symbols: GW-GM well- graded gravel with silt, GW-GC well-graded gravel with clay, GP-GM poorly graded gravel with silt, GP-GC poorly graded gravel with clay. D Sands with 5 to 12% fines require dual symbols: SW-SM well- graded sand with silt, SW-SC well-graded sand with clay, SP-SM poorly graded sand with silt, SP-SC poorly graded sand with clay. E Cu = D60/D10 Cc = F If soil contains ≥ 15% sand, add “with sand” to group name. G If fines classify as CL-ML, use dual symbol GC-GM, or SC-SM. H If fines are organic, add “with organic fines” to group name. I If soil contains ≥ 15% gravel, add “with gravel” to group name. J If Atterberg limits plot in shaded area, soil is a CL-ML, silty clay. K If soil contains 15 to 29% plus No. 200, add “with sand” or “with gravel,” whichever is predominant. L If soil contains ≥ 30% plus No. 200 predominantly sand, add “sandy” to group name. M If soil contains ≥ 30% plus No. 200, predominantly gravel, add “gravelly” to group name. N PI ≥ 4 and plots on or above “A” line. O PI < 4 or plots below “A” line. P PI plots on or above “A” line. Q PI plots below “A” line. 6010 2 30 DxD )(D