HomeMy WebLinkAboutSW7980429_HISTORICAL FILE_20140904 Quible Quible &Associates, P.C. ENGINEERING.ENVIRONMENTAL SCIENCES•PLANNING.SURVEYING SINCE 1959 P O.Drawer 870 Kitty Hawk NC 27949 Phone:252-261-3300 August 29, 2014 RECEIVED Eweb?qublecom0 Samir Dumpor, P,E. NCDENR, DEMLR SEP - 4 2014 943 Washington Square Mall Washington, NC 27889 DWQ-�J V' /�/�1R /q, O Re: Stormwater Management Certification Ocean Commerce Park Center- Permit No. SW7980429 Kill Devil Hills, Dare County, NC Mr. Dumpor, On behalf of Wigwam Caravan, LLC, Associate Change Form package for the above referenced project. sDunng Submitted bmi t ew n the Ownership wnowne ship change, it was discovered that the existing Permitted stormwater been certified. Therefore, the current owner initiated maintenance procedures that included clearing the previously constructed infiltration basins by cutting vegetoceduremanagement system had not grade, clearing the existing curb and gutter, and cleaning out the existing storm pipes, curb inlets, and outfalls. As we discussed, it is important to note that the existing infiation to ltration basins had accumulated bushes that included multiple woody stems and they were cut down near grade during the maintenance procedures at your direction as opposed to uprooting large root balls which would have resulted in unnecessary land disturbance and creation of soil voids. It is important to further acknowledge that the existing site has not been surveyed to verify lot coverage nor have the existing infiltration basins been surveyed to verify storage capacity. I, Michael W. Strader, Jr., P.E., as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe the above referenced stormwater management system, hereby state that the existing Ocean Commerce Park Center stormwater management, collection and conveyance has been completed in general conformance of the approved design Plans prepared by C.P. Lewis - Surveyor, P.C., dated March 9, 1989. Please do not hesitate to contact me at (252) 261-3300, or mstraderC�3 have any questions or concerns. qx Sincerely, a\\�� * "0 Id you Quible & Assoc'a s ?Q`oF�•5S�0 -.A � P.C. _ SEAL 037813 ichael . Strad C+ R Q w Jr., P.E. iy9 NQItdE • 'Q�'o" %iF< •.. .. �0� ti Encl: Design plan prepared by Cc: Thomas G. Haddon, IV Wig Lewis - Surveyor, P.C. J 2`1 20tY wam Caravan, LLC ertific ion North Carolina DepartmenNC®ENR Environment and Natural Pat McCrory Resources Governor John E. Skvarla, In Wigwam Caravan, LLC September 2, 2014 Secretary Mr. Thomas G. Haddon, IV, Member/manager PO Box 1868 Nags Head, NC 27959 Subject: Stormwater Permit No. SW7980429 — Ocean Commerce Park Ownership Change High Density Project Dare County Dear Mr. Haddon: The Washington Regional Office received a complete Stormwater Management Permit Ownership Change Application information on Augus , 14 foStaff r Ocean Commerce Park on July 16, 2014 and additional determined that the project, as Proposed Will Compw of ly plans and specifications has forth in Title 15A NCAC e " as 0. p y with the Stormwater Regulations set September 2, 2014, for the construction of the subject project. We are forwarding Permit No. SW7980429 dated This permit shall be effective from the date of issuance until April 16, 2022, shall void Permit number SW7980429 dated April 16, 2008 and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this proposed addition, now revised and covered under Srmit. This W P 30802e removes the originally Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. The original) a plans (approved on July 8, 1998) are still in effect and shall be transferred from Ocean Commerce Park, LLC to Wigwam Caravan, LLC. y approved If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicato days following receipt of this rY hearing upon written request within thirty ab) conforming to Chapter 150E of the North Carolina General Statutes, and filed with the Office of Administrative Heanpngs, 6714 hMa I Service Cen request must ter ernRal the form of a written Unless such demands are petition, made this permit shall be final and binding'. NC 27699-6714. If you have any questions, or need additional information concerning this matter, please contact me at (252) bons, 81. or Sincerely, Samir Dumpor, PE Environmental Engineer Division of Energy,Mineral,and Land Resources.Land Quality Section 943 Washington Square Mallonal office ,Washington,NorthCarolina ashington '278 9-Phone:252-946-6481/FAX:252-975 An Equal Opportunity I AffintumativetAcf on Employer-50%Reclycled 1 10t 3716 %Post Consumer Paper PHM/sd: G:\LR\SWP\SD\Permits — Infiltration\SW7980429 Michael Strader, PE, Quible & Associates cc: gill Higham, Ocean Commerce Park, LLC (6214 Higham Drive, Alexandria, VA 22310)Dare County Building Inspections Washington Regional Office I k STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Wigwam Caravan, LLC for the Ocean Commerce Park Dare County FOR THE construction, operation and maintenance of an infiltration basin in compliance with the Provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Energy, Mineral, and Land Resources (Division) and considered a part of this permit. This permit shall be effective from the date of issuance until April 16, 2022, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.6 on page 3 of this permit. The stormwater control has been designed to handle the runoff fr impervious area. om 85,515 square feet of i 3. The tract will be limited to the amount of built-upon area indicated on page 3 of this permit, and per approved plans. 4• All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 5. The runoff from all built-upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. 6. The following design criteria have been provided in the infiltration basin and must be maintained at design condition: Page 2 of 5 i a. Drainage Area, ftz: 85,608 b. Total Impervious Surfaces, ft2: 1.0 5, c. Design Storm, inches: 1.0 d. Basin Depth, feet: 11.00 e. Bypass Weir Elevation, FMS1�: 7,098 f. Required Storage Volume, ft a 7,098 g. Permitted Storage Volume, ft h. Receiving Stream/River Basin: UT to Bu0z21rd Bay/Pasquotank i. Stream Index Number: "Sc., j. Classification of Water Body: II. SCHEDULE OF COMPLIANCE 1 vegetatedThe stormwater and operat onal for is intended use pr orrtern shall betructed to the const uctionin itsyof any built-upon surface. eroded areas of l be 2. t system During swi I be repaired immeld atelypt to a minimum and any ntenance 3. The permitteenecessary to assulreathelpermit times provide s orrmwater system f nctio�ns at optimum approved Operation and Maintenance Plan must be followed in efficiency. The its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. c. Mowing and revegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. tans and e. Maintenance of all slopes in accordance with approvedP specifications. ass structure, infiltration media, flow f. Debs removal and ssp ea der catch basins, lpip ogging of bypass and vegetated filter. g. A clear access path to the bypass structure must be available at all times. t and available on 4. Records of rnrequest to autaintenance horized personnel of DENR. Tes must be he records well indicate the date, activity, name of person performing the work and what actions were taken. 5. The facilities shall be constructed as shown on the approved plans. This permit in accordance with the pobecome nd conditions ofth slpemit, the approved plans and spee unless the facilities are constructecificat ons, and other supporting data. ance of a Certificate of Occupancy, 6. Upon completion of construction, prior to issunust be cation n and prior to operationiate designer or the system ieritted nstalledficertifying that the permittedo from an appropriate facility has been installed in accordance ocumtent ti permit,Any deviationsions romans thean specifications, and other supporting approved plans and specifications must be noted on the Certification. modification may be required for those deviations. d as an rosion Control device it must be 7 If stored to design condition prior e toopera ti r on as a stormwater treatment device, and prior to occupancy of the facility. Page 3 of 5 8. Access to the stormwater facilities shall be maintained via appropriate easements at all times. 9. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built-upon area, details, etc. b. Project name change. C. Transfer of ownership. d• Redesign or addition to the approved amount of built-upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 10. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. 11. A copy of the approved plans and specifications shall be maintained on file by the Permittee at all times. 12. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. III. GENERAL CONDITIONS 1. This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a formal permit transfer request to the Division of Energy, Mineral, and Land Resources, accompanied by a completed name/ownership change form, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. 2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 3. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. Page 4 of 5 ENR ff permission to enter the 5. The business hour grants the purpose of inspecting all components of the permitted stormwater management facility. or terminated for 6. filingThe rmit ma be of a request for a peg mitrmodificd t on and reissued and reissuance orse. The termination does not stay any permit condition. 7. Unless specifed elsewhereermanent seeding requirements forcontrol must fool ow the guid'eli es established in the North Carolina r Erosion and Sediment Control Planning and Design Manual. 8. and are d plansa and partsfic the specificationst his project are incorporated by reference 9. The permittee shall notify the Division any name, ownership or mailing address I changes within 30 days. 10. 022. Application fora)erm tfrentive ewalrom shallhbed ute of bmitteduance 180 daysilprioorito th 16,e expiration App date of this permit and must be accompanied by the processing fee. Permit issued this the 2nd day of September, 2014. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION A for Tracy avis, PE, CPM, Director Division of Energy, Mineral, and Land Resources By Authority of the Environmental Management Commission Permit No. SW7980429 — Ownership Change Page 5 of 5 QUIble7��42� Quible &Associates, P. ENGINEERING•ENVIRONMENTAL SCIENCES•PLANNING•SURVEYING SINCE 1959 P.O.Drower 870 Kitty Hawk NC 27949 Phone:252-261-3300 Fox:252-261-1260 web:quible.com July 15, 2014 Samir Dumper P.E, \L..C L.I V ED , NCDENR, DEMLR 943 Washington Square Mall JUL 16 2014 Washington, NC 27889 Re: Ownership Change Request Package �IN ,AWARZ Ocean Commerce Park Center Kill Devil Hills, Dare County, NC Mr. Dumpor, On behalf of Wigwam Caravan, LLC, Quible & Associates, P.C. and approval an Ownership Change Form hereby previous permit holder, Ocean Commerce Park Center, is transferring full responsibility Is for rtuan view ownership of the existing Stormwater Management Permit Number gW79e for the above ced project. The Caravan, LLC. Y d 80429 to Wigwam The following is enclosed and shall be considered part of the Ownership Change Request Package: I. One (1) copy of the State Stormwater Permit Name/Ownership Change 2• One (1) copy of the current property deed; 3. One (1) copy of the Secretary of State data for Wigwam Caravan, LLC Please don't hesitate to contact myself or Michael W. Strader, Jr., P.E. at (252) 261-3300 should you have any questions or require additional information. Thank you for your attention to this project. Sincerely, Quible & Associates, P.C. Dylan L. Tillett, El Encl: as stated Cc: Thomas G. Haddon, IV, Wigwam Caravan, LLC State f Caro rth Department of Enviro moent and Tina {� � ,r Natural Resources ' `ECEI V ED Division of Water Quality IIII STATE STORMWATER PERMIT NAME/OWNERSHIP CHANGE FAA 16 2014 I. CURRENT PERMIT INFORMATION /A� 1. Stormwater Management Permit Number: SW7980429 ,A® —W" "° O 2. Project Name: Ocean Commerce Park Center 3. Current Permit Holder's Company Name/Organization: Ocean Commerce Park Center 4. Signing Official's Name: Bill Hi ham 5. Mailing Address: 6214 Hi ham Drive Title: Previous Owner City: Alexandria 6. Phone: ( 04 ) 971-2900 State: VA Zip: 22310 Fax: 04 ) 971.2909 11. PROPOSED PERMITTEE/ OWNER / PROJECT/ ADDRESS INFORMATION This request is for: (please check all that apply) ❑ Name change of the owner (Please complete Items 1, 2 and 3 below) ❑ Name change of project (Please complete item 5 below) Change in ownership of the property/company (Please complete Items 1 2 ❑ Mailing address/phone number change. (Please complete Item 4 below) ❑ Other (please explain): 3, and 4 below) 1. Proposed permittee's company name/organization:_Wigwam Caravan LLC 2. Proposed permittee's signing official's name: Thomas G. Haddon, IV 3. Proposed permittee's title: Member/Manager 4. Mailing Address: PO Box 1868 City: Nags Head Phone: ( 252 ) 267-2287 State: N_�Zip: 27959 5. New Project Name to be placed on permit: Fax: ( 252) 715-0152 Please check the appropriate box. The proposed permittee listed ElHOA or POA (Attach documentation showing that the HOAe is: above a bov owns, controls, or has recorded easement for all areas that contain stormwater sys or POAtem features. Print name a or POA in#f above and provide name of HOA/POA's authorized representative in#2 above) Q The property owner ❑ Lessee (Attach a copy of the lease agreement and complete Property Owner Information on page 4) ❑ Purchaser (Attach a copy of the pending sales agreement. Final a granted upon receipt of a copy of the recorded deed) ❑ Developer (Complete Property Owner Information on page 4) approval of this transfer will be SSW N/O Change Rev24Sept2012 Page 1 of 4 _,: t ' III• REQUIRED ITEMS A request to transfer a permit will not be approved by the Division of Water Quality (DWQ) unless all of the applicable required items listed below are included with the submittal. Failure to provide the listed items may result in processing delays or denial of the transfer . 1. This completed and signed form. This certification current permit holder and the new i must be completed and signed by both the applicant if this is a change of ownership. 2. Legal documentation of the property transfer new 3. A copy of any recorded deed restrictio owner. ns, covenants, or easements, if required by the permit. 4. The designer's certification DW each DWQ Regional office), if required by the permit and if not already submitted to DWQ. Q Engineer and Designer Certification Forms are available from 5. If the proposed permittee is a firm,company, or other corporate entity,partnership,documentation showing representative to act on behalf of the proposed pe m documentation on, institution, corporation, limited liability 6. The $40.00 processing fee. If this is an initial transfer from the original permittee the processing g the authority of the named fee is not required. Subsequent ownership transfers will require the $40.00 processing fee. IV- CURRENT PERMITTEE'S CERTIFICATION Please check one of the following statements and fill out the certification below that statement: ❑ Check here if the current permittee is only changing his/her/its name, the project name, or mailing address, but will retain the permit. I,permittee, hereby notify the DWQ address and/or I am changing the name orf the permitted project. I further attest that this application for if name/ownership change is accurate and compete to the besC in Y name t Of my changingthe current that if all required parts of this application are not completed or if all required w my mailing and attachments listed above are not included, this application package will be returned as y knowledge. I understand incomplete. pporting information o Check here e current permittee is transferring the property to a new owner and will not retain ownership of the permit. 1, Bill Hi ham Ocean Co formmerce Park Center , the current permittee, am submitting this application for a transfer of oft elpstormwater sysem asermit soc aged with this permit.the most recent permit, the designer's certification for each h this e r notify DWQ of the sale or covenants, or easements, the DWQ a p mit. I have provided a copy of operation and maintenance agreeme pproved plans and/or approved as-built Plans,ed dthesapp one,stormwater inspection report to the proposed permittee named in Sections II and V of this form. 1 further attest that this application for a name/own, past iersh p change is accuntenance records, rate nd the scomplete to t DWQ ved Of my knowledge. I understand that if all required required supposing information and attachments listed above are not included, this applicationl e best Package will be returned as incomplete. 1 assign ally rights anrts of id oblliigatio s as permittee to thelication are not completed if all proposed permittee named in Sections II and V of this form. I understand that this transfer of ownership can t be approved b the DWQ permit. ���j y Q unless and until the facility is in compliance with the Signature: Date: 4' 2cs %w,`,q a Notary Public for the State of County of —� -/2 �9X do hereby certify that day of personally appeared before me this the -� /J�,¢ for instrument. Wit 20 and acknowledge the due execution of the s my hand and official seal, ""61e1eejeeee �l r c eal) Y re PUBLIC 1 REG#332744 •• o MY COMMISSION SSW N/O Change Rev24Sept2012 ; EXPIRES Q: Page 2 of 4 V. PROPOSED PERMITTEE CERTIFICATION: (This section must be completed by the Proposed Permittee for all transfers of ownership) I, Thomas G. Haddon, IV, Wigwam Caravan, LLC through sale, lease or legal transfer, the responsibilit hereby notify the DWy for operating and maintthat I aining the permitted stormwater management system, and, if applicable, constructing the permitted system e I acquired acknowledge and attest that I have received a copy of: (check all that apply to this permit) N/A� the most recent permit the designer's certification for each BMP WAD any recorded deed restrictions, covenants, or easements 9 the DWQ approved plans and/or approved as-built plans N/A[] the approved operation and maintenance agreement N/A past maintenance records from the previous permittee (where required) N/A e DWQ stormwater inspection report showing compliance within 90 days prior to this I have reviewed the permit, approved plans and other documents listed above, and I will comply with the terms and conditions of the permit and approved plans. I acknowledge and agree that I will operate and maintain the system pursuant to the requirements listed in the permit and in the operation and maintenance agreement. I further attest that this application for a name/ownership change is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed or if all required supporting information and attachments listed above are not inc uded, this application package a returned as incomplete. Signature: �� J/ Date:� &l O vp County of C� r I a Notary Public for the State of (�' d� �/ � , �( 42 a � ���CId C)n do hereby certify that �/ pers �onally appeared before me this the day of 20P forgoing instrument. Witness my hand and official seal ' and acknowledge the due execution of the 4Not n! � aleiK USi�`TO���U4Si atiire 2 (Nt�Qa���sal) s PUBUG �yO,99 p`�a Additional copies of the original permit and the approved Operation an be obtained from the a ppropriate Regional Office of the Division of WaterQuality. .nce agreement can This completed form, including all supporting documents and processing fee (if required), should be sent to the appropriate Regional Office of the North Carolina Department of Environment and Natural Resources, Division of Water Quality, as shown on the attached map. Please note that if the Proposed Permittee listed above is not the property owner, the property owner must complete and sign page 4 of this document. Both the lessee/developer and the property owner will appear on the permit as permittees. SSW N/O Change Rev24Sept2012 Page 3 of 4 VI. PROPERTY OWNER CONTACT INFORMATION AND CERTIFICATION If the Proposed Permittee listed in Sections 11 and V of this form is not the Property Owner, the Property Owner must provide his/her Contact Information Below and sign this form: Printed Name: Organization: Title within the Organization: Street Address: City: State: Mailing Address: Zip' (if different from street address) City: State: Phone: Zip. Fax: Email: I certify that I own the property idened in this permit transfer document and have given permission to the Proposed Permittee listed in Sections II and V to develop and/or, lease the property. A copy of the lease agreement or other contract, which indicates the party responsible for the construction and/or operation and maintenance of the stormwater system, has been provided with the submittal. As the legal property owner I acknowledge, understand, and agree by my signature below, that I will appear as a with the D along with the lessee/developer and I will therefore share responsibility for compliance with the DWQ tor water permit. As the property owner, it is my responsibility to notify DWQ by submitting a completed Name/Ownership Change Form within 30 days of procuring a developer, lessee or purchaser for the property. I understand that failure to operate and maintain the stormwater treatment facility in accordance with the permit is a violation of NC General Statute (NCGS) 143-215.1, and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. Signature of the property owner Date:_ I, a Notary Public for the State of County of , do hereby certify that personally appeared before me this the day of 20_, and acknowledge the due execution of the forgoing instrument. Witness my hand and official seal, Notary Signature (Notary Seal) SSW N/O Change Rev24Sept2012 Page 4 of 4 6Zuible Quible &Associates, P.C. En GINEERING.FNAC CNWNIAE SCENCES•PLANNING•SUNERNG SINCE 1959 Pp prow..820 Wy Hawk NC 27949 Phone 252.261 33W August 29, 2014 wex 2s2z69 6 web: 2261.com Samir Dumpor, P.E. NCDENR, DEMLR 943 Washington Square Mall Washington, NC 27889 Re: Stormwater Management Certification Ocean Commerce Park Center—Permit No. SW7980429 Kill Devil Hills, Dare County, NC Mr. Dumpor, On behalf of Wigwam Caravan, LLC, Quible & Associates, P.C. submitted an Ownership Change Form package for the above referenced project. During the review of the ownership change, it was discovered that the existing permitted stormwater management system had not been certified. Therefore, the current owner initiated maintenance Procedures that included clearing the previously constructed infiltration basins by cutting vegetation to near existing grade, Clearing the existing curb and gutter, and cleaning out the existing storm pipes, curb inlets, and accumulated ls. As we discussed, it is important to note that the existing infiltration basins had accumulated bushes that included multiple wood y stems grade during the maintenance procedures at your direction wepposed nd they were cut down near balls which would have resulted in unnecessary land disturbance and creation of soil voids. It is important to further acknowledge that the existing site has not been survey uprooting large root coverage nor have the existing infiltration basins been surveyed to verify storage capacity. surveyed to verify lot I, Michael W. Strader, Jr., P.E., as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe the above referenced stormwater management system, hereby state that the existing Ocean Commerce Park Center stormwater management, collection and conveyance has been completed in general conformance of the approved design Plans prepared by C.P. Lewis—Surveyor, P.C., dated March 9, 1989. Please do not hesitate to contact me at (252) 261-3300, or mstrader@ have any questions or concerns. p Ild you O Sincerely. �.��Q•F�.8Sjp•�iy��� Quible & Asso a s, P.C. `? SEAL 9;9 " 037813 r ichael . Stradet J" r., p•E. NEQ�Q����1 Encl: Design plan p re Cc: Thomas G. pared by C.P. Lewis—Surveyor, P.C.. 29 Zdiy Haddon, IV, Wigwam Caravan, LLC ertific ion ` � y al �� 71 •1, $ t s� I. Je z 9 211 NO tl It lic j IIII+ I I) rl l III ; �' I i• loll � Y a !�j f7 i j di .i ilia.°� € $�of, ° ,i Al!t,— sjpo 'l l llll_th,, l _y�•Ff 'II! '1 j I li'.. -14 i 1" 'I t a 1by yip: �; � �•� t � f'1`.li•'.11h't, � j I tall tta ,l 1 t _ - 4 d gE t 'q Ill 1,, f I .qIti 4dd b 'j t it n I -.e ji' et Il E 1 1'�, j a i Y �1'._' I !t i ��ePj �F� 1�� tjt 1i1=C ��•j ° 9 ! � - Yi,j jj ftl {1 ilia. �3 .1 1•F €t : bfz- sS-" 1 j Ily3a I If 11� 3't t � i x el r lit �ja � e P t { t3 . i ( z zt ' 1. ftjl • + lb I i t J 1 •t°I t�� I ' I 1 M1 l 1 I 1 Dumpor, Samir From: Michael Strader <MStrader@quible.com> Sent: Friday, August 29, 2014 2:26 PM To: Dumpor, Samir Cc: Tom Haddon (tom@haddon-homes.com) Subject: Ocean Commerce Park - SW Permit No. SW7980429 Attachments: P13060-ExSWMCertification.pdf, Old SW Permit SW7980429.pdf Samir, Good afternoon. Please find the attached pdf containing an electronic copy of the Stormwater Management Certification for the Ocean Commerce Park Center— Permit No. SW7980429 per your request. A hard copy of the attached documentation is being mailed to your attention. Please acknowledge that we have performed a site inspection to obtain photo documentation of the current condition of the stormwater management system after the recent maintenance operation. I also had visited the site just after they began the maintenance operation to obtain photo documentation of the status prior to the maintenance. Please do not hesitate to contact me should you have any questions or require additional information in order to issue the change of ownership. Thank you, Michael W. Strader, Jr., P.E. Director of Engineering Quible & Associates, P.C. 8 Juniper Trail P.O. Drawer 870 Kitty Hawk, NC 27949 t 252.261.3300 f 252.261.1260 m 252.207.6751 www.guible.com i LEGAL DISCLAIMER The information transmitted is intended solely for the individual or entity to which it is addressed and may contain confidential and/or privileged material. Any review, retransmission, dissemination or other use of or taking action in reliance upon this information by persons or entities other than the intended recipient is prohibited. If you have received this email in error please contact the sender and delete the material from any computer. t 01 I951 P: 481 �S ^ DLler2at4 12 3e pn Doc Id: 6O365 ��y - WED �f'�Doc Code DEED Receipt p 1q,p,65 ate. ,,,,f �V�nxpi la rycMur en-Smith Reg,star DpT xDlotl%TeDa" r$2700 DO q:. -. JUL 10 2014 DARE APPROVED COUNTYe' ` TRANSFER TAXa 5fi m*e DARE COUNTY TAX ' C LLECT R { ITal4 ly $13 a NO. 3 Excise Tex: NORTH CAROLINA GENERAL WARRANTY DEED \\ Parcel Identifier No.029650000,029851000,029953000,029854000,029855000,0299560o0,029857000, 5 ,0298 Verified by 029861000,029662000,029863000,029864000,029865000,029866000,0298670DO Verified by Co]oty on the_day of ,20_ 'By: M&iVBOx to: Robert B.Hobbs,Jr.,2502 S.Croton]Hwy,Nags Head,NC 27959 This instrument was prepared by: Thomas P.Nash,IV,Trimpi a Nash,I.I.P.2 NO TITLEWORK REQUESTEDORPERFO St.Sic ' NC 27909 Brief description for the Index: Units 3,4,6,7,8,9,10,11,12,13,14,15,1 , 7,8,19�2200 E Ocean Commerce Park Condos THIS DEED made thiJ 3 day of January,2014,by and betwam GRANTOR G Ocean Commerce Park,LLC A North Carolina Ilmited liability company Wigwam Caravan,LLC A North Carolina limited liability company Alexandria, VA 22310 o Alex Drive Jtou Q Haddon,IV dA,, m? 868 'lags KC 27959 Enter In appropriate block for each Grantor 9411-rant«: cory]retim or partnership. l'at8 s,and,if appropriate,character of entity,ag. The designation Grantor and Grantee a,used herein s ' oil,singular,Plural,masculine,fe dome or oe u by 'es,their heirs,suceeswn,and assigns,and shall include � a!R WITNESSETH,that the Grantor,fora Ie consid pa The Grantee,the receipt ofwhieh is by these presents does grant, am,nil convey un pt Grantee in fee simple,all that certain lot or pence,ereby ,has and Town of Kill Devil Hills, c`/To�w\ns ' , Coun orth Carolina and more Particularly described as1 follonwsaed in din All of Unit Numben 3 4, 7 9� p,y. f 2, 3�1 15,16,17,I8,19 and 26,of the condominium(mown as Ocean Commerce Park C6hdo I ,era a rdlog to North Carolina General Smtu Chapter site Condominiums d 702,Pa which Plata and plan,recorded in VQK Ownership 7F3k Pages 303.306, site such refer t p qe and ameoltks app eo t to m a1Fty Pu c Registry,together with the undivided interest le We cemmoa propertks y Au dNtribd In the Declaration. The property heraieabov .deairibtd was acquired by Grantor by imtrumeM recorded in Book 1711,Page 283,Dare County Regis \\\/� ne.Pm inabove se 'bd was acgWmdby Gmtorby ioax mentrecorddm Book 1711,Page 282,Dare County Registry. All ar a port a pro herein conveyed includes or J,�doea trot include the- primary resides«of a grantor. m ho g "bow nec"'hd property is recorded in Map Book 3,Page 4,Dare County Registry. Thi "nstrummtp by Thomas)`,Nash,IV,a licensed North Carolina attorney. Delinquentmxm,ifany,tobepaidby theclosiog qm to the county tax w0ector upon disbursement of closing proceeds. C� 6339583 B: 1950 P: 481 Page 1 of 3 1/28/14 12:.38 PM 1111M��.rAy1Rr:lG�1tiG4r1'h +I+,1r�'t1Pf�4RY3lF�lki1IIli TO HAVE AND TO HOLD the aforesaid lot or parrot of land and all privileges end appurtenances thereto belonging to the Gramm in fcosimple. And the Grantor covenants with the Grantee,that Grantor is seized oftbe premises in fa simple,has the right to convey the same\\'' simple,that title is merketebk and free and clear of eg mcumhraoAn,and that Grantor will warrant and defend the title again lawful claims of all persons whomsoever,other than the following exceptions: \\v\ Easements,restrictions,rights of way ofrecord,public service utility easemcnt%if any and 2014 Ad VOID=Taxes. IN WITNESS WHEREOF,the Grantor has duly exewted the foregoing as of the day and year first above wri e� Ocean Commerce Park,LLC, A North Caroline limited liabili um an /] (SEAL) I iem ///I,Je,Man er Maoeg By. Q d ax L.High STATEOF ferjLnLB COLT/NTYOF r.oL— 1,�1 fi� R__DN SD(�a Notary JLhli f Co aforesaid, unify that Nancy L.HigMm and Jane L.Higham,Managers of Ocean C e LC,a orth Caroline limited liability company,personally came before me this day and aclmo a due of the foregoing instrument for the purposes therein expressed on behalf of the limited a lity comp Witness my hand ial seal, is e 2ls y of January,2014. �assssurssyr 140 �,•,G� R JOy,ar, otary c : .-"NOTARY". 0 My Comrei a E ircs: //0 ` h ' PUBLIC REG 1)7523200 c, MY COMMISSION" l EXPIRES 8131/2016 s'rrs fill sst`s I � 9 E of 3 4Y4r� �l ill� IU01TI11i1111FII M117 bii: rAlL STATE OF V I f r. COUNTY/CITY OF I, A Mk 12 0-%n a Notary Public of the County/City and State aforesai o hereby certify that Nancy L. Higham,attorney in fact for William H. Higham,Jr., ger of Ocean Commerce Park,LLC,a North Carolina limited liability company,pe appeared before me this day,and being by me duly sworn,says that she exec t the foregoing and annexed instrument for and in behalf of William H. Higham,J" anage of Ocean Commerce Park,LLC and that her authority to execute and ac ed instrument is contained in an instrument duly executed and acknowled a re 1 Book.Page_� in the Office of the Register of Deeds of D ounty, o Carolina,and that this instrument was executed under and b e o autho ' given by said instrument granting her Power of Attorney;that ancy , acknowledged the due execution of the foregoing and xed instrum t e purposes. therein expressed for and in behalf of said William H. i Jr.as ger of Ocean Commerce Park,LLC. 2 Witness my hand and notarial seal,this "day of 2014. Pu Iic My Commission Expires: °�•'p.pV R JOy�'•. j•�K";• •NOTARY PUBLIC ' y O REG/t 7523200 z :MY ECp MISSION:. O 6339583 B: 1950 P: 481 Page 3 of 3 1/28/14 12:38 Prl mill 11111 North Carolina Elaine F. Marshall D EPARTMENT OF- TILE • Secretary ECRETARYOF- STATE PO Box 29622 Raleigh, NC 27626-0622 (919ft7-2000 Account Login Register Date: 7/15/2014 Click here to: View Document Filings i File an Annual Report i IPrint a Pre-populated Annual Report Fillable PDF Form i Amend A Previous Annual Report i Corporation Names Name Name Type NC WIGWAM CARAVAN, LLC LEGAL Limited Liability Company Information SOSID: 1351040 Status: Current-Active Effective Date: 12/6/2013 Citizenship: DOMESTIC Duration: PERPETUAL Annual Report Status: CURRENT Registered Agent Agent Name: HADDON, THOMAS G., IV Office Address: 157 W WATERSIDE LANE NAGS HEAD NC 27959 Mailing Address: PO BOX 842 Principal Office NAGS HEAD NC 27959 Office Address: 157 W WATERSIDE LANE NAGS HEAD NC 27959 Mailing Address: PO BOX 842 Officers/Company Officials NAGS HEAD NC 27959 This website is provided to the public as a part of the Secretary of State Knowledge Base(SOSKB) system. Version: 3617 ! YG Michael P.Easley,Governor Y r William G.Ross Jr.,Secretary North Carolina Department of Environment and Natural Resources Y Coleen H.Sullins,Director Division of Water Quality April 16, 2008 Mr. Bill Higham, Managing Partner Ocean Commerce Park, LLC1 � � �� 6214 Higham Drive Alexandria, VA 22310T'T>�f°� (�� Subject: Permit No. SW7980429 Renewal Ocean Commerce Park High Density Stormwater Project Dear Mr. Higham: Dare County he Washinproject on February 4t Regionalon 2007, Weareforwarding rwa ding Permit No completed dated April y16, 2008 to al Applicat(Ocean Commerce Park, LLC for an infiltration basin to serve an existing Commerce Park and an expansion to the park located at 2004 South Croatan Highway in Kill Devil Hills, NC. Once the expansion of the commerce park has taken place an engineers certification will need to be submitted to this office. This permit shall be effective from the date of issuance until April 16, 2018 and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. The issuance of this permit does not resolve any Previous violations of the stormwater rules for construction without a permit. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 1508 of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Roger Thorpe or me at(252) 946-6481. t ere Al Hodge, Remto Supervisor �~ Surface Water Protection Section Washington Regional Office cc: ✓Washington Regional Office Central Files North Caroline Division of Water Quality 943 Washington Square Mall Internet -nc,ter ualin-.ors Washington,NC 27889 Phone(252)946-6481 One Fax (2521946-9215 NorthCarolina Na&ii lly State Stormwater Management Systems Permit No. SW7980429 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Ocean Commerce Park, LLC Ocean Commerce Park Center Dare County FOR THE operation and maintenance of an existing infiltration basin to serve the existing Ocean Commerce Park Center located at 2004 South Croatan Highway in Kill Devil Hills, NC and for the construction, operation and maintenance of an expansion to the infiltration basin when the park is expanded in compliance with the provisions of 15A NCAC 2H.1000 (hereafter referred to as the "Stormwater rules') and the approved stormwater management plans and specifications and other Supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until April 16, 2018 and shall be subject to the following specified conditions and limitations: I• DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume Of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described on page I 2 of this permit, the Project Data Sheet. The expanded stormwater control has been runoff from 2.81 acres of impervious area. designed to handle the 3. The tract will be limited to 2.81 acres of built-upon area as shown on the approved plans. I 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with approved plans. 5. The runoff from all built-upon area within the permitted drainage area of this project must be directed into th permitted stormwater control system. e DIVISIOPNROJECT OF WATER QUALITY Ocean Commerce Park Center Project Name: SW7980429 Permit Number: Dare County l Location: j Ocean Commerce Park, LLC Applicant: 6214 Higham Drive Mailing Address: Alexanderia,VA 22310 2/0412008 Application Date: Receiving to Buzzard Bay Stream: Classification of Water Body: SC 4.33 ac Project area: 4.33 ac Drainage Area: Existi_ njsile Proposes n Total 1.96 ac 0.85 ac 2.61 ac Impervious area: 7,098 cf 3,078 cf 10,176 cf ✓ Required Storage Volume 7,098 cf 4,016 cf 11,114 cf Provided Storage Volume: 11.0ft. 11.0ft Overflow Elevation: fl. SCHEDULE OF COMPLIANCE �. The expanded stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the expansion of any built-upon. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months) b• Sediment removal C. Mowing and revegetation of side slopes d. Immediate repair of eroded areas e. Maintenance of side slopes in accordance with approved plans and specifications f. Debris removal and unclogging of bypass structure, infiltration media, flow spreader, catch basins, piping and vegetated filter. 9. A clear access path to the bypass structure must be available at all times. 4 Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. The facilities shall be constructed as shown on the approved plans. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 6. Upon completion of construction of the proposed expansion, prior to issuance of a Certificate of Occupancy, and prior to operation of this expanded permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Mail the Certification to the Washington Regional Office, 943 Washington Square Mall, Washington, North Carolina, 27889, attention Division of Water Quality. Any deviation from the approved plans and specifications must be noted on the Certification.A permit modification may be required for those deviations. 7. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 8. Access to the stormwater facilities shall be maintained via appropriate easements at all times. 9. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to to any item shown on the approved plans, including the stormwater management measures, built-upon area,details,etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built-upon area or drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 10. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. 11. A copy of the approved plans and specifications shall be maintained on file by the Permittee at all times. 12. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. III. GENERAL CONDITIONS 1. This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership, or name change, the permittee must submit a formal permit transfer request to the Division of Water Quality, accompanied by a completed nametownership change form, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. 2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143- 215.6A to 143-215.6C. with any and all statutes, rules, 3 The issuance of this ermit does not preclude the Permittee from regulations, or o dinanc s, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 5. The permittee grants DENR staff permission to enter the property during normal working hours for the purpose of inspecting all components of the permitted stormwater management facility 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification,revocation and reissuance or termination does not stay any permit condition. ements for the control must 7. Unless specified elsewhere, permanent guidelines established in the North Carolina Erosion andrSed'ment Controlstormwater Planning la gand Design Manual. the 8. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 9. The permittee shall notify the Division of any name change, ownership or mailing address changes within 30 days. 10. This permit shall be effective from the date of issuance until the expiration date. An application for permit renewal shall be submitted at least 180 days prior to the expiration of this permit and must be accompanied by the appropriate processing fee. Permit issued this the 16 th day of April 2008. NORTH C ROLINA ENVIRONMENTAL MANAGEMENT COMMISSION `r L for Coleen H. Sullins, Director Division of Water Quality By Authority of the Environmental Management Commission Permit Number SW7980429 Ocean Commerce Park-Stormwater Permit No. SW7980429- DareCounty Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe(periodically/weekly/full time)the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: SEAL Signature Registration Number Date Certification Requirements: _1. The drainage area to the system contains approximately the permitted acreage. _2. The drainage area to the system contains no more than the permitted amount of built-upon area. 3. All the built-upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. _5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. _7. Trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The iniets are located per the approved plans and do not cause short-circuiting of the system. _11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. _15. The required system dimensions are provided per the approved plans. OF \NA rf9 `j�1/�G a�S/OS Michael F. Easley, Governor RECLIVED �O G William G. Ross, Jr., Secretary r North Carolina Department of Environment and Natural Resources o Y FEB 0 4 20H Alan W. Klimek, P.E. Director DWQ-WARD Division of Water Quality SURFACE WATER PROTECTION SECTION COASTAL STORMWATER PERMIT RENEWAL APPLICATION FORM PERMIT INFORMATION: 1. Stormwater Management Permit Number: � VJ jq g(Oy.L� 2. Permit Holder's name: 0, u �,A ( ,rv4,,tn,.Q,t,c.t (2 j( 3. Property Owners Name: (if different from permit holder) 4. Signing official's name: w Title: _fYllyn wu4 6A (person legally responsible for pe 5. Mailing address: rry}) t y C (!rxv Qtl t City: kw" (, 6. State: V A Zip Code: L3 I D Phone: -103 9 1 1-�-100 n V\ I (Area Code and Number) 7. Project Name: v\ l hv>Wr�Cn c �rkv l2 -q 8. Location of Project: (street address Q GU W lSu, 9. Directions to Project (from nearest major intersection) c"_ VDAJ wrk-, P�1 I�tJ ttV.�� y�plJ ✓t'1 In7s PlY� �.UPl9�' CA Q�Q 10. Specify the type of stormwater treatment (wet pond,infiltration,etc.): 1 1. List any Changes(from project that was originally approved,attach additional pages if needed) Applicant's Certification: ro I, (print) � u �,��4v,, certify that the information included on this permit renewal application, is to the best of'my correct and complete. Signature: L •� o Date: t Submit this completed form along with an application fee of $505.00, a new signed Operation and Maintenance Agreement and a copy of the designer's certification to the address listed below. North Carolina Division of Water Quality 943 Washington Square Mall Phone(252)946-6481 Customer Service 1-877-623-6748 Washington Regional Office Washington,NC 27889 FAX (252)946-9215 Internet: www ncwaterouality org NorthCarolina An Equal Opportunity/Affirmative Action Employer-50%RecycledNO%Post Consumer Paper Naturally 3 3 3 i to:> s 0 i F 3 -S Er ir 0 0 Er a ui O O O O c0 ru 1 O a s JLn J O LO csA O CD 0 53 oW Ocean Commerce Park 6214 H gh m Drive mg Member Alexandria,Virginia 22310 L L C (866)971-2900 971-2909 fax BIIIHigham@aol.com The Bt'�ef PIi1CCfOf Good Businiesses 2OD4 S Croatanrrgrway FEB n 4 ?008 KDJ4,INC Z1W Feb. 1, 2008 DWI I WAR NCDENR Division of Water Quality, SWP 943 Washington Square Mall Washington, NC 27889 RE: Permit renewal for#SW7980429 for Ocean Commerce Park—98 additions Sirs: Due to economic conditions at the time the work associated with this permit was never started HOWEVER we expect that economic conditions will soon improve so we can begin construction and therefore we wish to RENEW PERMIT#SW7980429 AND HEREWITH ENCLOSED IS A CHECK IN THE AMONUT OF$505.00 PER FEE CHANGES. Please accept this$505.00 as payment in full and renew the permit. If there are any questions,advice, or concerns please contact me at the above address. Thank you, �` ' Bill Higham, Managing Member dquible arenevva1NCSWpennit0208 .KiV��L�r� CK � �((� � �S��`•�1U -k�e �C�citVYC 2111 b8 �pF WATFgo Michael F.Easley,Governor O William G.Ross Jr.,Secretary r North Carolina Department of Environment and Natural Resources pQ Y Colleen H.Sullins,Director Division of Water Quality June 12, 2007 Ocean Commerce Park Center Attn: Mr. Bill Higham 6214 Higham Drive Franconia, VA 22310 Subject:: Stormwater Permit No. SW7980429 Ocean Commerce Park—98 additions Dare County Dear Mr. Higham: The Division of Water Quality issued a Coastal Stormwater Management Permit, Number SW7980429 for Ocean Commerce Park— '98 additions on July 8, 1998. This permit expires on July 8, 2008. Section .1003(h) of 15 A NCAC 2H .1000 (the stormwaterrules) requires that applications for permit renewals shall be submitted 180 days prior to the expiration of a permit and must be accompanied by a processing fee, which is currently set at $420.00. If this is still an active project please complete and submit the enclosed renewal application in a timely manner. If this project has not been constructed and a permit is no longer needed, please submit a request to have the permit rescinded. If you have sold the project, or are no longer the permittee, please provide the name, mailing address and phone number of the person or entity that is now responsible for this permit. Enclosed is a form for change of ownership, which should be completed and submitted if the property has changed hands. Your permit requires that upon completion of construction and prior to operation of the permitted treatment units a certification of completion be submitted to the Division from an appropriate designer for the system installed. This is to certify that the permitted facility has been installed in accordance with the permit, the approved plans, specifications and supporting documentation. Please include a copy of the certification with your permit renewal request and processing fee. Enclosed is a copy of a sample certification. Also enclosed/s a new Operation and Maintenance agreement that should be completed and submitted along with your renewal application. You should be aware that failure to provide the Designer's Certification and the operation of a stormwater treatment facility without a valid permit, are violations of NC General Statute 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $10,000 per day. If you have any questions, please feel free to contact us at 252-946-6481. i cer I L_- - AI Hodge, eglonal Supervisor Surface Water Protection Section Washington Regional Office Enclosures cc: Puble &Associates ashington Regional Office North Carolina Division of Water Quality Internet www.ncwatercualitv.ore One 943 Washington Square Mall Phone(252)946-6481 NorthCarolina Washington,NC 27889 Fax (252)946.9215 Naturally An Equal Opportunity/Affrmative Action Employer—50%Recycled/10%Post Consumer Paper Naturally W11RO State of North Carolina Department of Environment A �A and Natural Resources Division of Water Quality ��� James B. Hunt, Jr., Governor NCDENR Wayne McDevitt, Secretary NORTH CMOU"DERMTMENT OF A. Preston Howard, Jr., P.E., Director ENVIRONMENT AND NA RAL ResouRcE DIVISION OF WATER QUALITY July 8, 1998 Ocean Commerce Park Center Attn: Mr. Bill Higham 6214 Higham Drive Franconia, VA 22310 Subject: Permit No. SW7980429 Ocean Commerce Park Center High Density Stormwater Project Dare County Dear Mr. Higham: The Washington Regional Office received the completed Stormwater Application for the subject project on April 23 , 1998. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW7980429 dated July 8, 1998 to Ocean Commerce Park Center. This permit replaces all previous stormwater certifications for this project site. This permit shall be effective from the date of issuance until July 8 , 2008 and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty ( 30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447 , Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. 943 Washington Square Mall,Washington,North Carolina 27889 Telephone 252-946-6481 FAX 252-975.3716 An Equal Opportunity Affirmative Action Employer Ocean Commerce Park Center July 8 , 1998 Page Two If you have any questions, or need additional information concerning this matter, please contact Bill Moore at (919) 946- 6481, extension 264 . Sincerely, Jim Mulligan Water Quality Regional Supervisor Washington Regional Office cc: Quible & Associates Dare County Inspections John Parker, DCM-Raleigh vl6shington Regional Office Central Files State Stormwater Management Systems Permit No SW79804 9 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143 , General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Ocean Commerce Park Center Dare County FOR THE construction, operation and maintenance of stormwater management systems in compliance with the provisions of 15A NCAC 2H.1000 (hereafter referred to as the "stormwater rules" ) and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit for an infiltration basin to serve Ocean Commerce Park Center located at Nags Head, NC. This permit replaces all previous stormwater certifications for this project site, and shall be effective from the date of issuance until July 8, 2008 and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1 . This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2 . This stormwater system has been approved for the management of stormwater runoff as described on page 4 of this permit, the Project Data Sheet. 3 . Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 3 DIVISION OF WATER QUALITY PROJECT DATA Project Name: Ocean Commerce Park Center Permit Number: SW7980429 Location: Dare County Applicant: Ocean Commerce Park Center Mailing Address: 6214 Higham Drive Franconia, VA 22310 Application Date: 4/23/98; original Water Body Receiving Stormwater Runoff: UT-Buzzard Bay Classification of Water Body: SC Total Site Area: 4. 33 acres Total Impervious 2. 81 acres Surfaces Allowed: Required Storage Volume: 10 ,176 cubic feet (based on 1-inch) Provided Storage Volume: 11, 114 cubic feet Provided Basin Area: 2589 sf Controlling Orifice: all runoff is routed to the infiltration basin; overflow elevation set at 11 .0 ft 4 4 . No homeowner/lot owner/developer shall be allowed to fill in, alter, or pipe any vegetative practices (such as swales) shown on the approved plans as part of the stormwater management system without submitting a revision to the permit and receiving approval from the Division. 5. The following items will require a modification to the permit: a. Any revision to the approved plans, regardless of size b. Project name change C. Transfer of ownership d. Redesign or addition to the approved amount of built-upon area e. Further subdivision of the project area. In addition, the Director may determine that other revisions to the project should require a modification to the permit. 6 . The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. II. SCHEDULE OF COMPLIANCE 1 . The permittee will comply with the following schedule for construction and maintenance of the stormwater management system. a. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built-upon surfaces except roads. b. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 2 . The facilities must be properly maintained and operated at all times. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals. 3 . The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency including, but not limited to: 5 a. Semiannual scheduled inspections (every 6 months) b. Sediment removal C. Mowing and revegetation of side slopes d. Immediate repair of eroded areas e. Maintenance of side slopes in accordance with approved plans and specifications f. Debris removal and unclogging of outlet structure, orifice device and catch basins and piping. 4 . Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 6 . Upon completion of construction and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Mail the Certification to the Washington Regional Office, 943 Washington Square Mall , Washington, North Carolina, 27889 , attention Division of Water Quality. 7. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of five years from the date of the completion of construction. III. GENERAL CONDITIONS 1. This permit is not transferable. In the event there is a desire for the facilities to change ownership, or there is a name change of the Permittee, a formal permit request must be submitted to the Division of Water Quality accompanied by an application fee, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. 2 . Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6(a) to 143-215.6(c) . 3 . The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. 6 4 . In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 5. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. Permit issued this the 8 th day of July, 1998 . NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION y?-A. Preston Howard, Jr P.E. , Director Division of Water Quality By Authority of the Environmental Management Commission Permit Number SW7980429 7 Ocean Commerce Park Center Dare County Stormwater Permit No. SW7980429 Designer's Certification i , , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, (Project) for (Project Owner) hereby state that to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. Signature Registration Number Date 8 i t ate Xeceive ee vat ermit Number <77 7 2 a 22 Z State of North Carolina Department of Environment and Natural Resources Division of Water Quality WASfi ��dFFICE STORMWATER MANAGEMENT PERMIT APPLICATION FORIIAPR 2 3 1998 This form may be photocopied for use as an original D. E. M. I. GENERAL INFORMATION 1. Applicants name (specify the name of the corporation, individual, etc. who owns the project): CJc EAN CENTE/L-/4rZT"&7251-//r- 2. Print Owner/Signing Official's name and title (the person who is legally responsible for the facility and its compliance): t /r ,L-L �Igt-Et�f1A , �" IA NAG1rJ Co I�EhJE1ZAL 4-4r4TKsere- 3. Mailing Address for person listed in item 2 above: Co211}- I-1��++Awt�rZ.iVE Gty I rAwcar J 14 State: VAI Zip- Zz3t o Telephone Number. ( '7 0 3 ) 9 9-1 -- 29 o o 4. Project Name (subdivision, facility,or establishment name- should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): _LEAN CQYNW1�tZC>=�AtzK fSS ttD 66 5. Location of Facility (street address): 2004 S. Csz0A rA1,J 44 i c 4wAy City V iLL_�vn_ "ILLS County PARE 6. Directions to facility (from nearest major intersection): Q�>. I5S 4, ZOC4- S . 7. Latitude Longitude: of facility 8. Contact person who can answer questions about the facility: Name -13"-� "t^ Telephone Number: ( 20-9 1 9 L I - 2900 II. PERMIT INFORMATION: C SEE COvE2 LETTE w-� 1. Specify whether project is (check one): New Renewal X Modification 2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit number N ^ and its issue date(if known) r✓1 A ac u M99 —� t/LE+rE fL or- A-vWo l/RL@TnnE�) Form SWU-101 Ianuary 1998 Noe 1 of 4 ... .,j"'Y " LYFc ui Flv)ecc tcnecxone): _Low Density High Density _Redevelop _General Permit _Other 4. Additional Project Requirements (check applicable blanks): CAMA Major Sedimentation/Erosion Control _404 Permit C FYOtMTZFn)N OF Ki LL'DEVIL. HIUS) III. PROJECT INFORMATION 1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages)describing stormwater management for the project. IHE LiYST II.1C.µaG 3'rbYwtWATE2 - -DOFF WI�-L BE RF:rAlhjED ANb �r.7GlL71LATCD CN_,S . I IFE graannic�IiTER WILY UA1DTcR.0 o �p��-p.N.r 'FI LTR14lY0N Ih1 THE CarIAE.SY 1,UK4L'E 1/EC.E-r4o,wN —pfGi Orz- To 'NFlL-rrZg1-yoN ANT-o -rF+� Se85Uvr��c 2. Stormwater runoff from this project drains to the buzzs+r�D-may River basin. 3. Total Project Area: 4.33 acres 4. Pro Built Upon Area: •`� 5. How many drainage basins does the project have? - s nr.�-Rus Pzovx� 6. Complete the following information for each drainage basin. If there are more than two drainage basins in the project, attach an additional sheet with the information for each basin provided in the same format as below. Basin Information Drainage Basin 1 Drainage Basin 2 Receiving Stream Name z2_0�m_b Av Receiving Stream Class Sc Drainage Basin Area 2.8 Akrses e Existing Impervious* Area gg s -OcfL Proposed Im ervious"Area a,G y Ff z % Impervious* Area (total) % Impervious*Surface Area Drainage Basin I: Drainage Basin 2 On-site Buildin zT/ 9�o z On-site Streets On-site Parkin -761,¢9q {¢z On-site Sidewalks Other on-site Off-site Total: E= /ZZ 459 Fez E_ .8 ate. " Impervious area is defined as the built upon area including, but not 'msted to, Widdings, roads, parking areas, sidewalks, gravel areas, etc. 7. How was the off-site impervious area fisted above derived? 2A IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS Deed restrictions and protective covenants are required to be recorded for all low density projects and all subdivisions prior to the sale of any lot. Please see Attachment A for the specific items that must be recorded. Form SWU-101 Januan 1998 Page 2 of 4 - "J J....• ., p-•-•-�- --•.•.., J......� ...J ..... u.crccvaucuuccu rcouacuvaaa m.0 t,rvrc va. c ... ........ ... ...... r ..��.. shall include all the items required by the permit, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. VI. AGENT AUTHORIZATION If you wish to designate submittal authority to another individual or firm so that they may provide information on your behalf, please complete this section: Designated agent(individual or firm): U1 TSL 6_V PC_ MailmgAddress t�o .-1rzawr<v-- �9-4p city. l=( hawk State: MC- Zip: Z-7," Phone: ( ZSZ 1 1(a I — 330o Fax: ( ZSZ 1 2-6 f — /ZloQ VII. SUBMITTAL REQUIREMENTS This application package will not be accepted by the Division of Water Quality unless all of the applicable items are included with the submittal. 1. Please indicate that you have provided the following required information by signing your initials in the space provided next to each item. Applicant's Initials • Original and one copy of the Stormwater Management Permit Application Form _)A- • One copy of the applicable Supplement Form(s) for each BMP (see Attachment A) D A, • Permit application processing fee (see Attachment A) 3h • Two copies of plans and specifications including: ,%%A • Detailed narrative description of stormwater treatment/management • Two copies of plans and specifications,including: -Development/Project name -Engineer and firm -Legend - North arrow - Scale -Revision number&date - Mean high water line -Dimensioned property/project boundary -Location map with named streets or NCSR numbers -Original contours, proposed contours, spot elevations, finished floor elevations - Details of roads,parking, cul-de-sacs, sidewalks,and curb and gutter -Wetlands delineated, or a note on plans that none exist - Existing drainage (including off-site), drainage easements, pipe sizes, nincff calculations - Drainage basins delineated - Vegetated buffers (where required) V. APPLICANT'S CERTIFICATION I,(print or type name of person listed in General Information,item 2) __h," 4"Am certify that the information included on this permit application form is correct, that the project will be constructed in conformance with the approved plans, that the deed restrictions in accordance with Attachment A of this form will be recorded with all required permit conditions,and that to the best of my knowledge the proposed project complies with the re uirements of 15A NCAC 2H .1000. Signature mu, Title _ f_ IL Form SNVU-101 January 1998 Pase 3 of 4 ATTACHMENTA 1. Deed Restriction Language The following statements must be recorded for all low density projects and for all projects that involve the subdivision and selling of lots or outparcels: 1. No more than _ square feet of any lot, including that portion of the right-of-way between the edge of pavement and the front lot line, shall be covered by impervious structures including asphalt, gravel, concrete, brick, stone, slate or similar material but not including wood decking or the surface of swimming pools. This covenant is intended to insure continued compliance with the stormwater permit issued by the State of North Carolina. The covenant may not be changed or deleted without the consent of the State. 2. No one may fill in, pipe, or alter any roadside swale except as necessary to provide a minimum driveway crossing. NOTE: If lot sizes vary significantly, the owner/developer must provide an attachment listing each lot number, size and the allowable built-upon area for each lot. For commercial projects that have outparcels or future development the following statements must also be recorded: 3. The connection from the outparcel or future area into the stormwater system must be made into the forebay such that short-circuiting of the system does not occur. 4. All built-upon area from the outparcel or future development must be directed into the permitted stormwater control system. 5. Built-upon area in excess of the permitted amount will require a permit modification prior to construction. For curb outlet systems,the following statement in addition to items 1 and 2 above must be recorded: 6. No one may pipe,fill in or alter any designated 100 foot long grassed swale used to meet the requirements of NCAC 2H .1008(g)• 2. Supplement Forms The applicable supplement form(s) listed below must be submitted for each BMP specified for this project: Form SWU-102 Wet Detention Basin Supplement Form SWU-103 Infiltration Basin Supplement Form SWU-104 Low Density Supplement Form SWU-105 Curb Outlet System Supplement Form SWU-106 Off-Site System Supplement Form SWU-107 Underground Infiltration Trench Supplement Form SWU-108 Neuse River Basin Nutrient Management Strategy Supplement 3. Permit Application Fees (check made payable to NCDENR and submitted to the appropriate Regional Office) Type of Permit New, Modification, or Timely Renewal Without Late Renewal Modification Low Density $225 n/a High Density (�$385 $225 Other $225 n/a Director's Certification $350 n/a General Permit $30 n/a Form SWLT-101 January 1998 Page 4 of 4 INFILTRATION BASIN ATTACHMENT I. BUILT-UPON AREA CALCULATION (See NCAC 2H.1008(c)and(d)for applicable design criteria. In cases where • more than one basin is proposed,please list each basins i,jormalion in separate columns). Basin# Classification 5G Existing Built-Upon Area SS,Sts f+ Z /tz frs"y rf: Z.9/ do Proposed Built-Upon Area 3ro,944 C+ / Total Project Area •33 Percent Built-Upon G4.9%a II. BREAKDOWN OF PROPOSED BUILT-UPON AREA - Exsnwe� 1'�zayO £-2 Buildings 36,0o o 4f; Is,9(_0_1 +f _lots @ sf(lot Streets Parking Sidewalks Future Development `V Other III. BASIN DESIGN P �c isTtnty '�zoPosEo Basin Depth Required Volume 7099 43-r- 3,0�8 S 76 cf Provided Volume 7,090 3 -Y 401(0 4+3 a Bottom Surface Area 14-6* F{z Storage Surface Area 509 Z. Bottom Elevation 9.0 M5L Storage Elevation v //-O /YISL �i/� 7Iou/e- Type of Soil Ca� Expected Infiltration Rate 72A rN H2, SHWT Elevation .0 nlSL See Attachment A for specific language that must be recorded in the deed restriction for all projects that involve the subdivision and selling of lots or outparcels, or have future development areas. m a•`' aC+ O e`en N e U A mzern C .? cCz o m = � a3 '^ � rcyu m Ha>C = cx e.� o Y > •� Vf°�f LL a' u .CON .. UQ 'n Ovnan 2 �d u c `r h C`. y O i.. s d s' Cupric �GLtn = N E en y � � v, Z v — L u r u •> C 3 c n > c =y c b u r c c t;= d a y = d VI U N s C » r r x Vl E y c L; o U _ `e C O j ^ i J T x -- gyp— < �.LL "�ECFIVF't), IPA VJAS+IING. OCEAN COMMERCE PARK CENTER PARTNERSHIP APR 5 .I, j 2004 S. Croatan Highway Stormwater Management System 1)' L Wa- Operatlon and Maint nan a Plan 1) Maintenance of the Ocean Commerce Park Center stormwater system shall be the responsibility of the Owner(Ocean Commerce Park Center Partnership-Mr. Bill Higham Managing General Partner). The Owner shall designate an operator familiar with the components of this system. Routine inspections shall be performed by the operator at regular intervals of approximately one month and at the time when heavy rainfall occurs. 2) The buffer and exposed side slopes of the basin shall be mowed at least twice a year to prevent woody growth. More frequent mowing may be needed if the basin is to be used as a passive recreation area or for landscaping. Remove all debris and litter during each mowing operation. 3) Elevations of the infiltration basin shall be maintained as shown on the approved plans of record at the Town of Kill Devil Hills Planning and Development Department. Siltation or erosion which alters those elevations shall be corrected by adding suitable soil or removing sediment as necessary. The mean depth of the dry infiltration basin shall be maintained at 1.25 ft.(15"). Sediment shall be removed when accumulation at the basin bottom reaches one foot in depth. 4) Any vegetation which inhibits proper performance of the pond shall also be removed and disposed of properly. 5) The embankment of the basin,rip rap aprons,flumes,culvert and flow diversion box shall be checked regularly to insure that they are structurally sound,are functioning as intended and have not been damaged by erosion or vehicular traffic. Quible&Associates,P.C.will certify at completion of installation,that the stormwater in system was installed in substantial conformance with the approved Plans and Specifications. � Oce an Commer k Center Partnership Mr. Bill Higham- anaging General Partner ate 6214 Higham Drive Franconia,Virginia 23310-1727 1 Notary Public of�g(,�L County,do hereby certify that Mr. Bill Higbam personally appe fore me this day and acknowledged th this 2� Y g e foregoing instrument. Witness my hand and official seal a of A� 1996. °°puoren• y �6�t . Pub c MY commission expires 1 ?5 2 P 9C` �•° NOTARY r . 4'e Pupl.lt `9c, 10�P °oo OUNT ��0aoocxoiane Quible 9uible &Associates,P.C. ENGINEERING.ENVIRONMENTAL SCIENCES.PLANNING P.O.Drawer 870 SINCE 1969 any Hawk,NC 27949 Phone:919-261-3300 Pox:919-261-1260 Sean C.BONe,PE. Joseph S.Los0o,C.E.P April 10, 1998 Eduardo J.ValdMM,PE. Mr. William J. Moore Environmental Engineer YdY'r`C rgyt�i WASHt^.;;;;-,, Division of Water Quality � 4 ppr-lr,r• NCDENR 943 Washington Square Mall APR 2 J Washington,NC 27889 Re: Ocean Commerce Park D M� Stonnwalcr Management Plan Kill Devil Hills,Dare County Dear Mr. Moore: On behalf of Ocean Commerce Park Center Partnership,we hereby submit for your review and approval a high density storuwater management plan"modification"package which pertains to a planned 15,960 sq.ft. building addition to the existing Ocean Commerce Park office/warehouse development project. The 4.33 acre site is located ur the Town of Kill Devil Hills at 2004 South Croatan Highway near the Nags Head/Kill Devil Hills town line. The site currently features a single 36,000 sq.ft. building which houses twenty(20) 30'x 60'office/warehouse"units"and approximately 49,515 sq.ft.of associated asphalt parking and drive aisles. Total existing site built upon area is 85,515 sq.ft. or 45%of tract area. The stormwater management plan for this existing portion of development was engineered by Craig B. Morgan,P.E., Craig B. Morgan and Associates,P.A. around March 1989. The plan was subsequently submitted to and"approved" by the NC Division of EnviroTmrental Management,Water Quality Section. The proposed development consists of a new,free standing 15,960 sq.ft. structure which will contain eight (8) 30'x 60'"units"and one(1)30'x 52'"unit"for a total of time additional office/warehouse spaces:New asphalt parking and drive aisles will add 20,983 sq.ft. of impervious coverage to the site. The total proposed site built upon area,including existing coverage,is: 85,515 + 15,960+20,983= 122,458 sq.ft. or 64.9%of tract area. 2 uc Details concerning the specific function of both the existing stornuvater management system and the proposed stonnwaler management system can be found within the enclosed stormwater plan narrative. The following items are included with and shall be considered part of this submittal package: (1) Original and one copy of the Stonmvater Management Permit Application Form; (2) One copy of the Infiltration Basin Supplement Form; (3) A$385.00 pennit application processing fee check made payable to NCDENR; (4) A detailed Stormwater Plan Narrative; (4) Calculations and supporting data; (5) Two(2)sets of Plans and Specifications. Please note that US Army Corps of Engineers Section 404 wetlands do not exist on this site. Please contact with any questions or requests for additional information at(252)261-3300. Sincerely, QUIBLE&ASSOCIATES,P.C. Ed�oJ. di 21o,ARE. one: as stated cc: Ocean Commerce Park Center Partnership Town of Kill Devil Hills Planning Department April 13, 1998 Stormwater Management Plan Narrative General The 4.33 acre site is located in the Town of Kill Devil Hills at 2004 South Croatan Highway near the Nags Head/Kill Devil Hills town line. The site currently features a single 36,000 sq.ft. building which houses twenty(20)30'x 60'office/warehouse"units"and approximately 49,515 sq.11. of associated asphalt parking and drive aisles. Total existing site built upon area is 85,515 sq.fl.or 45%of tract area. The stormwater management plan for this existing portion of development was engineered by Craig B. Morgan,P.E., Craig B. Morgan and Associates,P.A. around March 1989. The plan was subsequently submitted to and"approved" by the NC Division of Environmental Management,Water Quality Section. The proposed development consists of a new,free standing 15,960 sq.fl. structure which will contain eight (8)30'x 60'"units"and one(1) 30'x 52'"unit"for a total of nine additional office/warehouse spaces.New asphalt parking and drive aisles will add 20,983 sq.fl, of impervious coverage to the site. The total proposed site built upon area,including existing coverage,is: 85,515 + 15,960+20,983 = 122,458 sq.ft. or 64.9%of tract area. The project is within the Fresh Pond AEC and the nearest surface water is Buzzard Bay assigned a water quality classification SC. Stormwater Collection and Disposal The basic stormwater management design concept established by Craig Morgan was to sheet flow runoff to a primary dry infiltration drainage swale situated along the north property line adjacent to the parking lot and thence(if condition warrants)overflow to a secondary dry infiltration area located in the north east part of the site by the entrance driveway. The total above-ground storage capacity(i.e.not taking into consideration the infiltration and storage capacity of the in-situ sandy soils)of the two existing infiltration areas(derived from Craig Morgan's design plan details)equates to 1.0"of runoff over all built upon area. Excess runoff that is not retained or infiltrated on site within the two designated stormwater collection areas is then directed into the NCDOT drainage network within US 158 right of way. The system appears to be functioning as intended. As stated above,proposed development will add 36,943 sq.ft. (15,960+20,983)of built upon area to the site. Our approach to stormwater management planning in order to accommodate new construction is to simply expand the existing working system in proportionate amount to increased built-upon area. Detailed calculations and supporting documentation for the expanded system is enclosed. The proposed expansion to the stormwater management system to serve the proposed Phase 3 development will involve removing a large section of asphalt from the existing cul-de-sac and constructing a rectilinear stormwater infiltration basin expansion to the primary infiltration basin in the available area. The infiltration basin will have contours that will tie directly to the existing contours of the grassy swale containment system serving Phases 1 &2. The bottom elevation for the stormwater management system expansion as well as the existing system is approxinmately 9.0'MSL. The pond top elevation for both the expansion and the existing system is approximately l 1.0'MSL. This stornnwater system expansion will handle runoff in the same fashion as the previously approved system serving Phases 1 &2,that is to retain the first inch of runoff for infiltration in the primary and secondary infiltration basins. This infiltration pond expansion will more than WASHINGTON'OFFICE APR 2 S 1998 Stotmwater Management Plan Narrative M, for Ocean Commerce Park Center Partnership prepared by Quible&Associates,P.C. P.O. Drawer 870 Kitty Hawk,NC 27949 P98010 March 30, 1998 adequately provide on site storage of the first inch of stormwater generated from all proposed impervious areas. Calculations indicate that this basin expansion will retain 1.3"of stommvater runoff. Calculations showing the proposed retention pond volume verses the runoff volume generated by the proposed development have been included for inspection. Soils The soil type that is predominant on this project site is CoB, Corolla fine sand,B slope(see attached photocopy of soil map). This soil type has a high permeability and is subject to rare flooding only during strong wind tides or hurricanes. Additional information on this soil type can be found within the United States Department of Agriculture,Soil Conservation Service, Soil Survey of Dare County,North Carolina. The seasonal high water table for this soil is located 1.5 to 3.0 feet below the surface according to the above mentioned soil survey manual. Soil borings perfornned by Dare County Health Department and witnessed by our staff showed evidence of the seasonal high water table at 1.5 to 3.0 feet below the surface. Calculations (see following pages) Conclusion The stornnwatcr management system expansion to the existing system will adequately contain and infiltrate the first 1.0 inch of stormwater runoff on site. QUIBLE & ASSOCIA. _S, P.C. JOB -pnov P.O. Drawer 870 SHEET NO. KITTY HAWK, NC 27949 OF (252) 261.3300 Fax (252) 261-1260 CALCULATED BY�} �_ DATE--- DATE_-- 1/ /1 ^� SCALE � n arF Qr�a,i'�•a�G' .�C.b�`y,�„ Coacu 0.083 / 2-4Z(o 1 l3 -�1 Z X 0.O83. 19 3 1.444z. �— -L�p+.rvi`ays "ur-�uucc, �nea„p A-IIOwE,p 13�09$ f#-Z- 09sz . Z Ff�- 1402 .& 47- = s Z 153 .9 Ft z wo �-0416 AIlowo,61e. :9-4- 09B 4z- > F-`z- O Lc4y O r,. tl' e SRC'hV.l ismk5nelsl t05-I IPEEhdI QUIBLE & ASSOCIA, _S, P.C. JOB �9�nln P.O. Drawer 870 SHEETNO. Z OF KITTY (252) 261 3300 WFex (252) 261.1260 CALCULATED BY DATE CHECKED BY DATE v a v w. t . n Fro r o + VZ V, = rA_, + z x ,q At = zs88 .r56 1 994-. ' Zo A3 = 14S4 . LZ V, = a�� z� ,� r ,o Vi + 1 R94. Z- � x r . o VZ = ! 99� z - Z f- �yr4 -1 - z ,r . o Fez . s Vow 22-11 .¢ (--7Z4, Z -F 4O[S G 3 l�va.�lwb�2. `�arav�p�, �E):l 5 , fo -1 f-3 � 3 n�-g. (p •-�-� :. �¢s tl\[i gJi iSn[k5Ace151 A511%NNi • y' X�,�} 1.-•`' , v 4S )y F ¢ 4+:KL" ♦ a ii r � �� � 6 ': r �' f=Y r t C+A NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES feC2- 5,J T?9 DIVISION OF COASTAL MANAGEMENT NCDEiiNR WASIi,NGTONECEIV�'OOFFICF MAY 1 3 1998 JAMES B.HUNTJR. May 12, 1998 GOVERNOR 4 M. f, MEMORANDUM WAYNE MCDEVITT TO: Mr. A. Preston Howard, Director SECRETARY Division Of Water Quality FROM: John R. Parker, Jr. Major Permits Processing Coordinator ROGER N.SCHECTER DIRECTOR SUBJECT: CAMA/DREDGE & FILL Permit Application Review Applicant: Ocean Commerce Park Partnership Project Location: 2004 S. Croatan Highway, Kill Devil Hills, Dare County k Proposed Project: To expand an existing 49,515 square foot }% office/warehouse facility. The proposed expansion will y, include a combined 36, 944 square foot building and a< parking area and an additional 2,000 square foot stormwater retention expansion. Only the proposed -a• building and parking area are within the 5 foot Fresh t . Pond AEC setback. Please indicate below your agency,s position or viewpoint on the proposed project and return this form by June 2, 1998. If you have any questions regarding the proposed project, please contact Dennis Hawthorn at (919) SS � 264-3901. When a ppropriate, in-depth comments with supporting data is requested. �• -_ ar�pas•.. REPLY This agency has no Objection to the project as proposed. This agency has no comment on the proposed project. This agency ap proves of the project only if therecommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. Signed Date ELIZABETH CITY OFFICE 1367 U.B. 17 SOUTH ELIZABETH CITY,NC 27909 AN EQUAL OPPORTUNITY AFFIR MATIVE ACTION EMPLOYER. PHONE 918-284-9901 FAX 919-264-3723 60q RECYCLED/109e' POST-CONSUMER PAPER DIVISION OF COASTAL wns"iRve orva oFFicF FIELD INVESTIGATION NVESTIGATION REPORT 1. APPLICANT'S NAME: Ocean Commerce Park Partnership MAY , 3 1995 2. LOCATION OF PROJECT SITE: 2004 S. CFoa[an H E M. Photo Index - 1995: 185-1931, m 10 ; 1989: 146-27, 14 Kill Devil Hills, Fresh Pond AEC State Plane Coordinates - X: 2989600 Y: 882900 , Manteo Quad, UR 3. INVESTIGATION TYPE: CAMA 4• INVESTIGATIVE PROCEDURE: Dates of Site Visit - May 4, 1998 5. PROCESSING PROCEDURE: Was Applicant Present -yes Application Received Complete - April 30, 1998 6. SITE DESCRIPTION: Office -Elizabeth City (A) Local Land Use Plan - 1993 Kill Devil Hills Land-Use Plan Update Land Classification From LUP - Conservation/Community (B) AEC(s) Involved: Fresh Pond AEC (C) Water Dependent: No (D) Intended Use: Commercial (E) Wastewater Treatment: Existing - on 1,000 gpd onsite septic tank/drainfield and 2,850 sf.System stormwater retention Planned - 2,000 sf. additional retention pond. (F) Type of Structures: Existing -36,000 sf. commercial/light industrial office/warehouse with 49,515 sf. of asphalt/concrete parking; Planned- 15,960 sf, office/warehouse units with 20,984 sf. of parking. (G) Estimated Annual Rate of Erosion: Not applicable Source -Applicant 7. HABITAT DESCRIPTION: IN AREA TYPE OF HABITAT PROPOSED TOTAL EXCAVATED IMPERVIOUS SURFACE (A)UPland within Fresh Pond AEC IMPERVIOUS SURF. This i cl des the A) 36,944 sf. (0.848 A.) 86,459 sf. (2.808 A.) This includes the new retention structure (13) Freshwater Wetlands (C) Other (D) Total Area Disturbed: 38,944 square feet (0.894 A.) (E) Primary Nursery Area: No (F) Water Classification: Upland/not applicable 8. PROJECT SUMMARY: The applicant proposes to expand an existing 49,515 sf. office/warehouse facility. Proposed expansion will include a combined 36,944 sf. building and parking area and an additional sf. stormwater retention expansion. onlythe ro The setback. P Posed building and parking area are within the 500 ft. Fresh Pond AEC Ocean Commerce Park Center Partners1lo/Mgjor Application Bo Report,Page Two IP'y1PP1,_�p}}jna The applicants' site is a 4.33 acre tract located at 2004 South Croatan Hwy. in a section of the Town of Kill Devil Hills which is zoned for light industrial uses. This site is near the Kill Devil Hills/Nags Head municipal line directly south of Fresh Pond Drive and within designated Fresh Pond water supply watershed AEC. This site is currently used for light industrial/commercial uses and includes a total of 85,515 sf. of impervious surface. These surfaces include a 36,000 sf. one-story office and small warehousing building and approximately 49,515 sf. of asphalt/concrete parking area. The existing office/warehouse is serviced with a 1,000 gpd septic tank/drainfield system which is greater than 500 ft. from the designated freshwater pond. A 2,850 sf. swale area and retention pond exists on the site for current stormwater retention. The site is an average elevation of about 11 ft. MSL. The undeveloped portion of this tract is vegetated in predominantly Pinus taeda and Myrica cerifera as well as Quercus virginiana ,other Quercus species and indigenous grasses and sedges. This tract is within an A-II water body as classified by the Division of Environmental Management and is designated by the Coastal Resources Commission (CRC) as a Public Water Supply AEC. This AEC includes two broad categories including public water supply well fields and small surface water supply watersheds. Four specific public water supply areas have been identified by the NC DEHNR. This specific watershed has been designated by the CRC and includes a freshwater lake/pond that provides for raw water intake for both the of the Towns of Nags Head and Kill Devil Hills. This water body is supplied by precipitation and groundwater from the surrounding landmass. Use Standards for this AEC restrict development within 1,200 feet from the edge of the pond. This restriction concerns the construction or placement of effluent discharges or other influent pollution sources and limits the placement of these discharges to a horizontal distance of 500 feet from the edge of the Fresh Pond. PrWeet Description cripption . The applicant proposes to expand the existing office/ warehouse complex. The proposed development includes the addition of 15,960 sf, office building and 20,984 sf. asphalt parking area for a total impervious surface area increase of 36,944 sf. The project will be serviced with the existing septic tank and drainfield system. The project will include the expansion of the existing 2,850 sf. stormwater retention system and includes the addition of a 2,000 sf. retention pond which is greater than 500 feet from the Fresh Pond and will serve to collect all additional roof and parking area runoff and direct it away from the freshwater pond, outside the 500 foot line. Anticipated, Impget The proposed development will result in a total land disturbance of 0.894 acres and if runoff is unmanaged, it could impact the watershed with increased turbidity or other runoff associated influent impacts, etc. If the proposed (and approved) runoff retention expansions are in operation prior to building and parking lot construction, the stormwater retention system could minimize these impacts. This project will increase the total onsite impervious surface area on this tract to 2.808 acres within the watershed and Fresh Pond AEC. This increase brings the total impervious surface area for the entire tract to 64.8 %.This percentage conforms with the maximum impervious surfaces allowable in the Town of Kill Devil Hills Chapter 21 Zoning Ordinance. Submitted by Dennis W. Hawthorn, May 12, 1998 Form DCM-MP-I APPLICATION (To be completed by all applicants) b. City,town,community or landmark 1. APPLICANT Kill Devil Hills c. Street address or secondary road number a. Landowner. 2004 S. Croatan Highway Name Ocean Commerce Park Center Partnership d. Is proposed work within city limits or planning Address 6214 Higham Drive jurisdiction? X Yes No e. Name of body of water nearest project(e.g. river,creek, City Franconia State VA sound,bay)Fresh Pond AEC Zip 22310-1727 Day Phone(703)971-2900 Fax(703)971-2909 3. DESCRIPTION AND PLANNED USE b. Authorized Agent: OF PROPOSED PROJECT Name Quible&Associates_P.C. a. List all development activities p you propose (e.g. building a home, motel, marina, bulkhead, pier, and Address PO Drawer 870 excavation and/or filling activities. Proposed office/warehouse complex w/associated City Kitty Hawk State NC parking and infrastructure Zip 27949 Day Phone(252)261-3300 b. Is the proposed activity maintenance of an existing Fax(252)261-1260 project,new work,or both? New c. Will the project be for public, private or commercial c. Project name(if any)N/A use? Commercial d. Give a brief description of purpose, use, methods of NOTE., Permit will be Issued in name of lmndmnner(s), and/or construction and daily operations of proposed project. projec!name. If more space is needed,please attach additional pages. 9 unit office/warehouse building for unspecified uses consistent w/applicable LI-1 Kill Devil Hills 2. LOCATION OF PROPOSED Zoning. PROJECT a. County DARE Revised 03195 Form DCM-MP-1 4. LAND AND WATER in. Describe existing wastewater treatment facilities. CHARACTERISTICS On site septic tank,pump tank and drainfield a. Size of entire tract 4.33 Ac. n. Describe location and type of discharges to waters of the b. Size of individual lot(s) N/A state. (For example, surface runoff, sanitary wastewater, industrial/commercial effluent, "wash c. Approximate elevation of tract above MHW or NWL down"and residential discharges.)Runoff from 11.5' proposed impervious surfaces will be directed to Stormwater retention outside the 500'AEC line. d. Soil type(s)and texture(s)of tract CoB Corolla fine Sands o. Describe existing drinking water supply source. Dare County central potable system e. Vegetation on tract Pinus taeda.Myrica cerifera are dominant. f. Man-made features now on tract Twenty(20) Office/warehouse units w/associated parking& infrastructure. 5. ADDITIONAL INFORMATION g. What is the CAMA Land Use Plan land classification of In addition to the completed application form,the following the site? (Consult Me meal mad use pro,,.) items must be submitted: _Conservation Transitional _Developed X Community A copy of the deed(with state application only)or other Rural _Other instrument under which the applicant claims title to the affected properties. If the applicant is not claiming to be h. How is the tract zoned by local government? the owner of said property, then forward a copy of the Light Industrial 1 deed or other instrument under which the owner claims title,plus written permission from the owner to carry out 1. Is the proposed project consistent with die applicable the project. zoning? X Yes No (Atfach zoning compliance cerrif,care, ifapplicable) • An accurate,dated work plat(including plan view and cross-sectional drawings)drawn to scale in black ink on j. Has a professional archaeological assessment been done an 8'/2"by I P white paper. (Refer to Coastal Resources for the tract? _Yes X No Commission Rule 7J.0203 for a detailed description.) If yes,by whom? N/A Please note that original drawings are preferred and only k. Is the project located in a National Registered Historic high quality copies will be accepted. Blue-line prints or District or does it involve a National Register listed or other larger plats are acceptable only if an adequate eligible property? number of quality copies are provided by applicant. Yes X No (Contact the U.S.Army Corps of Engineers regarding that agency's use of larger drawings.) A site or location map I. Are there wetlands on the site? _Yes X No is a part of plat requirements and it must be sufficiently Coastal(marsh)_ Other detailed to guide agency personnel unfamiliar with the If yes,has a delineation been conducted? (Attach documentation,if available) Revised 03/95 Form DCM-MP-1 area to the site. Include highway or secondary road (SR) numbers,landmarks,and the like. 6. CERTIFICATION AND PERMISSION TO ENTER ON LAND • A Stormwater Certification, if one is necessary. • A list of the names and complete addresses of the I understand that any permit issued in response to this adjacent waterfront(riparian)landowners and signed application will allow only the development described the lication. The project will be subject to conditions and return receipts as proof that such owners have aPP received a copy of the application and plats by restrictions contained in the permit. certified mail. Such landowners must be advised that I certify that to the best of my knowledge, the proposed they have 30 days in which to submit comments on the activity complies with the Stale of North Carolina's approved proposed project to die Division of Coastal Management. Coastal Management Program and will be conducted in a Upon signing this fomn,die applicant further certifies that manner consistent with such program. such notice has been provided. Name Brian J. McDonald I certify that I am authorized to grant, and do in fact,grant Address PO Box 1415,Nags Head,NC 27959 permission to representatives of state and federal review Phone agencies to enter on the aforementioned lands in connection with evaluating information related to this permit Name Grass Courses Limited Partnership application and follow-up monitoring of die project. Address PO Box 3900,Kill Devil Hills,NC 27948 Phone (252)480-4054 I further certify that the information provided in this Name Town of Kill Devil Hills application is truthful to the best of my knowledge. Address PO Box 1719-Kill Devil Hills,NC 27948 Phone (252)480-4054 This is the,:�0 day of�, 19� • A list of previous state or federal permits issued for Print Name (tj i t...L n vv-- �a ,,, 2 work on the project tract. Include permit numbers, permittee, and issuing dates. Signature S� ��• C l C �w N/A Landowner orAfhorized Agen Please indicate attachments pertaining to your proposed • A check for $250 made payable to the Department of project. Environment,Health, and Natural Resources (DEHNR) _ DCM MP-2 Excavation and Fill Information to cover the costs of processing the application. X DCM MP-3 Upland Development _ DCM MP-4 Structures Information • A signed AEC hazard notice for projects in oceanfront _ DCM MP-5 Bridges and Culverts and inlet areas. _ DCM MP-6 Marina Development • A statement of compliance with the N.C. NOTE. Please sign and date each attachment in the Environmental Policy Act(N.C.G.S. 113A-1 to 10)If space provided at the bottom of each form. the project involves die expenditure of public f aids or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. Revised 03195 Form DCM-MP-3 VVASHI NGTCN_-OFFICF MAY 1 3 1998 UPLAND D. F_ M. DEVELOPMENT (Construction and/or land disturbing activities) Attach this form to Joint Application for CAMA Major h. Projects that require a CAMA Major Development Permit, Form DCM-MP-I. Be sure to complete all other Permit may also require a Stormwater Certification. sections of the Joint Application that relate to this proposed Has a site development plan been submitted to the project. Division of Environmental Management for review? X Yes No a. Type and number of buildings, facilities, units or If yes,date submitted structures proposed 9 office/warehouse units i. Describe proposed method of sewage disposal. 480 GPD_conventional septic tank&pump tank b. Nwnber of lots or parcels One(I l distribution box&conventional drainfield j. Have the facilities described in Item i. above received c. Density (give the number of residential units and the state or local approval? Yes units per acre) N/A (Allach appropriate documentation) k. Describe location and type of proposed discharges to d. Size of area to be graded, filled or disturbed including waters of the state(for example,surface runoff,sanitary roads,ditches,etc. +/-0.88 acres wastewater, industrial/commercial effluent, "wash +/- 38,143.7 sa.ft down" and residential discharges). Runoff from impervious surfaces (roof&parking e. If the proposed project will disturb more than one acre will be directed to stormwater infiltration areas of land,the Division of Land Resources must receive an outside the AEC Line 500' erosion and sedimentation control plan at least 30 days before land disturbing activity begins. If applicable,has 1. Describe proposed drinking water supply source (e.g. a sedimentation and erosion control plan been submitted well,community,public system,etc.) to the Division of Land Resources? Yes X No Dare County Public System If yes,date submitted m. Will water be impounded? _Yes X No f List the materials(such as marl,paver stone,asphalt,or If yes,how many acres? N/A concrete)to be used for paved surfaces. _Concrete and asphalt n. If the project is a oceanfront development,when was the lot(s)platted and recorded? N/A g. Give the percentage of the tract within 75 feet of MHW or NWL, or within 575 feet in the case of an Ocean Commerce Park Center Partnership Outstanding Resource Water, to be covered by Applicant or Project Name impervious and/or built-upon surfaces, such as lJu. _i,�, (�,,,- pavement, buildings, rooftops, or to be used for signatu vehicular driveways or parking. -0- Date Revised 03/95 '