Loading...
HomeMy WebLinkAboutSW7980412_HISTORICAL FILE_19991217 categories:apartmentslistingsinKillDevilHills, NCatYellowboo... http://www.yellowbook.coin/Category/apartments/North%2OCaroli... Piet/iOW _BUSINESS Product/Service '"/� PEOPI-r categories:apartments Location BOOA� REVERSE LOOKUP' or Company Name Kill Devil Hills, NC BY DISTANCE Home*Browse Categories*Search Results: "categories:apartments" in Kill Devil Hills, NC Sort By: Relevancy I Alphabetically I Distance Expand To (!252-480-0608 al Res Surrounding Kill Devil Hills, NC rate's Moor Townhomes ^ Dare County, NC 2 Pirates MoorResults Found In l Devil Hills NC 27948-7646 Apartments ore Results For:A artmen ore Info p Related Categories Search Results: "categodes:apartments" in Kill Devil Hills, NC Advertise With Us I Company Info I Careers Contact Us Browse Yellow Book I Browse Local Directories I Download Toolbar Recycling Information 02007 Yellow Book USA, Inc.All rights reserved. Conditions Of Use-Site Map-Help 1-800-YB-YELLOW 1 of 1 6/18/2007 4:52 PM Qu i b I e SINCE 1959 Quible & Associates, P.C. ENGINEERING•ENV]RONMENTAL SCIENCES•PLANNING c► TRANSMITTAL Projeot:Pirate's Moore Townhomes - Phase 2 Date: December 16, 1999 (Townhomes of Roanoke Ltd.) To: Bill Moore Project 1�I4:2,o 96035 NCDENR 943 Washington Square Mall Washington, NC 27889 We transmit: Vherewith ❑ per your request ❑ under separate cover Via: ❑ overnight ❑ hand delivery U- S Mail For your: ❑ use ❑ rrp�view&comment ❑ information ❑ approval V records ❑ distribution The following: ❑ drawings P/Correspondence ❑ shop drawings/samples ❑ specifications ❑ data ❑ contractual data # Date Description 1 12/10/99 Signed Engineer's Certification 1 7/8/98 DWQ Permit Letter(SW7980412) N REGIOtuIL UIrICE If enclosures are not as noted, please inform us immediately. Eddie Valdivieso, P.E. cc: Gene Myers Don Poklewaldt 8 Juniper Trail - P.O. Drawer 870, Kitty Hawk, NC27949 (252)261-3300 FAX(252)261-1260 E-Mail quible@interpath.com Townhomes of Roanoke, Ltd. Pirates Moor Townhomes, Phase 2 Dare County Stormwater Permit No. SW7980412 Designer's Certification // I , �,zy/(200 �/AL'C) IVI as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, Y1 CA- rS 1-1)9G H'-)mrsa (Project) for Irks rr (Oy1 KC L+� (Project owner) hereby state that to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. Signature �. Registration Number 187,�-2� m Date - Imo - `�� _ AL �5k;tiAA>it9T ��• DEC 17 1999 wnsrur+clo;" 8 State of North Carolina Department of Environment • �� and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor NCDENR Wayne McDevitt, Secretary NORTH CAROUNA DEPARTMENT OF A. Preston Howard, Jr., P.E., Director ENVIRONMENT ANo NR AL RESOURCES DIVISION OF WATER QUALITY July 8, 1998 Townhomes of Roanoke, Ltd. Attn: Mr. Richard E. Myers P.O. Box 327 Morehead, KY 40351 Subject: Permit No. SW7980412 Pirates Moor Townhomes, Phase 2 High Density Stormwater Project Dare County Dear Mr. Myers: The Washington Regional Office received the completed Stormwater Application for the subject project on July 8, 1998. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H. 1000. We are forwarding Permit No. SW7980412 dated July 8, 1998 to Townhomes of Roanoke, Ltd. This permit shall be effective from the date of issuance until July 8 , 2008 and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. 943 Washington Square Mall,Washington,North Carolina 27889 Telephone 252-946-6481 FAX 252-975-3716 An Equal Opportunity Affirmative Action Employer Townhomes of Roanoke, Ltd. July 8 , 1998 Page Two If you have any questions, or need additional information concerning this matter, please contact Bill Moore at (919) 946- 6481 , extension 264 . sincerely, , x-J7 m Mulligan Water Quality Regional Supervisor Washington Regional Office cc: yQuible & Associates Dare County Inspections Washington Regional Office Central Files JUL. -08' 98(WEO) 14:39 QCIKE&ASSOCIATES TEL:2522611260 P. 002 JUL--88-98 WED 01158 PM HICKORY HILL 606 885 596E P. 02 01'ERATION AND MAINTENANCE MANUAL 1. GF�RAG l Faciby; Pirates Moor Townbomes,Phase R 2 Owoe.' TOwMtomes oCRow okc,LTO. 395 Cavc hum Latin Road Salt Lack,Kattutky 40371 F11,04e,(606)683-3100 Pmt:(606)683-3300 3 EagincgingPlu Plans andtled"Site Plan-Piaates Moor Towehomes,Phase ll",Sbtxu C 1,&t2 dated A/I ON8,C3 dated 3/1 af98 with lium fcrision of-IA4/93,and/been C 4,C5,C6&C7 all dated 3/18/99,Prepared by Quible and Asaoc,awa,P.C. )(1. �PERAT)ON Atvo MnftYPEa1gNCE teat nevi t,�. 17ry 4eteuti0fl PONIA havo moderato to bigh mamteneem taptiremcats.depending 6k the extent to w6ieh future w4ftcaMounode we/gGeipatad durng the dC9,01 stage. Theamltr$,listedatpye,abeg he 1e111oft0le for both runti4n and inn-rnutina maletenanee task$. 7f t%ikd,r nlaWMaeaa and kup"Ors are not tmderta6i4 ule pond will not adMeve to intended Potppaa_ Tltxc baste elements era detcnti6ii plied maintenamit prow am da"Abed below. dry " f(auetne ltldnitrladec M WINC Tha side-slopes,etrtbankmcnt and vegelallve jEltef of a dry detemien pond must be mowed at.lesat OIte6 a MIA to discourage woody groutll add pout ml woods. More froquatt mu"may be d the bitt6 f9owm g tetftm Ttm use ofnativo or introduced grass"whid,ate w8Wr_tolwwt,hA*and su . BrwMA8 one ratommended S.,auacbal wading scnodule for ropr=talivc speaks and iwWizaUOA rakea. fCiBPEf'ifAM PendS Should be inspected on an animal basin to co ore tbet dra stmattro optxatas in a 1gal O WlpP �a�y uucndcd Whin pdaalbla,inlpemioar abonld bit aonductod during wet weather todumra a if the proud is mewling fheterQwtoe det`wtion t"S' !o pertiaulFri the uv"20w Storture she Uld be fegWarly inspected for evtdenae of etoggina,cc short ouccdting, Odtor i wob1cm which should he cbaew for include:subsidence,erosion,ereoking or tray growth on the embX&IM A,erasion ammd the inlet Ind Outkt structures;the adequacy ofdowneo-ef vc alive erosion of the pond's bad wed books:erosion of"do w,srream vegetative stter:and Atertaodi 1cY adoea ro the Pond Of i(s Contributing wemrshad that may irtftpeete Pond Parformooce. DEB NA Lj QIM REh10 AAL DQtKU tnrnxiago e[attometaeaomulala near the iNpt and cutlet swttwasshould60ramoved during regular P ERNS_ i0N CO tpL Ull 'd 09T119RSC131 S3Jai30s5td318111b 0U bU 103MI8b ,80 '111f JUL, -08' 98(W,ED) 14:40 QC18LE&ASSOCIATES TEL:2522611260 P. 003 JUL-08-98 WED 01 ;58 PM HICKORY HILL 606 885 596E P-0$ 7116 paAd side-slopes.and Mbank[AM Ali may periodically suffer from SIMplag anderosiOe, aldgpgh Hue ah ottld tale y b v eeiviv if the soils are ptopuly aeatptatod dwr oegatruotive. Reeradog and sw lures m ten wyePlAdOft 1bq be teQairvd to oorcett the limblrans Similarly.the dprap en die Wet and Outlet try Petivdically aced to bo repaired. NUISANOI COtrr'ROI, Standing water or s�og�y�condiltpao vr$bin t6 dry deiceu ,{�ion poa ertaj,nuatics toxAtion$for nmrby residents. 70ax,mdaqubos,woods and litter arc ell OctasionsUy veil to lea Pond; Most of Nat problean am gmeralty a sign Wae r P probloota in dry �'erfnemad(e,g her idspeulana end ma!at mnrroc are not bean m—i"s,debeis remavwl ilta.:,.s the a%'tffl ..trvct�..c. 8 Non.Routine Maintenance S Rlft: 2 IRS AAy sttveturat dusnoge iq the inlet or oudel s[rvaturas sbs11 be made as soon as peatlble, SP-MMMMRF [ Who„PrePa$ GlAWS004 dry detention ponds will aooanulaw sign,roaot qu=tiea of se reci t am time $edttntat eeoutnuletioo is a aetfeua me nee initea concern in dry delendon pond$lot several tsasow. Firth Le sod[meetsradwQyrsduerg Available storeAwatarNaeagmmntslorpp�eaeacitywillvn the PM& The Mt available estimate is that spproamuicly 1%oribe slmere voltr. a avac aeeoelatod with the two year da$ign stone[am be lost aanAaltY. Thus,as much et 20°,5 of a pendrs total storage aapaeity one be lost widlin 20 Years. Evert mote storage tAllselry cart be lost if the pond rceelvee large sodiitesi%t input during did eomlruetien phase. Soee 1d sediatmt eoAartalatio4 tan make dry eRkadad detention pt silo very u ghdy. Thud, aatd Perhaps most wpertm0y,scd®not tondo to aaeumulate a rowd the control daioa or dry deeration ponds. Scdinxmtdapositim Visduallyredtrxsnt SO eepaoity fassred on P-Hutaok romcval to thopowi. for For thcae reasons,arramulated Sodiment may Wed to be removed From the lesvcr slaBa rrmly 3 to 10 years in a dry dstemion pond More&RUent spot 01MR-Outt may be needed Sediment steamal operolloas are relatively sitripte if acims for hravy aquipei int is pro+•idad. Front-end 10PAW or bacld+ay we be used to Scrape off the bile of the arhanalated sc MML,fbllowcd by manual removal of seat e",el"iped amend die eats aaa a tea 9x�.�, The distw bca area ahwtd be immediately stabilized wltli vegetation arter removol Operations arc coalplttod, M. 8I SA 4 PERAT _AMMAINr RNA NCEaFQ�g� a1 u $v to maintata the dry retention pond as otUitned la dill —Si W ba!s eau d 09Z1IMSrIal S3WCi0D5S"�31910b UU=6U 103AI86 .80• '�Ilr h/ct/2 6 State of North Carolina Department of Environment �� • and Natural Resources _ Division of Water Quality James B. Hunt, Jr., Governor NCDENR Wayne McDevitt, Secretary .. NORTH C4ROLINA DEPARTMENT OF A. Preston Howard, Jr., P.E., Director ENVIRONMENT AND N4 URAL RESOURCES DIVISION OF WATER QUALITY July 8, 1998 Townhomes of Roanoke, Ltd. Attn: Mr. Richard E. Myers P.O. Box 327 Morehead, KY 40351 Subject: Permit No. SW7980412 Pirates Moor Townhomes, Phase 2 High Density Stormwater Project Dare County Dear Mr. Myers: The Washington Regional Office received the completed Stormwater Application for the subject project on July 8, 1998. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H. 1000. We are forwarding Permit No. SW7980412 dated July 8 , 1998 to Townhomes of Roanoke, Ltd. This permit shall be effective from the date of issuance until July 8 , 2008 and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150E of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447 , Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. 943 Washington Square Mall,Washington,North Carolina 27889 Telephone 252-946-6481 FAX 252-975-3716 An Equal Opportunity Affirmative Action Employer Townhomes of Roanoke, Ltd. July 8 , 1998 Page Two If you have any questions, or need additional information concerning this matter, please contact Bill Moore at (919) 946- 6481 , extension 264 . sincerely, �7im Mullig7n Water Quality Regional Supervisor Washington Regional Office cc: Quible & Associates DD re County Inspections ✓Washington Regional Office Central Files State Stormwater Management Systems Permit No. SW7980412 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143 , General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Townhomes of Roanoke, Ltd. Dare County FOR THE construction, operation and maintenance of stormwater management systems in compliance with the provisions of 15A NCAC 2H. 1000 (hereafter referred to as the "stormwater rules") and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit for (3) infiltration basins to serve Pirates Moor Townhomes, Phase 2 , located at Colington, NC. This permit shall be effective from the date of issuance until July 8, 2008 and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1 . This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2 . This stormwater system has been approved for the management of stormwater runoff as described on page 4 of this permit, the Project Data Sheet. 3 . Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 3 DIVISION OF WATER QUALITY PROJECT DATA Project Name: Pirates Moor Townhomes, Phase 2 Permit Number: SW7980412 Location: Dare County Applicant: Townhomes of Roanoke, Ltd. Mailing Address: P.O. Box 327 Morehead, KY 40351 Application Date: 4/07/98; original 7/08/98; complete Water Body Receiving Stormwater Runoff: UT-Colington Creek Classification of Water Body: SC Total Site Area: 14. 8 acres (includes 9. 3 acres of natural wetlands) Total Impervious Area: 1 .89 acres Pond/Basin Depth: 2 .0 feet Basin # 1 3 .0 feet Basin # 2 3 .0 feet Basin # 3 Provided Surface Area: 1729 sf Basin # 1 5118 sf Basin # 2 3003 sf Basin # 3 Required Storage Volume: 995 cf Basin # 1 (based on 1 . 0 inch runoff) 3438 cf Basin # 2 2418 cf Basin # 3 Provided Storage Volume: 2216 cf Basin # 1 11, 206 cf Basin # 2 5739 cf Basin # 3 Controlling Orifices: 10.0 ft Basin # 1 (overflow weir boxes) 7. 0 ft Basin # 2 7.0 ft Basin # 3 4 4 . No homeowner/lot owner/developer shall be allowed to fill in, alter, or pipe any vegetative practices (such as swales) shown on the approved plans as part of the stormwater management system without submitting a revision to the permit and receiving approval from the Division. 5. The following items will require a modification to the permit: a. Any revision to the approved plans, regardless of size b. Project name change C. Transfer of ownership d. Redesign or addition to the approved amount of built-upon area e. Further subdivision of the project area. In addition, the Director may determine that other revisions to the project should require a modification to the permit. 6. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. II. SCHEDULE OF COMPLIANCE 1. The permittee will comply with the following schedule for construction and maintenance of the stormwater management system. a. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built-upon surfaces except roads. b. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 2. The facilities must be properly maintained and operated at all times. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals. 3 . The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency including, but not limited to: 5 a. Semiannual scheduled inspections (every 6 months) b. Sediment removal C. Mowing and revegetation of side slopes d. Immediate repair of eroded areas e. Maintenance of side slopes in accordance with approved plans and specifications f. Debris removal and unclogging of outlet structure, orifice device and catch basins and piping. 4 . Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 6. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Mail the Certification to the Washington Regional Office, 943 Washington Square Mall, Washington, North Carolina, 27889, attention Division of Water Quality. 7. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of five years from the date of the completion of construction. III. GENERAL CONDITIONS 1. This permit is not transferable. In the event there is a desire for the facilities to change ownership, or there is a name change of the Permittee, a formal permit request must be submitted to the Division of Water Quality accompanied by an application fee, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. 2 . Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215. 6(a) to 143-215.6(c) . 3 . The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. 6 4 . In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 5. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. Permit issued this the 8 th day of July, 1998 . NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION y,l APreston Howard, Jr. , P.E. , Director Division of water Quality By Authority of the Environmental Management Commission Permit Number SW7980412 7 Townhomes of Roanoke, Ltd. Pirates Moor Townhomes, Phase 2 Dare County Stormwater Permit No. SW7980412 Designer's Certification I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, (Project) for (Project Owner) hereby state that to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. Signature Registration Number Date 8