Loading...
HomeMy WebLinkAboutSW7081009_HISTORICAL FILE_20090220 WAtZ0 NCDEENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary February 20, 2009 Mr. Robert S. Hall, Sr. Exec. Vice President State Employees' Credit Union 1000 Wade Avenue Raleigh, NC 27605 Subject: Stormwater Permit No. SW7081009 SECU — Swan Quarter High Density Commercial Wet Pond Project Dear Mr. Hall: Hyde County The Washington Regional Office received a complete Stormwater Management Permit Application for SECU — Swan Quarter on October 28, 2008. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Session Law 2008-211 and Title 15A NCAC 21-1.1000. We are forwarding Permit No. SW7081009 dated February 20, 2009, for the construction of the subject project. l 13 I 2 C,a.z This permit shall be effective from the date of issuance until February 20, 2019, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be In the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Samir Dumpor, or me at (252) 946-6481. inc ly , Al H �'g Regional upervisor Surface Water Protection Section North Carolina Division of Water Quality Internet: www.ncwatercualitv.ore 943 Washington Square Mall Phone: 252-946-6481 One Washington,NC 27889 FAX 252-946-9215 NorthCa�rofiina An Equal Opportunity/Affirmative Action Employer-50%Recycled/l0%Post Consumer Paper Nahanally Page 2 of 2 AH/ sd: J:\WPDATA\WQS\ State SW-SD\Permits — Wet Pond\SW7081009 cc: Patty Hillburn, PLS, Pabst & Hilburn, PA yde County Building Inspections Washington Regional Office Central Files State Stormwater Management Systems Permit No. SW7081009 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY NPDES PHASE II STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO State Employees' Credit Union SECU— Swan Quarter Hyde County FOR THE construction, operation and maintenance of two wet detention ponds in compliance with the provisions of Session Law 2008-211 and 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until February 20, 2019, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.6 on page 3 of this permit. The stormwater control has been designed to handle the runoff from 35,148 square feet of impervious area (total for both wet ponds). 3. The tract will be limited to the amount of built-upon area indicated in Section 1.7 on page 3 of this permit, and per approved plans. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 5. The runoff from all built-upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. 6. The built-upon areas associated with this project shall be located at least 30 feet landward of all perennial and intermittent surface waters. Page 2 of 7 State Stormwater Management Systems Permit No. SW7081009 7. The following design criteria have been provided in the wet detention ponds and must be maintained at design condition: Pond #1 Pond #2 a. Drainage Area, ft2: 20,467 39,006 b. Total Impervious Surfaces, ftZ: 11 ,695 23,453 C. Design Storm, inches: 1.5 1.5 d. Pond Depth, feet: 6.0 6.0 e. TSS removal efficiency: 90% 90% f. Permanent Pool Elevation, FMSI : 2.0 2.0 9. Permanent Pool Surface Areq, ft : 2,443 3,882 h. Permitted Storage Volume, ft : 2,901 3,627 i. Temporary Storage Elevation, FM§L: 2.75 2.75 j. Predevelopment 1 year 24 hour, ft /s: 0.70 1.30 k. Post development 1 year 24 hour, W /s: 1.72 3.45 I. Controlling Orifice: 0.75"0 pipe 0.75 0 pipe M. Permitted Forebay Volume, ft3: 996 1,429 n. Receiving Stream/River Basin: Swanquarter Bay / Tar-Pamlico o. Stream Index Number: 29-49 P. Classification of Water Body: "SA; ORW" II. SCHEDULE OF COMPLIANCE 1 . The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built-upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all time provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and re-vegetation of slopes and the vegetated filter strip. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, level spreader, filter strip, catch basins and piping. g. Access to the outlet structure must be available at all times. 4. Records of maintenance activities must be kept for each permitted BMP. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. The permittee shall submit to the Division of Water Quality an annual summary report of the maintenance inspection records for each BMP. The report shall summarize the inspection dates, results of the inspections, and the maintenance work performed at each inspection. 6. Access to the stormwater facilities shall be maintained via appropriate easements at all times. 7. The facilities shall be constructed as shown on the approved plans. This permit shall become void unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other Page 3 of 7 State Stormwater Management Systems Permit No. SW7081009 supporting data. 8. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 9. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 10. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built-upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built-upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 11. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 12. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. 13. A copy of the approved plans and specifications shall be maintained on file by the Permittee for the life of the project. III. GENERAL CONDITIONS 1. This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a completed Name/Ownership Change form, to the Division of Water Quality, signed by both parties, and accompanied by supporting documentation as listed on page 2 of the form. The project must be in good standing with the Division. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in Page 4 of 7 State Stormwater Management Systems Permit No. SW7081009 accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 7. The permit issued shall continue in force and effect until revoked or terminated. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re-issuance or termination does not stay any permit condition. 8. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 9. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 10. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules and regulations contained in Session Law 2008- 211, Title 15A NCAC 2H.1000, and NCGS 143-215.1 et.al. 11. The permittee shall notify the Division of any name, ownership or mailing address changes at least 30 days prior to making such changes. 12. This permit shall be effective from the date of issuance until February 16, 2019. Application for permit renewal shall be submitted 180 days prior to the expiration date of this permit and must be accompanied by the processing fee. Permit issued this the 20th day of February, 2009. 7RTH AROLINA ENVIRONMENTAL MANAGEMENT COMMISSION for Col .n H. Sullins, Director Division of Water Quality By Authority of the Environmental Management Commission Page 5 of 7 State Stormwater Management Systems Permit No. SW7081009 SECU — Swan Quarter Stormwater Permit No. SW7081009 Hyde County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: SEAL Signature Registration Number Date Page 6 of 7 State Stormwater Management Systems Permit No. SW7081009 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built-upon area. 3. All the built-upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1 . 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. 15. The required system dimensions are provided per the approved plans. cc: NCDENR-DWQ Regional Office Hyde County Building Inspections Page 7 of 7 Permit Number: (to be provided by DWQ) Drainage Area Number: Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected,repaired or replaced immediately. These deficiencies can affect the integrity of structures,safety of the public,and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. ,JAN 2 3 2009 This system (check one): ❑ does ® does not incorporate a vegetated filter at the outlet. This system (check one): ® does ❑ does not incorporate pretreatment other than a IForebay. Important maintenance procedures: — Immediately after the wet detention basin is established,the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed,until the plants become established(commonly six weeks). — No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. — Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. — If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. — Once a year,a dam safety expert should inspect the embankment. After the wet detention pond is established,it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire BMP Trash debris is present. Remove the trash/debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully,and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of long. I approximately six inches. Form SW401-Wet Detention Basin O&M-Rev.4 Page 1 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potentialproblem: How I will remediate theproblem: The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the swale sediment off-site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage, dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds,preferably by hand. If pesticide is used,wipe it on the plants rather than spraying. The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead,diseased or Determine the source of the dying. problem: soils,hydrology,disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds,preferably by hand. If pesticide is used,wipe it on the plants rather than spraying, The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50% of the area. and control the algal growth, Cattails,phragmites or other Remove the plants by wiping them invasive plants cover 50% of with pesticide(do not spray). the basin surface. Form SW401-Wet Detention Basin O&M-Rev.4 Page 2 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potentialproblem: How I will remediate theproblem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present, consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off-site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office,or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 5.00 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 2.00 feet in the forebay, the sediment shall be removed. BASIN DIAGRAM (fill in the blanks) Permanent Pool Elevation 2.00 Sediment Removal .0.00 Pe manen Pool -------------- Volume Sediment Removal Elevation-3.00 Bottom Elevatioi -1.00 -ft Min. --------------------------- '-----'----Ivolume ----- Sediment Bottom Elevation-4.00 1-ft n. Storage Sediment Storage FOREBAY MAIN POND Form SW401-Wet Detention Basin O&M-Rev.4 Page 3 of 4 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:State Employees' Credit Union- Swan Quarter BMP drainage area number: Pond 1 Print name: Robert S. Hall Title: Sr. Executive Vice President Address: 1000 Wade Avenue- Raleigh,NC 27605 Phone: 919 839-5000 A In Signature: Date: (© Note: The legally responsible party should not be a homeowners association unless more than 50%of the lots have been sold and a resident of the subdivision has been named the president. I, ` O-/ `C -b (��� , a Notary Public for the State of J �h CWotttvq County of�JOhN do hereby certify that CL U q personally appeared before me this �� St day of �A�yAf'� — I , and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, Jcw,c 1b lsoacz JAN6 �SA�CS SEAL My commission expires M�1 t 7D 12 Form SW401-Wet Detention Basin O&M-Rev.4 Page 4 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: F6AD 9'Z Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected,repaired or replaced immediately. These deficiencies can affect the integrity of structures,safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. OCT 2 8 2008 This system (check one): ❑ does ® does not incorporate a vegetated filter at the outlet. This system (check one): ® does ❑ does not incorporate pretreatment other than a forebay. Important maintenance procedures: - Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed,until the plants become established (commonly six weeks). - No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. - Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. - If the basin must be drained for an emergency or to perform maintenance,the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. - Once a year,a dam safety expert should inspect the embankment. After the wet detention pond is established,it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches(or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully,and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of long. approximately six inches. Form SW401-Wet Detention Basin O&M-Rev.3 Page 1 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: f6 ,C 'a"L. BMP element: Potentialproblem: How I will remediate theproblem: The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the Swale sediment off-site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the Swale if necessary to Swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems, Weeds are present. Remove the weeds,preferably by hand. If pesticide is used,wipe it on the plants rather than spraying. The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead,diseased or Determine the source of the dying. problem: soils,hydrology,disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds,preferably by hand. If pesticide is used,wipe it on the plants rather than spraying. The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50% of the area. and control the algal growth. Cattails,phragmites or other Remove the plants by wiping them invasive plants cover 50% of with pesticide(do not spray). the basin surface. Form SW401-Wet Detention Basin O&M-Rev.3 Page 2 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: Po, D 4-L_ BMP element: Potentialproblem: How I will remediate theproblem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off-site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office,or outlet. the 401 Oversight Unit at 919-733- 1756. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 3.00 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 2.00 feet in the forebay, the sediment shall be removed. BASIN DIAGRAM 011 in the blanks) Permanent Pool Elevation 3.00 Sediment Removal . 1.00 Pe manes Pool -------------- Volume Sediment Removal Elevation0.00 Volume _ ----------------------------- ---------— -"- --- Bottom Elevatioi 0.00 -ft Min. Sediment BottomElevation-1.00 I-ft n. Storage Sediment Storage FOREBAY MAIN POND Form SW401-Wet Detention Basin O&M-Rev.3 Page 3 of 4 Permit Number: (to be provided by DFVQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:State Employees' Credit Union - Swan Quarter BMP drainage area number: Pond #2 Print name: Robert S. Hall Title: Sr. Exec. Vice President Address:1000 Wade Avenue Ralei h NC 27605 Phone:919-839-5000 Signature: Date: T Note: The legally responsible party should not be a homeowners association unless more than 50%of the lots have been sold and a,resident of the subdivision has been named the president. 1, 2L) U�, POv�V), VJ�_GfZ••U _ , a Notary Public for the State of /J C County of V J G K 2 , do hereby certify that S , '�G �� personally appeared before me this day of Dclt-v(De C aW� , and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, �1 `+2 9 pIJ M �V SEAL n I q My commission expires I �1O lI �U a Form SW401-Wet Detention Basin O&M-Rev.3 Page 4 of 4 20 Cs�y DWQ USE ONLY Date Received Fee Paid Permit Number P009 1 15W708 1005 State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Applicants name(specify the name of the corporation,individual,etc.who owns the project): State Emiloyees'Credit Union 2. Print Owner/Signing Official's name and title(person legally responsible for facility and compliance): Robert S.Hall, Sr.Exec.Vice President 3. Mailing Address for person listed in item 2 above: 1000 Wade Avenue City:Raleigh State:NC Zip:27605 Phone: (919 ) 839-5000 Fax: ( ) Email: 4. Project Name(subdivision,facility,or establishment name-should be consistent with project name on plans, specifications,letters,operation and maintenance agreements,etc.): State Employees'Credit Union-Swan Quarter 5. Location of Project(street address): US Hwy 264(0.42 miles west of US Hwy 264 and SR 1166 intersection) City:Swan Quarter County:Hyde Zip:27885 6. Directions to project(from nearest major intersection): US Hwy 264(0.42 miles west of US Hwy 264 and SR 1166 intersection) 7. Latitude:35'25'29" N Longitude:76°19'35" W of project 8. Contact person who can answer questions about the project: Name:Pabst&Hilburn,PA (Patty E.Hilburn) Telephone Number: (919 ) 848-4399 Email:12hilburn@pabsthilburn.com II. PERMIT INFORMATION: 1. Specify whether project is(check one): ®New [-]Renewal ❑Modification Form SWU-101 Version 09.25.08 Page 1 of 4 2. If this application is being submitted as the result of a renewal or modification to an existing permit,list the existing permit number N/A and its issue date(if known) 3. Specify the type of project(check one): ❑Low Density ®High Density ❑Redevelop ❑General Permit ❑Universal SMP ❑Other 4. Additional Project Requirements (check applicable blanks;information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑CAMA Major ®Sedimentation/Erosion Control ❑404/401 Permit ❑NPDES Industrial Stormwater III. PROJECT INFORMATION 1. In the space provided below,summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages)describing stormwater management for the project. Post-Development runoff will be directed by grass swales to wet detention ponds as shown on plans prepared red by Pabst&Hilburn,PA,and dated 1/16/09 Stormwater from the wet ponds will be discharged into an existing drainage ditch located along US Hwy 264 2. Stormwater runoff from this project drains to the Tar-Pamlico River basin. 3. Total Property Area: 2.91 acres 4. Total Coastal Wetlands Area: N/A acres 5. Total Property Area(3) - Total Coastal Wetlands Area(4) = Total Project Area**: 2.91 acres 6. (Total Impervious Area/ Total Project Area)X 100 = Project Built Upon Area(BUA): 27.7 % 7. How many drainage areas does the project have? 2 8. Complete the following information for each drainage area. If there are more than two drainage areas in the project,attach an additional sheet with the information for each area provided in the same format as below. For high density projects,com lete the table with one drainage area for each engineered stormwater device. Basin Information Drainage Area 1 Drainage Area 2 Receiving Stream Name Swan Quarter Bay Swan Quarter Bay Stream Class&Index No. SA;ORW SA;ORW �— Total Drainage Area(so 20,467 39,006 On-site Drainage Area (sf) 20,467 39,006 Off-site Drainage Area(so 0 0 Existing Impervious*Area(so 0 0 Proposed Impervious*Area(so 11,695 23453 % Impervious*Area(total) 57.1 60.1 Impervious*Surface Area Drainage Area 1 Drainage Area 2 On-site Buildings(sf) 4,258 On-site Streets (so On-site Parking (so 10,421 16,221 On-site Sidewalks (so 1199 1,738 Other on-site (so 75 1,236 Off-site (so Total (so: 11,695 23,453 hapemious area is defined as the built upon area including, but not liniited to, buildings, roads,parking areas, sidernalks,gravel areas,etc. Form SWU-101 Version 09.25.08 Page 2 of **Total project area shall be calculated to exclude Coastal Wetlands from use When calculating the built upon area percentage calculation. This is the area used to calculate overall percent project built upon area(BUA). 9. How was the off-site impervious area listed above derived? N/A Projects in Union County: Contact the DWQ Central Ojjrce staff to check to see ifyou project is located within a Threatened&Endangered Species watershed that may be subject to more stringent stormwater requirements. IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS One of the following property restrictions and protective covenants are required to be recorded for all subdivisions,outparcels and future development prior to the sale of any lot. If lot sizes vary significantly,a table listing each lot number,size and the allowable built-upon area for each lot must be provided as an attachment. Forms can be downloaded from http://h2o enr state nc us/su/bmp forms htm-deed restrictions. Form DRPC-1 High Density Commercial Subdivisions Form DRPC-2 High Density Developments with Outparcels Form DRPC-3 High Density Residential Subdivisions Form DRPC-4 Low Density Commercial Subdivisions Form DRPC-5 Low Density Residential Subdivisions Form DRPC-6 Low Density Residential Subdivisions with Curb Outlets By your signature below,you certify that the recorded property restrictions and protective covenants for this project shall include all the applicable items required in the above form,that the covenants will be binding on all parties and persons claiming under them,that they will run with the land,that the required covenants cannot be changed or deleted without concurrence from the NC DWQ and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s)listed below must be submitted for each BMP specified for this project. Contact the Stormwater Permitting Unit at(919)807-6300 for the status and availability of these forms. Forms can be downloaded from http://h2o enr state nc us/su/bmp forms limn. Form SW401-Low Density Low Density Supplement Form SW401-Curb Outlet System Curb Outlet System Supplement Form SW401-Off-Site System Off-Site System Supplement Form SW401-Wet Detention Basin Wet Detention Basin Supplement Form SW401-Infiltration Basin Infiltration Basin Supplement Form SW401-Infiltration Trench Underground Infiltration Trench Supplement Form SW401-Bioretention Cell Bioretention Cell Supplement Form SW401-Level Spreader Level Spreader/Filter Strip/Restored Riparian Buffer Supplement Form SW401-Wetland Constructed Wetland Supplement Form SW401-Grassed Swale Grassed Swale Supplement Form SW401-Sand Filter Sand Filter Supplement Form SW401-Permeable Pavement Permeable Pavement Supplement Form SW401-Cistern Cistern Supplement Fonn SWU-101 Version 09.25.08 Page of VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Office. (Appropriate office may be found by locating project on the interactive online map at http://h2o.enr.state.ne.us/su/msi maps.htm) 1. Please indicate that you have provided the following required information by initialing in the space provided next to each item. Init' is • Original and one copy of the Stormwater Management Permit Application Form • Original and one copy of the Deed Restrictions&Protective Covenants Form(if required as per Part IV above) • Original of the applicable Supplement Form(s)and O&M agreement(s)for each BMP • Permit application processing fee of$505 (Express:$4,000 for HD,$2,000 for LD) payable to NCDENR • Calculations& detailed narrative description of stormwater treatment/management • Copy of any applicable soils report • Two copies of plans and specifications(sealed, signed &dated), including: -Development/Project name -Engineer and firm -Legend -North arrow -Scale -Revision number&date -Mean high water line -Dimensioned property/project boundary -Location map with named streets or NCSR numbers -Original contours,proposed contours,spot elevations, finished floor elevations -Details of roads, drainage features,collection systems,and stormwater control measures -Wetlands delineated,or a note on plans that none exist -Existing drainage(including off-site),drainage easements,pipe sizes, runoff calculations -Drainage areas delineated -Vegetated buffers(where required) VII. AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf(such as additional information requests),please complete this section. (ex. designing engineer or firm) Designated agent(individual or firm):Pabst& Hilburn,PA (Patty E. Hilburn,PLS) Mailing Address:911 Paverstone Drive,Suite E City: Raleigh State: NC Zip: 27520 Phone: (919 ) 848-4399 Fax: (919 ) 848-4395 Email:philburn@12absthilburn.com VIII. APPLICANT'S CERTIFICATION I, (print or type name of person listed in General Information, item 2) Robert S. Hall certify that the information included on this permit application form is, to the best of my knowledge,correct and that the project will be constructed in conformance with the approved plans,that the required deed restrictions and protective covenants will be recorded,and that the proposed project complies with the requirements of 15A NCAC 2H.1000. Signature: Date: Form SWU-101 Version 09.25.08 Page 4 o1'4 "'oF wArFgQ Beverly Eaves Perdue,Governor YDec Freeman,Secretary t— North Carolina Department of Environment and Natural Resources O ( Coleen H.Sullins,Director Division of Water Quality State Employees Credit Union February 13, 2009 Attn: Mr. Robert S. Hall 1000 Wade Ave. - Raleigh, NC 27605 Subject: Stormwater Review SW7081208 SECU-Columbia Tyrrell County Dear Mr. Hall: This office received a stormwater permit application for the subject project on December 22, 2008. A preliminary review of your project indicates that before a State Stormwater permit can be issued, the following additional information is needed: 1. Wet pond design should be based on a minimum average depth of 3-feet. Revise plans/calculations to provide minimum average depths. (BMP manual, chapter 10). 2. Soils report indicates the seasonal high water table (SHWT) at this site should be about 18- inches below existing ground surface. Based on this info and the County Soils Report, the SHWT elevation for this site should be between 3.5 -4.0 ft. The design permanent pool elevations should be set within 6-inches of the SHWT; therefore, permanent pool design elevations should be 3.5 -4.5 ft. Explain/justify design elevations. 3. Provide plan details and written vegetation plan for wet pond perimeter shelf. Wetland seed mix is not acceptable; (BMP manual, chapters 6 & 10). 4. Small diameter orifices can easily clog; suggest revise orifice structure with minimum 4-inch PVC pipe-capped and drilled. (See example BMP manual, chapter 10). 5. The proposed wet ponds are relatively small; suggest eliminate diversion berms to enhance sediment storage. Also, top of forebay berms should be 6-inches below design permanent pool elevation. 5. Revise application, supplements, narrative & plans as need to reflect changes. The above requested information must be submitted to this office prior to March 13, 2009, or your application will be returned as incomplete. The return of this project will necessitate resubmittal of all required items including a new application fee. If you need additional time to complete the application package, please mail or fax your request to this office and include any reason(s) for the time delays. You should also be aware that the Stormwater Rules require that the permit be issued prior to any development activity. Construction without a permit is a violation of 15A NCAC 2H.1000 and North Carolina General Statute 143-215.1 and may result in civil penalties of up to $25,000 per day. If you have questions, please feel free to contact me at(252) 948-3919, or you can send a message to: bill.moore@ncmail.net. Sincerely, William J. Moore Environmental Engineer Washington Regional Office cc: Pabst& Hilburn, PA Tyrrell County Planninglinspections Washington Regional Office p Mailing Address Phone(919)807-6300 Location N,p0,rerhCaro ina 1617 Mail Service Center Fax (919)807-6492 512 N.Salisbury St. dvahlCaltJ Raleigh,NC 27699-1617 Raleigh,NC 27604 Internet: www.ncwateraualitv.or¢ Customer Service 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer-50%Recycled/10%Post Consumer Paper �QF wATFino Michael F.Easley,Governor y 7 T William G.Ross Jr,Secretary r North Carolina Department of Environment and Natural Resources O Y Coleen H.Sullins,Director Division of Water Quality December 19, 2008 Mr. RVEmoyees' Credit all, Vice President State Union 1000Avenue Raleig , 27605 Subject:: Stormwater Review SW7081009 State Employees' Credit Union—Swan Quarter Hyde County Dear Mr. Hall: This office received a Coastal Stormwater permit application and plans for the subject project on October 28, 2008. A preliminary review of your project indicates that before a State Stormwater permit can be issued the following additional information is needed: V " The impervious area in drainage area 1 (in the SW Application) is different than the, impervious area in the wet pond supplement and calculations. Please revise. ✓ : Revise section 11.3 of the Stormwater Application to specify the type of the project as High ✓/ Density rather than General Permit. 3. As proposed both wet ponds have the depth of 2'. Size the wet pond using the average pond depth (use the BMP Manual for more information about this requirement) and revise the wet pond supplements for both ponds to include these information. Please be advised that the pond depth does not include the 1' sediment depth. 4. The two earthen berms with side slopes of 2:1 are proposed for each pond in order to achieve the longer flow path, however these berms will reduce the available volume within the wet pond. Please clarify if the volume taken by these berms was substracted of the total volume within the pond 5. For the orifice calculation use the orifice formula as specified in section 3 of the BMP / Manual (Stormwater Calculations section). VV6. Delineate wetlands on site or provide a note on plans that none exist. 7. Plan sheet C1201, wet pond #2, grass swale #3 is discharging into the main pond. Please ✓ revise and redirect swale to the forebay. 8. Revise the outlet structure detail to show a trash rack with 6" or less square openings (sheet C5102). 9. On the wet pond detail show elevations for both the permanent pool and the temporary pool (sheet C5102). j 10. Revise all other documents to reflect above changes. v/ 11. Provide 2 sets of signed and sealed plan sheets calculations and documents. The above requested information must be received in this office prior to January 23, 2009 or your application will be returned as incomplete. The return of this project will necessitate resubmittal of all required items including the application fee. If you need additional time to submit the required information, please mail or fax your request for time extension to me at the Letterhead address and include the application number on the request. The request must include justification for the amount of additional time needed. The request will only be granted for justifiable delays that are unforeseen and beyond the owner or consultant's control. North Carolina Division of Water Quality Internet: www ncwateraualiri ore One 943 Washington Square Mall Phone(252)946-6481 NorthCarolina Washington,NC 27889 Fax (252)946-9215 a atur ll ff An Equal OpportunitylAlfrmative Action Employer-50%Recycledll0%Post Consumer Paper �/ {�N% {K{I�I� You should also be aware that the Stormwater Rules require that the permit be issued prior to any development activity. Construction without a permit is a violation of 15A NCAC 21-1.1000 and North Carolina General Statute 143-215.1 and may result in civil penalties of up to $25,000 per day. Please reference the Stormwater Project Number above on all correspondence. If you have questions, please feel free to contact me at (252) 948-3959. Sincerely, Samir Dumpor, PE Environmental Engineer Washington Regional Office cc: " Washington Regional Office Patty Hillburn, PLS, Pabst & Hillburn, PA (911 Paverstone Drive, Suite E, Raleigh, NC 27520) 911 Paverstone Drive,Suite E P PABST& HILBURN, PA Raleigh, NC 27615 H Office: 919.848,4399 ENGINEERING&CONSUL iING Fax: 919.848.4395 January 19, 2009 P&H Project: 102-08 Mr. Samir Dumpor, PE Environmental Engineer NCDENR- Division of Water Quality ��� 3 ���� 943 Washington Square Mall Washington, NC 27889 RE: Responses to Stormwater Review Comments - SW7081009 State Employees' Credit Union - Swan Quarter Dear Mr. Dumper: Please find below responses to stormwater review comments dated December 19, 2009. V1. The impervious area in drainage area 1 (in the SW Application) is different than the impervious area in the wet pond supplement and calculations. Please revise. P&H Response: The impervious areas have been checked and corrected in the SW Application, the wet pond supplement, and calculations. V//2. Revise section 11.3 of the Stormwater Application to specify the type of the project as High Density rather than General Permit. P&H Response: The type of project in section 11.3 has been revised to High Density as requested. 3. As proposed both wet ponds have the depth of 2'. Size the wet pond using VV average pond depth (use BMP Manual for more information about this requirement) and revise the wet pond supplements for both ponds to include these information. Please be advised that the pond depth does not include the 1' sediment depth. P&H Response: Both wet ponds have been revised to have an average depth of 3 feet or more, which does not include the 1 foot of sediment depth. However, the slope below the vegetated shelf is now 2:1 (approved by Samir Dumpor) in order to achieve the 3 foot average depth without increasing the size of the ponds further. 1/ 4. The two earthen berms with side slopes 2:1 are proposed for each pond in order to achieve the longer flow path, however these berms will reduce the available volume within the wet pond. Please clarify if the volume taken by these berms was subtracted of the total volume within the pond. P&H Response: Earthen berms have been removed and ponds have been elongated to achieve the 3:1 flow path. See Sheet C1201 for revision. V 5. For the orifice calculation use the orifice formula as specified in section 3 of the BMP Manual (Stormwater Calculations section). P&H Response: Orifice sizing and drawdown time revised per section 3 of the BMP Manual as requested. 1 /6. Delineate wetlands on site or provide a note on plans that none exist. V P&H Response: Note added to Sheet C1201. Also, see Page 76 of the Design Narrative and Calculations for S&EC Preliminary Wetlands Delineation report, ,dated September 4, 2008. No wetlands exist on this site. V/7. Plan Sheet C1201, wet pond #2, grass swale #3 is discharging into the main pond. Please revise and redirect swale to the forebay. 1 / P&H Response: Grass Swale#3 has been removed. See Sheet C1201 for revision. 8. Revise the outlet structure detail to show a trash rack with 6" or less square openings (Sheet C5102). P&H Response: Trash rack with 6" square openings has been added to outlet structure detail on Sheet C5102. See Sheet C5103 for trash rack detail. 9. On the wet pond detail show elevations for both the permanent pool and the temporary pool (Sheet C5102). P&H Response: Permanent and temporary pool elevations are now show on Sheet C5102 as requested. 10. Revise all other documents to reflect above changes. P&H Response: All documents have been revised to reflect the above revisions. 2 �11. Provide 2 sets of signed and sealed plan sheets, calculations and documents. P&H Response: Enclosed. Please do not hesitate to contact me if you need additional information in order to expedite this process. Sincerely, 49PA HILBBURN,, PPAHilburn, PLS Principal Enclosure 3 911 Paverstone Drive,Ste. E P PABST& H/LBURN, PA Raleigh, NC 27615 '..I eNcraeeauwc s coNsu nrx, Office: 919.848.4399 Fax: 919.948.4395 LETTER OF TRANSMITTAL To: NCDENR Date: 1/21109 Division of Water Quality 943 Washington Square Mall Washington NC 27889 Re: SECU—Swan Quarter Job No.: 102-08 Stonnwater Permit Submittal I am sending you the following item(s): COPIES DATE NO. DESCRIPTION 2 1/16/09 Revised Plans 2 1/19109 Revised Design Narrative and Supporting Calculations 2 1/21/09 Stormwater Permit Application (1-Original, 1-Copy) 2 Wet Pond Supplement Forms (1 -Pond#1, 1 -Pond#2) 1/15/09 - Included in Design Narrative and Supporting Calculations 2 1/21/09 O&M Agreements (1 - Pond #1, 1 - Pond#2) Z III-Ile? ?-Vspo ssys 7-O Gpmiv�G rt S These are transmitted as checked below: ❑ As requested ❑ For your use ® For approval ❑ For Signatures ❑ For review and comment ❑ For Submittal Remarks: Please find the above referenced items for approval. Do not hesitate to call if you have any questions or need additional information. Thank you. Copy to: File Signed: P `. Hiibum, PLS 911 Paverstone Drive,Ste. E &g3fB AST& H/LBURN, PA Raleigh, NC 27615 trrv(awEI-wnc s UUNSUr_UM,' Office: 919.848.4399 Fax: 919.848.4395 LETTER OF TRANSMITTAL To: NCDENR Date: 10/24/08 Division of Water Quality (j(;I 1 �) ?OOf) 943 Washington Square Mall Washington NC 27889 Re: SECU —Swan Quarter Job No.: 102-08 Stormwater Permit Submittal I am sending you the following item(s): COPIES DATE NO. DESCRIPTION 2 10/22/08 Plans 2 10/24/08 Design Narrative and Supporting Calculations(Includes Soil Report) 2 10/16/08 Stormwater Permit Application (1-Original, 1-Copy) 2 10/21/08 Wet Pond Supplement Forms (1 - Pond#1, 1 - Pond #2) 2 10/16/08 O&M Agreements (1 - Pond#1, 1 - Pond#2) 1 10/15/08 Permit Application Permit Fee-$505.00 (Check#23137) These are transmitted as checked below: ❑ As requested ❑ For your use ® For approval ❑ For Signatures ❑ For review and comment ❑ For Submittal Remarks: Please find the above referenced items for review/approval. Do not hesitate to call if you have any questions or need additional information. Thank you. Copy to: File Signed Patty E. Hilburn, PLS . Sw►,�sAv►4XtF.0.kSF�V STORMWATER SUBMITTAL REQUIREMENTS fl WET DETENTION POND I. Objective %l A. Collect all runoff from all BUA(proposed and/or existing and/or offsite) as the case may be, by any means including piping or swales, and direct it to the pond. B. Check the proposed pond design to make sure it meets or exceeds the minimum design criteria for surface area, volume and drawdown. II. What makes up a complete wet detention pond application package? A. Two sets of sealed, signed & dated layout & grading plans with appropriate details. (Additional sets of plans may be requested for projects in certain counties) B. Completed application with supplement(s), SWU-101, SW401-Wet Pond, and inspection and maintenance agreements. C. Deed restriction document, if applicable (for subdivisions & projects with out parcels) D. Sealed, signed & dated calculations. E. Estimated seasonal high water table elevation at all pond locations. F. Chlorides test results must be provided if the project is within'/=mile of SR waters(Phase 11). (This is only required to test out of SR water treatment requirements) III. BIMS entry (for DWQ use only) Enter&track application acknowledged date, review date,add info requested/received dates, permit issue dates, and drainage area info. Best done after the add info letter is written and before sending permit up for signature. IV. Shell documents (for DWQ use only) Permit shells: s:\wqs\stormwater\shells\highcompond s:\wqskstormwater\shells\highsubpond s:\wqs\stormwater\shells\HDhybrid Spreadsheet: s:\wqs\stormwater\excel spreadsheets\pond VI. Review Procedure A. APPLICATION ✓1. An original signature is required. Photocopied signatures cannot be accepted. ✓2. A completed wet detention pond supplement and a signed, dated and notarized wet #S�ant �t. Z detention pond Inspection and Maintenance Agreement with an original signature. Appl. w S 3. The numbers on the supplement match up to the numbers used in the calculations and shown on the plan details. J4. Built-upon areas are reported in square feet in Section 111.6. -�1 5. Receiving stream name and classification.This is important because in the non-Phase 11 counties, a wet pond cannot be used on a project that is within'/mile of and draining to SA waters. For Phase 11, a wet pond is allowed within Y: mile of SA waters. J6. Section 111.6 is filled in-cannot be left blank. One column must be filled in for each proposed wet pond. -7. If the applicant is a corporation, partnership or LLC, look it up on the Secretary of State Corporations Database. Make sure corporationis.spelled correctly (capitalization and, punctuation matter) and that the person sigriing the application is'at least a Vice- president in the corporation, a General Partner in the partnership, a member in.a member-managed LLC, or the manager of a manager-managed LLC. Need documentation to support if the Articles.of Incorporation do not list the members or managers of the LLC. If an agent signs,then a letter of authorization is needed from the president, vice president, general partner, member or manager. t+iA8. For subdivided projects, a signed and notarized deed restriction statement must be provided. 14� '� c�eresa. ,,r��es\%MP �a w wea abet -OCN . .vex wItK�.`h.m\ o�S�*`� (IoJIS Wet Detention Pond, cont. B. CALCULATIONS 1. The orifice is sized based on drawing down the calculated minimum volume in 2-5 days. The average head to use in the orifice equation is approximately one-third of the distance between the permanent pool elevation (PPE) and the elevation of the next available outlet above the permanent pool. The elevation of the next available outlet must be either the elevation where the minimum volume is provided, or it can be higher. The temporary pool elevation (TPE) to report on the supplement will be the elevation of the next available outlet above the PPE. The temporary pool volume (TPV)to report on the supplement is the volume between the specified PPE and the W4PE. 2For Phase II projects that are within '/2 mile of and draining to SR waters, the difference in runoff from the predevelopment and post-development conditions for 3.yKthe 1 year 24 hour storm must be controlled and treated. or Phase II projects, the discharge rate leaving the pond can be no more than the pre-development discharge rate for the 1 year 24 hour storm. 4.0For Phase II projects draining to SA water, no discharge to surface waters may occur from wet ponds. The discharge leaving the orifice must be effectively infiltrated prior to reaching surface waters. 2 5. The average pond depth is the permanent pool volume divided by the permanent pool surface area. The result must be between 3 ft. and 7.5 ft. Parts of the pond can be eper than 7.5 ft., but in no case can any part of the pond be less than 3 ft deep. 6Y If the 85%TSS chart is used a 30' vegetated filter must be provided at the outlet of the ond. If the 90% TSS chart is used 7. Use the co a rom the BMP Manual noting that there are different 8. ✓�c arts for different areas of the State. equired surface area at permanent pool. 9. Provided surface area at permanent pool (Based on pond dimensions) 10. Required volume calculation based on 1.5"storm for Phase II projects*and 1"storm for all others projects. *unless the project is Phase II and within Y mile of and draining to /SR waters then the volume calculation must be based on difference between the pre and post development conditions for the 1-yr 24-hr storm. 11. able of elevations, areas, incremental volumes and accumulated volumes for overall pond and for forebay, to verify volumes provided. 12. Forebay designed to hold 20% of the permanent pool volume. (Range of 18%-22% .) ll i NoKn-erosive flow for 10 yr. storm in the vegetated filter, if using 85% TSS. 14. The seasonal high water table must be at or below the proposed permanent pool /e levation to assure that the necessary volume will be available above the permanent p ol. 15. ounding numbers off during the calculation process can result in deficiencies. Do not round the numbers until you get to the final result. 16. An additional one foot must be excavated below the bottom elevation of the pond.The 1 foot sediment accumulation depth is not included in the average depth calculation. deep <�r �oo}l+ �cr p> Qc�ahfy/�✓3e Sca�in�nt S�i^'��� - Av� or,n t till VSJ Wet Detention Pond, cont. C• PLANS- Due to stora small S ge space constraints, plan sheets should be kept commercial single wet pond proects, the plan set could consist of only layout, rading and details. For larger' to a minimum. For few eats as possible, without cl te Projects, show as 1 evelo much information as 2 or 3 sheets, 2 pment/Project Name 9 them up, possible on as gineer name and firm. 3. egend 4• North Arrow 5. Location Map with nearest intersection ytwo major roads shown. Major road is any 1, 6 �, or 3 digit NC US or interstate ale- standard engineering highway. 6: ig te al g scale, no off-the-wall stuff. 8. vision number g•�Zdelineating ofivin o contours and date, if applicable. arts, swale inveproposed contours, spot elevations, finished 10sting drainage rts, etc. floor elevations,tingg (piping• swales,ditches, ponds,etc. pipe e the offsite drainage areas. ), including off-site. Include a map 12p rty/Project boundary lines, bearing 13. Then High Water Line or Normal High g & distances. permanent pool elevation g Water Line, if a elevation a adjacent wetlands. Evaluate the applicable revert dewaterin above need for AneVr andjof above lowest �• 15, rainage Basemen wid widths, etlands delineated, or a note on the plans that none exist. Get a co berm/slurry wall to pipe sizes and swale inverts are provided. delineation map signed by the Corps of Engineers, or have the applicant py of the wetlands fthe unsigned delineation maps ubmitted to the Cor s. Wet copy m wetlands unless a permit to fill those y include a at 16 Details for the roads, parkin wetlands has been obtained. a �pes. 9, cul-de-sacs, Y not be located /1 l(i sacs, including sidewalk width, radii, dimensions& ,�// 1J partment/Condo development- Provide a and note all concrete and wood deck areas. 18. The drainage area for each wet typical building footprint with dimensions I calculations eet.Yons and supplement Drainage area delineation s b stdone as a se plan sheet. delin match up to 19 V el pond section detail to include the foreba elevations for the bottom, pirate above the permanent pool temporary wide vegetated shelf, pertinent orebay, permanent pool, and the weir elevation be pool' and SH 20. The 10 ve tween the ' 3:1 slopes � 21 9etated shelf extends 6° main pond and the n outlet structure detail showiextends below and 6"above the or, invert elevation (i.e., the a trash rack with 56"square pool elevation. 22 elevation. permanent Pool), quire openings,the necessary Dimensions for each line and arc formed b ) orifice size and tempora 2 ere the 85% TSS temporary spool shown on the chart was used, a 30 the permanent pool contour. 2 mechanism). Please note that the filter strip is not a ditch tated filter strip is rebe 24. A foreba is & detailed (elevations, inverts, slopes, and w spreader to er 25 Y provided for each inlet and located so as to flow spreader The pond must have a minimum 1.5:1 length to width ratio and a minimum 3:1 flow length. Artificial "baffles^ prevent short-circuiting. path. The top elevation of the timber, vinyl, or earth can be used to create a longer flow igher. baffle Should be set at the temporary path 26. A Vegetation plan is specified for the ry pool elevation or listed for planting on the 101 shelf. Wee°�d, includin 271. egetated cover for pond slo p 9 Love Grassssonot suitable as a pecies are �ll roof drainage must be directed to the Permanent the plan. This is necessary for projects whe edthehow the roof drain collection lines on where roof drainage may leave the site buildings back up the property lines prior to going through the pond. J/gbh r�k vti erYb�i'. • �o,.c�g co'� o�,�c��cb �o uecn,�, •No Foee`�rsy�pecx�'�� ' � 911 Paverstone Drive,Ste. E P PABST& HILBURN' PA Raleigh, NC 27615 '..' ervcweer+,Ncscor✓su�nroc Office: 919.848.4399 Fax: 919.848.4395 LETTER OF TRANSMITTAL To: Samir Dumpor Date: 2/09/09 NCDENR - Division of Water Quality 943 Washington Square Mall Washington, NC 27889 Re: SECU—Swan Quarter Job No.: 102-08 Stormwater Permit I am sending you the following item(s): COPIES DATE NO, DESCRIPTION 2 2/09/09 Revised Plan Sheet C5102 (Revised Forebay Elevation as Requested by Samir Dumpor on 2109/09) These are transmitted as checked below: ❑ As requested ❑ For your use ® For approval ❑ For Signatures ❑ For review and comment ❑ For Submittal Remarks: Please find the above referenced items for approval. Do not hesitate to call if you have any questions or need additional information. Thank you. Copy to: File Signed CS44 Pa . Hilburn, PLS 911 Paverstone Drive,Ste. E PABST& H/LBURN, PA Raleigh, NC 27615 PH ENGINEERING 8 CONSULTING FEB 1 9 2009 Office: 919.848.4399 Fax: 919.848.4395 LETTER OF TRANSMITTAL To: Samir Dumpor Date: 2/18/09 NCDENR - Division of Water Quality 943 Washington Square Mall Washington NC 27889 Re: SECU—Swan Quarter Job No.: 102-08 Stonnwater Permit I am sending you the following item(s): COPIES DATE NO. DESCRIPTION 2 2/18/09 Revised Plan Sheet L1301 (Revised Vegetated Shelf Plantings) These are transmitted as checked below: ❑ As requested ❑ For your use ® For approval ❑ For Signatures ❑ For review and comment ❑ For Submittal Remarks: Please find the above referenced items for approval. Do not hesitate to call if you have any questions or need additional information. Thank you. Copy to: File Signed: �, latty . Hilburn, PLS r DESIGN NARRATIVE AND SUPPORTING CALCULATIONS FOR STORMWATER RMP'S, STORM DRAINAGE, AND EROSION AND SEDIMENT CONTROL FOR THE ( JAN 2 3 2009 ( State Employees' Credit Union ( US Hwy 264 ( SWarl Quarter, Hyde County, north Carolina, Prepared for: ( State Employees' credit Union ( c/o O'Brien Atkins Architects ( PC) BOX 12037 RTP, NC 27709 ( (919) 941-9000 l Preparers by: mmn � ® PtiBSf& Fild_AURN, Pf: l H1 l 911 Paverstone Drive, Suite E SEAL 9``t Raleigh, NC 27615 032573 ' (919) 848-4399 % Date: January 19, 2009 l Project No.: 102-08 l t. L- r TABLE OF CONTENTS Pape Design Narrative 1 -3 USGS Map 4 Hyde County Soil Survey 5 FEMA Flood Map 6 Division of Water Quality Permitting Information 7 NOAA —Swan Quarter Precipitation Intensity Estimates 8 NOAA —Swan Quarter Precipitation Frequency Estimates 9 Wet Pond #1 Design • Wet Detention Basin Supplement 10— 12 • Water Quality Calculations 13 —20 • Time of Concentration — Pre-Development 21 • Pre-Development Hydrograph (1-yr, 24 hr Storm) 22 • Post-Development Hydrograph (1-yr, 24 hr Storm) 23 • Pond Design Report 24 • Pond Routing Hydrograph ((1-yr, 24 hr Storm) 25 • Riser Structure Buoyancy Calculation 26 Wet Pond #2 Design • Wet Detention Basin Supplement 27 —29 • Water Quality Calculations 30 - 37 • Time of Concentration—Pre-Development 38 • Pre-Development Hydrograph (1-yr, 24 hr Storm) 39 • Post-Development Hydrograph (1-yr, 24 hr Storm) 40 • Pond Design Report 41 • Pond Routing Hydrograph ((I-yr, 24 hr Storm) 42 • Riser Structure Buoyancy Calculation 43 Hydrograph Summary for Pond #1 and Pond #2 • 1-year, 24 hour Storm 44 • 10-year, 24 hour Storm 45 • 100-year, 24 hour Storm 46 I SCS Curve Number Calculations 47 Storm Drainage Design (10-yr Storm) 48— 53 Hydraulic Grade Line (10-yr Storm) 54 i Outlet Protection Design 55 - 58 Sediment Trap Design Trap #1 59 Trap #2 60 Grass Swale Design Grass Swale#1 61 - 63 Grass Swale#2 64 - 66 Culvert Design 67 - 70 Permanent Seed Specifications 71 Soil Evaluation Report by S&EC 72 - 75 Preliminary Wetland Delineation Report by S&EC 76 - 77 Drainage Area Maps • Pre-Development Drainage Area Map Sheet 1 • Post-Development Drainage Area Map Sheet 2 • Storm Drainage Area Map Sheet 3 r I DESIGN NARRATIVE 1. GENERAL The project site is located along US Hwy 264 and is approximately 0.40 miles west of the intersection of US Hwy 264 and SR 1166 in Swan Quarter, N.C. The intent of this project is to construct a new building, parking, utilities, and storm drainage features required to serve the project. 2. EXISTING SITE The existing site is located in the coastal area and is within 1/2 miles of SA waters. The site was utilized for many years as farm land and is currently undeveloped. Topographically, the site is mostly flat (approximately 0.50%). Currently, the runoff from this site is collected in farm ditches near the eastern and northern property lines and located on the adjacent properties. A series of ditches direct the runoff to Swan Quarter Bay. Based on Hyde County Soil Survey, the existing soils are RoA (Roper muck) and HyA (Hydeland silt loam). The FEMA Flood Insurance Rate Map shows the project site to be located in Zone AE with a 100-year flood elevation of approximately 6.5 to 7.0. The USGS map, the Hyde County soil survey map, and the FEMA map are included in this report. 3. PROPOSED IMPROVEMENTS This project will have a disturbed area of 2.40 acres, in which the majority of the disturbed area will be utilized for the construction of the building, parking areas, storm drainage, stormwater BMP's, sidewalks and vegetated slopes. The majority of stormwater runoff from the proposed improvements will be initially directed by sheet flow into curb inlets located in the parking area. The storm drainage system will carry the runoff to wet detention ponds, as shown on plans. The storm drainage system was designed for the 10-year storm with a minimum slope of 0.50%. A complete set of calculations, including hydraulic grade line calculations, for the stormwater drainage are attached. Stormwater Control and Treatment The current NCDENR Coastal Stormwater Rules require the control and treatment of runoff generated by 1.5" of rainfall OR the difference in runoff from the pre and post development conditions for the 1-year, 24-hour storm (whichever is greater) for a site that is located within '/2 mile of SA waters. The runoff volume for 1.5" of rainfall was calculated to be 1,443.6 cubic feet for drainage area #1 and 2,882.3 cubic feet for drainage area #2. The difference between the pre and post development conditions for the 1-year, 24-hour storm runoff volume was calculated to be 1,640 cubic feet for drainage area #1 and 3,724 cubic feet for drainage area #2. This site is required to satisfy water quantity one as a result of the runoff volume for the 1- year, 24-hour storm being greater than the runoff volume from the 1.5" rainfall for both drainage areas. However, water quality was also considered when designing the BMP devices. A soil evaluation prepared by Soil & Environmental Consultants (S&EC) dated September 4'", 2008, states that the infiltration rate of the existing soils is well below 0.52 inches/hour. The evaluation further states that the soil morphology (munsell color) from the 4 borings indicate the l i seasonable high water table to be less than 12 inches deep. Based on the above information, the soil conditions are not favorable for a stormwater infiltration device. A copy of the soil evaluation prepared by S&EC is attached. Water Quantity Using SCS (TR-55) Method, the ponds were designed to release the post-development 1-yr, 24-hr storm at a rate less than or equal to the pre-development 1-yr, 24-hr storm as required by NCDENR. See table below for results of pre-post development calculations. Wet Pond #1 1- ear, 24-hour Storm Pre-development Post-development Pond Total Drainage Area Runoff Runoff Discharge after (cfs) (cfs) Routing (cfs) 0.47 Ac. 0.36 1.81 0.04 Wet Pond #2 1- ear, 24-hour Storm Pre-development Post-development Pond Total Drainage Area Runoff Runoff Discharge after (cfs) (cfs) Routing (cfs) 0.90 Ac. 0.68 3.71 0.56 A complete set of calculations have been included in this report. Water Quality The wet detention ponds were also designed for 90% TSS removal for the first 1.5" of runoff given that the storm water from the ponds will discharged into and existing roadside ditch and not into a vegetated filter strip. The volume of runoff generated from the 1.5" rainfall will be drawn down at a rate between 2 to 5 days. Copies of the water quality calculations have been included in this report. CAMA Steve Trowell, with the Division of Coastal Management, was contacted concerning whether or not a CAMA permit for the subject site was required. Mr. Trowell stated that the site is not included in an area of the Division's jurisdiction and therefore, is not subject to CAMA permitting. 4. EROSION CONTROL AND MAINTENANCE CONSIDERATIONS Temporary silt fence will be placed along the lowest sides of the limits of disturbance to cleanse stormwater runoff before leaving the site. Temporary diversion ditches will be installed to direct stormwater runoff from the site to sediment traps. Inlet protection will be placed around all new drainage structures that may be affected by the proposed construction. Calculations for the design of the sediment trap are attached. All erosion control measures are documented on the enclosed erosion control plan. Contractors shall be responsible for periodic inspection and maintenance of all indicated erosion control devices. In addition, inspection and any necessary maintenance will be required v immediately following any significant storm event. Any measure that fails to function as intended shall be repaired immediately. Upon completion of construction, the property owner shall be responsible for site maintenance. �1 t.A3 GS MA IP \iM9 -\Ave'. fA F` 1 Jobe Chgpel e PX"ey Gr •a .( /� \• .. oAr •eY 4"• =4. i fs�•. .t • . 736, i .' e is / qz 'S 9WA411ARTER Project No. FI ure 2 - USGS 1 :24k 11141 .52 9 Topocyaghlc Quadrangle Project Mcjr.: ,SIC Swan Quarter SECU Soil & Environmental Consultants, PA hyde County, NC 11010 Raven Ridge Rd.- Raleigh,INC 27614 5cale: (919)846-5900•(919)846-9467 I" = 2,000' Web Page: www-SandEC.com 05/20/08 1 5wanquarter Quadrangle f r NyPE Cou�n.l so�L su2�t�1 r WaA WaA �\ 9A ScA amA GOA WaA \ RoA i RDA c R WaA oA CoA \ A > Y ,e, GuA HyA s4 COA RoA GuA RoA � z 1 1 GuA t� y 264 GuA RoA 9 1 s 41 r, SCSI �.ec. ' ' t PnA SCA O tirK 'k 1x` 1 4 Ud 129s \_ :A @id P-A LfA OeA �5� HY_ A 1735, / is \ ,�O ^^ IZ 13� l Project No. Figure 2 - NKCS I :24k 11141.52 County Sod Survey Project Mgr.: WC Swan Quarter SECU Soil & Environmental Consultants, PA Hyde County, NC 11010 Raven Ridge Rd.- Raleigh,NC 27614 5cale: (919)846-6900•(919)846 9467 I" = 2,000' Web Page: www.SandEC.corn 08/20/05 Sheet 39 S C P"g as rys„* 4 ;IeY' t x� 1 1111 1 IOI �Y . f IIIIIIII { � C 'LLy � 111• � yYk 5 .d st Y�SN Vu� � •i a'�[` y1p Ir�• `i � � t Y t: ,.ae ��{�a}"`.S d_'��4 .u+. p '�F"R` IE • 1• � w s� �'�z � s �" n r••I k le 1 f�Y >+9Y♦ } if r r i � r sip' � Ilil �' �.; r� btu�'n '�S4x!". '�' t � •`��i-4 `�Yul`�"�' �IIIII� rg -E /.nDa `. tit^+.d. a+'...�, r �. '" F nl�l • 5� t a 5 3y„�,k �E r ,.g , ,„ � 11....•1 �•! f IIIII111 AIV IIA All Jy� �- � x¢��f *R+t• F i i �✓'� '*iw y, p • •1 .1 • 11 North Carolina Areas Subject to Phase 11 Post-Construction & Other Stormwater Program... Page 1 of 1 i ( N.C. Division o Water Quality about the oimsion i contact us I dwq sections(glossary C.�.\ ._.'To preserve,pmtect 1.JIlK.�I and enhance North Carolina's wales Address Lat/Long Results t Permitting : State ® � .� ✓syt`; ��Yt�+.w'y,.ras3a s r, }u tr ��„�3i. Type: SA-Shellfish Waters Basis: HQWORW .__;. 0 Category: SA waters fl Notes: �N 264 ' State Stormwater n Contact: Permitting DWQ 19 Regional L County: HYDE i DENR Region: Washington tn� htip://204.211.239.202/stormwateT/ g/l/200g rreclpltation rrequency Vata Server Page 1 of 3 5EeA,4 - SW4t-) Cam.M-T - ( POINT PRECIPITATION �jam_ 1EN FREQUENCY ESTIMATES l FROM NOAA ATLAS 14 North Carolina 35.42 N 76.36 W 0 feet hom"Preclptlation-Frequency Alias of the United Sta1C"NOAA Allis 14,Volume 2.Vasiun i G.M.Nnnnln,n.Martin.❑.I.in.'I'.Panyhuk,M.yekn.and D.Riley f NOAA.National Weather Smic,Silver Spring,Maryland,21HW P:vtraelcd:1'ri Aug 1 2008 Confidence Limits Seasonality Location Maps Other Info. GIs data Maps Help D� Map- Precipitation Intensity Estimates (in/hr) (AyeRa1r*s)Fmq m 1m 12 24 48 10 20 1 45 60 terd h m 3 hr 6 r hrte dfp dy dfn min h 1�5.64 4.50 3.75 2.57 1.60 0.95 0.68 0.41 0.24 0.14 0.08 O.OS 0.03 0.02 0.02 0.01 0.01 0.01 2�6.42 5.14 4.30 2.97 1.86 1.1 1 0.80 0.48 0.28 0.17 0.10 0.06 0.04 003. 0.02 0.02 0.01 0.01 7.06 5.65 4.76 3.39 2.17 1.32 0.95 0.57 0.34 0.23 0.13 0.07 0.05 0041 0.02 0.02 0.02 0.01 lF 10 8.27 6.61 5.58 4.04 2.63 1.63 1.1E 0.72 0.42 0.27 0.15 0.08 0.06 0.04 0.03 0.02 0.02 0.02 I 25 9.29 7.40 6.26 4.63 3.08 1.95 1.43 0.87 0.52 0.33 0.19 0.10 0.07 0.05 0.03 0.03 0.02 0.02 50 10.34 8.23 6.95 5.23 3..5.5 2.29 1.70 1.03 0.62 0.39 0.22 0.12 0.08 0.06 0.04 0.03 0.02 0.02 100 11.21 8.90 7.50 5.75 3.96 2.60 1.95 1.19 0.72 0.45 0.26 0.14 0.09 0.06 0.04 0.03 0.03 0.02 200 12.07 9.56 8.04 6.26 4.39 2.94 2.23 1.37 0.83 0.51 0.30 0.15 0.10 0.07 0.05 . 0.03 0.03 0.02 500 I 13.02 10.30 8.64 6.88 4.93 3.37 2.59 1.60 0.98 0.61 0.36 0.18 0.11 0.08 0.05 0.04 0.03 0.03 ]000 14.09 11.09 9.28 7.51 5.49 3.82 2.98 1.84 1.14 0.69 0.41 0.21 0.13 0.09 0.06 0.04 0.04 0.03 i These pieciplation frayaency estimates are based on a camel duration series ARI is the Average aecucence Interval. Please refer to the documonfaW.for more information.NOTE formatting forces estimates near zero to appear as zero. * Upper bound of the 90% confidence interval Precipitation Intensity Estimates(in/hr) ARI** 5 ]0 15 30 60 120 3 6 12 24 48 4 7 ]0 20 30 45 60 (years) min min min min min min hr ter ter hr ter day day day day day day day 1�6.22 4.96 4.14 2.84 1.77 1.0E 0.77 0.47 0.27 0.16 0.09 0.05 0.03 0.03 0.02 0.01 0.01 0.01 07.06 5.65 4,73 3.27 2.05 1.23 0.89 0.55 0.32 0.19 0.11 0.06 0.04 FO 0-31 0.02 0.02 0.01 0. 11 =7.75 6.21 5.2 3.72 2.38 ].46 1.06 0.65 0.38 0.25 0.14 0.08 0.05 0.04 0.03 0.02 0.02 0.02 ! to 9.07 7.25 6.12 4.43 2.89 1.80 1.32 0.E1 0.48 0.30 0.17 0.09 0.06 0.05 0.03 0.02 0.02 0.02 25 10.19 8.12 6.86 5.08 3.38 2.15 1S9 0.9E 0.58 0.37 0.21 0.11 0.07 0.06 0.03 0.03 0.02 0.02 50 11.33 9.02 7.61 5.73 3.88 2.52 ].88 1.16 0.69 0.43 0.24 0.13 0.08 0.06 0.04 0.03 0.03 0.02 500 12.29 9.76 8.22 6.30 4.34 2.86 2.16 1.33 0.80 0.49 0.28 0.15 0.09 0.07 0.04 0.03 0.03 0.02 200 13.21 10.48 8.81 6.86 4.81 3.23 2.47 1.53 0.92 0.56 0.33 0.17 0.11 0.08 0.05 0 04TO-031 0.03 500 14.29 11.30 9.48 7.55 .5.41 3.71 2.88 1.78 1.09 0.67 0.40 0.20 0.12 0.09 0.06 0.04 0.04 0.03 1000 15.48 12.19 10.20 8.26 6.03 4.21 3.31 2.06 ].27 0.77 0.46 0.23 0.14 0.10 0.06 0.05 0.04 0.03 'The upper tsum)of the confidence interval at 90%confidence level is the value which S%of the simulated quintile values for a given Irequency are greater Nan. ^These preciptation mequency estimates are teased on a oriel duration ser'es ARI is the Average Recurrence Interval. Please refer to the AocumWat or for more information.NOTE:Pormaang prevents estimates near zero to appear as m. * Lower bound of the 90% confidence interval Precipitation Intensity Estimates(in/hr) ARI 5 10 15 30 60 120 3 6 12 24 48 4 7 ]0 20 30 45 60 (years) min min mm mm mm min hr ter ter ter ter da da da dety 11 day da da 05.12 4.09 3.4] 2.34 1.46 0.85 0.61 0.37 0.22 0.13 0.08 0.04 0.03 1 0.02 0.02 0.01 0.01 O.OI 5.88 4.70 3.9 4 2.72 1.71 1.01 0.72 0.44 0.25 0.16 0.09 0.05 0.03 0.0 30.02 0.02 0.01 0.01 OS 6.46 5.17 4.36 3.10 1.98 1.19 0.86 0.52 0.30 0.21 0.12 0.07 0.04 0.03 0.02 0.02 0.01 0.01 10 7.54 6.03 5.08 3.68 2.40 1.47 1.06 0.64 0.38 0.24 0.14 0.08 0.05 FO 0-41 0.03 0.02 0.02 OAI 25 8.42 6.71 5.67 4.20 2.80 1.75 1.28 0.77 0.46 0.30 0.17 0.09 0.06 0.05 0.03 0.02 0.02 0.02 50 9.34 7.43 6.28 4.73 3.20 2.05 1.51 0.91 0.54 0.34 0.20 0.11 0.07 0.05 0.03 0.03 0.02 0.02 100 1 10.08 8.01 6.75 5.17 3.56 2.32 1.72 1.05 0.63 0.39 0.23 0.12 0.08 006 FO 0-41 0.03 0.02 0.02 U http://hdsc.nws.noaa.gov/cgi-bi n/hdsc/bu i l dout.perl?type=idf&units=u s&se ries=pd&state n a... 8/1/2008 Precipitation Frequency Data Server Page 1 of 4 r ( POINT PRECIPITATION a` FREQUENCY ESTIMATES ( FROM NOAA ATLAS 14 1 North Carolina 35.42 N 76.36 W 0 feel form"Precipilalum Frequency Atlas of the Uniled States NOAA Atlas 14.Volume 2.Version 1 G.M.nnnnin,Il.Martin,❑.Lin, I,Pa nybok.M.Vekta,and D.Riley t NOAA,National Weather Service,Silver Spring.Maryland,2004 Ealm,wd,Pri Aug 1 20T8 i Confidence Limits Seasonality L Location Maps .Other Info. GIS data Maps Help i D�cs i U.S.Map_j I Precipitation Frequency Estimates (inches) AR7 S 10 Ic 311 hll LO 111 0 311 45 MI * 1 hr G hr 12 hr 241v 48 hr 4 day 7 d:p' ❑❑ ❑ (years) min min min min min m_in day day dal d:n day 1�0.47 0.75 0.94 1.29 1.60 1.9 0 2.05 2.47 3.97 4.49 5.22 5.91 Et9.83 12.15 14.56 i 00.54 0.86 1.08 1.49 1.8G 2.23 2.40 2.89 3.40 4.18 4.82 5.43 6.30 7.08 9.48 11.69 14_i8 17.18 �0.59 0.94 1.19 1.69 2.17 2.63 2.85 3.44 4.06 5A1 6.18 6.91 291 8.77 1L52 14.OG I -- 20.30 10 0.69 1.10 1.39 2.02 2.63 3.26 3.55 4.28 5.08 6.44 7.36 8.13 9.25 10.16 13.20 15.96 19.52 22.80 f 25 0.77 1.23 1.56 2.32 3.08 3.90 4.30 5.20 6.21 7.96 9.13 9.91 11.16 12.17 15.57 18.58 22.78 26.21 ( 50 0.86 1.37 1.74 2.62 3.55 4.58 5.09 6.19 7.44 9.27 10.66 11.40 F12 761 13.83 17.52 20.67 fl 28.91 ( 100 0.93 1.48 1.88 2.87 3.96 5.21 5.86 7.14 8.65 10.70 12.37 13.04 14.47 15.59 19.57 22.81 28.18 31.65 200 1.01 1S9 2.01 3.13 4.39 5.88 6.69 8.18 9.98 12.28 14.28 14.82 16.30 17.48 21.72 25.01 31.06 34.43 500 1.08 1.72 2.16 3.44 4.93 6.75 7.79 9.57 1i.76 14.63 ]7.15 1247 18.95 20.17 24.7.5 28.01 35.08 38.19 i ]000 1.17 1.85 2.32 3.76 5.49 7.64 8.95 11.04 13.69 16.63 19.G3 19.87 21.18 22.39 27.19 30.37 38.28 41.09 These precipitation frequency estimates are based on a partial duration series ARI is the Average Recurrence Interval. i Please refer to the docurnareabm for more informal NOTE'Formall forces estimates near zero to appear as zero. * Upper bound of the 90% confidence interval Precipitation Frequency Estimates (inches) j ARI•• ❑5 ]0 15 30 60 120 ❑3 6❑ 12 24 48 ❑4 7❑ 10 20 30 45 6U �(years)� mm mm mm mm mm mm hr hr hr hr hr day day day 11 day 11 day 11 day day I 10.52 0.83 1.03 1.42 1.77 2.11 2.31 2.81 3.30 3.81 4.41 4.93 5.70 6.41 8.57 10.52 13.01 15.50 0 0.59 0.94 1.18 1.63 2.05 2.46 2.68 3.26 3.84 4.64 5.35 5.97 6.88 7.70 10.21 12.51 15.40 18.30 ��0.65 1.03 1.31 1.86 2.38 2.92 3.19 3.88 4.58 5. 99 6.86 7.60 8.64 9.54 12.42 15.05 18.40 21.62 10 0.76 1.21 1.53 2.22 2.89 3.59 3.96 4.83 5.73 7.11 8.15 8.94 10.08 11.05 14.21 17.07 20.86 24.28 25 0.85 1.35 1.72 2.54 3.38 4.30 4.78 5.85 6.98 8.78 ]0.07 10.89 12.16 13.22 16.77 19.86 24.36 27.95 50 0.94 1.50 1.90 2.87 3.88 FT5.66 FT8.33 10.21 11.7 ]5 12.54 3.90 15.03 18.87 22.10 27.22 30.85 ]00 1.02 1.63 2.06 3.15 4.34 5.73 6.50 7.99 9.67 1L77 13.66 14.36 ]5.79 16.97 21.11 24.41 30.21 33.82 200 1.10 1.75 2.20 3.43 4.81 6.46 7.41 9.14 11.14 13,53 1.5.79 16.34 17.82 19.06 23.49 26.85 33.41 36.88 500 1.19 1.88 2.37 3.77 .5.41 7.43 8.64 10.68 13.13 16.17 19.05 19.35 20.80 22.13 26.91 30.20 37.90 41.08 1000 1.29 2.03 2.55 4.13 6.03 8.42 9.94 12.33 15.28 18.43 21.90 22.14 23.40 24.69 29.71 32.88 41.55 44.40 •The upper bound of the confidence interval at 90%confidence level's the value which 5%of Me simulated quartile values lot a given frequency are greater than ••These precipitation frequency estimates are based on a partial duration series ARI is Me Average Recurrence Interval. Please refer to Mar documenapcn for more information.NOTE:Formatting prevents estimates near zero to appear as zero. * Lower bound of the 90%p confidence interval Precipitation Frequency Estimates (inches) 6 20 AR • 15 30 0 3r6❑ ]2 24 48 ❑4 7 0 20 30 5 604 ayay15 mmmmm hh hr In hr d ❑ddy day day day dayyea ❑m r-]0.43 0.68 0.85 1.17 1.46 1.71 1.84 2.21 2.60 3.14 3.62 4.12 4.82 5.47 7.42 9.19 11.41 13.70 2 0.49 0.78 0.98 1.36 ].7] 2.02 2.17 2.60 3.06 3.82 4.39 4.98 SEI 6.56 8.85 10.93 13.50 16.17 0 0.54 O.Rb 1.09 1.55 1.98 2.39 2.57 3.09 3.65 4.93 5.62 6.33 7.28 8.11 10.74 13.13 16.12 19.10 ]0 0.63 I.00 1.27 1.84 2.40 2.94 3.19 3.84 4.55 5.84 6.66 7.42 8.47 9.37 12.29 14.87 ]8.24 21.41 25 0.70 1.12 1.42 2.10 2.80 3.51 3.84 4.64 5.53 216 8.20 8.98 10.16 11.15 14.41 17.23 21.19 24.53 50 0.78 1.24 1.57 2.36 3.20 4.- 4.52 5.48 G.SG 8.28 9.49 10.25 11.54 12.58 16.12 19.07 23.54 26.96 100 0.84 1.33 1.69 2.58 3.56 4.64 5.17 6.28 7.56 9.47 10.90 11.62 12.971 14.07 17.87 20.93 E9fl 29.36 http://hdsc.nws.noaa.gov/cgi-bin/hdsc/bu i l dout.perl?type=pf&units=us&series=pd&statena... 8/1/2008 1 Pe,rnd N. (to be provOed by OWO) 1 •Y A W OF A 7EF ( NCDENR r ( STORMWATER MANAGEMENT PERMIT APPLICATION FORM o T { 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled oul,printed and submitted. The Required Items Checklist(Part I//)must be printed,filled out and submitted along with all of the required information. ( I. PROJECT INFORMATION Project name State Employees Credit Union-Swan Quarter ( Contact person Patty E.Hilburn ( Phone number (919)8484399 Dale 111512009 ( Drainage area number Pond#1 ( II. DESIGN INFORMATION Site Characteristics Drainage area. 20,467 ft' ( Impervious area,post-development 11,695 ft3 ✓ %impervious 57.14% / ( Design rainfall depth ..5 in V ( Storage Volume: Nori Waters Minimum volume required ft3 Volume provided ft3 Storage Volume: SA Water ( 1.5'runoff volume 1,448 ft3 .V/ 1 Pre-development 1-yr,24-hr runoff 207 ft3 #REFI Post-development 1-yr,24-hr runoff 517 ft3 / #REFI ( Minimum volume required 1,448 rya' -Y// ( Volume provided 2901 ft3 Peak Flow Calculations Is the pre/post control of the lyr 24hr storm peak flow required? y (Y or N) ( 1-yr,24-hr rainfall depth 3.4 in 1 Rational C,pre-development 0.25(unitless) Rational C,post-development 0.65(unidess) t Rainfall intensity:1-yr,24-hr storm 5.64 in/hr OK Pre-development 1-yr,24-hr peak flow 0.43 ft3/sec Post-development 1-yr,24-hr peak flow 1.89 ft3/sec I Pre/Post 1-yr,24-hr peak flow control 1.46 ft3/sec Elevations Temporary pool elevation 2.75 fmsl t Permanent pool elevation 2.00 fmsl SHWT elevation(approx.at the perm.pool elevation) 1.40 fmsl Top of 10ft vegetated shelf elevation 2.50 knell Bottom of 10ft vegetated shelf elevation 1.50 fmsl l Sediment cleanout,lop elevation(bottom of pond) -3.00 fmsl Sediment cleanoul,bottom elevation .4 00 fmsl Sediment storage provided 1.00 ft V I Is there additional volume stored above the state-required temp.pool? n (Y or N) f Elevation of the lop of the additional volume 2.8 fmsl OK l l Form SW401-Wet Detention basin-Hev.5 Parts L 811.Design Summary,Page 1 of 2 l kv ( Permit No. - nn be provided by DWO7 II. DESIGN INFORMATION Surface Areas Area,temporary pool 4,705 tt' -V`' Area REQUIRED,permanent pool 1.378 ft' SAIDA ratio 6.50(unitless) V Area PROVIDED,permanent pool,Ap,,,, _ 2,443 fl' OK Area,bottom of 10ft vegetated shelf,P.d,d, 1,500 ft, ( Area,sediment cleanout,top elevation(bottom of pond),A,y,.,a 294 ft' ( Volumes ( Volume,temporary pod 2,901 RI / OK Volume,permanent pool,V,,n_P, 4.985 ft" y Volume,forebay(sum of forebays if more than one forebay) 996 ft, Forebay%of permanent pool volume 20.0%% OK ( SAIDA Table Data V Design TSS removal 90% Coastal SAIDA Table Used? y (Y or N) ( Mountain/Piedmont SAIDA Table Used? n (Y or N) SAIDA ratio 6.50 limitless) Average depth(used in SAIDA table): ( Calculation option 1 used?(See Figure 10-2b) It (Y or N) Volume,permanent pool,Vp„,-. It, ( Area provided,permanent pool,Ar,,,,� fle Average depth calculated It Average depth used in SAIDA,d„,(Round to nearest 0.5ft) It ( Calculation option 2 used?(See Figure 10.2b) y (Y or N) I Area provided,permanent pool,Ap,,,.. 2.443 ft' OK Area,bottom of 1 Oft vegetated shelf,Ab�.,,,y, 1,500 ft OK ( Area,sediment cleanout,lop elevation(bottom of pond),A.., 294 ft' OK ( 'Depth'(distance b/w bottom of IN shelf and top of sediment) 4.50 It OK Average depth calculated 3.06 ft OK Average depth used in SAIDA,d„,(Round to nearest 0.5ft) 3.1 it OK Dfawdown Calculations ( Drawdown through orifice? If (Y or N) j Diameter of orifice(if circular) 0.75 in ( Area of orifice(if-noncimulaQ ins Coefficient of discharge(Co) 0.60(uniless) ( Driving head(H,) 0.75 8 ( Drawdown through weir.) - n (Y or N) Weir type (unilless) ( Coefficient of discharge(C„) (unilless) t Length of weir(L) It Driving head(H) ft Pre-development 1-yr,24-hr peak flow 0.70 ft`/sec OK Post-development 1-yr,24-hr peak flow 1.72 fOlsec OK i Storage volume discharge rate(through discharge orifice or weir) 0_01 tt'/sec % Storage volume drawdown time 2.62 days J OK,draws down in 2-5 days. OK,drawdown time is coned. Additional Information Vegetated side slopes 3:1 OK Vegetated shelf slope 10:1 OK Vegetated shelf width 10.0 N OK Length of flowpath to width ratio _ 3:1 OK Length to width ratio 2.6:1 OK Trash rack for overflow 8 onfice? y (Y or N) OK Freeboard provided 1.3 It QK Vegetated filter provided? n (Y or N) /nu 1 Recorded drainage easement provided? _ n (Y or N) nlcT ?k Z7-1 c Cb PiElz- faM/Pe-uTaN c.l( 5A A 12- D , Capures all runoff at ultimate build-out? y (Y or N) OK t Drain mechanism for maintenance or emergencies Ports to be pumped for emergency or maintenance purposes Form SW401-Wet Detention Basin-Rev.5 Parts I.a II.Design Summary,Page 2 of 2 I Permit No. (to be provided by DWO) r 111. REQUIRED ITEMS CHECKLIST t i Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent,the agent may initial below. If a requirement has not been met,attach justification. ' Pagel Plan gals Sheet No. CI Zl6 1 1. Plans(1"-50'or larger)of the entire site showing: -Design at ultimate build-out, -Off-site drainage(if applicable), n/)A gviGIIIW�14 Z,Delineated drainage basins(include Rational C coefficient per basin), — 5c5. ME771e0 LAS&O Cstpy -Basin dimensions, — 0"1,4144 5 ln6clw,16n I^.) -Pretreatment system, Pea aA+24 A4A_.9-nje, 4. ! -High flow bypass system, ,b i -Maintenance access, -Proposed drainage easement and public right of way(ROW), -Overflow device,and -Boundaries of drainage easement. I CSlo2 2. Parlial plan(1"=30'or larger)and details for the wet detention basin showing: -Outlet structure with trash rack or similar, -Maintenance access, -Permanent pool dimensions, i -Forebay and main pond with hardened emergency spillway, -Basin cross-section, I -Vegetation specification for planting shelf,and I -Filter strip. �JI.4 — ')4,-/. T55 RZn'Ov'4L- i Ala Z 3. Section view of the wet detention basin(1"=20'or larger)showing: -Side slopes,3:1 or lower, -Pretreatment and treatment areas,and -Inlet and outlet structures. s�� ( 12y! 4. If the basin is used for sediment and erosion control during construction,clean out of the basin is specified on the plans prior to use as a wet detention basin. PP9.6 -11 5. A table of elevations,areas,incremental volumes&accumulated volumes for overall pond and for forebay, to verify volume provided. J?f,&t't C 1201 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. PE)i w 7. The supporting calculations. 4-1 P_g� e\.� 8. A copy of the signed and notarized operation and maintenance(0&M)agreement. rIW 9. A copy of the deed restrictions(if required). 72--7')10. A soils report that is based upon an actual field investigation,soil borings,and infiltration tests. County soil maps are not an acceptable source of soils information. Form SW401-Wet Detention Basin-Rev.5 Pan III.Required Items Checklist,Page 1 of 1 V i WATER QUALITY POND #1 CALCULATIONS Project Name SECU - Swan Quarter Project Number 102-08 Date 13-Jan-09 3rd revision _ 2nd revision 1 st revision l� r i r Water Quality Pond Drainage Area Data r Project SECU - Swan Quarter Project No. 102-08 Pond No. 1 Date 13-Jan-09 Total site area 20,467 square feet = 0.47 acres Drainage area to and Other Drainage Area TO Proposed Change Existing Proposed Impervious areas s s s s On-site buildings 0 0 0 0 On-site streets 0 0 0 0 On-site parking10,421 10,421 0 0 On-site sidewalks 1,199 1,199 0 0 Other on-site 75 75 0 0 Total off-site impervious 0 0 0 0 0 Total Impervious 0 11,695 11,695 0 0 Drainage area to and Other Drainage Area Existing Proposed Change Existing Proposed Non-impervious areas lsfl Isf] s s s On-site grass/landscape 0 8,772 8,772 0 0 On-site woods 0 0 0 0 0 Other undeveloped 20,467 0 -20,467 0 0 Total off-site non-impervious 0 0 0 0 0 Total non-impervious 20,467 8,772 71,695 0 0 Total Drainage Area 20,467 1 20,467 0 0 0 Percent Impervious 0.0 1 57.1 57.1 n/a n/a Notes: Water Quality Pond 1 Calculations Site Drainage Area Data Page 1 of 1 Printed 1/15/2009 4:31 PM l Water Quality Pond Surface Area Calculations Project SECU - Swan Quarter Project No. 102-08 Pond No. 1 Date 13-Jan-09 I" ( Total on-site drainage area to pond 20,467 square feet Total impervious area in drainage area 11,695 V square feet Average water depth of basin at normal pool 3.06 feet r r ( Location of site Swan Quarter Site region Coastal % Impervious cover 57.1 percent ( If the site is in a coastal area, will a vegetative filter be used? No ( Surface Area/Drainage Area Ratios: l For a site in the Piedmont 2.28 percent For a site in a Coastal County w/Vegetative Filter 4.70 ercent For a site in a Coastal County w/out Vegetative Filter 6.50 percent ( Required surface area of pond: I For a site in the Piedmont 470.0 square feet For a site in a Coastal County w/Vegetative Filter 970.0 square feet 1 For a site in a Coastal County w/out Vegetative Filter 1,340.0 square feet l I Notes: i Water Quality Pond 1 Calculations Pond Surface Area Calcs Page 1 of 1 Printed 1/15/2009 4:31 PM j$ Water Quality Pond Stormwater Runoff Volume Calculations r Project SECU - Swan Quarter Project No. 102-08 Pond No. 1 Date 13-Jan-09 ` Drainage area 20,467 square feet Impervious area 11,695 square feet Rainfall depth 1.50 inches ` Percent Impervious 57.1 percent R(v)=0.05+0.009*(Percent impervious) Runoff coefficient - R(v) 0.56 in/in i Runoff volume=(Design rainfall)*(R(v))*(Drainage area)' Runoff volume 1,443.6 cubic feet ,VI Notes: i Water Quality Pond 1 Calculations Runoff Volume Calcs Page 1 of 1 Printed 1/15/2009 4:31 PM �U i POND STAGE-STORAGE DATA PERMANENT POOL Project SEC -Swan Quarter Project No. 102-08 Pond No 1 Date 13-Jan-09 Incremental Incremental Incremental Incremental Cumulative Cumulative Contour ID Stage Area Area Area Area volume volume volume volume s . tt. acres [sq.ft.l Jacres cu.ft acre-ft cu. tt acre-tt -3 0 294.1 0.007 294.1 0.0 0.0 0.0 0.0 0.0 -2 1 506.1 0.012 212.0 0.0 400.1 0.0 400.1 0.0 -1 2 750.1 0.017 244.0 0.0 628.1 0.0 1,028.2 0.0 0 3 1,026.1 0.024 276.0 0.0 888.1 0.0 1,916.3 0.0 1 4 1,334.1 0.031 308.0 0.0 1,180.1 0.0 3,096.4 0.0 2 5 2,442.5„ 0.056 1,108.4 0.0 1,888.3 0.0 4,984.7 0.1 i Forebay Volume: 20%of Volume=approx. 997 cu.tt -1 0 115.0 0.003 115.0 0.0 0.0 0.0 0.0 0.0 0 3 243.0 0.006 128.0 0.0 179.0 0.0 179.0 0.0 1 4 402.1 0.009 159.1 0.0 322.6 0.0 501.6 0.0 f 2 5 587.2 0.013 185.1 0.0 494.7 0.0 ',9$B,a_,:, 0.0 i i Water Quality Pond 1 Calculations Stage-Storage(Perm Pool) Page 1 of 1 Printed 1/15/2009 3:56 PM 1/ 1/ I j POND STAGE-STORAGE DATA VOLUME REQUIRED f Project SECU -Swan Quarter Project No. 102-08 I Pond No. 1 Date 13-Jan-09 Incremental Incremental IncrementalFlncremental Cumulative Cumulative Contour ID Stage Area Area Area Area volumeme volume volume [sq.ft. acres s .ft. acres cu.ft -tt cu. tt acre-ft2 0 3,029.7 0.070 3,029.7 0.1 0.00 0.0 / 0.0 2.75 0.75 4,705.0 0.108 1,675.3 0.0 2,900.51 2;900.5 " 0.1 3 1 5,009.2 0.115 304.2 0.0 1,214.30 4,114.8 0.1 4 2 7,221.8 0.166 2,212.6 0.1 6,115.51 10,230.3 0.2 f i I 1 i Water Quality Pond 1 Calculations Stage-Storage(VOLUME) Page 1 of 1 Printed 1/16/2009 7:46 AM r r POND STAGE-STORAGE DATA Vag Shelf Volumes I Project SECU -Swan Quarter Project No. 102-08 I Pond No. 1 Date 13-Jan-09 Incremental Incremental Incremental Incremental Cumulative Cumulative Contour ID Stage Area Area Area Area volume volume volume volume [sq.ft. acres s , ft. acres cu.ft acre-ft cu.ft acre-ft -3 0 294.1 0.007 294.1 0.0 0.0 0.0 0.0 0.0 -2 1 506.1 0.012 212.0 0.0 400.1 0.0 400.1 0.0 .1 2 750.1 0.017 244.0 0.0 628.1 0.0 1,028.2 0.0 0 3 1,026.1 0.024 276.0 0.0 888.1 0.0 1,916.3 0.0 1 4 1,334.1 0.031 308.0 0.0 1,180.1 0.0 3,096.4 0.0 ........................ 1.5 4.5 1,500.0 0.034 165.9 0.0 708.5 00 a904.9 0.0 2 5 1 2,442.5 0.056 1 942.5 0.0 1 985.6 0.0 4,790.6 0.0 2.5 5.5 3,545.3 0.081 1,102.8 0.0 1,497.0 0.0 &287.6.J<: 0.1 t 1 Water Quality Pond 1 Calculations Vag Shelf Volumes 'Page 1 of 1 Printed 1/15/2009 4:16 PM Water Quality Basin Dewatering Time Calculations r Project SECU - Swan Quarter Project No. 102-08 Pond No. 2 Date 13-Jan-09 f Volume provided above orifice 2,901 cubic feet Surface Area of Basin 4,705 square feet Maximum head of water above dewatering hole 0.75 feet Orifice coefficient 0.60 Diameter of each hole 0.75 inches Number of holes 1 Discharge rate 0.013 cfs Cross sectional area of each hole = 0.003 square feet Cross sectional area of each hole = 0.4 square inches Cross sectional area of dewatering hole(s) = 0.003 square feet Cross sectional area of dewatering hole(s) = 0.4 square inches Dewatering time for basin = 2.62 days 20 f r TR55 Tc Worksheet Hydraflow Hydrographs by Intelisolve v9.1 Hyd. No. 1 ` Pre-Dev Basin 1 Description A B C Totals Sheet Flow Manning's n-value = 0.150 0.011 0.011 Flow length (ft) = 186.0 0.0 0.0 Two-year 24-hr precip. (in) = 4.18 0.00 0.00 Land slope (%) = 0.20 0.00 0.00 Travel Time (min) = 35.38 + 0.00 + 0.00 = 35.38 Shallow Concentrated Flow Flow length (ft) = 150.00 0.00 0.00 Watercourse slope (%) = 0.50 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) = 1 .14 0.00 0.00 Travel Time (min) = 2.19 + 0.00 + 0.00 = 2.19 Channel Flow X sectional flow area (sgft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 ` Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) = 0.00 0.00 0.00 Flow length (ft) = 0.0 0.0 0.0 ` Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc .............................................................................. 37.57 min 21 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.1 Monday,Jan 19,2009 Hyd. No. 1 Pre-Dev Basin 1 ` Hydrograph type = SCS Runoff Peak discharge = 0.357 cfs Storm frequency = 1 yrs Time to peak = 742 min Time interval = 7 min Hyd. volume = 2,105 cuft Drainage area = 0.470 ac Curve number = 74 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 38.00 min Total precip. = 3.44 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pre-Dev Basin 1 0 (cfs) Hyd. No. 1 -- 1 Year 0 (cfs) 0.50 0.50 0.45 0.45 0.40 0.40 I 0.35 0.35 0.30 0.30 0.25 0.25 0.20 0.20 0.15 0.15 0.10 0.10 0.05 0.05 0.00 0.00 0 2 4 6 8 11 13 15 17 19 21 23 25 Hyd No. 1 Time (hrs) - 2 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.1 Monday,Jan 19,2009 Hyd. No. 2 Post-Dev Basin 1 Hydrograph type = SCS Runoff Peak discharge = 1 .813 cfs Storm frequency = 1 yrs Time to peak = 717 min Time interval = 1 min Hyd. volume = 3,745 cuft Drainage area = 0.470 ac Curve number = 87 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 5.00 min Total precip. = 3.44 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post-Dev Basin 1 0 (cfs) 0 (cfs) Hyd. No. 2 -- 1 Year 2.00 2.00 1.00 1.00 0.00 0.00 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0 -- Hyd No. 2 Time (hrs) 23 r Pond Report ( Hydraflow Hydrographs by Intelisolve v9.1 Friday,Jan 16,2009 Pond No. 1 - Wet Pond 1 Pond Data Contours-User-defined contour areas. Conic method used for volume calculation. Begining Elevation= 7.00 If I Stage/ Storage Table Stage(ft) Elevation(ft) Contour area(sl Incr. Storage(cuff) Total storage(cutt) 0.00 7.00 294 0 0 1.00 8.00 506 395 395 2.00 9.00 865 678 1,073 3.00 10.00 1,266 1,059 2,132 4.00 11.00 1,736 1,495 3,627 5.00 12.00 3,030 2,353 5,980 6.00 13.00 5,009 3,978 9,958 7.00 14.00 7,222 6,081 16,039 Culvert/ Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] 1 Rise (in) = 12.00 0.75 0.00 0.00 Crest Len(ft) = 8.00 0,00 0.00 0.00 ! Span(in) = 12.00 0.75 0.00 0.00 Crest El.(ft) = 12.75 0.00 0.00 0.00 No. Barrels = 1 1 0 0 Weir Cal = 3.33 3.33 3.33 3.33 Invert El. (ft) = 9.25 12.00 0.00 0.00 Weir Type = Rect --- --- --- Length (ft) = 43,00 0.00 0.00 0.00 Multi-Stage = Yes No No No Slope(%) = 1.05 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000(by Contour) Multi-Stage = n/a Yes No No TW Ell (ft) 9.80 Note.Culven/Onfice outflows ate analyzed under inlet(is)and outlet loci control. Weir risers checked for orifice conditions(ic)and submergence(s). ) l Stage(ft) Stage/Storage Elev(ft) 8.00 15.00 1 i 6.00 13.00 4.00 11.00 2.00 9.00 0.00 7.00 0 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000 18,000 Storage Storage(tuft) 2� Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.1 Monday,Jan 19,2009 Hyd. No. 3 Wet Pond #1 Hydrograph type = Reservoir Peak discharge = 0.038 cfs Storm frequency = 1 yrs Time to peak = 940 min Time interval = 1 min Hyd. volume = 1 ,895 cuft Inflow hyd. No. = 2 - Post-Dev Basin 1 Max. Elevation = 12.71 ft Reservoir name = Wet Pond 1 Max. Storage = 8,799 cuft Storage Indication method used. Wet pond routing start elevation = 12.00 ft. Wet Pond #1 0 (cfs) Hyd. No. 3 -- 1 Year 0 (cfs) 2.00 2.00 i 1.00 1.00 0.00 0.00 0 3 6 9 12 15 18 21 24 27 30 — Hyd No. 3 — Hyd No. 2 Total storage used = 8,799 cuft Time (hrs) 25 Pond #1 1 i Bouyancy Calculations Wet Pond #1 Project: 102-08 Page 1 of 1 i Date: 1/15/09 Riser Width 2 Riser Length 2 Wall Thickness 0.67 Riser Depth 6.75 Base Volume 20.25 cf Riser Inner Volume 27 Riser Inner Volume 27.00 cf Riser Concrete Volume 48.30 Riser Concrete Volume 48.30 cf Total Buoyant Force 4698.74 Total Buoyant Force 5962.34 i Concrete Weight 7245.05 Base Weight 3037.50 Riser Weight 7245.05 Desired Factor Of Safety 1.5 Total Resisting Force 10282.55 Total Weight Required 7048.11 Factor of Safety 1.72 Additonal Weight Required -196.94 Volume of Additional Concrete -3.49 CF Base Width 4.5 Base Length 4.5 i Required Base Depth -0.17243 -2.06921 inches Set Depth to min 1 feet Page 1 2�v Permit No. ( (m be nmvdtl by DWG) ( ( ��A$ WA TF,9Oc ( NCDENR ( STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM ( WET DETENTION BASIN SUPPLEMENT ( This form must be filled out,printed and submitted. ( . The Required Items Checklist(Pad III)must be printed,filled out and submitted along with all of the required information. ( I. PROJECT INFORMATION Project name Slate Employees Credit Union-Swan Quarter ( Contact person Parry E.Hilburn Phone number (919)84BA399 ( Date 1/1512008 ( Drainage area number Pond#2 ( II. DESIGN INFORMATION ( Site Characteristics Drainage area 39,006 ry' ( Impervious area,post-development 23,453.00 ryt %impervious 60.13 as / ( Design rainfall depth 1.5 in V ( Storage Volume: Non-SA Waters Minimum volume required 113 ( Volume provided rys Storage Volume: SA Waters ( 1.5'runoff volume 2,882 ft3 v ( Pre-development 1-yr,24-hr runoff 381 rya Post-development 1-yr.24-hf runoff 1,035 rya ( Minimum volume required 2,882 rya ( Volume provided 3,627 rys Peak Flow Calculations Is the preipost control of the lyr 24hr storm peak flow required? y (Y or N) / 1-yr,24-hr rainfall depth 3.4 in 1/ ( Rational C,pre-development 0.25(unitless) Rational C,post-development 0.68 limitless) ( Rainfall intensity:1-yr,24-hr storm 5.64 iNhr OK Pre-development 1-yr,24-hr peak flow 1.30 ft3lsec ( Post-development 1-yr,24-hr peak flow 3.45 fl'Isec k Pre/Post 1-yr,24-hr peak flow control 2.15 ry'Isec Elevations (. Temporary pool elevation 2.75 fmsl Permanent pool elevation 2.00 fmsl SHWT elevation(approx.at the pen.pool elevation) 1.40 first l Top of 1 Oft vegetated shelf elevation 2.50 fmsl Bottom of 1Oft vegetated shelf elevation 1.50 fmsl Sediment cleanoul,top elevation(bottom of pond) -3.00 first Sediment cleanout,bottom elevation A.00 first Sediment storage provided 1.00 It Is there additional volume stored above the stale-required temp.pool? n (Y or N) Elevation of the lop of the additional volume 2.8 frost OK Form SWannWel Detention Basin-Rev.S Paris 1.811.Design Summary,Page 1 of f Permit No. (to be Provee0 by DWO) ( 11. DESIGN INFORMATION Surface Areas Area,temporary pool 5,791 fh / Area REQUIRED,permanent pool 2,610 it' ✓ / SAIDA ratio 6.69(unflless) Area PROVIDED,permanent pool,A.. 3,882 ft' OK Area,bottom of 1 Oft vegetated shelf,A._,,,, 1,971 fl' ( Area,sediment cleanout,top elevation(bottom of pond),Ate,. 495 It' ( Volumes -/ ( Volume,temporary pool 3,627 b'V OK Volume,permanent pool,Vim„, 6,799 fl' Volume,forebay(sum of forebays if more than one forebay) 1,429 II' / f Forebay%of permanent pool volume 21.0%% QK SAIDA Table Data ( Design TSS removal 90% Coastal SAIDA Table Used? y (Y or N) MountaiNPiedmont SAIDA Table Used? n (Y or N) ( SAIDA ratio 6.69(unifless) Average depth(used in SAIDA table): ( Calculation option 1 used?(See Figure 10-2b) n (Y or N) Volume,permanent pool,Vp,.m, fl3 Area provided,permanent pool,A.. tt' ( Average depth calculated If Average depth used in SAIDA,d„,(Round to nearest 0.5ft) It ( Calculation option 2 used?(See Figure 10-2b) y (Y or N) ( Area provided,permanent pool,A, 3,882 fl' OK Area,bottom of 1011 vegetated shelf,Ate,_, 1,971 fl' OK ( Area,sediment cleanoul,top elevation(bottom of pond),Ate, a 495 fl° OK ( 'Depth'(distance bhv bottom of 10f1 shelf and top of sediment) 4.50 It OK Average depth calculated 3.19 ff OK Average depth used in SAIDA,d„.,(Round to nearest 0.511) 3.2 It ,,/ OK ( Drawdown Calculations V ( Drawdown through odfice? y (Y or N) / Diameter of odfice(if circular) 0.75 in v ( Area of orifice(if-non-circular) in' ( Coefficient of discharge(Co) 0.60(unitless) Driving head(Ha) 0.75 fl Drawdown through weir? n (Y or N) Weir type (unifless) (. Coefficient of discharge(C„.) (unifless) Length of weir(L) It Driving head(H) It ( Pre-development 1-yr,24-hr peak flow 1.30 ff'/sec OK Post-development 1-yr,24-hr peak flow 3.45 fl'/sec OK l Storage volume discharge rate(through discharge office or weir) 0.01 fl'Isec ( OK,draws down in 2-5 days. Storage volume drawdown time 3.28 days t V OK,drawdown time is correct. Additional Information t Vegetated side slopes 3:1 OK 1 Vegetated shelf slope 10:1 OK Vegetated shelf width 10.0 fl OK Length of flowpath to width ratio 3:1 OK Length to width ratio 2.9:1 OK 1. Trash rack for overflow 8 orifice? y (Y or N) OK Freeboard provided 1.3 If OK Vegetated filter provided? n (Y or N) OK l Recorded drainage easement provided? n (Y or N) IacT P-E `1Qr"D PE�'L CONveVl�.1T(o,-1 wl SMnIQ.. D . Capons all runoff at ultimate build-out? y (Y or N) OK Drain mechanism for maintenance or emergencies Pond to be pumped for emergency,and maintenance purposes 1 Form SW401-Wet Detention Basin-Bev.5 Parts I.a II.Design Summary,Page 2 of 2 - 2 U Q ( Permit No. (to be provided by OWO) r Ill. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent,the agent may initial below. If a requirement has not been met,attach justification. i Pagel Plan I ' fals Sheet No. G1� 1. Plans If -50'or larger)of the entire site showing: Design at ultimate build-out, OH-site drainage(if applicable), f r4 5 V_frtVT5 l4 Z_ -Delineated drainage basins(include Rational C coefficient per basin), -5 CS "e/Wb L Strom C 5102— -Basin dimensions, _ DAA L. - AtigP L-1 -Pretreatment system, Des fw- fJAU Tn VG✓ C,-94. S . I High flow bypass system, Maintenance access, Proposed drainage easement and public right of way(ROW), Overflow device, and Boundaries of drainage easement. l G 0 2 2. Partial plan(1"=30'or larger)and details for the wet detention basin showing: -Outlet structure with trash rack or similar, -Maintenance access, -Permanent pool dimensions, Forebay and main pond with hardened emergency spillway, -Basin cross-section, -Vegetation specification for planting shelf,and -Filter strip. 9'=A4W 97 C SI d*- 3. Section view of the wet detention basin(1"=20'or larger)showing: -Side slopes,3:1 or lower, -Pretreatment and treatment areas,and -Inlet and outlet structures. 207 4. If the basin is used for sediment and erosion control during construction,clean out of the basin is specified 1 on the plans prior to use as a wet detention basin. 34-alp 5. A table of elevations,areas,incremental volumes&accumulated volumes for overall pond and for forebay, to verify volume provided. k 7-ib 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the ,1 entire drainage area is stabilized. PA,30 9-7 7. The supporting calculations. EtWASM &. A copy of the signed and notarized operation and maintenance(0&M)agreement. N I,� n7JA 9. A copy of the deed restrictions(if required). OQCr. 1_ 1-1 10. A soils report that is based upon an actual field investigation,soil borings,and infiltration tests. County soil maps are not an acceptable source of soils information. Form SW401-Wet Detention Basin Rev.5 Part III.Required Items Checklist.Page 1 of 29 I r WATER QUALITY POND #2 CALCULATIONS i Project Name SECU - Swan Quarter i r Project Number i i 102-08 i i Date i 13-Jan-09 i 3rd revision 2nd revision 1st revision 30 I Water Quality Pond Drainage Area Data Project SECU - Swan Quarter Project No. 102-08 Pond No. 2 Date 13-Jan-09 Total site area 39,006 square feet = 0.90 acres Drainage area to and Other Drainage Area Existing Proposed Change Existing Proposed Impervious areas lsfl Isqs s s On-site buildings 0 4,258 4,258 0 0 On-site streets 0 0 0 0 0 On-site parking 0 16,221 16,221 0 0 On-site sidewalks 0 1,738 1,738 0 0 Other on-site 0 1,236 1,236 0 0 Total off-site impervious 0 0 0 0 0 Total Impervious 0 1 23,453 23,453 0 0 Drainage area to end Other Drainage Area Existing Proposed Change Existing Proposed Non-impervious areas s s s s s On-site grass/landscape 0 15,553 15,553 0 0 On-site woods 0 0 0 0 0 Other undeveloped 39,006 0 -39,006 0 0 Total off-site non-impervious 0 0 0 0 0 Total non-impervious 39,006 15,553 -23,453 0 0 Total Drainage Area 39,006 39,006 0 0 0 Percent Impervious 0.0 60.1 60.1 n/a n/a Notes: Water Quality Pond 2 Calculations Site Drainage Area Data Page 1 of 1 Printed 1/15/2009 10:52 AM 3� Water Quality Pond Surface Area Calculations Project SECU - Swan Quarter Project No. 102-08 Pond No. 2 Date 13-Jan-09 Total on-site drainage area to pond 39,006 square feet Total impervious area in drainage area 23,453 square feet Average water depth of basin at normal pool 3.19 feet i Location of site Swan Quarter Site region Coastal % Impervious cover 60.1 percent If the site is in a coastal area, will a vegetative filter be used? No Surface Area/Drainage Area Ratios: i For a site in the Piedmont 2.3 percent For a site in a Coastal County w/Vegetative Filter 4.8 percent For a site in a Coastal County w/out Vegetative Filter 6.7 percent Required surface area of pond: For a site in the Piedmont 920.0 square feet For a site in a Coastal County w/Vegetative Filter 1,870.0 square feet For a site in a Coastal County w/out Vegetative Filter 2,610.0 Vsquare feet Notes: Water Quality Pond 2 Calculations Pond Surface Area Calcs Page 1 of 1 Printed 1/15/2009 11:00 AM 32 r ` Water Quality Pond Stormwater Runoff Volume Calculations Project SECU - Swan Quarter Project No. 102-08 i Pond No. 2 Date 13-Jan-09 Drainage area 39,006 square feet Impervious area 23,453 square feet Rainfall depth 1.50 inches Percent Impervious 60.1 percent I R(v)=0.05+0.009*(Percent impervious) Runoff coefficient - R(v) 0.59 in/in Runoff volume=(Design rainfall)*(R(v))*(Drainage area) Runoff volume 2,882.3 cubic feet Notes: i i Water Quality Pond 2 Calculations Runoff Volume Calcs Page 1 of 1 Printed 1/15/2009 10:48 AM � 33 1 Q r 0 O 0 O O N N I C a` r 0 0 0 0 0 0 0 0 <rj ? W 0 0 0 0 0 0 O O O O f 11 U K i u a O O O O N O 00 > > J O m N 00f O OmD d N � U o [OE r d o 0 0 0 0 ° o0 00 00000o E 0000 mp ,� 00ooN o 00m o V O m NN m 0) N ? I 0 a ��pp yy ; (� a N 0 0 0 0 0 0 O O O O a y a m 0 0 0 0 0 0 o 0 o o Z s LL A W W Z m Qd q O O O O O � O O 00 f w N Q N N O m W N O m m t0 N a U N < N m m m - N - - N O c 0 a a m i(1 N O i0 0 = m d N m o 0 o 0 Q 0 0 0 0 0 0 0 0 0 0 I m o 0 0 0 0 0 0 0 0 0 o o N 'a 0 0 o 0 0 0 0 0 0 N Q m m N m N j a N < !� p n U m C J _ a o 3 rn m 8 U 0 a U a m0 N ro ro o N m o m 0 m v m E U N � tw o ao m a d o @ m (J z d a o N � U m N 7 O N O e- N C a a m a` a` a0 o ) a a : ; ) , # E d) „ 6 , . # ( f ° 2-, t : Q # m ) > 6 ¥ \ \ \ 0000 \ { E ow , } - - - ) 7 \ j - 0000 , [ mo / ! k \ E cn w0 � w . 7 = . ! , t : \ / : . J « - 0000 $ ] ` \ , ° } ) {/ . \/\ « \ \ . )< r Water Quality Basin Dewatering Time Calculations Project SECU - Swan Quarter Project No. 102-08 Pond No. 2 i Date 13-Jan-09 Volume provided above orifice 3,627 cubic feet Surface Area of Basin 5,791 square feet Maximum head of water above dewatering hole 0.75 feet Orifice coefficient 0.60 Diameter of each hole 0.75 inches Number of holes 1 Discharge rate 0.013 cfs ' Cross sectional area of each hole = 0.003 square feet i Cross sectional area of each hole = 0.4 square inches Cross sectional area of dewatering hole(s) = 0.003 square feet Cross sectional area of dewatering hole(s) = 0.4 square inches i Dewatering time for basin = 3.28 days i 3� TR55 Tc Worksheet Hydraflow Hydrographs by Intelisolve v9.1 Hyd. No. 8 Pre-Dev Basin 2 Description A B C Totals Sheet Flow Manning's n-value = 0.150 0.011 0.011 Flow length (ft) = 186.0 0.0 0.0 Two-year 24-hr precip. (in) = 4.18 0.00 0.00 Land slope (%) = 0.20 0.00 0.00 Travel Time (min) = 35.38 + 0.00 + 0.00 = 35.38 Shallow Concentrated Flow Flow length (ft) = 150.00 0.00 0.00 Watercourse slope (%) = 0.50 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) = 1 .14 0.00 0.00 Travel Time (min) = 2.19 + 0.00 + 0.00 = 2.19 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) = 0.00 0.00 0.00 Flow length (ft) = 0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc .............................................................................. 37.57 min 3� Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.1 Monday,Jan 19,2009 Hyd. No. 5 Pre-Dev Basin 2 Hydrograph type = SCS Runoff Peak discharge = 0.684 cfs Storm frequency = 1 yrs Time to peak = 742 min Time interval = 7 min Hyd. volume = 4,031 cuft Drainage area = 0.900 ac Curve number = 74 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 38.00 min Total precip. = 3.44 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 I Pre-Dev Basin 2 0 (cfs) Hyd. No. 5 -- 1 Year 0 (cfs) 1.00 1.00 0.90 0.90 I 0.80 0.80 0.70 0.70 0.60 0.60 0.50 0.50 0.40 0.40 0.30 0.30 0.20 0.20 0.10 0.10 0.00 0.00 0 2 4 6 8 11 13 15 17 19 21 23 25 — Hyd No. 5 Time (hrs) t 39 I Hydrograph Report f Hydraflow Hydrographs by Irdelisolve v9.1 Monday,Jan 19,2009 Hyd. No. 6 Post-Dev Basin 2 Hydrograph type = SCS Runoff Peak discharge = 3.710 cfs Storm frequency = 1 yrs Time to peak = 717 min Time interval = 1 min Hyd. volume = 7,755 cult Drainage area = 0.900 ac Curve number = 89 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 5.00 min Total precip. = 3.44 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post-Dev Basin 2 r 0 (cfs) Hyd. No. 6 -- 1 Year 0 (cfs) 4.00 4.00 I f 3.00 3.00 I 2.00 2.00 1.00 1.00 0.00 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0 — Hyd No. 6 Time (hrs) �J r Pond Report ( Hydraflow Hydrographs by Intelisolve v9.1 Friday,Jan 16,2009 ! Pond No. 2 - Wet Pond #2 Pond Data Contours-User-defined contour areas.Conic method used for volume calculation. Begining Elevation=7.00 ft Stage/Storage Table Stage(ft) Elevation(ft) Contour area(sgft) Incr.Storage(cuft) Total storage(cult) I 0.00 7.00 495 0 0 1.00 8.00 767 626 626 2.00 9.00 1,274 1,010 1,636 3.00 10.00 1,770 1,515 3,151 4.00 11.00 2,330 2,043 5,194 5.00 12.00 3,882 3,073 8,267 6.00 13.00 6,375 5,077 13,344 7.00 14.00 9,262 7,773 21,117 t Culvert/Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 12.00 0.75 0.00 0.00 Crest Len(ft) = 8.00 0.00 0.00 0.00 Span (in) = 12.00 0.75 0.00 0.00 Crest El. (ft) = 12.75 0.00 0.00 0.00 No.Barrels = 1 1 0 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert El. (ft) = 9.00 12.00 0.00 0.00 Weir Type = Rect --- --- --- Length(it) = 54.00 0.00 0.00 0.00 Multi-Stage = Yes No No No Slope 1%) = 0.74 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000(by Contour) Multi-Stage = n/a Yes No No TW Elev.(it) = 10.60 i Note:Culvert/Onf ce ourflum are analyzed under Inlet(ic)and outlet foc)control. Weir risers checked for orifice conditions fic)and submergence(s). ( Stage(ft) Stage/Storage Elev(ft) 8.00 15.00 6.00 13.00 i 4.00 11.00 2.00 9.00 0.00 7.00 0 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000 18,000 20,000 22,000 Storage Storage(cuft) 4( i Hydrograph Report Hydratlow Hydrographs by Intelisolve v9.1 Monday,Jan 19,2009 Hyd. No. 7 Wet Pond #2 Hydrograph type = Reservoir Peak discharge = 0.560 cfs Storm frequency = 1 yrs Time to peak = 728 min Time interval = 1 min Hyd. volume = 5,144 cult Inflow hyd. No. = 6 - Post-Dev Basin 2 Max. Elevation = 12.82 ft Reservoir name = Wet Pond #2 Max. Storage = 12,430 cult Storage Indication method used. Wet pond routing start elevation= 12.00 ft. Wet Pond #2 (cfs) Hyd. No. 7 -- 1 Year Q (cfs) 4.00 4.00 3.00 3.00 I I 2.00 2.00 1.00 1.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 — Hyd No. 7 — Hyd No. 6 Total storage used = 12,430 cult Time (hrs) Z Pond #2 1 Bouyancy Calculations Wet Pond#2 Project: 102-08 Page 1 of 1 Date: 9/30/08 Riser Width 2 Riser Length 2 Wall Thickness 0.67 Riser Depth 6.75 Base Volume 20.25 cf Riser Inner Volume 27 Riser Inner Volume 27.00 cf Riser Concrete Volume 48.30 Riser Concrete Volume 48.30 cf Total Buoyant Force 4698.74 Total Buoyant Force 5962.34 Concrete Weight 7245.05 Base Weight 3037.50 Riser Weight 7245.05 Desired Factor Of Safety 1.6 Total Resisting Force 10282.55 Total Weight Required 7048.11 Factor of Safety 1.72 Additonal Weight Required -196.94 Volume of Additional Concrete -3.49 CF Base Width 4?5 Base Length 4.6 i Required Base Depth -0.17243 -2.06921 inches I Set Depth to min t feet Page 1 l �k3 1 Hydrograph Summary Report Hydraflow Hydrographs by lntelisolve v9,1 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval peak volume hyd(s) elevation strge used description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 0.357 7 742 2,105 ---- ------ ------ Pre-Dev Basin 1 2 SCS Runoff 1.813 1 717 3,745 ---- ------ ------ Post-Dev Basin 1 3 Reservoir 0.038 1 940 1,895 2 12.71 8,799 Wet Pond N1 5 SCS Runoff 0.684 7 742 4,031 ---- ------ ------ Pre-Dev Basin 2 i 6 SCS Runoff 3.710 1 717 7,755 ---- ----- ------ Post-Dev Basin 2 7 Reservoir 0.560 1 728 5,144 6 12.82 12,430 Wet Pond N2 I f 4 l i I SECU-SQ_BMP Design_.gpw Return Period: 1 Year Monday, Jan 19, 2009 ( 2 Hydrograph Summary Report Hydraflow Hydrographs by lntelisolve v9.1 ( Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval peak volume hyd(s) elevation strge used description (origin) (cfs) (min) (min) (cuft) 00 (cuft) i 1 SCS Runoff 1.116 7 742 6,252 ---- ------ ------ Pre-Dev Basin 1 i 2 SCS Runoff 4.023 1 717 8,690 ---- ------ ------ Post-Dev Basin 1 3 Reservoir 2.782 1 721 6,831 2 12.97 9,832 Wet Pond N1 5 SCS Runoff 2.138 7 742 11,971 ---- ------ ------ Pre-Dev Basin 2 6 SCS Runoff 7.931 1 717 17,393 ---- ----- ------ Post-Dev Basin 2 7 Reservoir 5.420 1 721 14,770 6 13.15 14,495 Wet Pond N2 1 I i i ( i l I 1 i I i ( 1, SECU-SQ_BMP Design_.gpw Return Period: 10 Year Monday, Jan 19, 2009 t �� 3 Hydrograph Summary Report Hydraflow Hydrographs by Intelisolve v9.1 r Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval peak volume hyd(s) elevation strge used description (origin) (cfs) (min) (min) (cult) (Il) (cuft) 1 SCS Runoff 2.313 7 735 12,999 ---- ------ ------ Pre-Dev Basin 1 2 SCS Runoff 7.117 1 717 16,001 ---- ------ ----- Post-Dev Basin 1 r 3 Reservoir 5.808 1 720 14,135 2 13.12 10,712 Wet Pond N1 i 5 SCS Runoff 4.429 7 735 24,892 ---- ------ ------ Pre-Dev Basin 2 I 6 SCS Runoff 13.81 1 717 31,493 ---- ------ ---- Post-Dev Basin 2 7 Reservoir 6.106 1 723 28,860 6 13.61 18,070 Wet Pond H2 i I I 1 I I i t I I i it SECU-SQ_BMP Design_.gpw Return Period: 100 Year Monday, Jan 19, 2009 I l �( _. __ :SE Gam_ SW.4r�1 �A/LTt'� �u Q.✓jE12.. ��_ - _ __-___ ��Z`O�_._. -74 jpO ST _ C->E�1 Flap M.tr'��r DA- = O•�-9. TL CnJ o p C,�s� o c t A✓1 t-r4 _ . 2 ti A o.vl -.z A-c.' 674 = S�. 2- _7 la-7 r i i e P2E -vEy�� M�,� bra _�• 92g� r • Posr - DFr rr,�.�r DA- = 0.92 A� Cf.) LMPE'Q-V\oJg s �$ 4(Lb-�A- (�.S Arc- L+ a �paaE _ -7-4 I v . g2A-� ' I I i i I i r a N c0 x I �I �I Io i C J O � I Z 42 �F 111 I O re l I � f � m T U m U � m U �f � m1 m� N I Q m N W Q r I ar o cc 00 �� rA , d m a � E 0 0 0 i m � 0 N !0 O 0 i0 N O I� C9 ^ m N m m It W cc m t O N N O O O O N N N C N h m t0 0 m O m 1� 0 N fV m m N O m (7 f7 0 N I d r N N o 0 o N N o o E N O. Y m N N N m 4 C N m Ind N d m m In 2 L 1q O m Ih O d m m O .. N � m O O d O m O O D m D) (V N 01 (V O J J � p U m m m m m m d ar � '^ co d m Co o m o - U y N N N N N N N N N N C N C_ J f/1 0 m c C a e m N tm0 m (OD N N w 100 U J O 0 O O O O O O y N C IS O N m O M O O m O N N I f C U N fV O O O w R C N U O IT, m om W oD m N wo V o 0 0 0 0 o. o. o 0 11 0 d L Cc OO N N N (AtN N N N N G C C O m m m OJ m m m m C a> tN0 N CO 7 m CO 'a E o 0 0 0 0 of 0 o m c F 0 D W m m m m N N m m m O N O f N my 6 r N N N N N N17 I� E 4 = y O O O O O O O O O N C Q N N m m m m N 66 7 o In co m LL U U LL U U U w m 11 L Jo a N U U w > U U v U U U W _ cn N N m w O C O No o _ J Z Z R?, -Y� r E 0 N N CD N � C11 C 3 C) c^O C, O o CO o (DC w 3 ! C) 1 + W � o C� m N 1 E N v ! N 0 d O 00 O W 1 10 ti I O 0 in O (0 d Q 1 O LO i p` O J � C l IR ONE, O Q x OD r N C : : (h + UJ W W O •J O CO ll 11 O O W N - O 10 p _ (0 > U) � � I � O 0 0 0 0 o 0 0 0 0 0 j L6 T ai <D Cl) o � � d � r �'7 N fn O N � y O� m E W o (n N O aD N n0 O o O N _ N O y m m o O + W W O = ( N OQ 0 _ > N U Q G O � I n I ( co � J C o ( C? N O N O m m cb W WW ( T N ( ^1 \_ O — b ( Cl)mNc" hi C6 @j QD O W W W N U ca E j j W 0) o n 1 0 p O LD O C •� O ON N N N 1 0 Q O n N N "'L 1 O W W W I G - - ( � o 0 0 0 0 0 rn r LO m O 111 l i Sp E o J 7 N O d O p Ip n U rn E Ju 1..� o W W o in tq > O } CO 2 c 30 is N v l O T S = o rn o i d 0 CD 0 C) A. t U) o r d ( vl O _ a r e o OD N W N V 1 + 1 / > > O N ca { y 0 •� O U( O (� CD { W + W J 1 O W N Ip C j N o> co � v O O O O O O o o O o 0 0 .LO- N O co m O W l f� 'I. 5 1 C N 00 N 13 d 0 r E m o p E a0 M c0 0 ( r (D O � U w `? m E 2 � o _ ch C� c 0 ! N ouOLO O Lo CD N p i g + www ppm E > > o I o O i I 0 ! --- rn 0 m r � � r � o ¢ 0 N ' O O O i N LI l 41 m W ' O J o V /r t ' I o, J O N �•J p ma) p _ _ g N m(D I I.L + w F, F,I o m E , N �cnE —` S ! � o f 1 o 0 0 0 0 0 o of vi c� i w ! r � 5 2 E o ( N � N O 3 O CO M ^ �a - - 3 n 0) r- L o J p f O W W m E _ D 65 Q C O- m J 2 I�1 O OJ i 1 i � 11 O i LO i O i i J n N O L d m I d m i J C � m aria W W W IA m E > j A cn ¢ 55 O 7 c+) 0 5 O — - N N o O y o l0 C ` N O •J � O ^ o O i� O W _ O -6 W m c '> C \ v O �n O O O O O O � O O O o 0 0 N O aD w 7 N W r i S c O O C O O O a w ( p Y m o o o a o v o n F ^' o L d V h N O c c c c c O O O C m N O m ] n N n Ip Q O c c C c c O O O I J > _ W d (Np N m nm N O O m _ a _ O O O O O O o O O o m N d O G N o 0 6 0 o 6 0 6 o E L 2 i S z n r m 0 0 v m M m N m (� d O m ~ > > N N O O O i(l m O O {U N N N m n N [p p] I J r c0 m N N f N O N m N J > ( S O O CL L N N � 1 E N N m N N m d d N N N N N m O O � d _ U N m N d_C Y m M O d d O � O O 0 0.O O O � a ' J y d o v m _ o m m N S d N m O N m O n .� of of a v ei 4 co a a I 9 l ` >v vo m o dX E . R " n M � i c m V — N N M M N V M M M d L_ N m O m O m O O O t0 4 O M O m O N m d N d c o 0 r •'1 ' DATE Page 1 1/1512009 PROJECT NAME PROJECT NO SECU Swan Ommor 1D2 08 BY PER Storm Outlet Structure FES No.= FES1 Oro/Olull- 062 Pipe Ola= 12 in VNto11= 1.05 am- 1.99 tls V= 4.2 Ips Olull= 3.19 ris Mull= 4061ps From Fig 806.b1 Zone I From Fig.8.06.b 2 D50 3 in D.. 45 in t R'pmp Class = A Apron Ri vkness = 4 in 1 - Apron Longer = 3D-k- 15 e,aeem 1U 1OE OF .SIOpF> Apron Width 3.Dm = 3 X(required) r I 5S . +DATE Page 2 n 1I15/21)09 PROJECT NAME PROJECT NO SECU-Swan Opener 102-08 BY PER i Storm Outlet Structure I FES No= FES-8 0,NOW- 0a6 Pipe Dian 12 in VNVI= 097 Oro= 208 cfs V= 56 fps OMI= 451 ds Vfull= 514 fps From Fig.806.b.I. Zone 1 F,o,,Fig.60662: D. = 3 In Danz 4.5 In n Riprap Class = A Apron Thickness = 12 p,. Apron Length - i94-��,rlT'-Map � TOE �ti< Sl � Apron Width=3.Dia f 3 ( wred) I tt f ue -k, DATE 915/2008 ( PROJECT NAME PROJECT NO SECU Swan OuaM1er 102 08 BY PER ( Storm Outlet Structure FES No.= FES-11 OmlOfull= 062 Pipe DIa= 12 in VNIUII= 1.05 Cho= 1.56 ch V= 3E fps I OtoII- 2.52 cis VVI= 3.21 fps I From Fig.8 06 b 1 Zone = 1 From Fig.806 b.2Y. Dso = 3 In Da. = 4.5 in Riprap Class = A ( - a Apron Thickness = 12 in ` Apron Length = 4.0 11 ( x Apron Width=3xD.a = 3 If(required) ) 1 I I DATE Page / 1/15/2009 PROJECTNAME PROJECT NO SECU-Swan Quarter 102-08 BY PEH 1 Storm Outlet Structure FES No.= FES-15 Ora/OMI= 001 Pipe DIa= 12 In VNfWl= 0.32 Oro= 002 cis V= 1.5 fps OU 3.60 Cis Vfoll= 4.60 fps ( From Fig.8.06.b.1: Zone 1 .. m.Fig 006 b2 OSC 3 In Duct 4 5 n Rii Class - A _ l { Apron Thickness 12 In h APron Lengib 00 it Apron Width=3xDie = 3 M1(required) DATE 1/15/2009 PROJErCT NAME PROJECT NO I SECU Swan Quarter 102-08 BY PEH ( Storm Outlet Structure FES Na.= FES-16 Ora/Olull= 0.11 Pipe Dian: 12 in VNI0 067 Oro= 0.34 cis V= 26 fps Qlull- 306 cis Vlull= 3 90 fps From Fig.8.06.b.I Zane = 1 From Fig.8.06.b.2. Dso = 3 In DMA% - 45 in r 'a Fill Class A Apron Thl@ness 12 in z, Apron Length = 4.0 X Apron Width=3xDia 3 V(required) t ft l 1 �� I a 1 a '4� DATE Lags 3 101612006 PROJECT NAME PROJECT NO / SECU Seem Ouarlar _ IO2-08 BY PEH Storm Outlet Structure FES No.= 30'CMP Om1O1uIl- 082 Pipe Dia= 30 in VNWII- L11 Ors- 15.01 ds V= 4.2fps Olull= 1034 rJs V1u1I= 374 fps From Fig.806 b.1'. Zone _ 1 From Fig.8 06 a Dso 3 In Din. _ 45 In - Prep Class A p Apron Thickness 12 in IM Apron Length 100 M1 J Apron Width=3x01a - 7.5 fl(,egmretl) r t' '• _4 DATE 1 9/5/2008 PROJECTNAME PROJECT NO SECU Swan Ouaner 102-08 BY PER Storm Outlet Structure FES Na.= 55'CMP O1011_ 012 Pipe 0', 15 in VNIWI. 061 Oro= 0.66 els V= 301, Droll= 5.56 cls VWIIin 4.53fps Fram FigeOb.b.t'. Zone 1 From Fig.8.06 b.2. Daa 3 In DM0.t _ 4.5 in 1 Riprap Class A Apron Tlllcss 12 in 1 1 Apron Length so fi Apron Width=3%Dia 375 il reeuir.G) 5Y1 r Sediment Basin Calculations SEDIMENT TRAP 1 l Peak Inflow O=CxIxA C value 1 0.35 Junimproved cleared area intensi 10 ear 8.27 Drainage area ac 0.88 Peak Inflow cfs 2.55 Surface Area A=0.Otx Peak inflow 10 = 2.55 cfs Surface Area 0.03 ac Calculation(A)= 1,110 sf Basin Shape Ensure flow length to basin width ratio is realer than 2:1 ft Calculated Ratio= len th = 47.11 width ft = 23.55 1 IxW = 1,110 used Ratio= length ft= 54,00 width fl = 1 28,00 1 LxW - 1.512 Basin Volume Required Volume for I Disturbed area (ac) 0.88 basins 3600 cf per 3,168 CF ac of disturbed area= Basin Dimensions Top of water storage Bottom Surface area Water storage Storage length N width tt length ft width ft s tle ih ft volume 54.00 28.00 42 16 1 31 631 3 3168 Top of basin Freeboard depth(fl) Total Depth Weir Width length tt width=ftd tt ft 60 34 1.5 4.5 10 f i 1 012 Sediment Trap Design 10/1/2008,2:39 PM s 1 r Sediment Basin Calculations ( SEDIMENT TRAP 2 Peak Inflow O=CxlxA C value 0.35 unimproved cleared area intensity 10 ear 8.27 Drainage area ac 1.07 Peak Inflow cfs 3.10 Surface Area A=0.01x Peak inflow 10 = 3.10 cis Surface Area 0.03 ac Calculation A= 1,349 sf Basin Shape Ensure flow Ien th to basin width ratio is realer than 2:1 Calculated Ratio= length tt= 51.94 width it = 25.97 LXW = 1 349 used Ratio= length = 60.00 width ft = 30.00 lxW = 1 800 ft ( Basin Volume I Required Volume for Disturbed area(ac) 1 W basins 3600 ct per 3,852 CF I ac of disturbed area- Basin Dimensions Top 01 water slora a Bottom Sudace area W star storage Storage length tt width ft length ft width ft s de th tt volume 60.00 30.00 48 18 38 631 3 3,888 To of basin Freeboard depth(tt) Total Depth Weir Width Ien ih tt width tt ry ry 66 1 36 1 1.5 4.5 10 l l i 1 011 Sediment Trap Design 10/l/2008.2:34 PM UO Grass Swale #1 2-yr Storm Given input Data: Shape . . . . . . . . . . . . . . . . . . . . . . . . Trapezoidal solving for . . . . . . . . . . . . . . . . . . . . . Depth of Flow Flowrate . . . . . . . . . . . . . . . . . . . . . . . . 0.9900 cfs slope . . . . . . . . . . . . . . . . . . . . . . . . . . . 0.0090 ft/ft manning's n . . . . . . . . . . . . . . . . . . . . . 0.0330 Height . . . . . . . . . . . . . . . . . . . . . . . . . . 1.0000 ft Bottom width . . . . . . . . . . . . . . . . . . . . 0.0000 ft Left slope . . . . . . . . . . . . . . . . . . . . . . 0.2500 ft/ft (v/H) Right slope . . . . . . . . . . . . . . . . . . . . . 0.2500 ft/ft (v/H) computed Results: Depth . . . . . . . . . . . . . . . . . . . . . . . . . . . 0.4118 ft velocity . . . . . . . . . . . . . . . . . . . . . . . . 1.4597 fps Full Flowrate . . . . . . . . . . . . . . . . . . . 10. 5493 cfs Flow area . . . . . . . . . . . . . . . . . . . . . . . 0.6782 ft2 Flow perimeter . . . . . . . . . . . . . . . . . . 3.3955 ft Hydraulic radius . . . . . . . . . . . . . . . . 0.1997 ft Top width . . . . . . . . . . . . . . . . . . . . . . . 3.2942 ft Area . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4.0000 ft2 Perimeter . . . . . . . . . . . . . . . . . . . . . . . 8.2462 ft Percent full . . . . . . . . . . . . . . . . . . . . 41.1770 critical information critical depth . . . . . . . . . . . . . . . . . . 0.3282 ft critical slope . . . . . . . . . . . . . . . . . . 0.0302 ft/ft critical velocity . . . . . . . . . . . . . . . 2.2978 fps critical area . . . . . . . . . . . . . . . . . . . 0.4309 ft2 critical perimeter . . . . . . . . . . . . . . 2.7064 ft critical hydraulic radius . . . . . . . 0.1592 ft critical top width . . . . . . . . . . . . . . 2 .6256 ft specific energy . . . . . . . . . . . . . . . . . 0.4449 ft Minimum energy . . . . . . . . . . . . . . . . . . 0.4923 ft i Froude number . . . . . . . . . . . . . . . . . . . 0. 5672 Flow condition . . . . . . . . . . . . . . . . . . Subcritical i i Grass Swale #1 10-yr Storm Given input Data: Shape . . . . . . . . . . . . . . . . . . . . . . . . Trapezoidal solving for Depth of Flow Flowrate . . . . . . . . . . . . . . . . . . . . . . . . 2.4700 cfs slope . . . . . . . . . . . . . . . . . . . . . . . . . . . 0.0090 ft/ft manning' s n . . . . . . . . . . . . . . . . . . . . . 0.0300 Height . . . . . . . . . . . . . . . . . . . . . . . . . . 1.0000 ft Bottom width . . . . . . . . . . . . . . . . . . . . 0.0000 ft Left slope . . . . . . . . . . . . . . . . . . . . . . 0.2500 ft/ft (v/H) Right slope . . . . . . . . . . . . . . . . . . . . . 0.2500 ft/ft (v/H) computed Results: Depth . . . . . . . . . . . . . . . . . . . . . . . . . . . 0. 5598 ft velocity . . . . . . . . . . . . . . . . . . . . . . . . 1.9705 fps Full Flowrate . . . . . . . . . . . . . . . . . . . 11.6042 cfs Flow area . . . . . . . . . . . . . . . . . . . . . . . 1.2535 ft2 Flow perimeter . . . . . . . . . . . . . . . . . . 4.6162 ft r Hydraulic radius . . . . . . . . . . . . . . . . 0.2715 ft Top width . . . . . . . . . . . . . . . . . . . . . . . 4.4784 ft r area . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4.0000 ft2 Perimeter . . . . . . . . . . . . . . . . . . . . . . . 8.2462 ft Percent full . . . . . . . . . . . . . . . . . . . . 55.9797 ! critical Information critical depth . . . . . . . . . . . . . . . . . . 0.4731 ft critical slope . . . . . . . . . . . . . . . . . . 0.0221 ft/ft r critical velocity . . . . . . . . . . . . . . . 2.7588 fps critical area . . . . . . . . . . . . . . . . . . . 0.8953 ft2 Critical perimeter . . . . . . . . . . . . . . 3.9013 ft Critical hydraulic radius . . . . . . . 0.2295 ft critical top width . . . . . . . . . . . . . . 3.7849 ft Specific energy . . . . . . . . . . . . . . . . . 0.6201 ft Minimum energy . . . . . . . . . . . . . . . . . . 0.7097 ft Froude number . . . . . . . . . . . . . . . . . . . 0.6566 Flow condition . . . . . . . . . . . . . . . . . . subcritical t �Z < r r : c \¥ § \ \` Lni Ci \\ \\}® £ \ \\\ ) r ) \ /\� ` k % — . ® 66 ) / r : > / ) {t5 \ : - - 'y f! ° f f / f /E ! JE 000 § / ^ f\fi , _ « ! )® : . § 5 Grass Swale rig 2-yr Storm Given Input Data: Shape . . . . . . . . . . . . . . . . . . . . . . . . Trapezoidal solving for Depth of Flow Flowrate . . . . . . . . . . . . . . . . . . . . . . . . 1.0300 cfs slope . . . . . . . . . . . . . . . . . . . . . . . . . . . 0.0075 ft/ft manning' s n . . . . . . . . . . . . . . . . . . . . . 0.0330 Height . . . . . . . . . . . . . . . . . . . . . . . . . . 1.0000 ft Bottom width . . . . . . . . . . . . . . . . . . . . 0.0000 ft Left slope . . . . . . . . . . . . . . . . . . . . . . 0.2000 ft/ft (v/H) Right slope . . . . . . . . . . . . . . . . . . . . . 0.2000 ft/ft (v/H) Computed Results: De th . . . . . . . . . . . . . . . . . . . . . . . . . . . 0.3967 ft velocity . . . . . . . . . . . . . . . . . . . . . . . . 1.3091 fps Full Flowrate . . . . . . . . . . . . . . . . . . . 12.1239 cfs Flow area . . . . . . . . . . . . . . . . . . . . . . . 0.7868 ft2 Flow perimeter . . . . . . . . . . . . . . . . . . 4.0454 ft Hydraulic radius . . . . . . . . . . . . . . . . 0.1945 ft Top width . . . . . . . . . . . . . . . . . . . . . . . 3.9669 ft Area . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5.0000 ft2 Perimeter . . . . . . . . . . . . . . . . . . . . . . . 10. 1980 ft Percent full . . . . . . . . . . . . . . . . . . . . 39.6688 critical Information Critical depth . . . . . . . . . . . . . . . . . . 0.3050 ft critical slope . . . . . . . . . . . . . . . . . . 0.0305 ft/ft critical velocity . . . . . . . . . . . . . . . 2.2149 fps Critical area . . . . . . . . . . . . . . . . . . . 0.4650 ft2 t critical perimeter 3.1101 ft critical hydraulic radius . . . . . . . 0.1495 ft critical top width 3.0497 ft specific energy . . . . . . . . . . . . . . . . . 0.4233 ft Minimum energy . . . . . . . . . . . . . . . . . . 0.4574 ft Froude number . . . . . . . . . . . . . . . . . . . 0. 5182 Flow condition Subcritical . . . . . . . . . . . . . . . . . . i ce� Grass Swale #2 10-yr Storm Given Input Data: Shape . . . . . . . . . . . . . . . . . . . . . . . . . Trapezoidal Solving for Depth of Flow Flowrate . . . . . . . . . . . . . . . . . . . . . . . . 2.2800 cfs Slope . . . . . . . . . . . . . . . . . . . . . . . . . . . 0.0075 ft/ft manning' s n . . . . . . . . . . . . . . . . . . . . . 0.0300 Height . . . . . . . . . . . . . . . . . . . . . . . . . . 1.0000 ft Bottom width . . . . . . . . . . . . . . . . . . . . 0.0000 ft Left slope . . . . . . . . . . . . . . . . . . . . . . 0.2000 ft/ft (v/H) Right slope . . . . . . . . . . . . . . . . . . . . . 0.2000 ft/ft (v/H) Computed Results: Depth 0. 5156 ft velocity . . . . . . . . . . . . . . . . . . . . . . . . 1.7151 fps Full Flowrate . . . . . . . . . . . . . . . . . . . 13. 3363 cfs Flow area . . . . . . . . . . . . . . . . . . . . . . . 1. 3294 ft2 Flow perimeter . . . . . . . . . . . . . . . . . . 5 . 2584 ft Hydraulic radius . . . . . . . . . . . . . . . . 0. 2528 ft Top width . . . . . . . . . . . . . . . . . . . . . . . 5 .1563 ft Area . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5.0000 ft2 Perimeter 10.1980 ft Percent full . . . . . . . . . . . . . . . . . . . . 51. 5630 critical Information critical depth . . . . . . . . . . . . . . . . . . 0.4191 ft critical slope . . . . . . . . . . . . . . . . . . 0.0227 ft/ft critical velocity . . . . . . . . . . . . . . . 2 . 5965 fps critical area . . . . . . . . . . . . . . . . . . . 0.8781 ft2 critical perimeter . . . . . . . . . . . . . . 4.2737 ft critical hydraulic radius . . . . . . . 0.2055 ft critical top width . . . . . . . . . . . . . . 4.1907 ft specific energy . . . . . . . . . . . . . . . . . 0.5613 ft Minimum energy . . . . . . . . . . . . . . . . . . 0.6286 ft Froude number . . . . . . . . . . . . . . . . . . . 0. 5955 Flow condition . . . . . . . . . . . . . . . . . . Subcritical l r r � f#r / !$� a / ( • - _ _ § - _ * : - \ / ■ � - - : ) { ® � � � \ \\\ � co r § ° >S2 ci ° \ � \ \} \[§/] \ \ ) § )§ 5 ! k / § k 'o[E / § laaaaaa � ! < ! # \! L § ! ) ) ~ \{\j) \ i r � � §V 3`l S. Vim = 3 . 73to FPs PRoPas� C twe�Td�-WEST' eoTa-4+. (.E L' COn3 }c�C.9S� r (o•osr�) C • z5 ) = Ors1 o . oT �} � � e � g • 2-1 � •...1 h!' Z too = l l . 2\ r,..' i•.f czz = c.st� q = �a.sl ) C8.z� rtif,,, � � a•oek�� = o. 3`�c�S CQ,Lo t 3a"'c,w�, _ 6. 34-r i -7 . 92 P�pasED c c1,y�-2T L - �v9s r ��,vT ► Nc� C s CU. o S /F G� • `3S� -p-Co r t 3 a-�� 25, 44 — O, orlY L> � � ro r g•'L--1 r .w1 .•.T t�X7 57-7„JG (�Pr =U. 7,44; D r t g tic = O • '� Z 4G (a •f�-) `• �Q'�C.> t�Or o 7 /}-�) ( . 5 s�-I- C o" 3 s,4c.� � z s-' ?mac a �o �ors�� ��,2,> ca. 4 Z. � too = Z. fvd- IFS f CULVERT-1 (30" RCP) 10-YEAR STROM Given Input Data: shape . . . . . . . . . . p • • . • . • . . . . . . . . . . Circular solving for . . . . . . . . . . . . . . . . . . . . . Depth of Flow Diameter . . . . . . . . . . . . . . . . . . . . . . . . 2 . 5000 ft Flowrate . . . . . . . . . . . . . . . . . . . . . . . . 18.2600 cfs slope . . . . . . . . . . . . . . . . . . . . . . . . . . . 0.0020 ft/ft Man m ng 's n . . . . . . . . . . . . . . . . . . . . . 0.0130 Computed Results: Depth . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.0388 ft Area . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4.9087 ft2 wetted Area . . . . . . . . . . . . . . . . . . . . . 4.2863 ft2 Wetted Perimeter . . . . . . . . . . . . . . . . 5.6342 ft Perimeter 7.8540 ft Velocity . . . . . . . . . . . . . . . . . . . . . . . . 4.2601 fps Hydraulic Radius . . . . . . . . . . . . . . . . 0.7608 ft Percent Full . . . . . . . . . . . . . . . . . . . . 81. 5518 % Full flow Flowrate . . . . . . . . . . . . . . 18. 3434 cfs Full flow velocity . . . . . . . . . . . . . . 3 .7369 fps critical Information Critical depth . . . . . . . . . . . . . . . . . . 1.4519 ft critical slope 0.0048 ft/ft critical velocity . . . . . . . . . . . . . . . 6.1710 fps critical area 2 .9590 ft2 Critical perimeter . . 4. 3307 ft Critical hydraulic radius . . . . . . . 0.6833 ft Critical top width . . . . . . . . . . . . . . 2. 5000 ft specific energy . . . . . . . . . . . . . . . . . 2.2386 ft i Minimum energy . . . . . . . . . . . . . . . . . . 2.1778 ft Froude number . . . . . . . . . . . . . . . . . . . 0. 5942 Flow condition . . . . . . . . . . . . . . . . . . subcritical l Q7 r CULVERT-2 (15" RCP) C 30" 7a BE �D1- �Do7� 10-YEAR STROM Given Input Data: shape . . . . . . . . . . . . . . . . . . . . . . . . . . . Circular solving for Depth of Flow Diameter . . . . . . . . . . . . . . . . . . . . . . . . 1.2500 ft Flowrate . . . . . . . . . . . . . . . . . . . . . . . . 0.6600 cfs slope . . . . . . . . . . . . . . . . . . . . . . . . . . . 0.0020 ft/ft Manning' s n . . . . . . . . . . . . . . . . . . . . . 0.0130 Computed Results: Depth . . . . . . . . . . . . . . . . . . . . . . . . . . . 0.4063 ft Area . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.2272 ft2 wetted Area . . . . . . . . . . . . . . . . . . . . . 0. 3459 ft2 wetted Perimeter . . . . . . . . . . . . . . . . 1. 5166 ft Perimeter . . . . . . . . . . . . . . . . . . . . . . . 3.9270 ft velocity . . . 1.9082 fps Hydraulic Radius . . . . . . . . . . . . . . . . 0.2281 ft Percent Full . . . . . . . . . . . . . . . . . . . . 32. 5020 Full flow Flowrate . . . . . . . . . . . . . . 2.8889 cfs Full flow velocity . . . . . . . . . . . . . . 2 . 3541 fps Critical Information Critical depth . . . . . . . . . . . . . . . . . . 0. 3173 ft Critical slope . . . . . . . . . . . . . . . . . . 0.0052 ft/ft Critical velocity . . . . . . . . . . . . . . . 2.6924 fps Critical area . . . . . . . . . . . . . . . . . . . 0.2451 ft2 Critical perimeter . . . . . . . . . . . . . . 1.3201 ft Critical hydraulic radius . . . . . . . 0.1857 ft critical top width . . . . . . . . . . . . . . 1.0880 ft specific energy . . . . . . . . . . . . . . . . . 0.4629 ft Minimum energy . . . . . . . . . . . . . . . . . . 0.4760 ft Froude number . . . . . . . . . . . . . . . . . . . 0.6190 Flow condition . . . . . . . . . . . . . . . . . . subcritical EXISTING 24" CMP 10-YEAR STROM Given Input Data: Shape . . . . . . . . . . . . . . . . . . . . . . . . . . . Circular solving for Depth of Flow r Diameter . . . . . . . . . . . . . . . . . . . . . . . . 2.0000 ft Flowrate . . . . . . . . . . . . . . . . . . . . . . . . 1.9500 cfs Slope . . . . . . . . . . . . . . . . . . . . . . . . . . . 0.0170 ft/ft Manning' s n . . . . . . . . . . . . . . . . . . . . . 0.0200 computed Results: Depth . . . . . . . . . . . . . . . . . . . . . . . . . . . 0.4308 ft Area . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3.1416 ft2 wetted Area . . . . . . . . . . . . . . . . . . . . . 0.4972 ft2 wetted Perimeter . . . . . . . . . . . . . . . . 1.9305 ft Perimeter . . . . . . . . . . . . . . . . . . . . . . . 6.2832 ft velocity Hydraulic Radius . . . . . . . . . . . . . . . . 0.2576 ft ps Percent Full 21. 5389 Full flow Flowrate . . . . . . . . . . . . . . 19.1724 cfs Full flow velocity . . . . . . . . . . . . . . 6. 1028 fps Critical Information Critical depth . . . . . . . . . . . . . . . . . . 0.4844 ft critical slope . . . . . . . . . . . . . . . . . . 0.0106 ft/ft Critical velocity . . . . . . . . . . . . . . . 3.3205 fps critical area . . . . . . . . . . . . . . . . . . . 0. 5873 ft2 critical perimeter . . . . . . . . . . . . . . 2.0581 ft Critical hydraulic radius . . . . . . . 0.2853 ft critical top width . . . . . . . . . . . . . . 1.7136 ft specific energy . . . . . . . . . . . . . . . . . 0.6698 ft Minimum energy . . . . . . . . . . . . . . . . . . 0.7266 ft t Froude number . . . . . . . . . . . . . . . . . . . 1.2573 Flow condition . . . . . . . . . . . . . . . . . . supercritical t I SEEDING & MULCHING SEEDBED PREPARATION THE CONTRACTOR SHALL CUT AND DISPOSE OF WEEDS OR OTHER UNACCEPTABLE GROWTH ON THE AREAS TO BE SEEDED, UNEVEN OR ROUGH AREAS SHALL BE SHAPED AND SMOOTHED TO PROVIDE FOR EFFECTIVE SEEDING AND EASE OF MOWING. THE SOIL SHALL BE SCARIFIED TO A DEPTH OF NOT LESS THAN 5 INCHES. CLODS SHALL BE BROKEN AND THE TOP 3-4 INCHES OF THE SOIL SHALL BE WORKED INTO A SEEDBED BY THE USE OF PULVERIZERS, DRAGS, OR HARROWS, THE PREPARATION OF SEEDBEDS SHALL NOT BE DONE WHEN THE SOIL IS FROZEN OR EXTREMELY WET. SOIL AMENDMENTS APPLY LIME AND FERTILIZER ACCORDING TO SOIL TESTS, OR APPLY 3,000-5,000 LB/ACRE GROUND AGRICULTURAL LIMESTONE (USE THE LOWER RATE ON SANDY SOILS) AND 1,000 LB/ACRE 10-10-10 FERTILIZER. MULCHING ANCHOR APPLY TRAW BY TACKINGE GRAIN WI H ASPHALT, NEMNG,OR EQUIVALENT O NG, OR BY CRIMPING COVER OF WITH ER SUITABLE A MULCHMULCH. ANCHORING TOOL A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCHING TOOL. MAINTENANCE IF GROWTH IS LESS THAN FULLY ADEQUATE, REFERTIUZE IN THE SECOND YEAR, ACCORDING TO SOIL TESTS OR TOPDRESS WITH 500 LB/ACRE 10-10-10 FERTILIZER. MOW AS NEEDED WHEN ` SERICEA IS OMITTED FROM THE MIXTURE RESEED, FERTILIZE, AND MULCH DAMAGED AREAS ( IMMEDIATELY. PERMANENT SEEDING AMOUNT/ TIME OF FERTILIZATION / 10D0 SF. GRASS TYPE 1ODO SF. SEEDING INITIAL MAINTENANCE BERMUOA, COMMON 1-2 LEIS. APR. THRU .DINE 25 LEIS. f0-10-10 MARCH - APRIL EACH 4-8 MEEKS AUG. - SEPT. 12 LBS. 10-10-10 1-2 LEIS. N. 12 LBS. 10-113-10 FESCUE, TALL 5-7 LBS. SEPT. THRU OCT. 25 LBS. 10-10-10 FEE. - MARCH MAY & DEC. SEPT. - OCT. (KENTUCKY 31) FEE. THRU OCT. 12 LBS. 10-10-10 1/2 TO 1 LB. N. 12 LBS. 10-10-10 SERICEA IESPEDEZA (SLOPES 1-2 LDS. MARCH THRU APR, 25 LBS. 10-10-10 FEB. - MARCH 1/2 TO 1 LB. N. NA ( s r Soil & Environmental Consultants , PA 11010 Raven Ridge Road • Raleigh, North Carolina 27614 • Phone:(919)846-5900 • Fax: (919) 846-9467 www.SandEC.cotn September 4, 2008 ( S&EC Project #: 11141.S2 Geotechnologies, Inc P.A. Attn: Ernie Stitzinger 3200 Wellington Court Suite 108 Raleigh, NC 27615 Re: Detailed Soils Evaluation at proposed State Employees Credit Union located adjacent to Hwy 264 in Swan Quarter, Hyde County, NC. Dear Mr. Stitzinger: I Soil & Environmental Consultants, PA (S&EC) has performed a detailed soil evaluation in the proposed stonnvater infiltration area at the site mentioned above. A map showing the location of the proposed stormwater infiltration area was provided to us by the project engineer. At the indicated locations, the following activities were performed: a profile description to seven feet (or as deep as possible with hand augers), estimation of permeability, hydraulic conductivity, and seasonal high water table based on soil color, and apparent (observed) water table measurement (groundwater rise in auger holes). The purpose of this evaluation was to provide you with additional information for designing a stormwater infiltration device. The following is a brief report of the methods utilized in this evaluation and the results obtained. ( SoillSite Evaluation A site evaluation was performed by Walter Cole, Sarah Menser(NCLSS and NCSSIT) to I acquire the information you needed. The eva uatlon was performed by making hand auger borings to a depth of seven feet at four locations which were located with a GPS receiver and are shown on the attached map and identifying and recording the soil morphological conditions at those locations in order to develop soil profile descriptions, which are also included with this report and shown of the attached map. Seasonal high Water Table );valuation Under current regulations, the bottom of any infiltration device shall not be placed in locations with less than 2 feet separation between the bottom of the infiltration device and I the seasonal high groundwater [I5A NCAC 02H .1008 (d) (3)],underlying impervious soil horizon, or bedrock (4 foot separation is recommended). For Soil Borings 1-4, the seasonal high water table based on soil morphology(munsell color), was less than 12 inches from the soil surface. The apparent (observed) water table in all three borings at one hour was 72 inches, however this is just a "snap-shot"measurement the reality is that the actual seasonal high water table is most likely deeper than what is serve Soil color, especially with existing agricultural ditching, ut s a ower tan was 1s Chu lotte Office; OLnsboro OKce: 236 LePhillip Court,Suitc C 3817-E Lawndale Drive Concord,NC 28025 Greensboro,NC 27455 Phone: (704)720-9405 Phone: (336)540-8234 Fax: (704)720-9406 Fax: (336)540-8235 Z Z observed by apparent water table. The only way to accurately determine the seasonal high w put m test wells, monitor the site, and perform a water table assessment, and this service can be provided by our firm if requested. Based on our findings, the soil conditions on-site seem unsuitable for an infiltration device with respect to seasonal high water table, however it may have favorable characteristics for a wet detention pond. Permeability/Hydraulic Conductivity Estimation Under current regulations, soils underlying a stormwater infiltration device must have a minimum infiltration rate of 0.52 inches per hour or greater [15A NCAC 02H .1008 (d) (6)]. Soil borings 2 -4 revealed a silt loam surface horizon and a silty clay loam subsurface horizon which is slowly permeable soils with estimated hydraulic conductivity ranges form .01-.14 inches/hour which is well below the threshold of 0.52 inches/hour. Please refer to the enclosed map and soil profile descriptions for more information. Although on-site saturated hydraulic conductivity measurements would be needed to definitively show that these layers are below the 0.52 inches per hour threshold, we feel strongly that any testing will reveal that these soils will not meet the threshold, and that if the water table depth were favorable which it is not, the excavation of the soil horizons and replacement with sand will be necessary and must be proposed to NCDWQ for then) to approve on a case-by-case basis. All of these estimates obtained from one or more of the following: Hyde County Soil Survey"Physical & Chemical Properties of the Soil - Permeability'; and/or USDA-NRCS (United States Department of Agriculture -Natural Resource Conservation Service) Roanoke official series description, and/or"NRCS Field Book for Describing & Sampling Soils" and since the rules require a minimum hydraulic conductivity of 0.52 inches per hour or more, the permeability estimates were converted to conductivity on the profile description tables. In conclusion, the soil conditions on-site do not seem favorable for a stormwater infiltration device with respect to soil permeability/hydraulic conductivity, and the seasonal high water table, however the site may be suitable and have favorable conditions for an alternative stormwater treatment device such as a wet detention pond. 1 Soil & Environmental Consultants, PA is pleased to be of service in this matter and we look forward to assisting in the successful completion of the project. Please feel free to call with any questions or comments. '�3 t Sincerely, Tr Y _ r 12G7 r walter Cole NC Licensed Soil Scientist t11267 File: Figure 1: USGS Quadrangle Map I Figure 2: Hyde County Soil Survey Map Figure 3: Stormwater Boring Map Soil Profile Descriptions ' r t ,. N is µ" SCALE 50- ZI 4 y� I t w p s •n C-..ne.Sf4'� 11 ll a�. s T"Ue L 7- 1 Ci WAQfq . : �,- �_ Soil & Environmental Consultants, PA r r Soil & Environmental Consultants, PA 11010 Raven Ridge Road Raleigh, North Carolina 27614 • Phone:(919)846-5900 • Fax: (919) 846-9467 Nvww.SandEC.corn i September 4, 2008 S&EC Project # 11141.S2 GeoTechnologies, Inc P.A. Attn: Ernie Stitzinger 3200 Wellington Court Suite 108 ( Raleigh, NC 27615 Re: Preliminary Wetland Delineation ( Swan Quarter SECU Site ( Hyde County,NC Dear Mr. Stitzinger: In August, 2008, S&EC personnel traversed the subject property to determine the presence of potential wetlands. The site is located on the north side of US 264, as shown on the attached i USGS Quad map(Figure 1) and Hyde County Soil Survey (Figure 2). Wetlands: ( Potential wetland areas on the site were evaluated for the presence of hydric soils and evidence ( of hydrology and vegetation. In these areas, hydrologic proof includes the existence of hydric soils with oxidized root channels in the upper 12 inches of the soil profile, water borne deposits, l drift lines, scour marks, and regional indicators of soil saturation. We have determined that no ( jurisdictional wetlands exist on the site. Tar-Pamlico River Buffers: The Tar-Pamlico River Buffer rules protect up to 50 feet from the edge of existing "surface waters" (intermittent streams, perennial streams, lakes, ponds and estuaries) found within the Tar-Pamlico River Basin that appear on either the appropriate USGS or county soil survey map. The 50-foot buffer basically consists of two zones. The first zone is measured 30 feet landward froth the top bank of streams and intended to contain an undisturbed-forested area. The second zone is measured 20 feet from the edge of the first zone and is intended to contain a vegetated buffer. We have determined that no buffered streams exist on the site. l Grccnshoi n Office. Charlene Office: 236 LePhillip Corot,Suite C 3817-E Lawndale Drive Concord,NC 28025 Greensboro,NC 27455 Phone:(336)540-8234 f Phone: (704)7-0-940 Fax*(336)540-8235 Pax'. (704)720-9406 ( -1 (v f Please call or email me (wco q)sandec.com) if you should need further explanation. Sincerely, Walter Cole, NCLSS Soil & Environmental Consultants, PA ` Attachments: 1) USGS site vicinity map i 2) Hyde County Soil Survey site vicinity map i l l �7