HomeMy WebLinkAboutDLC.Site.Plan.For.WQ.Appl.07.15.24.pdfFier projection L i 4e,, 10' from property corner
width of comae measured from
proposed construction point
so that max pier length = 138/3 = 4ro'
4�o' max pier --
--------------
----------
pro jection
Lake Norman 133.
propo pi
41 x 40
wooden ramp
o_ __ ert_ -- Ccorne_r_---to_-nor_
line across pr --p y
min disturbance 4 tree c l ear i ne n l� as
I
required to stabilize shore l ne -ow- 1O
two trees w/ dia > 12" require re oval for ,
30 buffer
rip -rap placement
use shoreline 5MF in bu fer
10' work access\, fio
o m
corridor
Catawba Co.
F I D 461902-1515-16
10'
------- ---------------
------------ --------- ---------
------- ----------- -
--------
.1 ------- /--AW -----------------
U1
rii
Site Plan for Water Quality Certification
Shoreline Stabilization Application
rl aa40 Dog Leg Rd
po
1-�g Md - — -scale I" = 20f t g _
Rev, 01,01,24