HomeMy WebLinkAboutWQ0045632_Application (FTSE)_20240719State of North Carolina
Department of Environmental Quality
Division of Water Resources
Flow Tracking for Sewer Extension Applications
(FTSE 10-18)
Entity Requesting Allocation: Willie H Davender Jr.
Project Name for which flow is being requested: Willie H Davender Jr homesite
More than one FT SE rna_y be required for a single project if the owner of the 6YWTP is not responsihle fi r all pump
stations along the route of the proposed )vastewater flow.
I. Complete this section only if you are the owner of the wastewater treatment plant.
a. WWTP Facility Name: Town of Belhaven WWTP
b. WWTP Facility Permit #: NC 0026492
C. WWTP facility's permitted flow
d. Estimated obligated flow not yet tributary to the WWTP
e. WWTP facility's actual avg. flow
f. Total flow for this specific request
g. Total actual and obligated flows to the facility
h. 'Percent of permitted flow used
All flows are in MGD
1.00
0.109
0.215
0.00036
0.32436
32.44%
II. Complete this section for each pump station you are responsible for along the route of this proposed
wastewater flow.
List pump stations located between the project connection point and the WWTP:
(A)
(B)
(C)
(D)=(B+C)
(E)=(A-D)
Design
Obligated,
Pump
Pump
Average
Approx,
Not Yet
Total Current
Station
Station
Finn
Daily Floe **
Current
Tributary
Flow Plus
(Naine or
Permit
Capacity, *
(Finn / pf),
Avg. Daily
Daily Floe-,
Obligated
Available
Number)
No_
MGD
MGD
Flow. MGD
MGD
Flow
Capacity***
Pantego
0.504
0.202
0.023
0.090
0.113
0.089
* The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow
that can be achieved with the largest pump taken out of service.
* * Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor
(pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria.
* * * A Planning Assessment Addendum shall be attached for each pump station located
between the project connection point and the WWTP where the Available Capacity is < 0.
Downstream Facility Name (Sewer): Town of Belhaven WWTP
Downstream Permit Number: NC 0026492
Page 1 of 6
FTS1=: 10-18
III. Certification Statement:
I Stephen A Hall certify to the best of my knowledge that the addition of
the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving
wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity
related sanitary sewer overflows or overburden any downstream pump station en route to the receiving
treatment plant under normal circumstances, given the implementation of the planned improvements
identified in the planning assessment where applicable. This analysis has been performed in accordance
with local established policies and procedures using the best available data. This certification applies to
those items listed above in Sections I and II plus all attached planning assessment addendums for which I
am the responsible party. Signature of this form certifies that the receiving collection system or treatment
works has adequate capacity to transport and treat the proposed new wastewater.
Sigriil7g 0.. Wial Sigllatrfre Date
�✓i� 6TE L.Js3TG'�! �$ c cc7 e7zV t s O A —
Tille of Signing Official l!
Page 2 of 6
1'TS:r 10-18