HomeMy WebLinkAboutNCC242196_ESC Approval Submitted (2)_20240722 From: SVC DoNotReolv-DEOPermits
To: Neil R Uldrick
Cc: Hairston,Jalen A
Subject: NC DEMLR-FROF Application Approval with Modifications Needed CRM:0104297
Date: Thursday,July 18,2024 11:32:31 AM
Attachments: Application Report-Wednesday.July 17.2024 841 AM.odf
DAVID-2025-0160 Aspen Place Lots.Ddf
[External]
North Carolina Department of Environmental Quality
Division of Energy, Mineral&Land Resources
Land Quality Section
Roy Cooper
Governor
Elizabeth S.Biser
Secretary
William Vinson Jr.(Acting)
Director
07-18-2024
DR Horton,Inc.
4150 Mendenhall Oaks Parkway
High Point,NC 27265
R
Project Name:Aspen Place Lots
•
I Acres Approved:22.77
Application ID:PA-005671
Permit Number: DAVID-2025-
0160
Address:Kennedy Road
City:Thomasville
County:Davidson
River Basin:Yadkin-Pee Dee
Stream Classification:WS-III:Water
Supply III
Plan Type:New Plan
Dear DR Horton,Inc.,
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby
issue this Letter of Approval with Modifications. The Modifications Required for Approval are listed below.The Certificate of Approval must be
posted at the job site. This plan approval shall expire three(3)years following the date of approval,if no land-disturbing activity has been
undertaken,as is required by Title 15A NCAC 4B.0129.
As of April 1,2019,all new construction activities are required to complete and submit an electronic Notice of Intent(eNOI)form requesting a
Certificate of Coverage(COC)under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete,you
will receive a link with payment instructions for the$120 annual permit fee.After the fee is processed,you will receive the COC via email.As the
Financially Responsible Party shown on the FRO form submitted for this project,you MUST obtain the COC prior to commencement of any land
disturbing activity.TheeNOlform may be accessed atdeci nc.gov/NCG01.Please directquestions about theeNOlform totheStormwater
Program staff in the Raleigh central office.If the owner/operator of this project changes in the future,the new responsible party must obtain a
new COC.
Title 15A NCAC 4B.0118(a)and the NCG01 permit require that the following documentation be kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC,once it is received.
3. Records of inspections made during the previous 12 months.
Also,this letter gives the notice required by G.S.113A-61.1(a)of our right of periodic inspection to ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented,requiring protection of existing natural resources and adjoining
properties. If,following the commencement of this project,the erosion and sedimentation control plan is inadequate to meet the requirements
of the Sedimentation Pollution Control Act of 1973(North Carolina General Statute 113A-51 through 66),this office may require revisions to the
plan and implementation of the revisions to insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws,regulations,and rules.In
addition,local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other
permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility/Ownership Form,
which you provided. You are requested to file an amended form if there is any change in the information included on the form. This permit
allows for a land-disturbance,as called for on the application and plan,not to exceed the approved acres. Exceeding the acreage can be a
violation of this permit and may require a revised plan and additional application fee.In addition,it would be helpful if you notify this office of
the proposed starting date for this project.
Modifications Required for Approval:
1.Depending on the phasing/sale/building of the lots,permanent Stormwater control measures shown on plan may need maintenance before
this permit can be closed out.
General Comments:
1.Please print this email as your Letter of Approval for your NCG010000 Certificate of Coverage application.
2.Please notify this office prior to your pre-construction conference for this project by calling(336)776-9800 and asking to speak with the Land
Quality inspector for your county.Permission must be obtained and granted from NC DEQ DEMLR prior to the removal of any ESC
measures.All additional permits should be obtained,as necessary,prior to beginning construction.[GS 113A-51,15A NCAC 4B.0120]
3.Any off-site borrow and waste required for this project must come from a site with an approved erosion control plan,a site regulated under
the Mining Act of 1971,or a landfill regulated by the Division of Solid Waste Management. Trash/debris from demolition activities or generated
by any activities on site must be disposed of at a facility regulated by the Division of Solid Waste Management or per Division of Solid Waste
Management or Division of Water Resources rules and regulations.[15A NCAC 4B.0110]
4.Additional measures may be required-The applicant is responsible for the control of sediment on-site. If the approved erosion and
sedimentation control measures prove insufficient,the applicant must take those additional steps necessary to stop sediment from leaving this
site. [15A NCAC 4B.0115]
5.The NCG01 has a$120 yearly fee and our office often receives closure inspection requests days prior to yearly NCG01 fee payment due dates.
Be advised the project requires a closure inspection report by DEMLR prior to filing the Notice of Termination(NOT)to terminate NCG01
coverage. The closure inspection should not be requested until after the site has achieved full vegetative stabilization and measures have been
removed. The removal of temporary ESC measures,including basins,requires prior approval.Often,a full growing season is necessary between
initial seeding/mulching and removal of measures. Please plan your construction accordingly to avoid contacting our office prematurely for a
closure inspection. Also be advised you may be asked for representative site pictures prior to a closure inspection. [General Comment]
Your cooperation is appreciated.
Sincerely,
Nicole Chiles,PE-Assistant Regional Engineer
North Carolina Department of Environmental Quality
Division of Energy,Mineral&Land Resources
Land Quality Section
Attachments:Certificate of Approval
FRO Application Report
North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources
Winston-Salem Regional Office 1450 West Hanes Mill Road,Suite 300 I Winston-Salem NC,27105
336-776-9800
Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official.
CAUTION:This email originated from outside of the organization.Do not click links or open attachments unless
you recognize the sender and know the content is safe.