LETTER OF APPROVAL
Anthony Travis Brittain
2238 Swain Court
Gastonia, NC 28054
RE: Project Name: Lakeside Reserve Lot 216
Permit Number: BURKE-2025-0124
Acres Approved: 0.75
County: Burke
City: Connelly Springs
Address: 3311 Pyramid Peak Trl
River Basin: Catawba
Stream Classification:WS-IV: Water Supply IV; CA: Critical Area
Submitted By: Mr.Anthony Brittain
Plan Type: Residential
Dear Mr. Brittain,
This office has reviewed the subject erosion and sedimentation control plan.We hereby issue
this Letter of Approval. Any modifications required for approval are listed in the body of the
email that accompanied this attached letter. The enclosed Certificate of Approval must be
posted at the job site. This plan approval shall expire three (3) years following the date of
approval,if no land-disturbing activity has been undertaken,as is required by Title 15A NCAC
4B .0129.
As of April 1, 2019, all new construction activities not explicitly exempt are required to
complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of
Coverage (COC) under the NCG010000 Construction General Permit. After the form is
reviewed and found to be complete,you will receive a link with payment instructions for the
annual permit fee. After the fee is processed, you will receive the COC. As the Financially
Responsible Party shown on the FRO form submitted for this project, you MUST obtain the
COC prior to commencement of any land disturbing activity. The eNOI form may be accessed
at deq.nc.gov/NCG01.
DE North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources
--;) Asheville Regional Office 12090 U.S.Highway 70 I Swannanoa,North Carolina 28778
NORTH CAROLINA
Department nt Environmental umr\ 828.296.4500
Letter of Approval
Mr.Anthony Brittian
07-12-2024
Page 2 of 2
Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central
office. If the owner/operator of this project changes in the future,the new responsible party must
obtain a new COC.
Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation
be kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC,once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic
inspection to ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring
protection of existing natural resources and adjoining properties. If, following the
commencement of this project, the erosion and sedimentation control plan is inadequate to
meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina
General Statute 113A-51 through 66), this office may require revisions to the plan and
implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and
State water quality laws,regulations,and rules.In addition,local city or county ordinances or
rules may also apply to this land-disturbing activity. This approval does not supersede any
other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in
the Financial Responsibility Form and on the plan,which you provided.You are requested to
file an amended form if there is any change in the information included on the form.
Your cooperation is appreciated.
Sincerely,
Land Quality Section