HomeMy WebLinkAboutNC0085553_Authorization to Construct_20081201Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
Coleen H. Sullins, Director
Division of Water Quality
December 1, 2008
Mr. Calvin Peck
Village of Bald Head Island
106 Light House Wynd '
Bald Head Island, North Carolina 28461
SUBJECT: Authorization to Construct
A to C No. 085553A01
Village of Bald Head Island
Reverse Osmosis WTP
Force Main to Bald Head Island
Marina
Brunswick County
Dear Mr. Peck:
A letter of request for an Authorization to Construct was received June 30, 2008, by the
Division, and final plans and specification's for the subject project have been reviewed and found
to be satisfactory. Authorization is hereby granted for the construction of modifications to the
existing 0.087 MGD discharge of the Reverse Osmosis Water Treatment Plant, with discharge of
treated water into the Bald Head Island Marina Basin in the Cape Fear River Basin.
This authorization results in no increase in design or permitted capacity and is awarded
for the construction of the following specific modifications:
Installation of approximately 10,500 feet of 4-inch force main, in conformity with
the project plans, specifications, and other supporting data subsequently filed and
approved by the Department of Environment and Natural Resources.
This Authorization to Construct is issued in accordance with Part III, Paragraph A of
NPDES Permit No. NCO085553 issued September 15, 2006, and shall be subject to revocation
unless the wastewater treatment facilities are constructed in accordance with the conditions and
limitations specified in Permit No. NC0085553.
The sludge generated from these treatment facilities must be disposed of in accordance
with G.S. 143-215.1 and in a manner approved by the North Carolina Division of Water Quality.
In the event that the facilities fail to perform satisfactorily, including the creation of
nuisance conditions, the Permittee shall take immediate corrective action, including those as may
be required by this Division, such as the construction of additional or replacement wastewater
treatment or disposal facilities. ?PorthCarolina
JUatura!!�
North Carolina Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 Phone (919) 733-7015 Customer Service
Internet: wvow.ncwaterquality.om 512 N. Salisbury St. Raleigh, NC 27604 FAX (919) 733-2496 1-877-623-6748
An Equal Opportunity/Affirmative Action Employer — 50% Recycled110% Post Consumer Paper
Mr. Calvin Peck
December 1, 2008
Page 2
The Wilmington Regional Office, telephone number (910) 796-7215, shall be notified at
least forty-eight (48) hours in advance of operation of the installed facilities so that an on site
inspection can be made. Such notification to the regional supervisor shall be made during the
normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State
Holidays.
Upon completion of construction and prior to operation of this permitted facility, a
certification must be received from a professional engineer certifying that the permitted facility
has been installed in accordance with the NPDES Permit, this Authorization to Construct and the
approved plans and specifications. Mail the Certification to: Construction Grants & Loans,
DWQ/DENR, 1633 Mail Service Center, Raleigh, NC 27699-1633.
Upon classification of the facility by the Certification Commission, the Permittee shall
employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the
wastewater treatment facilities. The operator must hold a certificate of the type and grade at
least equivalent to or greater than the classification assigned to the wastewater treatment
facilities by the Certification Commission.
The Permittee must also employ a certified back-up operator of the appropriate type and
grade to comply with the conditions of T15A:8G.0202. The ORC of the facility must visit each
Class I facility at least weekly and each Class II, III and IV facility at least daily, excluding
weekends and holidays, must properly manage the facility, must document daily operation and
maintenance of the facility, and must comply with all other conditions of T15A:8G.0202.
A copy of the approved plans and specifications shall be maintained on file by the
Permittee for the life of the facility.
During the construction of the proposed additions/modifications, the permittee shall
continue to properly maintain and operate the existing wastewater treatment facilities at all times,
and in such a manner, as necessary to comply with the effluent limits specified in the NPDES
Permit.
You are reminded that it is mandatory for the project to be constructed in accordance
with the North Carolina Sedimentation Pollution Control Act, and when applicable, the North
Carolina Dam Safety Act. In addition, the specifications must clearly state what the contractor's
responsibilities shall be in complying with these Acts.
Prior to entering into any contract(s) for construction, the recipient must have obtained all
applicable permits from the State.
Failure to abide by the requirements contained in this Authorization to Construct may
subject the Permittee to an enforcement action by the Division of Water Quality in accordance
with North Carolina General Statute 143-215.6A to 143-215.6C.
Mr. Calvin Peck
December 1, 2008
Page 3
The issuance of this Authorization to Construct does not preclude the Permittee from
complying with any and all statutes, rules, regulations, or ordinances which may be imposed by
other government agencies (local, state, and federal) which have jurisdiction.
One (1) set of approved plans and specifications is being forwarded to you. If you have
any questions or need additional information, please contact Seth Robertson, P.E. at telephone
number (919) 715-6206.
Sincerely,
— Coleen H. Sullins
MM:sr
cc: Anthony W. Boahn, P.E., - McKim & Creed, P.A., 243 North Front Street,
Wilmington, NC 28401
Brunswick County Health Department
DWQ Wilmington Regional Office, Surface Water Protection
Technical Assistance and Certification Unit
Point Source Branch, NPDES Program
Daniel Blaisdell, P.E.
Seth Robertson, P.E.
Michelle McKay, E.I.
ATC File
Village of Bald Head Island
A To C No. 085553AOI
Issued December 1, 2008
Engineer's Certification
I, , as a duly registered Professional Engineer in
the State of North Carolina, having been authorized to observe (periodically/weekly/full time)
the construction of the modifications and improvements to the Village of Bald Head Island WTP,
located on Edward Teach Wynd in Brunswick County for the Village of Bald Head Island,
hereby state that, to the best of my abilities, due care and diligence was used in the observation
of the following construction:
Installation of approximately 10,500 feet of 4-inch force main, in conformity with
the project plans, specifications, and other supporting data subsequently filed and
approved by the Department of Environment and Natural Resources.
I certify that. the construction of the above referenced project was observed to be built within
substantial compliance and intent of the approved plans and specifications.
Signature
Date
Registration No.
Send to: Construction Grants & Loans
DENR/DWQ
1633 Mail Service Center
Raleigh, NC 27699-1633