HomeMy WebLinkAboutNCG200335_Resc Inspection_20240716 Compliance Inspection Report
Permit:NCG200335 Effective: 06/01/24 Expiration: 05/31/29 Owner: Elite Newco I LLC
SOC: Effective: Expiration: Facility: Raleigh Metals
County: Wake 2310 Garner Rd
Region: Raleigh
Raleigh NC 27610
Contact Person:Dan Wall Title: Phone: 919-650-8353
Directions to Facility:
System Classifications: SWNC,
Primary ORC: Certification: Phone:
Secondary ORC(s):
On-Site Representative(s):
Related Permits:
Inspection Date: 07/16/2024 Entry Time 10:45AM Exit Time: 12:20PM
Primary Inspector:Thaddeus W Valentine Phone:
Secondary Inspector(s):
Reason for Inspection: Routine Inspection Type: Technical Assistance
Permit Inspection Type: Wholesale Trade of Metal Waste and Scrap Stormwater Discharge COC
Facility Status: ❑ Compliant ❑ Not Compliant
Question Areas:
Storm Water
(See attachment summary)
Page 1 of 3
Permit: NCG200335 Owner-Facility:Elite Newco I LLC
Inspection Date: 07/16/2024 Inspection Type:Technical Assistance Reason for Visit: Routine
Inspection Summary:
I spoke with Nathan Pipkin (site manager)about their plans for initiating permit requirements and he said they are working
on that at the present time. I recommended using what information they have already on the facility and updating to nclude
all new responsible parties and personnel along with incorporating any new or alternative practices or procedures used at the
facility that were not part of the previous business. The facility operates the same businessas as the previous establishment,
which is the purchase of scrap metal for recycling.
Page 2 of 3
Permit: NCG200335 Owner-Facility:Elite Newco I LLC
Inspection Date: 07/16/2024 Inspection Type:Technical Assistance Reason for Visit: Routine
Stormwater Pollution Prevention Plan Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan? ❑ ❑ ❑
#Does the Plan include a General Location (USGS) map? ❑ ❑ ❑
#Does the Plan include a"Narrative Description of Practices"? ❑ ❑ ❑
#Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ ❑ ❑
#Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ❑
#Has the facility evaluated feasible alternatives to current practices? ❑ ❑ ❑
#Does the facility provide all necessary secondary containment? ❑ ❑ ❑
#Does the Plan include a BMP summary? ❑ ❑ ❑
#Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ❑ ❑
#Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ ❑
#Does the facility provide and document Employee Training? ❑ ❑ ❑
#Does the Plan include a list of Responsible Party(s)? ❑ ❑ ❑
# Is the Plan reviewed and updated annually? ❑ ❑ ❑
#Does the Plan include a Stormwater Facility Inspection Program? ❑ ❑ ❑
Has the Stormwater Pollution Prevention Plan been implemented? ❑ ❑ 0 ❑
Comment: This facility was sold and and has since been taken over by Foss Recycling. Permit
documentation from the previous onwers is still available and is being used to develope the
new plan
Qualitative Monitoring Yes No NA NE
Has the facility conducted its Qualitative Monitoring? ❑ ❑ 0 ❑
Comment: Sampling has started
Analytical Monitoring Yes No NA NE
Has the facility conducted its Analytical monitoring? ❑ ❑ ❑ ❑
#Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ❑ ❑
Comment: sampling has started
Permit and Outfalls Yes No NA NE
# Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ ❑ ❑
#Were all outfalls observed during the inspection? ❑ ❑ ❑
# If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑
#Has the facility evaluated all illicit(non stormwater)discharges? ❑ ❑ 0 ❑
Comment:
Page 3 of 3