HomeMy WebLinkAbout820422_POA for High Freeboard_20240716PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number: AWS820422 County: Sampson
Facility Name: Beivoir Farm, Inc. 1-10, 11-14
Certified operator Name: Nathan Bridges Operator Number: 990554
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Lagoon Name/ID:
Spillway(Y or N):
Level(inches):
Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5
14-Nov
N
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures.
Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are
within acceptable ranges.
X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A
30 day Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste
to be pumped and hauled is reflected in section III tables. Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information. Contact and secure approval from the DWQ prior to transfer of waste to a site
not covered in the facility's CAWMP.
Operation will be partially or fully depopulated.
*Attach a complete schedule with corresponding animal units and dates fro depopulation
*if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste:
I hereby certify that I have reviewed the information listed above and included within the
attached Plan of Action, and to the best of my knowledge and ability, the information is
accurate and correct.
Belinda Deluca Phone:
Facility Owner/Manager (print)
Date:
Facility Owner/Manager ignature)
If. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL
FREEBOARD ANDIOR 25 YRJ24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1.
Structure ID: Farm11-14
line m = 343.4 lb PAN
2.
Structure ID:
line m =
lb PAN
3.
Structure ID:
line m =
lb PAN
4.
Structure ID:
line m =
lb PAN
5.
Structure ID:
line m =
lb PAN
6.
Structure ID:
line m =
lb PAN
n.lines 1+2+3+4+5+6= 343.4lbPAN
Ill. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD_ DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD.
o. tract #
p. field #
q. crop
r. acres
s. remaining IRR
2 PAN balance
(lbiacre)
t. TOTAL PAN
BALANCE FOR
FIELD (Ibs.)
u. application window
3272
H1
HYBRID BERMUDA
1.75
157.70
276.0
Mar -Sept
3272
H2
HYBRID BERMUDA
4.48
11928
534.0
Mar -Sept
3272
H3
HYBRID BERMUDA
3.54
189.13
669.5
Mar -Sept
3272
H4
HYBRID BERMUDA
2.33
125.62
292.7
Mar -Sept
v. I otal PAN available for att news (sum of column t) _
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section 11) _
x. Crop's remaining PAN balance (line v from section 111) _
y. Overall PAN balance (w - x) =
If /1.2- Ib. PAN
343.4 lb. PAN
1772.2 lb. PAN
-1428.79596 lb. PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
Called in to DWR on 7115f24_ Will pumps as weather and field conditions allow.
30 DAY DRAW DOWN PERIOD
1. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): 113eivoir Farm, Inc. 1-10, 11-14
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr./24 hr. storm & structural freeboard
c. line b - line a (inches in red zone) _
top of dike surface area according to design
d. (area at below structural freeboard elevation)
e. line c/12 x line d x 7.48 gallons/ft3
3. Projected volume of waste liquid produced during draw down period
18.0 inches
19.0 inches
1.0 inches
68276 ft2
42559 gallons
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 895601 ft3
h. current herd # 2880 certified herd #1 2880
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 1 5/17/202�
m. ((lines e + k)/1000) x line I =
REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
89560 ft3
j 01 ft3
--41854.2 ft3
163830 gallons
1.66 Ibs/1000 gal.
343 Ibs. PAN