HomeMy WebLinkAboutNCC242132_ESC Approval Submitted_20240717 From: scausey allied-engsurv.com
To: kay allied-engsurv.com
Subject: FW: NC DEMLR-FROF Application Approval CRM:0104253
Date: Friday,July 12,2024 11:37:05 AM
Attachments: Application Report-Monday,June 17,2024 318 PM.pdf
DAVIE-2024-0117 Fiddlers Ridoe.pdf
From: SVC_DoNotReply-DEQPermits <DoNotReply-DEQPermits@deq.nc.gov>
Sent: Monday,June 17, 2024 3:31 PM
To: scausey allied-engsurv.com <scausey@allied-engsurv.com>; Baltimore RE, LLC
<stillwaterhomesnc@gmail.com>
Subject: NC DEMLR- FROF Application Approval CRM:0104253
North Carolina Department of Environmental Quality
Division of Energy, Mineral & Land Resources
Land Quality Section
Roy Cooper
Governor
Elizabeth S. Biser
Secretory
William Vinson Jr. (Acting)
Director
06-17-2024
LETTER OF APPROVAL
Baltimore RE, LLC
323 Riverbend Drive
Bermuda Run, NC 27006
RE: Project Name: Fiddlers Ridge
Acres Approved:9.87
Application ID: PA-005413
Permit Number: DAVIE-2024-0117
Address: Bingham and Parks Rd
City:Advance
County: Davie
River Basin:Yadkin-Pee Dee
Stream Classification:C:Aquatic Life,Secondary Contact Recreation,Fresh water
Plan Type: Revised Plan
Dear Baltimore RE, LLC,
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable
and hereby issue this Letter of Approval. The Certificate of Approval must be posted at the job site. This plan
approval shall expire three (3)years following the date of approval, if no land-disturbing activity has been
undertaken, as is required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of
Intent (eNO1)form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater
General Permit. After the form is reviewed and found to be complete,you will receive a link with payment
instructions for the $120 annual permit fee. After the fee is processed,you will receive the COC via email. As
the Financially Responsible Party shown on the FRO form submitted for this project,you MUST obtain the COC
prior to commencement of any land disturbing activity. The eNOI form may be accessed at
deq.nc.gov/NCG01. Please direct questions about the eNOI form to the Stormwater Program staff in the
Raleigh central office. If the owner/operator of this project changes in the future,the new responsible party
must obtain a new COC.
Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at
the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also,this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure
compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing
natural resources and adjoining properties. If,following the commencement of this project,the erosion and
sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act
of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and
implementation of the revisions to insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality
laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-
disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility/Ownership Form, which you provided. You are requested to file an amended form if there is any
change in the information included on the form. In addition, it would be helpful if you notify this office of the
proposed starting date for this project. Please notify us if you plan to have a preconstruction conference.
General Comments:
1. Please print this email as your Letter of Approval for your NCG010000 Certificate of Coverage application.
2.Please notify this office prior to your pre-construction conference for this project by calling (336) 776-9800
and asking to speak with the Land Quality inspector for your county. Permission must be obtained and granted
from NC DEQ DEMLR prior to the removal of any ESC measures. All additional permits should be obtained, as
necessary, prior to beginning construction. [GS 113A-51, 15A NCAC 4B .0120]
3. Any off-site borrow and waste required for this project must come from a site with an approved erosion
control plan, a site regulated under the Mining Act of 1971, or a landfill regulated by the Division of Solid Waste
Management. Trash/debris from demolition activities or generated by any activities on site must be disposed of
at a facility regulated by the Division of Solid Waste Management or per Division of Solid Waste Management
or Division of Water Resources rules and regulations. [15A NCAC 4B .0110]
4. Additional measures may be required - The applicant is responsible for the control of sediment on-site. If the
approved erosion and sedimentation control measures prove insufficient,the applicant must take those
additional steps necessary to stop sediment from leaving this site. [15A NCAC 4B .0115]
5. The NCGO1 has a $120 yearly fee and our office often receives closure inspection requests days prior to yearly
NCGO1 fee payment due dates. Be advised the project requires a closure inspection report by DEMLR prior to
filing the Notice of Termination (NOT)to terminate NCGO1 coverage. The closure inspection should not be
requested until after the site has achieved full vegetative stabilization and measures have been removed. The
removal of temporary ESC measures, including basins, requires prior approval. Often, a full growing season is
necessary between initial seeding/mulching and removal of measures. Please plan your construction
accordingly to avoid contacting our office prematurely for a closure inspection. Also be advised you may be
asked for representative site pictures prior to a closure inspection. [General Comment]
Your cooperation is appreciated.
Sincerely,
Nicole Chiles, PE - Assistant Regional Engineer
North Carolina Department of Environmental Quality
Division of Energy, Mineral & Land Resources
Land Quality Section
North Carolina Department of Environmental Quality I Division of Energy,
Mineral and Land Resources
Winston-Salem Regional Office 1450 West Hanes Mill Road,Suite 300 I
Winston-Salem NC,27105
336-776-9800
Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third
parties by an authorized state official.