Loading...
HomeMy WebLinkAboutSW7121007_CURRENT PERMIT_20210806 �va�o ROY COOPER Governor ELIZABETH S.BISER u Secretary BRIAN WRENN NORTH CAROLINA Director Environmental Quality August 6, 2021 Flockhart Oriental Investments, LLC Attention: William C. Flockhart, Manager P.O. Box 296 Grantsboro, NC 28529 Subject: Stormwater Permit Renewal Stormwater Management Permit SV 7131007 Oriental Grocery —Wal-Mart Pamlico County Dear Mr. Flockhart: A Division of Energy, Mineral, and Land Resources file review has determined that Stormwater Permit SV 7131007 for a stormwater treatment system consisting of a wet detention pond system serving Oriental Grocery located at 1400 Broad Street, Oriental, NC expires on January 13, 2022. This is a reminder that permit renewal applications are due 180 days prior to expiration. We do not have a record of receiving a renewal application. Please submit a completed permit renewal application along with a $505.00 fee for permit renewal within the required time. Permit application forms for renewal can be found on our website at: https://deq.nc.gov/about/divisions/energy-mineral-and-land- resources/stormwater/stormwater-program/post-construction-2. North Carolina General Statutes and the Coastal Stormwater rules require that this property be covered under a stormwater permit. Failure to maintain a permit subjects the owner to assessment of civil penalties. If you have questions, please feel free to contact me at (252) 948-3923. 1 will be glad to discuss this by phone or meet with you. If you would like, I can e-mail you a copy of the application forms. You can request a copy by e-mailing me at roger.thorpe(@ncdenr.gov. Sincerely, 4Q, Roger K. Thorpe Environmental Engineer North Carolina Department of Environmental Quality Division of Energy.M1Cineral and Land Resources Washington Regional Office 947 Washinyteu Squarer Mall i N7ashingnm.Nnrth Carolina 27889 R$29,4,6461 PAT MCCRORY Governor DONALD R. VAN DER VAART Secretary Energy,Mineral and Land Resources TRACY DAVIS ENVIRONMENTAL QUALITY Director July 14, 2016 Flockhart Oriental Investments, LLC Attn: Mr. William C. Flockhart PO Box 296 Grantsboro, NC 28529 Subject: Stormwater Permit No. SW7131007 Oriental Grocery High Density Commercial Wet Pond Project Pamlico County Dear Mr. Flockhart: The Washington Regional Office received your request for a name/ownership change for the subject project on May 31, 2016. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Session Law 2008-211 and Title 15A NCAC 2H.1000. We are forwarding Permit No. SW7131007 dated July 14, 2016, for the construction of the subject project. This permit shall be effective from the date of issuance unti anua 13, 2022 and shall be subject to the conditions and limitations as specified therein. ea`s� special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150E of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please this office at (252) 946-6481. Sincerely, Samir Dumpor,, PEE t / Regional Engineer cc: Nick Goodman, Walmart Stores East, LP P mlico County Planning / Building Inspections L^ashington Regional Office State of North Carolina I Environmental Quality[Energy,Mineral and Land Resources 943 Washington Square Mall. I Washington,NC 27889 252-946-6481 T STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Flockhart Oriental Investments, LLC Oriental Grocery Pamlico County FOR THE construction, operation and maintenance of one wet detention pond, two grassed swales, one level spreader and vegetated filter strip in compliance with the provisions of Session Law 2008-211 and 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Energy, Mineral, and Land Resources and considered a part of this permit. This permit shall be effective from the date of issuance until January 13, 2022, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.7 of this permit. The stormwater control has been designed to handle the runoff from 56,890 square feet of impervious area. 3. The tract will be limited to the amount of built-upon area indicated in this permit, and per approved plans. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 5. The runoff from all built-upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. 6. The built-upon areas associated with this project shall be located at least 50 feet landward of all perennial and intermittent surface waters. Page 2 of 7 7. The following design criteria have been provided in the wet detention pond and must be maintained at design condition: a. Drainage Area, ft2: 79,015 b. Total Impervious Surfaces, ft2: 56,890 C. Design Storm, inches: 3.5 (diff.pre-post) d. Pond Depth - average, feet: 3.0 e. TSS removal efficiency: 85% f. Permanent Pool Elevation, FMSL: 4.50 g. Permanent Pool Surface Area required, ft2: 4,867 h. Permanent Pool Surface Area provide, ft2: 5,050 i. Min. Volume required, ft3: 13,915 j. Permitted Storage Volume, ft3: 13,921 k. Temporary Storage Elevation, FMSL: 6.25 I. Controlling Orifice: 1.50"O pipe M. Permitted Forebay Volume, ft3: 1,713 n. Receiving Stream/River Basin: Whittaker Creek/Neuse o. Stream Index Number: 27 — 130 P. Classification of Water Body: "SA; HWQ, NSW" II. SCHEDULE OF COMPLIANCE 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built-upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all time provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and re-vegetation of slopes and the vegetated filter strip. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, level spreader, filter strip, catch basins and piping. g. Access to the outlet structure must be available at all times. 4. Records of maintenance activities must be kept for each permitted BMP. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. The permittee shall submit to the Division of Energy, Mineral, and Land Resources an annual summary report of the maintenance inspection records for each BMP. The report shall summarize the inspection dates, results of the inspections, and the maintenance work performed at each inspection. 6. Access to the stormwater facilities shall be maintained via appropriate easements at all times. Page 3 of 7 7. The facilities shall be constructed as shown on the approved plans. This permit shall become void unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 8. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 9. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 10. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built-upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built-upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 11. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 12. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. 13. A copy of the approved plans and specifications shall be maintained on file by the Permittee at all times. III. GENERAL CONDITIONS 1. This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a completed Name/Ownership Change form, to the Division of Energy, Mineral, and Land Resources, signed by both parties, and accompanied by supporting documentation as listed on page 2 of the form. The project must be in good standing with the Division. The approval of this request will be considered on its merits and may or may not be approved. Page 4 of 7 2. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Energy, Mineral, and Land Resources, in accordance with North Carolina General Statute 143- 215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 7. The permit issued shall continue in force and effect until revoked or terminated. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re-issuance or termination does not stay any permit condition. 8. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 9. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 10. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules and regulations contained in Session Law 2008- 211 , Title 15A NCAC 2H.1000, and NCGS 143-215.1 et.al. 11. The permittee shall notify the Division of any name, ownership or mailing address changes at least 30 days prior to making such changes. 12. This permit shall be effective from the date of issuance until January 13, 2022. Application for permit renewal shall be submitted 180 days prior to the expiration date of this permit and must be accompanied by the processing fee. Permit issued this the 14 th day of July, 2016. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION for Tracy E. Davis, PE, CPM Division of Energy, Mineral, and Land Resources By Authority of the Environmental Management Commission Stormwater Permit No. SW7131007 Page 5 of 7 Oriental Grocery Stormwater Permit No. SW7131007 Pamlico County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: SEAL Signature Registration Number Date Page 6 of 7 Certification Requirements: 1 . The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built-upon area. 3. All the built-upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. 15. The required system dimensions are provided per the approved plans. cc: NCDENR-DEMLR Washington Regional Office Page 7 of 7