HomeMy WebLinkAboutSW7121007_CURRENT PERMIT_20210806 �va�o
ROY COOPER
Governor
ELIZABETH S.BISER u
Secretary
BRIAN WRENN NORTH CAROLINA
Director Environmental Quality
August 6, 2021
Flockhart Oriental Investments, LLC
Attention: William C. Flockhart, Manager
P.O. Box 296
Grantsboro, NC 28529
Subject: Stormwater Permit Renewal
Stormwater Management Permit SV 7131007
Oriental Grocery —Wal-Mart
Pamlico County
Dear Mr. Flockhart:
A Division of Energy, Mineral, and Land Resources file review has determined that
Stormwater Permit SV 7131007 for a stormwater treatment system consisting of a wet
detention pond system serving Oriental Grocery located at 1400 Broad Street, Oriental,
NC expires on January 13, 2022. This is a reminder that permit renewal applications are
due 180 days prior to expiration. We do not have a record of receiving a renewal
application.
Please submit a completed permit renewal application along with a $505.00 fee for
permit renewal within the required time. Permit application forms for renewal can be
found on our website at: https://deq.nc.gov/about/divisions/energy-mineral-and-land-
resources/stormwater/stormwater-program/post-construction-2. North Carolina General
Statutes and the Coastal Stormwater rules require that this property be covered under a
stormwater permit. Failure to maintain a permit subjects the owner to assessment of
civil penalties.
If you have questions, please feel free to contact me at (252) 948-3923. 1 will be glad to
discuss this by phone or meet with you. If you would like, I can e-mail you a copy of the
application forms. You can request a copy by e-mailing me at
roger.thorpe(@ncdenr.gov.
Sincerely,
4Q,
Roger K. Thorpe
Environmental Engineer
North Carolina Department of Environmental Quality Division of Energy.M1Cineral and Land Resources
Washington Regional Office 947 Washinyteu Squarer Mall i N7ashingnm.Nnrth Carolina 27889
R$29,4,6461
PAT MCCRORY
Governor
DONALD R. VAN DER VAART
Secretary
Energy,Mineral
and Land Resources TRACY DAVIS
ENVIRONMENTAL QUALITY
Director
July 14, 2016
Flockhart Oriental Investments, LLC
Attn: Mr. William C. Flockhart
PO Box 296
Grantsboro, NC 28529
Subject: Stormwater Permit No. SW7131007
Oriental Grocery
High Density Commercial Wet Pond Project
Pamlico County
Dear Mr. Flockhart:
The Washington Regional Office received your request for a name/ownership change
for the subject project on May 31, 2016. Staff review of the plans and specifications has
determined that the project, as proposed, will comply with the Stormwater Regulations
set forth in Session Law 2008-211 and Title 15A NCAC 2H.1000. We are forwarding
Permit No. SW7131007 dated July 14, 2016, for the construction of the subject project.
This permit shall be effective from the date of issuance unti anua 13, 2022 and shall
be subject to the conditions and limitations as specified therein. ea`s� special
attention to the Operation and Maintenance requirements in this permit. Failure to
establish an adequate system for operation and maintenance of the stormwater
management system will result in future compliance problems.
If any parts, requirements, or limitations contained in this permit are unacceptable, you
have the right to request an adjudicatory hearing upon written request within thirty (30)
days following receipt of this permit. This request must be in the form of a written
petition, conforming to Chapter 150E of the North Carolina General Statutes, and filed
with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC
27699-6714. Unless such demands are made this permit shall be final and binding.
If you have any questions, or need additional information concerning this matter, please
this office at (252) 946-6481.
Sincerely,
Samir Dumpor,, PEE t /
Regional Engineer
cc: Nick Goodman, Walmart Stores East, LP
P mlico County Planning / Building Inspections
L^ashington Regional Office
State of North Carolina I Environmental Quality[Energy,Mineral and Land Resources
943 Washington Square Mall. I Washington,NC 27889
252-946-6481 T
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES
STATE STORMWATER MANAGEMENT PERMIT
HIGH DENSITY DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of
North Carolina as amended, and other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
Flockhart Oriental Investments, LLC
Oriental Grocery
Pamlico County
FOR THE
construction, operation and maintenance of one wet detention pond, two grassed
swales, one level spreader and vegetated filter strip in compliance with the provisions of
Session Law 2008-211 and 15A NCAC 2H .1000 (hereafter referred to as the
"stormwater rules') and the approved stormwater management plans and specifications
and other supporting data as attached and on file with and approved by the Division of
Energy, Mineral, and Land Resources and considered a part of this permit.
This permit shall be effective from the date of issuance until January 13, 2022, and
shall be subject to the following specified conditions and limitations:
I. DESIGN STANDARDS
1. This permit is effective only with respect to the nature and volume of stormwater
described in the application and other supporting data.
2. This stormwater system has been approved for the management of stormwater
runoff as described in Section 1.7 of this permit. The stormwater control has been
designed to handle the runoff from 56,890 square feet of impervious area.
3. The tract will be limited to the amount of built-upon area indicated in this permit,
and per approved plans.
4. All stormwater collection and treatment systems must be located in either
dedicated common areas or recorded easements. The final plats for the project
will be recorded showing all such required easements, in accordance with the
approved plans.
5. The runoff from all built-upon area within the permitted drainage area of this
project must be directed into the permitted stormwater control system.
6. The built-upon areas associated with this project shall be located at least 50 feet
landward of all perennial and intermittent surface waters.
Page 2 of 7
7. The following design criteria have been provided in the wet detention pond and
must be maintained at design condition:
a. Drainage Area, ft2: 79,015
b. Total Impervious Surfaces, ft2: 56,890
C. Design Storm, inches: 3.5 (diff.pre-post)
d. Pond Depth - average, feet: 3.0
e. TSS removal efficiency: 85%
f. Permanent Pool Elevation, FMSL: 4.50
g. Permanent Pool Surface Area required, ft2: 4,867
h. Permanent Pool Surface Area provide, ft2: 5,050
i. Min. Volume required, ft3: 13,915
j. Permitted Storage Volume, ft3: 13,921
k. Temporary Storage Elevation, FMSL: 6.25
I. Controlling Orifice: 1.50"O pipe
M. Permitted Forebay Volume, ft3: 1,713
n. Receiving Stream/River Basin: Whittaker Creek/Neuse
o. Stream Index Number: 27 — 130
P. Classification of Water Body: "SA; HWQ, NSW"
II. SCHEDULE OF COMPLIANCE
1. The stormwater management system shall be constructed in its entirety,
vegetated and operational for its intended use prior to the construction of any
built-upon surface.
2. During construction, erosion shall be kept to a minimum and any eroded areas of
the system will be repaired immediately.
3. The permittee shall at all time provide the operation and maintenance necessary
to assure the permitted stormwater system functions at optimum efficiency. The
approved Operation and Maintenance Plan must be followed in its entirety and
maintenance must occur at the scheduled intervals including, but not limited to:
a. Semiannual scheduled inspections (every 6 months).
b. Sediment removal.
C. Mowing and re-vegetation of slopes and the vegetated filter strip.
d. Immediate repair of eroded areas.
e. Maintenance of all slopes in accordance with approved plans and
specifications.
f. Debris removal and unclogging of outlet structure, orifice device, level
spreader, filter strip, catch basins and piping.
g. Access to the outlet structure must be available at all times.
4. Records of maintenance activities must be kept for each permitted BMP. The
records will indicate the date, activity, name of person performing the work and
what actions were taken.
5. The permittee shall submit to the Division of Energy, Mineral, and Land
Resources an annual summary report of the maintenance inspection records for
each BMP. The report shall summarize the inspection dates, results of the
inspections, and the maintenance work performed at each inspection.
6. Access to the stormwater facilities shall be maintained via appropriate
easements at all times.
Page 3 of 7
7. The facilities shall be constructed as shown on the approved plans. This permit
shall become void unless the facilities are constructed in accordance with the
conditions of this permit, the approved plans and specifications, and other
supporting data.
8. Upon completion of construction, prior to issuance of a Certificate of Occupancy,
and prior to operation of this permitted facility, a certification must be received
from an appropriate designer for the system installed certifying that the permitted
facility has been installed in accordance with this permit, the approved plans and
specifications, and other supporting documentation. Any deviations from the
approved plans and specifications must be noted on the Certification. A
modification may be required for those deviations.
9. If the stormwater system was used as an Erosion Control device, it must be
restored to design condition prior to operation as a stormwater treatment device,
and prior to occupancy of the facility.
10. The permittee shall submit to the Director and shall have received approval for
revised plans, specifications, and calculations prior to construction, for any
modification to the approved plans, including, but not limited to, those listed
below:
a. Any revision to any item shown on the approved plans, including the
stormwater management measures, built-upon area, details, etc.
b. Project name change.
C. Transfer of ownership.
d. Redesign or addition to the approved amount of built-upon area or to the
drainage area.
e. Further subdivision, acquisition, lease or sale of all or part of the project
area. The project area is defined as all property owned by the permittee,
for which Sedimentation and Erosion Control Plan approval or a CAMA
Major permit was sought.
f. Filling in, altering, or piping of any vegetative conveyance shown on the
approved plan.
11. The Director may notify the permittee when the permitted site does not meet one
or more of the minimum requirements of the permit. Within the time frame
specified in the notice, the permittee shall submit a written time schedule to the
Director for modifying the site to meet minimum requirements. The permittee
shall provide copies of revised plans and certification in writing to the Director
that the changes have been made.
12. The permittee shall submit final site layout and grading plans for any permitted
future areas shown on the approved plans, prior to construction.
13. A copy of the approved plans and specifications shall be maintained on file by
the Permittee at all times.
III. GENERAL CONDITIONS
1. This permit is not transferable except after notice to and approval by the Director.
In the event of a change of ownership, or a name change, the permittee must
submit a completed Name/Ownership Change form, to the Division of Energy,
Mineral, and Land Resources, signed by both parties, and accompanied by
supporting documentation as listed on page 2 of the form. The project must be in
good standing with the Division. The approval of this request will be considered
on its merits and may or may not be approved.
Page 4 of 7
2. The permittee is responsible for compliance with all permit conditions until such
time as the Division approves the transfer request.
3. Failure to abide by the conditions and limitations contained in this permit may
subject the Permittee to enforcement action by the Division of Energy, Mineral,
and Land Resources, in accordance with North Carolina General Statute 143-
215.6A to 143-215.6C.
4. The issuance of this permit does not preclude the Permittee from complying with
any and all statutes, rules, regulations, or ordinances, which may be imposed by
other government agencies (local, state, and federal) having jurisdiction.
5. In the event that the facilities fail to perform satisfactorily, including the creation
of nuisance conditions, the Permittee shall take immediate corrective action,
including those as may be required by this Division, such as the construction of
additional or replacement stormwater management systems.
6. The permittee grants DENR Staff permission to enter the property during normal
business hours for the purpose of inspecting all components of the permitted
stormwater management facility.
7. The permit issued shall continue in force and effect until revoked or terminated.
The permit may be modified, revoked and reissued or terminated for cause. The
filing of a request for a permit modification, revocation and re-issuance or
termination does not stay any permit condition.
8. Unless specified elsewhere, permanent seeding requirements for the stormwater
control must follow the guidelines established in the North Carolina Erosion and
Sediment Control Planning and Design Manual.
9. Approved plans and specifications for this project are incorporated by reference
and are enforceable parts of the permit.
10. The issuance of this permit does not prohibit the Director from reopening and
modifying the permit, revoking and reissuing the permit, or terminating the permit
as allowed by the laws, rules and regulations contained in Session Law 2008-
211 , Title 15A NCAC 2H.1000, and NCGS 143-215.1 et.al.
11. The permittee shall notify the Division of any name, ownership or mailing
address changes at least 30 days prior to making such changes.
12. This permit shall be effective from the date of issuance until January 13, 2022.
Application for permit renewal shall be submitted 180 days prior to the expiration
date of this permit and must be accompanied by the processing fee.
Permit issued this the 14 th day of July, 2016.
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
for
Tracy E. Davis, PE, CPM
Division of Energy, Mineral, and Land Resources
By Authority of the Environmental Management Commission
Stormwater Permit No. SW7131007
Page 5 of 7
Oriental Grocery
Stormwater Permit No. SW7131007
Pamlico County
Designer's Certification
I, , as a duly registered in the
State of North Carolina, having been authorized to observe (periodically/weekly/ full
time) the construction of the project,
(Project)
for (Project Owner) hereby state that, to the
best of my abilities, due care and diligence was used in the observation of the project
construction such that the construction was observed to be built within substantial
compliance and intent of the approved plans and specifications.
The checklist of items on page 2 of this form is included in the Certification.
Noted deviations from approved plans and specification:
SEAL
Signature
Registration Number
Date
Page 6 of 7
Certification Requirements:
1 . The drainage area to the system contains approximately the permitted
acreage.
2. The drainage area to the system contains no more than the permitted
amount of built-upon area.
3. All the built-upon area associated with the project is graded such that the
runoff drains to the system.
4. All roof drains are located such that the runoff is directed into the system.
5. The outlet/bypass structure elevations are per the approved plan.
6. The outlet structure is located per the approved plans.
7. Trash rack is provided on the outlet/bypass structure.
8. All slopes are grassed with permanent vegetation.
9. Vegetated slopes are no steeper than 3:1.
10. The inlets are located per the approved plans and do not cause short-
circuiting of the system.
11. The permitted amounts of surface area and/or volume have been
provided.
12. Required drawdown devices are correctly sized per the approved plans.
13. All required design depths are provided.
14. All required parts of the system are provided, such as a vegetated shelf,
and a forebay.
15. The required system dimensions are provided per the approved plans.
cc: NCDENR-DEMLR Washington Regional Office
Page 7 of 7