Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
B-4786_Permit Drawings_070162024
Submitted 7/16/2024 WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 1 -L- 22+70 RT / 25+54 RT Temporary Access Road 0.10 2 -L- 32+43 RT / 34+50 RT Temporary Access Road 0.01 TOTALS*: 0.11 0 0 0 *Rounded totals are sum of actual impacts NOTES: <0.01 acres of Permanent SW impacts for bridge interior bents (driven piles) at -L- 26+65, 27+30, 27+95, 28+60 & 29+25. <0.01 acres of Temporary SW impacts for temporary workbridge interior bents (likely pipe piles) between -L- 26+15 & 29+70. Revised 2016 09 09