Loading...
HomeMy WebLinkAbout310806_Compliance Evaluation Inspection_20240711 G"Division of Water Resources Facility Number - R—JO-1 O Division of Soil and Water Conservation O Other Agency Type of Visit: Compliance Inspection 0 Operation Review O Structure Evaluation O Technical Assistance Reason for Visit: O Routine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access Date of Visit: Arrival Time: Departure Time: County: Region: Farm Name: `�� — f Owner Email: Owner Name: Q� �) lt _l ('��� Phone: Mailing Address: Physical Address: Facility Contact: Title: Phone: Onsite Representative: Integrator: Certified Operator: Certification Number: Back-up Operator: Certification Number Location of Farm: Latitude: Longitude: RW�Duouo Design Current Design Current Design Current Swine Capacity Pop. Wet Poultry Capacity Pop. Cattle Capacity Pop. Wean to Finish La er I I Dairy Cow Wean to Feeder Non-La er I Dairy Calf Feeder to Finish ja9 ' Dairy Heifer Farrow to Wean Design Current Dry Cow _ Farrow to Feeder Dry Poultry Capacity Pop. Non-Dairy Farrow to Finish Layers Beef Stocker Gilts Non-Layers Beef Feeder Boars Pullets _ Beef Brood Cow Turkeys Other Turkey Poults Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes E�4 ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ No ❑ NA ❑ NE b. Did the discharge reach waters of the State?(If yes,notify DWR) ❑ Yes [] No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State(gallons)? d. Does the discharge bypass the waste management system?(If yes,notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? 0 Yes WN ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes ❑ NA ❑ NE of the State other than from a discharge? Page I of 3 511212020 Continued Facili Number: - 1)ate of Inspection: �! Waste Collection&Treatment 4. Is storage capacity(structural plus storm storage plus heavy rainfall)less than adequate? ❑ Yes []No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes [g-<o ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: �1 LQr U Spillway?: Designed Freeboard(in): Observed Freeboard(in): 5.Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes ❑�No ❑ NA ❑ NE (i.e.,large trees,severe erosion,seepage,etc.) 6.Are there structures on-site which are not properly addressed and/or managed through a ❑ Yes Q 1 o ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes,and the situation poses an immediate public health or environmental threat,notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes [9 o ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes [ o ❑ NA ❑ NE (not applicable to roofed pits,dry stacks,and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes 8 No ❑ NA ❑ NE maintenance or improvement? Waste ADDlication 10. Are there any required buffers,setbacks,or compliance alternatives that need ❑ Yes E3�0 ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes,check the appropriate box below. ❑ Yes U(No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals(Cu,Zn,etc.) ❑ PAN ❑ PAN> 10%or 10 lbs. ❑ 'rotal Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14.Do the receiving crops differ from those designated in the CAWMP? ❑ Yes E;3"No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes [g1Vo ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes [:g Qo ❑ NA ❑ NE acres determination?17. Does the facility lack adequate acreage for land application? ❑ Yes [9/No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes Dio ❑ NA ❑ NE Required Records& Documents 19. Did the facility fail to have the Certificate of Coverage&Permit readily available? ❑ Yes [Z No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available?If yes,check ❑ Yes ff No ❑ NA ❑ N E the appropriate box. ❑WUP ❑Checklists ❑Design ❑Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement?If yes,check the appropriate box below. [] Yes O/No ❑ NA ❑ NE ❑Waste Application ❑Weekly Freeboard ❑Waste Analysis ❑Soil Analysis ❑Waste Transfers ❑Weather Code ❑Rainfall ❑Stocking ❑Crop Yield ❑120 Minute Inspections ❑Monthly and 1" Rainfall Inspections ❑Sludge Survey 22.Did the facility fail to install and maintain a rain gauge? ❑ Yes [�No ❑ NA ❑ NE 23. If selected,did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes [2/No ❑ NA ❑ NE Page 2 of 3 511212020 Continued Facility Number: - Date of Ins ection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ❑No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes,check ❑ Yes [ d No ❑ NA ❑ NE the appropriate box(es)below. ❑Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels ❑Non-compliant sludge levels in any lagoon List structure(s)and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes ff No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments(PLAT)certification? ❑ Yes �4rEg-eA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes [J '"'' ❑ NA ❑ NE and report mortality rates that were higher than normal? 29.At the time of the inspection did the facility pose an odor or air quality concern? [:] Yes QAo ❑ NA ❑ NE If yes,contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes [9-4 ❑NA ❑ NE permit?(i.e.,discharge,freeboard problems,over-application) 31.Do subsurface tile drains exist at the facility?If yes,check the appropriate box below. ❑ Yes [:]No ❑NA Ej"NE ❑ Application Field ❑ Lagoon/storage Pond ❑ Other: ll 32.Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes E j ( 0 ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on-site representative? ❑ Yes E3No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes E3 No ❑ NA ❑ NE Comments(refer to question #): Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility, to better explain situations(use additional pages as necessary). Reviewer/Inspector Name: Phone: NIA — ON Reviewer/Inspector Signature: J 1411 Date: Page 3 of 3 S/1212020