Loading...
HomeMy WebLinkAbout310418_Compliance Evaluation Inspection_20240711 Division of Water Resources Facility Number 0 - O Division of Soil and Water Conservation O Other Agency Type of Visit: Compliance Inspection 0 Operation Review Q Structure Evaluation O Technical Assistance Reason for Visit: O Routine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access Date of Visit: Arrival Time: Departure Time: County: Ll Region: Farm Name: / (�/ 1�t. �I �jQ�( �QJ�I� Owner Email: Owner Name: 1 ( /�_I���� �j Phone: Mailing Address: Physical Address: Facility Contact: Title: 1'I1one: Onsite Representative: Integrator: Certified Operator: Certification Number: Back-up Operator: Certification Number: Location of Farm: Latitude: Longitude: iv�/e Design Current Design Current Design Current Swine Capacity Pop. Wet Poultry Capacity Pop. Cattle Capacity Pop. Wean to Finish I ILayer I I I Dairy Cow Wean to Feeder I INon-Layer I I I Dairy Calf Feeder to Finish z 960J Dairy Heifer Farrow to Wean Design Current Dry Cow Farrow to Feeder Dry Poultry Capacity Pop. Non-Dairy Farrow to Finish Layers 113eef Stocker Gilts Non-Layers Beef Feeder Boars _ Pullets I Beef Brood Cow Turkeys Other Turkey Poults Other Discharees and Stream Impacts 1. Is any discharge observed from any part of the operation? [:] Yes No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ No ❑ NA ❑ NE b. Did the discharge reach waters of the State?(If yes,notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State(gallons)? d. Does the discharge bypass the waste management system?(If yes,notify DWR) 0 Yes ❑ No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes No ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes [/No ❑ NA ❑ NE of the State other than from a discharge? Page 1 of 3 511212020 Continued Facili Number: - Date of Inspection: ", / - Waste Collection & Treatment 4. Is storage capacity(structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes [ hJo ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard(in): /9 Observed Freeboard(in): _ 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes E]"'No ❑ NA ❑ NE (i.e., large trees, severe erosion,seepage, etc.) 6. Are there structures on-site which are not properly addressed and/or managed through a ❑ Yes [g/No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes,and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes [3/No ❑ NA ONE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes [-lo ❑ NA ❑ NE (not applicable to roofed pits,dry stacks,and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks,or compliance alternatives that need ❑ Yes [9Io ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes [/No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground [] Heavy Metals(Cu,Zn, etc.) ❑ PAN ❑ PAN> 10%or 10 lbs. ❑ Total Phosphorus [] Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift [] Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes [/No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes []'No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes EjNo ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes [ /No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes E]/No ❑ NA ❑ NE Required Records& Documents 19. Did the facility fail to have the Certificate of Coverage& Permit readily available? ❑ Yes [fNo ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? if yes,check ❑ Yes allo ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑Design ❑Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes,check the appropriate box below. ❑ Yes [D'No ❑ NA ❑ NE ❑Waste Application ❑Weekly Freeboard ❑Waste Analysis ❑Soil Analysis ❑Waste Transfers ❑Weather Code [:]Rainfall ❑Stocking ❑Crop Yield ❑120 Minute Inspections [:]Monthly and l" Rainfall Inspections ❑Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes [EfNo ❑ NA 0 NE 23. If selected,did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ETNo ❑ NA ❑ NE Page 2 of 3 511212020 Continued Facility Number: - Date of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes E]"No ❑ NA ❑ NF 25. Is the facility out of compliance with permit conditions related to sludge? If yes,check ❑ Yes Jo ❑ N A ❑ N F' the appropriate box(es)below. ❑Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels ❑Non-compliant sludge levels in any lagoon List structure(s)and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes E3No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments(PLAT)certification? ❑ Yes ' NA ❑ NE Other Issues \ 28.Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes [� No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes EJ�4o ❑ NA ❑NE If yes,contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes GD/No ❑ NA ❑ NE permit?(i.e.,discharge,freeboard problems,over-application) 31.Do subsurface tile drains exist at the facility? If yes,check the appropriate box below. ❑ Yes ❑ No ❑ NA [ 44E ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes []3/No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on-site representative? ❑ Yes ❑/No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes [�/No ❑ NA ❑ NE Comments(refer to question #): Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations(use additional pages as necessary). 1-1a9- I�ro C v10 Reviewer/Inspector Name: l�( - ,L ` Phone: Reviewer/Inspector Signature: C, 24 Date: Page 3 of 3 5/12/2020