HomeMy WebLinkAbout310418_Compliance Evaluation Inspection_20240711 Division of Water Resources
Facility Number 0 - O Division of Soil and Water Conservation
O Other Agency
Type of Visit: Compliance Inspection 0 Operation Review Q Structure Evaluation O Technical Assistance
Reason for Visit: O Routine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access
Date of Visit: Arrival Time: Departure Time: County: Ll Region:
Farm Name: / (�/ 1�t. �I �jQ�( �QJ�I� Owner Email:
Owner Name: 1 ( /�_I���� �j Phone:
Mailing Address:
Physical Address:
Facility Contact: Title: 1'I1one:
Onsite Representative: Integrator:
Certified Operator: Certification Number:
Back-up Operator: Certification Number:
Location of Farm: Latitude: Longitude:
iv�/e
Design Current Design Current Design Current
Swine Capacity Pop. Wet Poultry Capacity Pop. Cattle Capacity Pop.
Wean to Finish I ILayer I I I Dairy Cow
Wean to Feeder I INon-Layer I I I Dairy Calf
Feeder to Finish z 960J Dairy Heifer
Farrow to Wean Design Current Dry Cow
Farrow to Feeder Dry Poultry Capacity Pop. Non-Dairy
Farrow to Finish Layers 113eef Stocker
Gilts Non-Layers Beef Feeder
Boars _ Pullets I Beef Brood Cow
Turkeys
Other Turkey Poults
Other
Discharees and Stream Impacts
1. Is any discharge observed from any part of the operation? [:] Yes No ❑ NA ❑ NE
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made? ❑ Yes ❑ No ❑ NA ❑ NE
b. Did the discharge reach waters of the State?(If yes,notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE
c. What is the estimated volume that reached waters of the State(gallons)?
d. Does the discharge bypass the waste management system?(If yes,notify DWR) 0 Yes ❑ No ❑ NA ❑ NE
2. Is there evidence of a past discharge from any part of the operation? ❑ Yes No ❑ NA ❑ NE
3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes [/No ❑ NA ❑ NE
of the State other than from a discharge?
Page 1 of 3 511212020 Continued
Facili Number: - Date of Inspection: ", / -
Waste Collection & Treatment
4. Is storage capacity(structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes [ hJo ❑ NA ❑ NE
a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Identifier:
Spillway?:
Designed Freeboard(in): /9
Observed Freeboard(in): _
5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes E]"'No ❑ NA ❑ NE
(i.e., large trees, severe erosion,seepage, etc.)
6. Are there structures on-site which are not properly addressed and/or managed through a ❑ Yes [g/No ❑ NA ❑ NE
waste management or closure plan?
If any of questions 4-6 were answered yes,and the situation poses an immediate public health or environmental threat, notify DWR
7. Do any of the structures need maintenance or improvement? ❑ Yes [3/No ❑ NA ONE
8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes [-lo ❑ NA ❑ NE
(not applicable to roofed pits,dry stacks,and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require ❑ Yes ❑ NA ❑ NE
maintenance or improvement?
Waste Application
10. Are there any required buffers, setbacks,or compliance alternatives that need ❑ Yes [9Io ❑ NA ❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes [/No ❑ NA ❑ NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground [] Heavy Metals(Cu,Zn, etc.)
❑ PAN ❑ PAN> 10%or 10 lbs. ❑ Total Phosphorus [] Failure to Incorporate Manure/Sludge into Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift [] Application Outside of Approved Area
12. Crop Type(s):
13. Soil Type(s):
14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes [/No ❑ NA ❑ NE
15. Does the receiving crop and/or land application site need improvement? ❑ Yes []'No ❑ NA ❑ NE
16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes EjNo ❑ NA ❑ NE
acres determination?
17. Does the facility lack adequate acreage for land application? ❑ Yes [ /No ❑ NA ❑ NE
18. Is there a lack of properly operating waste application equipment? ❑ Yes E]/No ❑ NA ❑ NE
Required Records& Documents
19. Did the facility fail to have the Certificate of Coverage& Permit readily available? ❑ Yes [fNo ❑ NA ❑ NE
20. Does the facility fail to have all components of the CAWMP readily available? if yes,check ❑ Yes allo ❑ NA ❑ NE
the appropriate box.
❑WUP ❑Checklists ❑Design ❑Maps ❑ Lease Agreements ❑Other:
21. Does record keeping need improvement? If yes,check the appropriate box below. ❑ Yes [D'No ❑ NA ❑ NE
❑Waste Application ❑Weekly Freeboard ❑Waste Analysis ❑Soil Analysis ❑Waste Transfers ❑Weather Code
[:]Rainfall ❑Stocking ❑Crop Yield ❑120 Minute Inspections [:]Monthly and l" Rainfall Inspections ❑Sludge Survey
22. Did the facility fail to install and maintain a rain gauge? ❑ Yes [EfNo ❑ NA 0 NE
23. If selected,did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ETNo ❑ NA ❑ NE
Page 2 of 3 511212020 Continued
Facility Number: - Date of Inspection:
24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes E]"No ❑ NA ❑ NF
25. Is the facility out of compliance with permit conditions related to sludge? If yes,check ❑ Yes Jo ❑ N A ❑ N F'
the appropriate box(es)below.
❑Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels
❑Non-compliant sludge levels in any lagoon
List structure(s)and date of first survey indicating non-compliance:
26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes E3No ❑ NA ❑ NE
27. Did the facility fail to secure a phosphorus loss assessments(PLAT)certification? ❑ Yes ' NA ❑ NE
Other Issues \
28.Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes [� No ❑ NA ❑ NE
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes EJ�4o ❑ NA ❑NE
If yes,contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes GD/No ❑ NA ❑ NE
permit?(i.e.,discharge,freeboard problems,over-application)
31.Do subsurface tile drains exist at the facility? If yes,check the appropriate box below. ❑ Yes ❑ No ❑ NA [ 44E
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes []3/No ❑ NA ❑ NE
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on-site representative? ❑ Yes ❑/No ❑ NA ❑ NE
34. Does the facility require a follow-up visit by the same agency? ❑ Yes [�/No ❑ NA ❑ NE
Comments(refer to question #): Explain any YES answers and/or any additional recommendations or any other comments.
Use drawings of facility to better explain situations(use additional pages as necessary).
1-1a9- I�ro C v10
Reviewer/Inspector Name: l�( - ,L ` Phone:
Reviewer/Inspector Signature: C, 24 Date:
Page 3 of 3 5/12/2020