Loading...
HomeMy WebLinkAbout310250_Compliance Evaluation Inspection_20240711 ivision of Water Resources Facility Number - a`. O Division of Soil and Water Conservation O Other Agency Type of Visit: UCompliance Inspection 0 Operation Review Q Structure Evaluation p Technical Assistance Reason for Visit: O Routine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access Date of Visit: Arrival Time: Departure Time: County Region: Farm Name: Owner Email: T Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: Title: Phone: Onsite Representative: Integrator: Certified Operator: Certification Number: Back-up Operator: Certification Number: Location of Farm: Latitude: Longitude: Design Current Design Current Design Current Swine Capacity Pop. Wet Poultry Capacity Pop. Cattle Capacity Pop. Wean to Finish 33 Layer I I I Dairy Cow Wean to Feeder Non-Layer I I I Dairy Calf Feeder to Finish Dairy Heifer Farrow to Wean Design Current Dry Cow Farrow to Feeder Dry Poultry Capacity Pop. INon-Dairy Farrow to Finish ILayers I Beef Stocker Gilts Non-Layer Beef Feeder Boars Pullets Beef Brood Cow Turkeys Other Turkey Poults Other Discharges and Stream Impacts t. Is any discharge observed from any part of the operation? [:] Yes F T DNA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ No ❑ NA ❑ NE b. Did the discharge reach waters of the State?(If yes,notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State(gallons)? d. Does the discharge bypass the waste management system? (if yes, notify DWR) 0 Yes ❑ No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes ENo ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes [ o ❑ NA ❑ NE of the State other than from a discharge? Page I of 3 511212020 Continued Facility Number: - Date of Inspection: Waste Collection & Treatment 4. Is storage capacity(structural plus storm storage plus heavy rainfall)less than adequate? ❑ Yes ❑,No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard(in): Observed Freeboard(in): q b 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes ["No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.)6.Are there structures on-site which are not properly addressed and/or managed through a ❑ Yes [a/No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat,notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes 2 No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes 2-No ❑ NA ❑ NE (not applicable to roofed pits,dry stacks,and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes �o ❑ NA [] NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks,or compliance alternatives that need ❑ Yes [D]No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes ZNo ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals(Cu,Zn, etc.) ❑ PAN ❑ PAN> 10%or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes [2 1`Io ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes �o ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes [g/No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes �No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes Go ❑ NA ❑ NE Reauired Records&Documents 19. Did the facility fail to have the Certificate of Coverage& Permit readily available? ❑ Yes VNo ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes,check [] Yes E3"No ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑Design ❑Maps [] Lease Agreements ❑Other: 21. Does record keeping need improvement? 1f yes, check the appropriate box below. ❑ Yes [V]TNo ❑ NA ❑ NE ❑Waste Application ❑Weekly Freeboard ❑Waste Analysis ❑Soil Analysis ❑Waste Transfers ❑Weather Code ❑Rainfall ❑Stocking ❑Crop Yield ❑120 Minute Inspections ❑Monthly and 1" Rainfall Inspections ❑Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes Eg/?No ❑ NA ❑ NE 23. If selected,did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes [ffNo ❑ NA ❑ NE Page 2 of 3 511212020 Continued Facility Number: - Date of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes [ /No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes,check [] Yes ✓CJ'No ❑ NA ❑ NE the appropriate box(es)below. ❑Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels ❑Non-compliant sludge levels in any lagoon List structure(s)and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? [] Yes E�(No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments(PLAT)certification? ❑ Yes ❑ No �jrN A ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes [J o ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes Q4o ❑ NA ❑ NE If yes,contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes [IXo ❑ NA ❑ NE permit?(i.e.,discharge, freeboard problems,over-application) 31. Do subsurface the drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA Eg4E ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes [DNo ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on-site representative? ❑ Yes o ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes BIN ❑ NA ❑ NE t IMenits(refet'to ques#1pp#t� Explain any- a� rWers anc 16r'any addli 1phal:rrecornt�edd bons or any other comments [� drawin 5,pt`fciitlty#o her expl`'[ti;situatibiu's`(use additlbnal pages as necessary). i i Reviewer/Inspector Name: Phone: Reviewer/Inspector Signature: I IM Date: Page 3 of 3 511212020