Loading...
HomeMy WebLinkAboutWQ0034603_BIMS Report_20240628Compliance Inspection Report Permit:WQ0034603 Effective:02/13/23 Expiration:09/30/28 Owner :Seqirus Inc SOC: Contact Person: Region: County: Directions to Facility: Wake Raleigh Anne Marie Baese Effective:Expiration:Facility:Seqirus Reclaimed Water System 475 Green Oaks Pkwy Holly Springs NC 27540 Title:Phone:919-324-4910EHS Specialist Secondary ORC(s): Phone:Certification:Primary ORC: SINC,System Classifications: On-Site Representative(s): Related Permits: WQ0032289 Town of Holly Springs - Utley Creek WWTP Reclaimed Water System Secondary Inspector(s): Primary Inspector: Inspection Date:Exit Time:Entry Time: Phone: 06/28/2024 09:05AM 10:05AM Chris Smith 919-791-4200 Facility Status: Permit Inspection Type: Reason for Inspection:Inspection Type: Not CompliantCompliant Routine Reclaimed Water Compliance Evaluation Question Areas: Miscellaneous Questions Record Keeping End Use-Irrigation (See attachment summary) Page 1 of 4 Inspection Date: Permit: Inspection Type : Owner - Facility: Reason for Visit: WQ0034603 06/28/2024 Compliance Evaluation Seqirus Inc Routine Inspection Summary: On June 28, 2024, Chris Smith of the Raleigh Regional Office (RRO) conducted a compliance evaluation inspection of the reclaimed water conjunctive utilization system located at the Seqirus, Inc. Facility in Wake County, NC. This facility is permitted for operation of a reclaimed water conjunctive utilization system consisting of a 23.55 acre conjunctive reclaimed water irrigation area, rainfall sensors with automatic shutoff system, and all associated piping, valves, controls, and appurtenances. The purpose of this inspection was to ensure compliance with the subject permit. During the inspection the cooperation and assistance provided by Anne Marie Baese, Bakri Abushouk, and Andrew Noonan from Seqirus, and Bill Smith from Ideal Landscaping was helpful and appreciated. This compliance evaluation inspection consisted of the following: •Review of the permit •Review of the owner/facility information •Review of Non-Discharge Monitoring Reports (NDMRs) and •On-site inspection of conjunctive utilization components The current permit was issued February 13, 2023 and will expire on September 30, 2028. The inspector reviewed the facilities Operation and Maintenance Plan, which was found to be adequate. Reclaimed water system components are properly color coded except for some tubing installed during leak repairs. In many places the color has faded due to age and sun exposure and needs to be refreshed. Rain breaker devices are installed on all irrigation control panels as required by the permit. The facility has not irrigated any reclaimed water in over a year and does not currently have any intentions of irrigating any reclaimed water in the future. System components should be evaluated and repaired or replaced if necessary and brought to good working condition prior to any future irrigation events. Division of Water Resources (DWR) RRO should be contacted upon completion of needed repairs and prior to any future irrigation events to request a start-up inspection. Overall, the facility appears to be well-maintained and operated and in compliance with permit conditions. Page 2 of 4 Inspection Date: Permit: Inspection Type : Owner - Facility: Reason for Visit: WQ0034603 06/28/2024 Compliance Evaluation Seqirus Inc Routine Type Yes No NA NE Infiltration System Lagoon Spray, LR Single Family Spray, LR Activated Sludge Spray, LR Activated Sludge Spray, HR Activated Sludge Drip, LR Recycle/Reuse Single Family Drip Reuse (Quality) Record Keeping Yes No NA NE Is a copy of current permit available? Are monitoring reports present: NDMR? NDAR? Are flow rates less than of permitted flow? Are flow rates less than of permitted flow? Are application rates adhered to? Is GW monitoring being conducted, if required (GW-59s submitted)? Are all samples analyzed for all required parameters? Are there any 2L GW quality violations? Is GW-59A certification form completed for facility? Is effluent sampled for same parameters as GW? Do effluent concentrations exceed GW standards? Are annual soil reports available? # Are PAN records required? # Did last soil report indicate a need for lime? If so, has it been applied? Are operational logs present? Are lab sheets available for review? Do lab sheets support data reported on NDMR? Do lab sheets support data reported on GW-59s? Are Operational and Maintenance records present? Were Operational and Maintenance records complete? Has permittee been free of public complaints in last 12 months? Is a copy of the SOC readily available? Page 3 of 4 Inspection Date: Permit: Inspection Type : Owner - Facility: Reason for Visit: WQ0034603 06/28/2024 Compliance Evaluation Seqirus Inc Routine No treatment units bypassed since last inspection? Comment: End Use-Irrigation Yes No NA NE Are buffers adequate? Is the cover crop type specified in permit? Is the crop cover acceptable? Is the site condition adequate? Is the site free of runoff / ponding? Is the acreage specified in the permit being utilized? Is the application equipment present? Is the application equipment operational? Is the disposal field free of limiting slopes? Is access restricted and/or signs posted during active site use? Are any supply wells within the CB? Are any supply wells within 250' of the CB? How close is the closest water supply well? Is municipal water available in the area? # Info only: Does the permit call for monitoring wells? Are GW monitoring wells located properly w/ respect to RB and CB? Are GW monitoring wells properly constructed, including screened interval? Are monitoring wells damaged? Comment: Page 4 of 4